Workload management and Business process improvement (BPI) Using the Theory of Constraints (ToC), Lean, Six Sigma and  Kaizen Doing the right things effectively and efficiently
Quadrant BPI Case load management and business processes are interlinked around four perspectives:
Quadrant BPI Lean Six Sigma
Knowledge Base ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Time focuses on how long a piece of work takes to complete. This also focuses on waiting time for others to complete their task. Quadrant BPI
A focus should be applied to the cost of work including internal and external labour, purchased goods and overheads that are allocated. This is a good focus for VFM or Value for Money Quadrant BPI
Knowledge Base Lean ,[object Object],[object Object],[object Object],[object Object],[object Object]
Quality focus looks at the work itself to identify defects / errors and aims to eliminate them before reaching the end customer or the next person in the chain of events Quadrant BPI
Knowledge Base Six Sigma:  seeks to improve the quality of outputs by identifying and removing the causes of defects.  The six sigma methodology follows a process improvement: DMAIC -  Define  your goals / objectives -  Measure  your work processes -  Analyse  the way work is done and the errors / issues faced -  Improve  what you do -  Control  the processes using error proofing techniques to ensure errors do not re-occur Six Sigma
Capacity looks at the resources required to complete the job without bottle necks stopping work, such as waiting time on management approval or waiting on other departments to clear their backlog Quadrant BPI
Knowledge Base ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Example  – Authorising and paying a purchase invoice Start: Worker Supplier 5 – Purchase ledger add invoice to system 1 - Phone in order 2 - Deliver goods and invoice 6 - Pay invoice 3 - Send invoice to manager 4 – Authorise invoice and send to purchase ledger
Example  – Authorising and paying a purchase invoice 7 Wastes analysis - Unnecessary transportation of invoices to different locations - Too much motion opening letters and sending letters - Risk of defects of wrong orders being made, invoices being paid twice - Too much waiting time for manager approval - Inventory building up of invoices waiting for approval - Overproduction and inspection and review of paper work - Over processing of the same information into different systems Lean
Quality risk / defect analysis - Paper work from supplier different to the original order (interpretation) - Paper work lost in the post or sent to the wrong person - There may not be enough money left in the budget to buy goods - Invoices incorrectly entered into the purchase ledger system - Payments made to supplier not the same as the invoice (cheques) Example  – Authorising and paying a purchase invoice Six Sigma
Example  – Authorising and paying a purchase invoice Constraints analysis / bottle necks - Too many invoices for manager to approve, therefore not done - Too many invoices for purchase ledger to enter onto the system Adding resources would add cost, removing bottle necks and inefficiencies increase productivity
Example  – Authorising and paying a purchase invoice Solution!!! Start: Worker Supplier 1 - Create Purchase order (electronically) 3 - Deliver goods and insert invoice electronically into purchase ledger 5 – Purchase ledger automatically checks PO receipt and automatically creates BACS payment  2 – Authorise order on the system, send electronic order to supplier’s back office 4 – Receipt delivery into PO system
Example  – Authorising and paying a purchase invoice Improvements: - Reduces errors in paper work - Eliminates paper files being lost - Eliminates postage costs - Reduces administration time to of approval - PO’s only approved with sufficient budget - Reduces labour costs of purchase ledger  - Improves value for Money of overall service - Payments only made if PO system is correct
Where to start 1 – Process map your activities using post it notes and brown wall paper 2 – Document the flow of work with process times, waiting times and costs
Where to start 3 – Identify the issues using the principles of Lean, Six Sigma and ToC  Obtain statistical evidence that the issues exist
Where to start 4 – Put a value against each issue whether that be time, cost or quality and rank them.  Use the pareto rule and focus on those issues that accumulate to 80% 5 – Work out the solutions and implement them
Written References
Video References Theory of constraints (ToC) http://www.youtube.com/watch?v=dtjTVwd8x-4 Lean http://www.youtube.com/watch?v=ZdHGTCXcJQU Six Sigma http://www.youtube.com/watch?v=ToxdnjB-xWA&feature=related Kai Zen http://www.youtube.com/watch?v=E6rRHqb5MV0
[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Destaque

Lean prezi
Lean preziLean prezi
Lean prezioklerera
 
Staffing strategies that cut cost
Staffing strategies that cut costStaffing strategies that cut cost
Staffing strategies that cut costCraig Albin
 
Lean Six Sigma Greenbelt Project B - Regrind
Lean Six Sigma Greenbelt Project B - RegrindLean Six Sigma Greenbelt Project B - Regrind
Lean Six Sigma Greenbelt Project B - RegrindChawal Ukesh
 
Hied2006 performance Improvement Theory
Hied2006 performance Improvement TheoryHied2006 performance Improvement Theory
Hied2006 performance Improvement TheoryJeff Allen
 
Lean Six Sigma and the principles of Kaizen for your business
Lean Six Sigma and the principles of Kaizen for your business   Lean Six Sigma and the principles of Kaizen for your business
Lean Six Sigma and the principles of Kaizen for your business Brent Spilkin
 
