SlideShare uma empresa Scribd logo
1 de 22
Evelean William
OUTLINE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
EIGHT SERVICE INDUSTRY WASTES ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
EXAMPLES OF OFFICE PROCESS WASTE  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
5S AND VISUAL CONTROL ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
WHAT IS KAIZEN? ,[object Object],[object Object],[object Object],[object Object],[object Object]
OUTLINE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PUSH VS. PULL SCHEDULING  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
WHAT IS JUST-IN-TIME? ,[object Object],[object Object],Goal:  Achieve the minimal level of resources required to add the necessary value in the system.
KANBAN ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],One Piece Flow
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Standardized Work
WHAT IS MISTAKE PROOFING? ,[object Object],[object Object],[object Object],[object Object],[object Object]
CHANGEOVER TIME DEFINED ,[object Object]
WHAT IS SIX SIGMA? ,[object Object],[object Object],[object Object],[object Object]
ACTIVITY-BASED COSTING ,[object Object],[object Object],[object Object]
LEAN ACCOUNTING ,[object Object],[object Object]
THEORY OF CONSTRAINTS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
WHAT IS ERGONOMICS? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Why Knowledge Management? Knowledge is: Knowledge results in: Conclusion ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Knowledge is fast becoming a primary factor of production   (e.g., Handy, 1989, 1994; Peter, 1993; Drucker, 1992) ,[object Object],[object Object],[object Object],[object Object],[object Object]
COST OF ACCIDENTS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CONDUCTING EFFECTIVE MEETINGS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados

Mba 505 business_processes_operations_productivity_strategy
Mba 505 business_processes_operations_productivity_strategyMba 505 business_processes_operations_productivity_strategy
Mba 505 business_processes_operations_productivity_strategy
Chainon
 
Lean Fundamentals And Line Design 06 04 01
Lean  Fundamentals And  Line  Design 06 04 01Lean  Fundamentals And  Line  Design 06 04 01
Lean Fundamentals And Line Design 06 04 01
Dan Junkins
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma Overview
Ron Drew
 

Mais procurados (19)

Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
Value Steam Mapping
Value Steam MappingValue Steam Mapping
Value Steam Mapping
 
Lean startup
Lean startupLean startup
Lean startup
 
Webinar On Lean In Non Manufacturing Environments
Webinar On Lean In Non Manufacturing EnvironmentsWebinar On Lean In Non Manufacturing Environments
Webinar On Lean In Non Manufacturing Environments
 
Application of value stream mapping for reduction of cycle time in machining ...
Application of value stream mapping for reduction of cycle time in machining ...Application of value stream mapping for reduction of cycle time in machining ...
Application of value stream mapping for reduction of cycle time in machining ...
 
Guidebook productivity measurement
Guidebook productivity measurementGuidebook productivity measurement
Guidebook productivity measurement
 
Operationalization of Lean thinking through Value Stream Mapping with Simulat...
Operationalization of Lean thinking through Value Stream Mapping with Simulat...Operationalization of Lean thinking through Value Stream Mapping with Simulat...
Operationalization of Lean thinking through Value Stream Mapping with Simulat...
 
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraValue Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
 
Productivity
ProductivityProductivity
Productivity
 
Mba 505 business_processes_operations_productivity_strategy
Mba 505 business_processes_operations_productivity_strategyMba 505 business_processes_operations_productivity_strategy
Mba 505 business_processes_operations_productivity_strategy
 
Lean Fundamentals And Line Design 06 04 01
Lean  Fundamentals And  Line  Design 06 04 01Lean  Fundamentals And  Line  Design 06 04 01
Lean Fundamentals And Line Design 06 04 01
 
Value stream mapping a case study of automotive
Value stream mapping a case study of automotiveValue stream mapping a case study of automotive
Value stream mapping a case study of automotive
 
Reduction in production time via Value Stream Mapping in garment industry(1)
Reduction in production time via Value Stream Mapping in garment industry(1)Reduction in production time via Value Stream Mapping in garment industry(1)
Reduction in production time via Value Stream Mapping in garment industry(1)
 
Value stream mapping to create value and eliminate muda
Value stream mapping to create value and eliminate mudaValue stream mapping to create value and eliminate muda
Value stream mapping to create value and eliminate muda
 
Materials And Information Flow Map
Materials And Information Flow MapMaterials And Information Flow Map
Materials And Information Flow Map
 
Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...
 
Process mapping session final-Lean Six Sigma
Process mapping session final-Lean Six SigmaProcess mapping session final-Lean Six Sigma
Process mapping session final-Lean Six Sigma
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma Overview
 
Business process mapping
Business process mappingBusiness process mapping
Business process mapping
 

Semelhante a Office Lean Overview

460 operations - 4.6
460   operations - 4.6460   operations - 4.6
460 operations - 4.6
Kyle Bakken
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
sashi prabhu
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
sashi prabhu
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
grubinm
 

Semelhante a Office Lean Overview (20)

3 lean thinking & jit
3 lean thinking & jit3 lean thinking & jit
3 lean thinking & jit
 
460 operations - 4.6
460   operations - 4.6460   operations - 4.6
460 operations - 4.6
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
Lean & kaizen
Lean & kaizenLean & kaizen
Lean & kaizen
 
Lean Terminology
Lean TerminologyLean Terminology
Lean Terminology
 
8 Wastes of Lean
8 Wastes of Lean8 Wastes of Lean
8 Wastes of Lean
 
Lean Methodology July Monthly
Lean Methodology July MonthlyLean Methodology July Monthly
Lean Methodology July Monthly
 
Core Lean Tools
Core Lean ToolsCore Lean Tools
Core Lean Tools
 
05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy
 
Productivity for BMS student
Productivity for BMS studentProductivity for BMS student
Productivity for BMS student
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 
Production and operation management ppt @ bec doms bagalkot
Production and operation management ppt @ bec doms bagalkot Production and operation management ppt @ bec doms bagalkot
Production and operation management ppt @ bec doms bagalkot
 
Process selection
Process selectionProcess selection
Process selection
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Alternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionAlternate Hourly Lean Introduction
Alternate Hourly Lean Introduction
 
Lean & Agile Value Streams
Lean & Agile Value StreamsLean & Agile Value Streams
Lean & Agile Value Streams
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
 

Mais de ahmad bassiouny (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 

Último

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 

Último (20)

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

Office Lean Overview

  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.

Notas do Editor

  1. There are many more examples of waste. Can you think of some?
  2. It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.
  3. Mistake-proofing is the use of process or design features to prevent errors or their negative impact. Mistake-proofing is also known as poka-yoke, which is Japanese slang for avoiding inadvertent errors. It was formalized by Shigeo Shingo, whose picture is up here in the corner, and comes out of the Toyota product system. I understand that there is a long way between the Toyota product system and medical operations, but I think there are also some worthwhile similarities. Mistake-proofing is inexpensive. Mistake-proofing is very effective for manufacturers that are aware of it. Not all manufacturers are aware of it. It is also based on simplicity and ingenuity. But let me be clear that simplicity, in its true sense, is rarely an easy thing to accomplish. Finally, mistake-proofing is something you probably already have in isolated instances in your organization. So, as you look around you will find examples.