<PROJECT NAME>
RISK MANAGEMENT PLAN
Version <1.0>
04/08/2013
Risk Management Plan
<Project Name> Version: 1.0
TABLE OF CONTENTS
1 INTRODUCTION......................................................................................................................1
1.1 Purpose Of The Risk Management Plan............................................................................1
2 RISK MANAGEMENT PROCEDURE...................................................................................2
2.1 Process................................................................................................................................2
2.2 Risk Identification..............................................................................................................3
2.3 Risk Analysis......................................................................................................................3
2.3.1 Qualitative Risk Analysis........................................................................................3
2.3.2 Quantitative Risk Analysis......................................................................................4
2.4 Risk Response Planning.....................................................................................................5
2.5 Risk Mitigation and Avoidance..........................................................................................5
3 RISK REGISTER.......................................................................................................................6
6
Risk Management Plan
<Project Name> Version: 1.0
1 INTRODUCTION
1.1 PURPOSE OF THE RISK MANAGEMENT PLAN
Any kind of project is susceptible to risks of various natures that can have different degrees
of effect in the normal project. It may or may not have positive or negative effects on a
project’s objectives. Risk Management assists in the prevention and minimization of
unfavorable events. The objective of a risk management is to secure the project from risks
by identifying, assessing, responding to, monitoring, and reporting risks.
The purpose of the risk management plan is to establish the framework in which the
project team will identify risks and develop strategies to mitigate or avoid those risks.
However, before risks can be identified and managed, there are preliminary project
elements which must be completed. These elements are outlined in the risk management
approach.
This project is considered a medium risk project as it has an overall risk score of 24 on a
scale from 0 to 100. The project risk score is the average of the risk scores of the most
significant risks to this project. A risk score below 16 is low risk project, a score between
16 and 45 is a medium risk project and a score above 45 is a high-risk project.
Before risk management begins it is imperative that a foundation is established for
providing structured project information, thus, the following project elements were
completed and defined prior to developing this Risk Management Plan:
• Define work scope, schedule, resources, and cost elements
o Develop project WBS/WBS dictionary
o Develop master schedule and detailed schedules
o Estimate project cost and finalize budget
o Identify required and available resources
o Establish performance measurement metrics
• Define minimum and maximum baseline thresholds
o Schedule
o Resources
o Cost
• Baseline reporting requirements
o Format
o Frequency of distribution
o Distribution list
• Define Risk Management Roles and Responsibilities
o Project Manager chairs the risk assessment meetings
Page 1
Risk Management Plan
<Project Name> Version: 1.0
o Project team participates in risk assessment meetings and members serve as
meeting recorder and timekeeper
o Key stakeholders participate in risk assessment meetings
o Project Sponsor may participate in risk assessment meetings
The Risk Management Plan for the Construction of Scrap Tire Recycling Plant gives an
outline of the risk associated with the project by identifying, analyzing and managing the
risks involved.
2 RISK MANAGEMENT PROCEDURE
2.1 PROCESS
The approach we have taken to manage risks for Construction of Scrap Tire recycling Plant
included a methodical process by which the project team identified, scored, and ranked the
various risks. The most likely and highest impact risks were added to the project schedule
to ensure that the assigned risk managers take the necessary steps to implement the
mitigation response at the appropriate time during the schedule. Risk managers will
provide status updates on their assigned risks in the bi-weekly project team meetings, but
only when the meetings include their risk’s planned timeframe. Upon the completion of
the project, during the closing process, the project manager will analyze each risk as well
as the risk management process. Based on this analysis, the project manager will identify
any improvements that can be made to the risk management process for future projects.
These improvements will be captured as part of the lessons learned knowledge base.
The risk management process gives an outline to Project Manager and all the project
personnel of the future risk and gives an ample amount of time to come up with the
solutions beforehand. A well articulated Risk Management Plan helps in utmost resource
utilization, meet scheduling on time and prevent unwanted risks associated.
The risk management process comprises of some steps, but is not limited to, and if
followed properly helps in mitigating the risk or minimizing the effects. Some of the steps
are identifying the risk, identifying the source of the risk, measuring, evaluating, mitigating
and monitoring the risk.
The diagram below depicts the various steps involved in the risk management process.
Page 2
Risk Management Plan
<Project Name> Version: 1.0
2.2 RISK IDENTIFICATION
The task of the Risk Management Manager would be to identify all the risks associated
with the Construction of Scrap Tire Recycling Plant and submit it during the risk
identification process. After acquiring all the details about the risks the project team,
appropriate stakeholders would work on handling the risks. This process would also
include an evaluation of environmental factor, organizational culture and the project
management plan including the project scope.
Some of the important factors, which will be included in the identification process, are
project deliverables, assumptions, constraints, WBS, cost/effort estimates, resource plan,
and other key project documents.
A Risk Management Log will then be created and updated as and when needed. The log