Factors which influnce the consumer choice
Factors which influnce the consumer choiceFactors which influnce the consumer choice
Factors which influnce the consumer choiceJithin Mathew
 
Introduction To Theory of Constraints
Introduction To Theory of ConstraintsIntroduction To Theory of Constraints
Introduction To Theory of ConstraintsHasham22
 
Workforce Management & BPM Integration
Workforce Management & BPM IntegrationWorkforce Management & BPM Integration
Workforce Management & BPM IntegrationNathaniel Palmer
 
Lean Six Sigma For Municipal Government
Lean Six Sigma For Municipal GovernmentLean Six Sigma For Municipal Government
Lean Six Sigma For Municipal GovernmentStephen Deas
 

Destaque (12)

Lean prezi
Lean preziLean prezi
Lean prezi
 
Lean in prezi
Lean in preziLean in prezi
Lean in prezi
 
Staffing strategies that cut cost
Staffing strategies that cut costStaffing strategies that cut cost
Staffing strategies that cut cost
 
The paradox of choice
The paradox of choiceThe paradox of choice
The paradox of choice
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Lean Six Sigma Greenbelt Project B - Regrind
Lean Six Sigma Greenbelt Project B - RegrindLean Six Sigma Greenbelt Project B - Regrind
Lean Six Sigma Greenbelt Project B - Regrind
 
Hied2006 performance Improvement Theory
Hied2006 performance Improvement TheoryHied2006 performance Improvement Theory
Hied2006 performance Improvement Theory
 
Lean Six Sigma and the principles of Kaizen for your business
Lean Six Sigma and the principles of Kaizen for your business   Lean Six Sigma and the principles of Kaizen for your business
Lean Six Sigma and the principles of Kaizen for your business
 
Factors which influnce the consumer choice
Factors which influnce the consumer choiceFactors which influnce the consumer choice
Factors which influnce the consumer choice
 
Introduction To Theory of Constraints
Introduction To Theory of ConstraintsIntroduction To Theory of Constraints
Introduction To Theory of Constraints
 
Workforce Management & BPM Integration
Workforce Management & BPM IntegrationWorkforce Management & BPM Integration
Workforce Management & BPM Integration
 
Lean Six Sigma For Municipal Government
Lean Six Sigma For Municipal GovernmentLean Six Sigma For Municipal Government
Lean Six Sigma For Municipal Government
 

Mais de Simon Misiewicz

Creative thinking template
Creative thinking templateCreative thinking template
Creative thinking templateSimon Misiewicz
 
Is starting a business right time for you
Is starting a business right time for youIs starting a business right time for you
Is starting a business right time for youSimon Misiewicz
 
Raising finance for your business
Raising finance for your businessRaising finance for your business
Raising finance for your businessSimon Misiewicz
 
Business user requirements for it development
Business user requirements for it developmentBusiness user requirements for it development
Business user requirements for it developmentSimon Misiewicz
 
Business process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationBusiness process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationSimon Misiewicz
 
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Simon Misiewicz
 
Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Simon Misiewicz
 
Deliver training to suit varying learning styles
Deliver training to suit varying learning stylesDeliver training to suit varying learning styles
Deliver training to suit varying learning stylesSimon Misiewicz
 
4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee 4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee Simon Misiewicz
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and managementSimon Misiewicz
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project managementSimon Misiewicz
 
Effective Communication for successful working and personal relationships
Effective  Communication for successful working and personal relationships Effective  Communication for successful working and personal relationships
Effective Communication for successful working and personal relationships Simon Misiewicz
 
Strategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementStrategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementSimon Misiewicz
 
Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Simon Misiewicz
 
Staff appraisal document - template
Staff appraisal document - template Staff appraisal document - template
Staff appraisal document - template Simon Misiewicz
 
Optimised - Programme start up
Optimised - Programme start upOptimised - Programme start up
Optimised - Programme start upSimon Misiewicz
 
Project End Report - Project Management template
Project End Report - Project Management template Project End Report - Project Management template
Project End Report - Project Management template Simon Misiewicz
 
Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Simon Misiewicz
 
Highlight Report - Project Management template
Highlight Report - Project Management template Highlight Report - Project Management template
Highlight Report - Project Management template Simon Misiewicz
 

Mais de Simon Misiewicz (20)

Creative thinking template
Creative thinking templateCreative thinking template
Creative thinking template
 
Is starting a business right time for you
Is starting a business right time for youIs starting a business right time for you
Is starting a business right time for you
 
Raising finance for your business
Raising finance for your businessRaising finance for your business
Raising finance for your business
 
Business user requirements for it development
Business user requirements for it developmentBusiness user requirements for it development
Business user requirements for it development
 
Business process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationBusiness process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementation
 
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
 
Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...
 
