Meaning
• Capital budgeting is the process of making
investment decisions in capital expenditure.
• A capital expenditure may be defined as an
expenditure the benefits of which areexpenditure the benefits of which are
expected to be received over period of time
exceeding one year.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Examples
• Some of the examples of capital
expenditure are:
• Cost of acquisition of acquiring permanent
assets like land, building, plant, machinery,
goodwill etc.goodwill etc.
• Cost of addition, expansion, improvement
or alteration in the fixed assets.
• Cost of replacement of permanent assents.
• Research and development project cost,
etc.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Definition
• According to G. C. Philippatos, “capital
budgeting is concerned with the allocation of
firm’s scarce financial resources among the
available market opportunities.”
PDF created with pdfFactory Pro trial version www.pdffactory.com
Introduction
• Capital budgeting addresses
the issue of strategic long-
term investment decisions.
• Capital budgeting can be
defined as the process of
analyzing, evaluating, andanalyzing, evaluating, and
deciding whether resources
should be allocated to a
project or not.
• Process of capital budgeting
ensure optimal allocation of
resources and helps
management work towards
the goal of shareholder
wealth maximization.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Importance of Capital
Budgeting Decision
Long-term
Implications
Involvement of
large amount
of funds
Irreversible
DecisionsImplications
of funds
Decisions
Risk and
uncertainty
Difficult to
make
PDF created with pdfFactory Pro trial version www.pdffactory.com
Methods of Capita Budgeting
Methods
Traditional
Method
Pay-Back
Period
Post- Payback
Rate of
Return
Time
Adjusted
Method
Net Present
Value
Internal Rate
of Return
Profitability
Index
PDF created with pdfFactory Pro trial version www.pdffactory.com
Which Technique should
we follow?
• A technique that helps us in selecting projects
that are consistent with the principle of
shareholder wealth maximization.
• A technique is considered consistent with• A technique is considered consistent with
wealth maximization if
• It is based on cash flows
• Considers all the cash flows
• Considers time value of money
• Is unbiased in selecting projects
PDF created with pdfFactory Pro trial version www.pdffactory.com
Pay-Back Period
• The Payback- period is the time duration
required to recover the initial cash outflows.
This method is based on cash flows and not
on accounting data like the ARR.
• Suppose somebody spent Rs.50,000 on any
project and expects that within 3 year he can
get back this amount, then the payback
period is 3 years.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Cont…
• Payback period of any proposal can be
calculated as follows,
• If the cash inflows are uniform then
• Under this method, various investments with a
shorter pay back period is preferred to the one
which has longer pay back period.
• Annual Net Earnings i.e before depreciation after
tax
PDF created with pdfFactory Pro trial version www.pdffactory.com
Questions:
• Q 1 A project costs Rs 1,00,000 and yields an
annual cash inflow of Rs. 20,000 for 8 years.
Calculate its payback period.
• Q2 Determine the pay back period for a project
which requires a cash outlay of Rs. 10,000 andwhich requires a cash outlay of Rs. 10,000 and
generates cash inflows of Rs. 2,000, Rs. 4000. Rs.
3000, and Rs. 2000 in the first, second, third and
forth year respectively.
• Q 3 A project cost Rs 5,00,000 and yields annually
a profit of Rs. 80,000 after depreciation @12%
p.a. but before tax of 50%. Calculate the payback
period.
PDF created with pdfFactory Pro trial version www.pdffactory.com
• There are two projects X and Y. Each project
requires an investment of Rs 20,000. you are
required to rank these projects according to
the pay back method from the following
information:information:
(Net profit before depreciation after tax)
Years Project X Project Y
1st 1000 2000
2nd 2000 4000
3rd 4000 6000
4th 5000 8000
5th 8000 -
PDF created with pdfFactory Pro trial version www.pdffactory.com
Ques: X Ltd is producing articles mostly by manual
labour and is considering to replace it by a new
machine. There are two alternative models M &
N of the new machine. Prepare a statement of
profitability showing the pay-back period from
the following information:
Machine M Machine N
Estimated life of machine 4 years 5 years
Cost of Machine Rs. 90,000 Rs. 1,80,000
Estimated savings in scrap 5,000 8,000
Estimated savings in direct
wages
60,000 80,000
Additional cost of
maintenance
8000 10,000
Additional cost of supervision 12,000 18,000
PDF created with pdfFactory Pro trial version www.pdffactory.com
Advantages
• Simple to understand and easy to calculate
• It takes lesser time and labour as compared to
other methods.
• Due to its short term approach, this method is• Due to its short term approach, this method is
particularly suited to a firm which has
shortage of cash or whose liquidity position is
not particularly good.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Disadvantage
• It doesn’t take into consideration the cash inflows
earned after the pay back period and hence the
true profitability of the projects cannot be correctly
assessed.
• This method ignores the time value of money and
does not consider the magnitude and timings of
cash in flows.
does not consider the magnitude and timings of
cash in flows.
• It may be difficult to determine the minimum
acceptable pay-back period, it is usually, a
subjective decision.
• It does not measure the true profitability of the
project as the period consider under this method is
limited to short period only and not the full life of
the asset.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Post Payback Period
• One of the limitations of the pay-back period
method is that it ignores the life of the project
beyond the pay-back period.
• Post pay-back period method takes into account
the period beyond the pay-back method. This
method is also known as surplus life over pay-backmethod is also known as surplus life over pay-back
period may be accepted.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Ques: For each of the following projects compute (i)
pay back period, (ii) post-back period profitability,