will be stored electronically which can be used for future reference.
2.3 RISK ANALYSIS
In order to determine the severity of the risks identified by the team, a probability and
impact factor was assigned to each risk. This process allowed the project manager to
prioritize risks based upon the effect they may have on the project. The project manager
utilized a probability-impact matrix to facilitate the team in moving each risk to the
appropriate place on the chart.
Once the risks were assigned a probability and impact and placed in the appropriate
position on the chart, the recorder captured the finished product and the project manager
moved the process on to the next step: risk mitigation/avoidance planning
2.3.1 Qualitative Risk Analysis
The Project Manager will assess each identified risk based on the probability and impact of
occurrence for each risk, with input from the project team using the following approach:
Page 3
Risk Management Plan
<Project Name> Version: 1.0
Probability
• High – Greater than <70%> probability of occurrence
• Medium – Between <30%> and <70%> probability of occurrence
• Low – Below <30%> probability of occurrence
Impact
• High – Risk that has the potential to greatly impact project cost, project schedule or
performance
• Medium – Risk that has the potential to slightly impact project cost, project schedule or
performance
• Low – Risk that has relatively little impact on cost, schedule or performance
Risks that fall within the RED and YELLOW zones will have risk response planning which
may include both a risk mitigation and a risk contingency plan.
2.3.2 Quantitative Risk Analysis
The most likely and greatest impact risks have been added to the project plan to ensure that
they are monitored during the time the project is exposed to each risk. At the appropriate
time in the project schedule a Risk Manager is assigned to each risk. During the bi-weekly
project team meeting the Risk Manager for each risk will discuss the status of that risk;
however, only risks, which fall in the current time period, will be discussed. Risk
monitoring will be a continuous process throughout the life of this project. As risks
approach on the project schedule the project manager will ensure that the appropriate risk
Page 4
Risk Management Plan
Impact
H
M
L
L M H
Probability
<Project Name> Version: 1.0
manager provides the necessary status updates which include the risk status, identification
of trigger conditions, and the documentation of the results of the risk response.
The qualitative analysis will prioritize the risks based on the probability and the impact
criteria. The effect of the risks on the project activities will then be estimated, a numerical
rating will be applied to each risk, and then documentation will be done based on the
following steps:
• Identifying and valuing assets
• Determining the Single Loss Expectancy (SLE)
• Determining Annual Rate of Occurrence
• Determining Annual Loss Expectancy
• Determining the cost of controls
• Risk On Security Investment (ROSI)
• Results of the Quantitative Risk Analysis
2.4 RISK RESPONSE PLANNING
Each major risk (those falling in the Red & Yellow zones) will be assigned to a project
team member for monitoring purposes to ensure that the risk will not “fall through the
cracks”.
For each major risk, one of the following approaches will be selected to address it:
• Avoid – eliminate the threat by eliminating the cause
• Mitigate – Identify ways to reduce the probability or the impact of the risk
• Accept – Nothing will be done
• Transfer – Make another party responsible for the risk (buy insurance, outsourcing, etc.)
For each risk that will be mitigated, the project team will identify ways to prevent the risk
from occurring or reduce its impact or probability of occurring. This may include
prototyping, adding tasks to the project schedule, adding resources, etc.
For each major risk that is to be mitigated or that is accepted, a course of action will be
outlined for the event that the risk does materialize in order to minimize its impact.
2.5 RISK MITIGATION AND AVOIDANCE
The project manager has led the project team in developing responses to each identified
risk. As more risks are identified, they will be qualified and the team will develop
avoidance and mitigation strategies. These risks will also be added to the Risk Register
and the project plan to ensure they are monitored at the appropriate times and are
responded to accordingly.
The risks for this project will be managed and controlled within the constraints of time,
scope, and cost. All identified risks will be evaluated in order to determine how they affect
Page 5
Risk Management Plan
<Project Name> Version: 1.0
this triple constraint. The project manager, with the assistance of the project team, will
determine the best way to respond to each risk to ensure compliance with these constraints.
In extreme cases it may be necessary to allow flexibility to one of the project’s constraints.
Only one of the constraints for this project allows for flexibility as a last resort. If
necessary, funding may be added to the project to allow for more resources in order to
meet the time (schedule) and scope constraints. Time and scope are firm constraints and
allow for no flexibility. Again, the cost constraint is flexible only in extreme cases where
no other risk avoidance or mitigation strategy will work.
3 RISK REGISTER
The Risk Register for this project is a log of all identified risks, their probability and impact
to the project, the category they belong to, mitigation strategy, and when the risk will
occur. The register was created through the initial project risk management meeting led by
the project manager. During this meeting, the project team identified and categorized each
risk. Additionally, the team assigned each risk a score based on the probability of it
occurring and the impact it could potentially have. The Risk Register also contains the
mitigation strategy for each risk as well as when the risk is likely to occur.
Based on the identified risks and timeframes in the risk register, each risk has been added
to the project plan. At the appropriate time in the plan—prior to when the risk is most
likely to occur—the project manager will assign a risk manager to ensure adherence to the
agreed upon mitigation strategy. The each risk manager will provide the status of their
assigned risk at the bi-weekly project team meeting for their risk’s planned timeframe.
The Risk Register will be maintained as an appendix to this Risk Management Plan.
Page 6
Risk Management Plan