Deliver training to suit varying learning styles
Deliver training to suit varying learning stylesDeliver training to suit varying learning styles
Deliver training to suit varying learning styles
 
4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee 4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and management
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 
Effective Communication for successful working and personal relationships
Effective  Communication for successful working and personal relationships Effective  Communication for successful working and personal relationships
Effective Communication for successful working and personal relationships
 
Strategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementStrategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme management
 
Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology
 
Staff appraisal document - template
Staff appraisal document - template Staff appraisal document - template
Staff appraisal document - template
 
Be proactive
Be proactiveBe proactive
Be proactive
 
Optimised - Programme start up
Optimised - Programme start upOptimised - Programme start up
Optimised - Programme start up
 
Project End Report - Project Management template
Project End Report - Project Management template Project End Report - Project Management template
Project End Report - Project Management template
 
Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Lessons learned Report - Project Management template
Lessons learned Report - Project Management template
 
Highlight Report - Project Management template
Highlight Report - Project Management template Highlight Report - Project Management template
Highlight Report - Project Management template
 

Último

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 

Último (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 

Workload management and Business process improvement (BPI) - Using the Theory of Constraints (ToC), Lean, Six Sigma and Kaizen

  • 1. Workload management and Business process improvement (BPI) Using the Theory of Constraints (ToC), Lean, Six Sigma and Kaizen Doing the right things effectively and efficiently
  • 2. Quadrant BPI Case load management and business processes are interlinked around four perspectives:
  • 3. Quadrant BPI Lean Six Sigma
  • 4.
  • 5. Time focuses on how long a piece of work takes to complete. This also focuses on waiting time for others to complete their task. Quadrant BPI
  • 6. A focus should be applied to the cost of work including internal and external labour, purchased goods and overheads that are allocated. This is a good focus for VFM or Value for Money Quadrant BPI
  • 7.
  • 8. Quality focus looks at the work itself to identify defects / errors and aims to eliminate them before reaching the end customer or the next person in the chain of events Quadrant BPI
  • 9. Knowledge Base Six Sigma: seeks to improve the quality of outputs by identifying and removing the causes of defects. The six sigma methodology follows a process improvement: DMAIC - Define your goals / objectives - Measure your work processes - Analyse the way work is done and the errors / issues faced - Improve what you do - Control the processes using error proofing techniques to ensure errors do not re-occur Six Sigma
  • 10. Capacity looks at the resources required to complete the job without bottle necks stopping work, such as waiting time on management approval or waiting on other departments to clear their backlog Quadrant BPI
  • 11.
  • 12. Example – Authorising and paying a purchase invoice Start: Worker Supplier 5 – Purchase ledger add invoice to system 1 - Phone in order 2 - Deliver goods and invoice 6 - Pay invoice 3 - Send invoice to manager 4 – Authorise invoice and send to purchase ledger
  • 13. Example – Authorising and paying a purchase invoice 7 Wastes analysis - Unnecessary transportation of invoices to different locations - Too much motion opening letters and sending letters - Risk of defects of wrong orders being made, invoices being paid twice - Too much waiting time for manager approval - Inventory building up of invoices waiting for approval - Overproduction and inspection and review of paper work - Over processing of the same information into different systems Lean
  • 14. Quality risk / defect analysis - Paper work from supplier different to the original order (interpretation) - Paper work lost in the post or sent to the wrong person - There may not be enough money left in the budget to buy goods - Invoices incorrectly entered into the purchase ledger system - Payments made to supplier not the same as the invoice (cheques) Example – Authorising and paying a purchase invoice Six Sigma
  • 15. Example – Authorising and paying a purchase invoice Constraints analysis / bottle necks - Too many invoices for manager to approve, therefore not done - Too many invoices for purchase ledger to enter onto the system Adding resources would add cost, removing bottle necks and inefficiencies increase productivity
  • 16. Example – Authorising and paying a purchase invoice Solution!!! Start: Worker Supplier 1 - Create Purchase order (electronically) 3 - Deliver goods and insert invoice electronically into purchase ledger 5 – Purchase ledger automatically checks PO receipt and automatically creates BACS payment 2 – Authorise order on the system, send electronic order to supplier’s back office 4 – Receipt delivery into PO system
  • 17. Example – Authorising and paying a purchase invoice Improvements: - Reduces errors in paper work - Eliminates paper files being lost - Eliminates postage costs - Reduces administration time to of approval - PO’s only approved with sufficient budget - Reduces labour costs of purchase ledger - Improves value for Money of overall service - Payments only made if PO system is correct
  • 18. Where to start 1 – Process map your activities using post it notes and brown wall paper 2 – Document the flow of work with process times, waiting times and costs
  • 19. Where to start 3 – Identify the issues using the principles of Lean, Six Sigma and ToC Obtain statistical evidence that the issues exist
  • 20. Where to start 4 – Put a value against each issue whether that be time, cost or quality and rank them. Use the pareto rule and focus on those issues that accumulate to 80% 5 – Work out the solutions and implement them
  • 22. Video References Theory of constraints (ToC) http://www.youtube.com/watch?v=dtjTVwd8x-4 Lean http://www.youtube.com/watch?v=ZdHGTCXcJQU Six Sigma http://www.youtube.com/watch?v=ToxdnjB-xWA&feature=related Kai Zen http://www.youtube.com/watch?v=E6rRHqb5MV0
  • 23.