(iii) post-back profitability index:
(a) Initial outlay Rs. 50,000
Annual Cash Inflow (after tax & before
dep.)
Rs. 10,000
Estimated Life 8 years
(b) Initial outlay Rs. 50,000
Annual Cash Inflow (after tax & before
dep.)
First three years Rs. 15,000
Next five years Rs. 5,000
Estimated Life 8 years
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rate of Return or Accounting
Rate of Return
• This method takes into account the earnings
expected from the investment over their whole
life.
• It is known as accounting rate of return method
for the reason that under this method the
accounting concept of profit (net profit after tax
for the reason that under this method the
accounting concept of profit (net profit after tax
and depreciation) is used rather than cash
inflows.
• The project with the higher rate of return than
the minimum rate specified by the firm also
known as cut off rate, is accepted and the other
which gives a lower expected rate of return than
the minimum rate is rejected.
PDF created with pdfFactory Pro trial version www.pdffactory.com
This Method can be Used in
Several WaysSeveral Ways
PDF created with pdfFactory Pro trial version www.pdffactory.com
1. Average Rate of Return
Method
• Under this method average profit after tax and
depreciation is calculated and then it is divided
by the total capital outlay or total investment in
the project. In other words, it establishes the
relationship between average annual profits torelationship between average annual profits to
total investments.
• Thus,
PDF created with pdfFactory Pro trial version www.pdffactory.com
Q. A project requires an investment of Rs 5,00,000
and has a scrap value of Rs. 20,000 after 5 years.
It is expected to yield profits after depreciation
and taxes during the 5 years amounting to Rs.
40,000, Rs. 60,000, Rs. 70,000, Rs. 50,000 and Rs.
20,000. Calculate average rate of return on the20,000. Calculate average rate of return on the
investment.
PDF created with pdfFactory Pro trial version www.pdffactory.com
2. Return per unit of
investment method
• This method is small variation of the average
rate of return method. In this method the
total profit after tax and depreciation is
divided by the total investment, i.e.,
PDF created with pdfFactory Pro trial version www.pdffactory.com
Q. A project requires an investment of Rs
5,00,000 and has a scrap value of Rs. 20,000
after 5 years. It is expected to yield profits after
depreciation and taxes during the 5 years
amounting to Rs. 40,000, Rs. 60,000, Rs. 70,000,
Rs. 50,000 and Rs. 20,000. Calculate averageRs. 50,000 and Rs. 20,000. Calculate average
rate of return on the investment.
PDF created with pdfFactory Pro trial version www.pdffactory.com
3. Return on average
investment method
¨ In this method the return on average
investment is calculated. Using of average
investment for the purpose of return on
investment is preferred because the original
investment is recovered over the life of theinvestment is recovered over the life of the
asset on account of depreciation charges.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Q. A project requires an investment of Rs 5,00,000
and has a scrap value of Rs. 20,000 after 5 years.
It is expected to yield profits after depreciation
and taxes during the 5 years amounting to Rs.
40,000, Rs. 60,000, Rs. 70,000, Rs. 50,000 and
Rs. 20,000. Calculate average rate of return onRs. 20,000. Calculate average rate of return on
the investment.
PDF created with pdfFactory Pro trial version www.pdffactory.com
4. Average return on
average investment method
• This is the most appropriate method of rate of
return on investment. Under this method,
average profit after depreciation and taxes id
divided by the average amount of investment;
thus:thus:
PDF created with pdfFactory Pro trial version www.pdffactory.com
Q. A project requires an investment of Rs 5,00,000
and has a scrap value of Rs. 20,000 after 5 years.
It is expected to yield profits after depreciation
and taxes during the 5 years amounting to Rs.
40,000, Rs. 60,000, Rs. 70,000, Rs. 50,000 and
Rs. 20,000. Calculate average rate of return onRs. 20,000. Calculate average rate of return on
the investment.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Q. Calculate the average rate of return for projects
A & B from the following:
Project A Project B
Investments Rs. 20,000 Rs. 30,000
Expected Life (No Salvage value) 4 years 5 years
Projected Net Income (After interest, depreciation and taxes)
Years Project A Project B
1 2,000 3,000
2 1,500 3,000
3 1,500 2,000
4 1,000 1,000
5 - 1,000
If the required rate of return is 12%, which project should be undertaken
PDF created with pdfFactory Pro trial version www.pdffactory.com
Advantages of Rate of
Return Method
• It is very simple to understand and easy to
operate
• It uses the entire earnings of a project in
calculating rate of return and not only thecalculating rate of return and not only the
earnings upto pay-back period and hence
gives a better view of profitability as
compared pay-back period method.
• As this method is based upon accounting
concept of profits, it can be readily calculated
from the financial data.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Disadvantages of Rate of
Return Method
• It ignores time value of money as profits earns
at different point of time are given equal
weight by averaging the profits.
• It doesn’t take into consideration the cash• It doesn’t take into consideration the cash
flows which are important the accounting
profits.
• This method cannot be applied to a situation
where investment in a project is to be made in
parts.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Time Adjusted Method or
Modern Method
• This method takes into consideration the
profitability and time value of money (the
fact that a rupee earned today has more
value than a rupee earned after 5 years.)value than a rupee earned after 5 years.)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Net Present Value (NPV)
• It is net present value of all the cash flows that
occur during the entire life span of a project.
• The outflows will have negative values while the
inflows will have positive values.
• Obviously, if the present value of inflows is
greater than outflows, we get a positive NPV and
• Obviously, if the present value of inflows is
greater than outflows, we get a positive NPV and