Mais conteúdo relacionado

Mais procurados

Chapter 1 risk management
Chapter 1 risk managementChapter 1 risk management
Chapter 1 risk managementRione Drevale
 
11.1 Plan Risk Management
11.1 Plan Risk Management11.1 Plan Risk Management
11.1 Plan Risk ManagementDavidMcLachlan1
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)rafeeqameen
 
Supply chain risk management
Supply chain risk management Supply chain risk management
Supply chain risk management Megha Kotak, PMP
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 
Business risk assessment
Business risk assessmentBusiness risk assessment
Business risk assessmentUzair Khan
 
Risk-management
 Risk-management Risk-management
Risk-managementUmesh Gupta
 
Risk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareRisk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareDavid Bustin
 
Risk assessment presentation
Risk assessment presentationRisk assessment presentation
Risk assessment presentationmmagario
 
Risk Management Outline Powerpoint Presentation Slides
Risk Management Outline Powerpoint Presentation SlidesRisk Management Outline Powerpoint Presentation Slides
Risk Management Outline Powerpoint Presentation SlidesSlideTeam
 
Risk analysis and management
Risk analysis and managementRisk analysis and management
Risk analysis and managementgnitu
 
Risk Management module PowerPoint Presentation Slides
Risk Management module PowerPoint Presentation SlidesRisk Management module PowerPoint Presentation Slides
Risk Management module PowerPoint Presentation SlidesSlideTeam
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Dhamo daran
 
Risk mangement
Risk mangementRisk mangement
Risk mangementcollege
 
Risk Identification.ppt
Risk Identification.pptRisk Identification.ppt
Risk Identification.pptAvicenna6
 
Risk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesRisk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesSlideTeam
 

Mais procurados (20)

9.3 Acquire Resources
9.3 Acquire Resources9.3 Acquire Resources
9.3 Acquire Resources
 
Chapter 1 risk management
Chapter 1 risk managementChapter 1 risk management
Chapter 1 risk management
 
11.1 Plan Risk Management
11.1 Plan Risk Management11.1 Plan Risk Management
11.1 Plan Risk Management
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)
 
Supply chain risk management
Supply chain risk management Supply chain risk management
Supply chain risk management
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Business risk assessment
Business risk assessmentBusiness risk assessment
Business risk assessment
 
Risk-management
 Risk-management Risk-management
Risk-management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareRisk management plan for Human Resource Software
Risk management plan for Human Resource Software
 
Risk assessment presentation
Risk assessment presentationRisk assessment presentation
Risk assessment presentation
 
Risk Management Outline Powerpoint Presentation Slides
Risk Management Outline Powerpoint Presentation SlidesRisk Management Outline Powerpoint Presentation Slides
Risk Management Outline Powerpoint Presentation Slides
 
Risk analysis and management
Risk analysis and managementRisk analysis and management
Risk analysis and management
 
Risk Management module PowerPoint Presentation Slides
Risk Management module PowerPoint Presentation SlidesRisk Management module PowerPoint Presentation Slides
Risk Management module PowerPoint Presentation Slides
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
 
Risk management
Risk managementRisk management
Risk management
 
Risk mangement
Risk mangementRisk mangement
Risk mangement
 
Risk Identification.ppt
Risk Identification.pptRisk Identification.ppt
Risk Identification.ppt
 
Risk Management in Project Management
Risk Management in Project ManagementRisk Management in Project Management
Risk Management in Project Management
 
Risk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesRisk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation Slides
 

Destaque

Destaque (10)

HC Data Pro Risk Management Plan
HC Data Pro Risk Management PlanHC Data Pro Risk Management Plan
HC Data Pro Risk Management Plan
 
Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4
 
Project Management Plan - Group Presentation
Project Management Plan - Group PresentationProject Management Plan - Group Presentation
Project Management Plan - Group Presentation
 
Risk Management Plan Example
Risk Management Plan ExampleRisk Management Plan Example
Risk Management Plan Example
 
Pm study project risk management test
Pm study project  risk management testPm study project  risk management test
Pm study project risk management test
 
Kaizen bcic
Kaizen bcicKaizen bcic
Kaizen bcic
 
PMP - Risk Management plan & template
PMP - Risk Management plan & templatePMP - Risk Management plan & template
PMP - Risk Management plan & template
 
4 m's of production
4 m's of production 4 m's of production
4 m's of production
 
5 m’s of management
5 m’s of management5 m’s of management
5 m’s of management
 
Sample project plan
Sample project planSample project plan
Sample project plan
 

Semelhante a Construction Risk Management Plan

Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan templateVivek Srivastava
 
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxTemplates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxmattinsonjanel
 
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docx
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docxProject Name Risk Management PlanVersion 1.0 Error! Unkno.docx
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docxwkyra78
 
Risk management and assessment
Risk management and assessmentRisk management and assessment
Risk management and assessmentabassociates
 
Project risk management
Project risk managementProject risk management
Project risk managementBarnatuCoffee
 
Construction project management &amp; risk mitigation
Construction project management &amp; risk mitigationConstruction project management &amp; risk mitigation
Construction project management &amp; risk mitigationrajlaxmipardeshi
 
2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1reddvise
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaGlobalSkillup
 
Eplc risk management_template
Eplc risk management_templateEplc risk management_template
Eplc risk management_templategguinle
 
RM_audit_overview_w_voice.pptx (2).mp4 Interoperability.docx
RM_audit_overview_w_voice.pptx (2).mp4  Interoperability.docxRM_audit_overview_w_voice.pptx (2).mp4  Interoperability.docx
RM_audit_overview_w_voice.pptx (2).mp4 Interoperability.docxSUBHI7
 
Risk management
Risk managementRisk management
Risk managementbipulpwc
 
Critical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_enCritical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_enVyacheslav Guzovsky
 
10.9 STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
10.9  STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx10.9  STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
10.9 STORE-DRIVEN FORECASTS. The Home Depot is a lead.docxhyacinthshackley2629
 
Risk management plan
Risk management planRisk management plan
Risk management planKashif Mastan
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk ManagementSAJJAD KHUDHUR ABBAS
 

Semelhante a Construction Risk Management Plan (20)

Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan template
 
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxTemplates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
 
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docx
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docxProject Name Risk Management PlanVersion 1.0 Error! Unkno.docx
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docx
 
Risk management and assessment
Risk management and assessmentRisk management and assessment
Risk management and assessment
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Construction project management &amp; risk mitigation
Construction project management &amp; risk mitigationConstruction project management &amp; risk mitigation
Construction project management &amp; risk mitigation
 
2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
 
Eplc risk management_template
Eplc risk management_templateEplc risk management_template
Eplc risk management_template
 
11 project risk management
11 project risk management11 project risk management
11 project risk management
 
RM_audit_overview_w_voice.pptx (2).mp4 Interoperability.docx
RM_audit_overview_w_voice.pptx (2).mp4  Interoperability.docxRM_audit_overview_w_voice.pptx (2).mp4  Interoperability.docx
RM_audit_overview_w_voice.pptx (2).mp4 Interoperability.docx
 