if the present value of outflows is greater than
inflows, we get a negative NPV.
• The positive NPV means a net gain in value
maximization and, therefore, any project which
gives a positive NPV is an acceptable project and
if it gives a negative NPV, then the project should
not be accepted.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Steps for Calculating NPV
• First of all determine the appropriate rate of
interest that should be selected as the minimum
required rate of return called cut off rate or
discount rate. The rate should be the minimum
rate of return below which the investor considers
that it doesn’t pay him to invest. The discount
rate should be the actual rate of interest in therate should be the actual rate of interest in the
market on long-term loans or it should reflect the
opportunity cost of capital of the investor.
• Compute the present value of the total
investment outlay, i.e. cash outflows at the
determined discount rate. If the total investment
is to be made in the initial year, the present value
shall be the same as the cost of investment.
PDF created with pdfFactory Pro trial version www.pdffactory.com
• Compute the present values of total investment
proceeds, i.e., cash inflows, (profit before
depreciation and after tax) at the above
determined discount rate.
• Calculate the net present value of each project by
substracting the present value of cash inflows
from the present value of cash outflows for eachfrom the present value of cash outflows for each
project.
• If the NPV is positive or zero the proposal may be
accepted and vice versa.
• In case of mutually exclusive projects, projects
should be ranked in order of net present values.
The project with high NPV should be given
highest rank and so on.
PDF created with pdfFactory Pro trial version www.pdffactory.com
The Present Value of Re 1 due in any
number of years can be found with the use
of the following mathematical formula:
PV = 1/(1+r)n
Where, PV = Present value
r = rate of interest / discount rate
n = number of yearsn = number of years
The present value for all the cash inflows for a number of years is thus
found as follows:
However as n becomes large, the calculation of (1+r)n become difficult. PV can
also be found by the use of PV tables.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Internal Rate of Return
• Under this method, the cash flow of a project
are discounted at a suitable rate by hit and
trial method, which equates the NPV so
calculated to the amount of the investment.
Under this method, since the discount rate isUnder this method, since the discount rate is
determined internally, this method is called as
the internal rate of return method. The IRR
can be defined as that rate of discount at
which the PV of cash inflows is equal to the
PV of cash outflows.
PDF created with pdfFactory Pro trial version www.pdffactory.com
It can be calculated with the
help of following formula:
• C = initial outlay at time zero
• A1, A2, A3… An = future net cash flows at• A1, A2, A3… An = future net cash flows at
different periods
• 2, 3……, = number of years
• r = Rate of discount of IRR
PDF created with pdfFactory Pro trial version www.pdffactory.com
The IRR can also be cal. with the help of
PV tables. The following steps are
required to practice the IRR method.
• Determine the future net cash flows during the entire
economic life of project. The cash inflows are
estimated for future profits before depreciation but
after tax
• Determine the rate of discount at which the value of
cash inflows is equal to the values of cash outflows.
• Determine the rate of discount at which the value of
cash inflows is equal to the values of cash outflows.
• Accept the proposal if the IRR is higher than or equal
to the minimum required rate of return i.e. the cost
of capital or cut off rate and reject the proposal if the
IRR is lower than the cost of cut off rate.
• In case of alternative proposals select the proposal
with the highest rate of return as the rates are higher
than the cost of capital or cut-off rate.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Determination of IRR
• When the annual cash flows are equal over the
life of the asset: firstly, find out present value
factor by dividing initial outlay (cost of the
investment) by annual cash flow, i.e.
Present Value Factor
= Initial Outlay / Annual cash flow
PDF created with pdfFactory Pro trial version www.pdffactory.com
• In case annual cash flows are unequal over the
life of the asset, the IRR cant be determined
according to the technique suggested above. In
such cases, the IRR is calculated by hit and trial an
that is why this method is also known as hit and
trial yield method. We may start any assumed
that is why this method is also known as hit and
trial yield method. We may start any assumed
discount rate and find out the total PV of cash
outflows which is equal to the cost of initial
investment where total investment is to be made
in the beginning. The rate at which the total PV of
all cash inflows equals the initial outlay, is the
IRR. Several discount rates may have to be tried
until the appropriate rate is found.
PDF created with pdfFactory Pro trial version www.pdffactory.com
The calculation process may be
summed up as follows:
• Prepare the cash flow table using arbitrary assumed
discount rate to discount the net cash flows to the
PV.
• Find out the NPV by deducting from the PV of total
cash flows calculated in above the initial cost of
investmentinvestment
• If the NPV is positive, apply higher rate of discount
• If the higher discount rate still gives a positive NPV,
increase the discount rate further until the NPV
becomes negative
• If the NPV is negative at this higher rate, the internal
rate of return must be between these 2 rates.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Profitability Index
• NPV is an absolute value and therefore is not
appropriate for comparing the relative
profitability between different projects. In
order to overcome this limitation of NPV, we
make one modification in it to make it amake one modification in it to make it a
relative measurement. This is called
Profitability Index (P.I.) or Benefit Cost Ratio
(B-C Ratio). The P.I. is as follows:
PDF created with pdfFactory Pro trial version www.pdffactory.com
PDF created with pdfFactory Pro trial version www.pdffactory.com