TOPIC5.pdf
TOPIC5.pdfTOPIC5.pdf
TOPIC5.pdf
 
Risk management
Risk managementRisk management
Risk management
 
Project risk analysis
Project risk analysisProject risk analysis
Project risk analysis
 
Critical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_enCritical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_en
 
10.9 STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
10.9  STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx10.9  STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
10.9 STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
 
Risk management plan
Risk management planRisk management plan
Risk management plan
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk Management
 
Risk analysis
Risk analysisRisk analysis
Risk analysis
 

Mais de abhishekthakur309

Seminar on diffusion welding
Seminar on diffusion weldingSeminar on diffusion welding
Seminar on diffusion weldingabhishekthakur309
 
Project plan tyre recycling plant
Project plan   tyre recycling plantProject plan   tyre recycling plant
Project plan tyre recycling plantabhishekthakur309
 
Presentation on project plan for tyre recycling plant
Presentation on project plan for tyre recycling plantPresentation on project plan for tyre recycling plant
Presentation on project plan for tyre recycling plantabhishekthakur309
 
Presentation on failure of nokia
Presentation on failure of nokiaPresentation on failure of nokia
Presentation on failure of nokiaabhishekthakur309
 
Mrketing plan recharging technology abhishek thakur,sourabh kulkarni
Mrketing plan recharging technology  abhishek thakur,sourabh kulkarniMrketing plan recharging technology  abhishek thakur,sourabh kulkarni
Mrketing plan recharging technology abhishek thakur,sourabh kulkarniabhishekthakur309
 
Failure of nokia research paper
Failure of nokia research paperFailure of nokia research paper
Failure of nokia research paperabhishekthakur309
 
Cost management plan tyre recycling plant
Cost management plan  tyre recycling plantCost management plan  tyre recycling plant
Cost management plan tyre recycling plantabhishekthakur309
 

Mais de abhishekthakur309 (9)

Smart cycle presentation
Smart cycle presentationSmart cycle presentation
Smart cycle presentation
 
Seminar on diffusion welding
Seminar on diffusion weldingSeminar on diffusion welding
Seminar on diffusion welding
 
Project plan tyre recycling plant
Project plan   tyre recycling plantProject plan   tyre recycling plant
Project plan tyre recycling plant
 
Presentation on project plan for tyre recycling plant
Presentation on project plan for tyre recycling plantPresentation on project plan for tyre recycling plant
Presentation on project plan for tyre recycling plant
 
Presentation on failure of nokia
Presentation on failure of nokiaPresentation on failure of nokia
Presentation on failure of nokia
 
Mrketing plan recharging technology abhishek thakur,sourabh kulkarni
Mrketing plan recharging technology  abhishek thakur,sourabh kulkarniMrketing plan recharging technology  abhishek thakur,sourabh kulkarni
Mrketing plan recharging technology abhishek thakur,sourabh kulkarni
 
Failure of nokia research paper
Failure of nokia research paperFailure of nokia research paper
Failure of nokia research paper
 
Cost management plan tyre recycling plant
Cost management plan  tyre recycling plantCost management plan  tyre recycling plant
Cost management plan tyre recycling plant
 
Smart cycle proposal
Smart cycle proposalSmart cycle proposal
Smart cycle proposal
 

Último

CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 

Último (20)

CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 

Construction Risk Management Plan

  • 1. <PROJECT NAME> RISK MANAGEMENT PLAN Version <1.0> 04/08/2013 Risk Management Plan
  • 2. <Project Name> Version: 1.0 TABLE OF CONTENTS 1 INTRODUCTION......................................................................................................................1 1.1 Purpose Of The Risk Management Plan............................................................................1 2 RISK MANAGEMENT PROCEDURE...................................................................................2 2.1 Process................................................................................................................................2 2.2 Risk Identification..............................................................................................................3 2.3 Risk Analysis......................................................................................................................3 2.3.1 Qualitative Risk Analysis........................................................................................3 2.3.2 Quantitative Risk Analysis......................................................................................4 2.4 Risk Response Planning.....................................................................................................5 2.5 Risk Mitigation and Avoidance..........................................................................................5 3 RISK REGISTER.......................................................................................................................6 6 Risk Management Plan
  • 3. <Project Name> Version: 1.0 1 INTRODUCTION 1.1 PURPOSE OF THE RISK MANAGEMENT PLAN Any kind of project is susceptible to risks of various natures that can have different degrees of effect in the normal project. It may or may not have positive or negative effects on a project’s objectives. Risk Management assists in the prevention and minimization of unfavorable events. The objective of a risk management is to secure the project from risks by identifying, assessing, responding to, monitoring, and reporting risks. The purpose of the risk management plan is to establish the framework in which the project team will identify risks and develop strategies to mitigate or avoid those risks. However, before risks can be identified and managed, there are preliminary project elements which must be completed. These elements are outlined in the risk management approach. This project is considered a medium risk project as it has an overall risk score of 24 on a scale from 0 to 100. The project risk score is the average of the risk scores of the most significant risks to this project. A risk score below 16 is low risk project, a score between 16 and 45 is a medium risk project and a score above 45 is a high-risk project. Before risk management begins it is imperative that a foundation is established for providing structured project information, thus, the following project elements were completed and defined prior to developing this Risk Management Plan: • Define work scope, schedule, resources, and cost elements o Develop project WBS/WBS dictionary o Develop master schedule and detailed schedules o Estimate project cost and finalize budget o Identify required and available resources o Establish performance measurement metrics • Define minimum and maximum baseline thresholds o Schedule o Resources o Cost • Baseline reporting requirements o Format o Frequency of distribution o Distribution list • Define Risk Management Roles and Responsibilities o Project Manager chairs the risk assessment meetings Page 1 Risk Management Plan
  • 4. <Project Name> Version: 1.0 o Project team participates in risk assessment meetings and members serve as meeting recorder and timekeeper o Key stakeholders participate in risk assessment meetings o Project Sponsor may participate in risk assessment meetings The Risk Management Plan for the Construction of Scrap Tire Recycling Plant gives an outline of the risk associated with the project by identifying, analyzing and managing the risks involved. 2 RISK MANAGEMENT PROCEDURE 2.1 PROCESS The approach we have taken to manage risks for Construction of Scrap Tire recycling Plant included a methodical process by which the project team identified, scored, and ranked the various risks. The most likely and highest impact risks were added to the project schedule to ensure that the assigned risk managers take the necessary steps to implement the mitigation response at the appropriate time during the schedule. Risk managers will provide status updates on their assigned risks in the bi-weekly project team meetings, but only when the meetings include their risk’s planned timeframe. Upon the completion of the project, during the closing process, the project manager will analyze each risk as well as the risk management process. Based on this analysis, the project manager will identify any improvements that can be made to the risk management process for future projects. These improvements will be captured as part of the lessons learned knowledge base. The risk management process gives an outline to Project Manager and all the project personnel of the future risk and gives an ample amount of time to come up with the solutions beforehand. A well articulated Risk Management Plan helps in utmost resource utilization, meet scheduling on time and prevent unwanted risks associated. The risk management process comprises of some steps, but is not limited to, and if followed properly helps in mitigating the risk or minimizing the effects. Some of the steps are identifying the risk, identifying the source of the risk, measuring, evaluating, mitigating and monitoring the risk. The diagram below depicts the various steps involved in the risk management process. Page 2 Risk Management Plan