Mais conteúdo relacionado

Mais procurados (20)

Budgetary control final ppt
Budgetary control  final pptBudgetary control  final ppt
Budgetary control final ppt
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Present value lecture 3
Present value lecture 3Present value lecture 3
Present value lecture 3
 
Profitability index
Profitability indexProfitability index
Profitability index
 
Chap006
Chap006Chap006
Chap006
 
The Time Value of Money
The Time Value of MoneyThe Time Value of Money
The Time Value of Money
 
Net Present Value and Other Investment Rules
Net Present Value and Other Investment RulesNet Present Value and Other Investment Rules
Net Present Value and Other Investment Rules
 
Payback period by harikrishnanan
Payback period by harikrishnananPayback period by harikrishnanan
Payback period by harikrishnanan
 
Capital budgeting theory
Capital budgeting theoryCapital budgeting theory
Capital budgeting theory
 
NET PRESENT VALUE (NPV)
NET PRESENT VALUE (NPV)NET PRESENT VALUE (NPV)
NET PRESENT VALUE (NPV)
 
Npv
NpvNpv
Npv
 
Internal rate of return(IRR)
Internal rate of return(IRR)Internal rate of return(IRR)
Internal rate of return(IRR)
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital budgeting techniques
Capital budgeting techniquesCapital budgeting techniques
Capital budgeting techniques
 
Payback period time value of money ad internal rate ofreturn
Payback period time value of money ad internal rate ofreturn Payback period time value of money ad internal rate ofreturn
Payback period time value of money ad internal rate ofreturn
 
Capital budgeting and estimating cash flows
Capital budgeting and estimating cash flowsCapital budgeting and estimating cash flows
Capital budgeting and estimating cash flows
 
Financial Assets
Financial AssetsFinancial Assets
Financial Assets
 
Capital Budgeting
Capital Budgeting Capital Budgeting
Capital Budgeting
 
Fixed Assets Accounting
Fixed Assets AccountingFixed Assets Accounting
Fixed Assets Accounting
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 

Destaque

Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingankyta89
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingALOK GIRI
 
Capital Budgeting Er. S Sood
Capital Budgeting Er. S SoodCapital Budgeting Er. S Sood
Capital Budgeting Er. S Soodshart sood
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital BudgetingDayasagar S
 
Capital budgeting Summary 1
Capital budgeting Summary 1Capital budgeting Summary 1
Capital budgeting Summary 1Ibrahim Ganiyu
 
Net present value pptx
Net present value pptxNet present value pptx
Net present value pptxParth Purohit
 
Capital Investment And Budgeting
Capital Investment And BudgetingCapital Investment And Budgeting
Capital Investment And BudgetingShubham Goyal
 