  • 5. <Project Name> Version: 1.0 2.2 RISK IDENTIFICATION The task of the Risk Management Manager would be to identify all the risks associated with the Construction of Scrap Tire Recycling Plant and submit it during the risk identification process. After acquiring all the details about the risks the project team, appropriate stakeholders would work on handling the risks. This process would also include an evaluation of environmental factor, organizational culture and the project management plan including the project scope. Some of the important factors, which will be included in the identification process, are project deliverables, assumptions, constraints, WBS, cost/effort estimates, resource plan, and other key project documents. A Risk Management Log will then be created and updated as and when needed. The log will be stored electronically which can be used for future reference. 2.3 RISK ANALYSIS In order to determine the severity of the risks identified by the team, a probability and impact factor was assigned to each risk. This process allowed the project manager to prioritize risks based upon the effect they may have on the project. The project manager utilized a probability-impact matrix to facilitate the team in moving each risk to the appropriate place on the chart. Once the risks were assigned a probability and impact and placed in the appropriate position on the chart, the recorder captured the finished product and the project manager moved the process on to the next step: risk mitigation/avoidance planning 2.3.1 Qualitative Risk Analysis The Project Manager will assess each identified risk based on the probability and impact of occurrence for each risk, with input from the project team using the following approach: Page 3 Risk Management Plan
  • 6. <Project Name> Version: 1.0 Probability • High – Greater than <70%> probability of occurrence • Medium – Between <30%> and <70%> probability of occurrence • Low – Below <30%> probability of occurrence Impact • High – Risk that has the potential to greatly impact project cost, project schedule or performance • Medium – Risk that has the potential to slightly impact project cost, project schedule or performance • Low – Risk that has relatively little impact on cost, schedule or performance Risks that fall within the RED and YELLOW zones will have risk response planning which may include both a risk mitigation and a risk contingency plan. 2.3.2 Quantitative Risk Analysis The most likely and greatest impact risks have been added to the project plan to ensure that they are monitored during the time the project is exposed to each risk. At the appropriate time in the project schedule a Risk Manager is assigned to each risk. During the bi-weekly project team meeting the Risk Manager for each risk will discuss the status of that risk; however, only risks, which fall in the current time period, will be discussed. Risk monitoring will be a continuous process throughout the life of this project. As risks approach on the project schedule the project manager will ensure that the appropriate risk Page 4 Risk Management Plan Impact H M L L M H Probability
  • 7. <Project Name> Version: 1.0 manager provides the necessary status updates which include the risk status, identification of trigger conditions, and the documentation of the results of the risk response. The qualitative analysis will prioritize the risks based on the probability and the impact criteria. The effect of the risks on the project activities will then be estimated, a numerical rating will be applied to each risk, and then documentation will be done based on the following steps: • Identifying and valuing assets • Determining the Single Loss Expectancy (SLE) • Determining Annual Rate of Occurrence • Determining Annual Loss Expectancy • Determining the cost of controls • Risk On Security Investment (ROSI) • Results of the Quantitative Risk Analysis 2.4 RISK RESPONSE PLANNING Each major risk (those falling in the Red & Yellow zones) will be assigned to a project team member for monitoring purposes to ensure that the risk will not “fall through the cracks”. For each major risk, one of the following approaches will be selected to address it: • Avoid – eliminate the threat by eliminating the cause • Mitigate – Identify ways to reduce the probability or the impact of the risk • Accept – Nothing will be done • Transfer – Make another party responsible for the risk (buy insurance, outsourcing, etc.) For each risk that will be mitigated, the project team will identify ways to prevent the risk from occurring or reduce its impact or probability of occurring. This may include prototyping, adding tasks to the project schedule, adding resources, etc. For each major risk that is to be mitigated or that is accepted, a course of action will be outlined for the event that the risk does materialize in order to minimize its impact. 2.5 RISK MITIGATION AND AVOIDANCE The project manager has led the project team in developing responses to each identified risk. As more risks are identified, they will be qualified and the team will develop avoidance and mitigation strategies. These risks will also be added to the Risk Register and the project plan to ensure they are monitored at the appropriate times and are responded to accordingly. The risks for this project will be managed and controlled within the constraints of time, scope, and cost. All identified risks will be evaluated in order to determine how they affect Page 5 Risk Management Plan
  • 8. <Project Name> Version: 1.0 this triple constraint. The project manager, with the assistance of the project team, will determine the best way to respond to each risk to ensure compliance with these constraints. In extreme cases it may be necessary to allow flexibility to one of the project’s constraints. Only one of the constraints for this project allows for flexibility as a last resort. If necessary, funding may be added to the project to allow for more resources in order to meet the time (schedule) and scope constraints. Time and scope are firm constraints and allow for no flexibility. Again, the cost constraint is flexible only in extreme cases where no other risk avoidance or mitigation strategy will work. 3 RISK REGISTER The Risk Register for this project is a log of all identified risks, their probability and impact to the project, the category they belong to, mitigation strategy, and when the risk will occur. The register was created through the initial project risk management meeting led by the project manager. During this meeting, the project team identified and categorized each risk. Additionally, the team assigned each risk a score based on the probability of it occurring and the impact it could potentially have. The Risk Register also contains the mitigation strategy for each risk as well as when the risk is likely to occur. Based on the identified risks and timeframes in the risk register, each risk has been added to the project plan. At the appropriate time in the plan—prior to when the risk is most likely to occur—the project manager will assign a risk manager to ensure adherence to the agreed upon mitigation strategy. The each risk manager will provide the status of their assigned risk at the bi-weekly project team meeting for their risk’s planned timeframe. The Risk Register will be maintained as an appendix to this Risk Management Plan. Page 6 Risk Management Plan