Financial Decision Making for Entrepreneurs
Financial Decision Making for EntrepreneursFinancial Decision Making for Entrepreneurs
Financial Decision Making for EntrepreneursAchuthan Rajagopal
 
Managerial decision making - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - ...
Managerial decision making -  ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - ...Managerial decision making -  ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - ...
Managerial decision making - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - ...Barani Dharan
 
Steps in decision maKing - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - DR....
Steps in decision maKing - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - DR....Steps in decision maKing - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - DR....
Steps in decision maKing - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - DR....Barani Dharan
 
Behavioral economics and financial decision making
Behavioral economics and financial decision making Behavioral economics and financial decision making
Behavioral economics and financial decision making Yumonomics
 
Transart Ad Pharma Case Study En
Transart Ad Pharma Case Study EnTransart Ad Pharma Case Study En
Transart Ad Pharma Case Study EnAndrei Pinte
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingbradhapa
 
Report on comparative analysis of banks
Report on comparative analysis of banksReport on comparative analysis of banks
Report on comparative analysis of banksMahek Dhoot
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8 sho...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8  sho...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8  sho...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8 sho...Aquamarine Emerald
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingHamza Ali
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...Aquamarine Emerald
 
Sales Optimization
Sales Optimization Sales Optimization
Sales Optimization R. Hosseini
 

Destaque (20)

Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital Budgeting Er. S Sood
Capital Budgeting Er. S SoodCapital Budgeting Er. S Sood
Capital Budgeting Er. S Sood
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Capital budgeting Summary 1
Capital budgeting Summary 1Capital budgeting Summary 1
Capital budgeting Summary 1
 
Net present value pptx
Net present value pptxNet present value pptx
Net present value pptx
 
Capital Investment And Budgeting
Capital Investment And BudgetingCapital Investment And Budgeting
Capital Investment And Budgeting
 
Financial Decision Making for Entrepreneurs
Financial Decision Making for EntrepreneursFinancial Decision Making for Entrepreneurs
Financial Decision Making for Entrepreneurs
 
Managerial decision making - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - ...
Managerial decision making -  ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - ...Managerial decision making -  ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - ...
Managerial decision making - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - ...
 
Steps in decision maKing - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - DR....
Steps in decision maKing - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - DR....Steps in decision maKing - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - DR....
Steps in decision maKing - ENGINEERING ECONOMICS & FINANCIAL ACCOUNTING - DR....
 
Behavioral economics and financial decision making
Behavioral economics and financial decision making Behavioral economics and financial decision making
Behavioral economics and financial decision making
 
Transart Ad Pharma Case Study En
Transart Ad Pharma Case Study EnTransart Ad Pharma Case Study En
Transart Ad Pharma Case Study En
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Report on comparative analysis of banks
Report on comparative analysis of banksReport on comparative analysis of banks
Report on comparative analysis of banks
 
DECISION MAKING - ENGINEERING ECONOMICS AND FINANCIAL ACCOUNTING
DECISION MAKING - ENGINEERING ECONOMICS AND FINANCIAL ACCOUNTINGDECISION MAKING - ENGINEERING ECONOMICS AND FINANCIAL ACCOUNTING
DECISION MAKING - ENGINEERING ECONOMICS AND FINANCIAL ACCOUNTING
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8 sho...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8  sho...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8  sho...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8 sho...
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
 
Sales Optimization
Sales Optimization Sales Optimization
Sales Optimization
 

Semelhante a ITFT -Capital Budgeting

_Investment decision.pptx
_Investment decision.pptx_Investment decision.pptx
_Investment decision.pptxMsDeepikaR
 
Prachi gupta 02415101718 bba4sem
Prachi gupta 02415101718 bba4semPrachi gupta 02415101718 bba4sem
Prachi gupta 02415101718 bba4semPrachi Gupta
 
Unit 4 Capital Budgeting
Unit 4 Capital BudgetingUnit 4 Capital Budgeting
Unit 4 Capital BudgetingParrthipan B K
 
Capital budgeting (1)- Management accounting
Capital budgeting (1)- Management accountingCapital budgeting (1)- Management accounting
Capital budgeting (1)- Management accountingJithin Zcs
 
Capital Budgeting1.pptx.ppt
Capital Budgeting1.pptx.pptCapital Budgeting1.pptx.ppt
Capital Budgeting1.pptx.ppttanushreesingh23
 
Group 3 Capital_Budgeting_Techniques- Dr. Vijay Shankar Pandey.pdf
Group 3 Capital_Budgeting_Techniques- Dr. Vijay Shankar Pandey.pdfGroup 3 Capital_Budgeting_Techniques- Dr. Vijay Shankar Pandey.pdf
Group 3 Capital_Budgeting_Techniques- Dr. Vijay Shankar Pandey.pdfKristinejoyClaud
 
Investment Decisions I.pptx
Investment Decisions I.pptxInvestment Decisions I.pptx
Investment Decisions I.pptxssuser2bba051
 
capital budgeting process investment rules.pptx
capital budgeting process investment rules.pptxcapital budgeting process investment rules.pptx
capital budgeting process investment rules.pptxATEEQURRehman366058
 
618659-ACCA_FM-NM_Rao.pptx
618659-ACCA_FM-NM_Rao.pptx618659-ACCA_FM-NM_Rao.pptx
618659-ACCA_FM-NM_Rao.pptxitsmycreation1
 
Net Present Value Vs Profitability Index
Net Present Value Vs Profitability IndexNet Present Value Vs Profitability Index
Net Present Value Vs Profitability IndexAseem R
 
2.8 skill financial analysis
2.8 skill financial analysis2.8 skill financial analysis
2.8 skill financial analysisNigestAbebaw1
 
2.0 capital budgetingGOOD PRACTICAL.pptx
2.0 capital budgetingGOOD PRACTICAL.pptx2.0 capital budgetingGOOD PRACTICAL.pptx
2.0 capital budgetingGOOD PRACTICAL.pptxPearlShell2
 

Semelhante a ITFT -Capital Budgeting (20)

2 4
2 42 4
2 4
 
_Investment decision.pptx
_Investment decision.pptx_Investment decision.pptx
_Investment decision.pptx
 
Prachi gupta 02415101718 bba4sem
Prachi gupta 02415101718 bba4semPrachi gupta 02415101718 bba4sem
Prachi gupta 02415101718 bba4sem
 
Unit 4 Capital Budgeting
Unit 4 Capital BudgetingUnit 4 Capital Budgeting
Unit 4 Capital Budgeting
 
Capital budgeting (1)- Management accounting
Capital budgeting (1)- Management accountingCapital budgeting (1)- Management accounting
Capital budgeting (1)- Management accounting
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Capital Budgeting1.pptx.ppt
Capital Budgeting1.pptx.pptCapital Budgeting1.pptx.ppt
Capital Budgeting1.pptx.ppt
 
Group 3 Capital_Budgeting_Techniques- Dr. Vijay Shankar Pandey.pdf
Group 3 Capital_Budgeting_Techniques- Dr. Vijay Shankar Pandey.pdfGroup 3 Capital_Budgeting_Techniques- Dr. Vijay Shankar Pandey.pdf
Group 3 Capital_Budgeting_Techniques- Dr. Vijay Shankar Pandey.pdf
 
Investment Decisions I.pptx
Investment Decisions I.pptxInvestment Decisions I.pptx
Investment Decisions I.pptx
 
Investment
InvestmentInvestment
Investment
 
capital budgeting process investment rules.pptx
capital budgeting process investment rules.pptxcapital budgeting process investment rules.pptx
capital budgeting process investment rules.pptx
 
Investing decisions
Investing decisionsInvesting decisions
Investing decisions
 
618659-ACCA_FM-NM_Rao.pptx
618659-ACCA_FM-NM_Rao.pptx618659-ACCA_FM-NM_Rao.pptx
618659-ACCA_FM-NM_Rao.pptx
 
Net Present Value Vs Profitability Index
Net Present Value Vs Profitability IndexNet Present Value Vs Profitability Index
Net Present Value Vs Profitability Index
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
UNIT-1-FDM.pptx
UNIT-1-FDM.pptxUNIT-1-FDM.pptx
UNIT-1-FDM.pptx
 
2.8 skill financial analysis
2.8 skill financial analysis2.8 skill financial analysis
2.8 skill financial analysis
 
2.0 capital budgetingGOOD PRACTICAL.pptx
2.0 capital budgetingGOOD PRACTICAL.pptx2.0 capital budgetingGOOD PRACTICAL.pptx
2.0 capital budgetingGOOD PRACTICAL.pptx
 
Investment1Appraisal.ppt
Investment1Appraisal.pptInvestment1Appraisal.ppt
Investment1Appraisal.ppt
 
capital_budgeting.ppt
capital_budgeting.pptcapital_budgeting.ppt
capital_budgeting.ppt
 

Último

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 

Último (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 

ITFT -Capital Budgeting

  • 1. Capital budgeting PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 2. Meaning • Capital budgeting is the process of making investment decisions in capital expenditure. • A capital expenditure may be defined as an expenditure the benefits of which areexpenditure the benefits of which are expected to be received over period of time exceeding one year. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 3. Examples • Some of the examples of capital expenditure are: • Cost of acquisition of acquiring permanent assets like land, building, plant, machinery, goodwill etc.goodwill etc. • Cost of addition, expansion, improvement or alteration in the fixed assets. • Cost of replacement of permanent assents. • Research and development project cost, etc. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 4. Definition • According to G. C. Philippatos, “capital budgeting is concerned with the allocation of firm’s scarce financial resources among the available market opportunities.” PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 5. Introduction • Capital budgeting addresses the issue of strategic long- term investment decisions. • Capital budgeting can be defined as the process of analyzing, evaluating, andanalyzing, evaluating, and deciding whether resources should be allocated to a project or not. • Process of capital budgeting ensure optimal allocation of resources and helps management work towards the goal of shareholder wealth maximization. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 6. Importance of Capital Budgeting Decision Long-term Implications Involvement of large amount of funds Irreversible DecisionsImplications of funds Decisions Risk and uncertainty Difficult to make PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 7. Methods of Capita Budgeting Methods Traditional Method Pay-Back Period Post- Payback Rate of Return Time Adjusted Method Net Present Value Internal Rate of Return Profitability Index PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 8. Which Technique should we follow? • A technique that helps us in selecting projects that are consistent with the principle of shareholder wealth maximization. • A technique is considered consistent with• A technique is considered consistent with wealth maximization if • It is based on cash flows • Considers all the cash flows • Considers time value of money • Is unbiased in selecting projects PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 9. Pay-Back Period • The Payback- period is the time duration required to recover the initial cash outflows. This method is based on cash flows and not on accounting data like the ARR. • Suppose somebody spent Rs.50,000 on any project and expects that within 3 year he can get back this amount, then the payback period is 3 years. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 10. Cont… • Payback period of any proposal can be calculated as follows, • If the cash inflows are uniform then • Under this method, various investments with a shorter pay back period is preferred to the one which has longer pay back period. • Annual Net Earnings i.e before depreciation after tax PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 11. Questions: • Q 1 A project costs Rs 1,00,000 and yields an annual cash inflow of Rs. 20,000 for 8 years. Calculate its payback period. • Q2 Determine the pay back period for a project which requires a cash outlay of Rs. 10,000 andwhich requires a cash outlay of Rs. 10,000 and generates cash inflows of Rs. 2,000, Rs. 4000. Rs. 3000, and Rs. 2000 in the first, second, third and forth year respectively. • Q 3 A project cost Rs 5,00,000 and yields annually a profit of Rs. 80,000 after depreciation @12% p.a. but before tax of 50%. Calculate the payback period. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 12. • There are two projects X and Y. Each project requires an investment of Rs 20,000. you are required to rank these projects according to the pay back method from the following information:information: (Net profit before depreciation after tax) Years Project X Project Y 1st 1000 2000 2nd 2000 4000 3rd 4000 6000 4th 5000 8000 5th 8000 - PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 13. Ques: X Ltd is producing articles mostly by manual labour and is considering to replace it by a new machine. There are two alternative models M & N of the new machine. Prepare a statement of profitability showing the pay-back period from the following information: Machine M Machine N Estimated life of machine 4 years 5 years Cost of Machine Rs. 90,000 Rs. 1,80,000 Estimated savings in scrap 5,000 8,000 Estimated savings in direct wages 60,000 80,000 Additional cost of maintenance 8000 10,000 Additional cost of supervision 12,000 18,000 PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 14. Advantages • Simple to understand and easy to calculate • It takes lesser time and labour as compared to other methods. • Due to its short term approach, this method is• Due to its short term approach, this method is particularly suited to a firm which has shortage of cash or whose liquidity position is not particularly good. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 15. Disadvantage • It doesn’t take into consideration the cash inflows earned after the pay back period and hence the true profitability of the projects cannot be correctly assessed. • This method ignores the time value of money and does not consider the magnitude and timings of cash in flows. does not consider the magnitude and timings of cash in flows. • It may be difficult to determine the minimum acceptable pay-back period, it is usually, a subjective decision. • It does not measure the true profitability of the project as the period consider under this method is limited to short period only and not the full life of the asset. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 16. Post Payback Period • One of the limitations of the pay-back period method is that it ignores the life of the project beyond the pay-back period. • Post pay-back period method takes into account the period beyond the pay-back method. This method is also known as surplus life over pay-backmethod is also known as surplus life over pay-back period may be accepted. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 17. Ques: For each of the following projects compute (i) pay back period, (ii) post-back period profitability, (iii) post-back profitability index: (a) Initial outlay Rs. 50,000 Annual Cash Inflow (after tax & before dep.) Rs. 10,000 Estimated Life 8 years (b) Initial outlay Rs. 50,000 Annual Cash Inflow (after tax & before dep.) First three years Rs. 15,000 Next five years Rs. 5,000 Estimated Life 8 years PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 18. Rate of Return or Accounting Rate of Return • This method takes into account the earnings expected from the investment over their whole life. • It is known as accounting rate of return method for the reason that under this method the accounting concept of profit (net profit after tax for the reason that under this method the accounting concept of profit (net profit after tax and depreciation) is used rather than cash inflows. • The project with the higher rate of return than the minimum rate specified by the firm also known as cut off rate, is accepted and the other which gives a lower expected rate of return than the minimum rate is rejected. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 19. This Method can be Used in Several WaysSeveral Ways PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 20. 1. Average Rate of Return Method • Under this method average profit after tax and depreciation is calculated and then it is divided by the total capital outlay or total investment in the project. In other words, it establishes the relationship between average annual profits torelationship between average annual profits to total investments. • Thus, PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 21. Q. A project requires an investment of Rs 5,00,000 and has a scrap value of Rs. 20,000 after 5 years. It is expected to yield profits after depreciation and taxes during the 5 years amounting to Rs. 40,000, Rs. 60,000, Rs. 70,000, Rs. 50,000 and Rs. 20,000. Calculate average rate of return on the20,000. Calculate average rate of return on the investment. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 22. 2. Return per unit of investment method • This method is small variation of the average rate of return method. In this method the total profit after tax and depreciation is divided by the total investment, i.e., PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 23. Q. A project requires an investment of Rs 5,00,000 and has a scrap value of Rs. 20,000 after 5 years. It is expected to yield profits after depreciation and taxes during the 5 years amounting to Rs. 40,000, Rs. 60,000, Rs. 70,000, Rs. 50,000 and Rs. 20,000. Calculate averageRs. 50,000 and Rs. 20,000. Calculate average rate of return on the investment. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 24. 3. Return on average investment method ¨ In this method the return on average investment is calculated. Using of average investment for the purpose of return on investment is preferred because the original investment is recovered over the life of theinvestment is recovered over the life of the asset on account of depreciation charges. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 25. Q. A project requires an investment of Rs 5,00,000 and has a scrap value of Rs. 20,000 after 5 years. It is expected to yield profits after depreciation and taxes during the 5 years amounting to Rs. 40,000, Rs. 60,000, Rs. 70,000, Rs. 50,000 and Rs. 20,000. Calculate average rate of return onRs. 20,000. Calculate average rate of return on the investment. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 26. 4. Average return on average investment method • This is the most appropriate method of rate of return on investment. Under this method, average profit after depreciation and taxes id divided by the average amount of investment; thus:thus: PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 27. Q. A project requires an investment of Rs 5,00,000 and has a scrap value of Rs. 20,000 after 5 years. It is expected to yield profits after depreciation and taxes during the 5 years amounting to Rs. 40,000, Rs. 60,000, Rs. 70,000, Rs. 50,000 and Rs. 20,000. Calculate average rate of return onRs. 20,000. Calculate average rate of return on the investment. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 28. Q. Calculate the average rate of return for projects A & B from the following: Project A Project B Investments Rs. 20,000 Rs. 30,000 Expected Life (No Salvage value) 4 years 5 years Projected Net Income (After interest, depreciation and taxes) Years Project A Project B 1 2,000 3,000 2 1,500 3,000 3 1,500 2,000 4 1,000 1,000 5 - 1,000 If the required rate of return is 12%, which project should be undertaken PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 29. Advantages of Rate of Return Method • It is very simple to understand and easy to operate • It uses the entire earnings of a project in calculating rate of return and not only thecalculating rate of return and not only the earnings upto pay-back period and hence gives a better view of profitability as compared pay-back period method. • As this method is based upon accounting concept of profits, it can be readily calculated from the financial data. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 30. Disadvantages of Rate of Return Method • It ignores time value of money as profits earns at different point of time are given equal weight by averaging the profits. • It doesn’t take into consideration the cash• It doesn’t take into consideration the cash flows which are important the accounting profits. • This method cannot be applied to a situation where investment in a project is to be made in parts. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 31. Time Adjusted Method or Modern Method • This method takes into consideration the profitability and time value of money (the fact that a rupee earned today has more value than a rupee earned after 5 years.)value than a rupee earned after 5 years.) PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 32. Net Present Value (NPV) • It is net present value of all the cash flows that occur during the entire life span of a project. • The outflows will have negative values while the inflows will have positive values. • Obviously, if the present value of inflows is greater than outflows, we get a positive NPV and • Obviously, if the present value of inflows is greater than outflows, we get a positive NPV and if the present value of outflows is greater than inflows, we get a negative NPV. • The positive NPV means a net gain in value maximization and, therefore, any project which gives a positive NPV is an acceptable project and if it gives a negative NPV, then the project should not be accepted. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 33. Steps for Calculating NPV • First of all determine the appropriate rate of interest that should be selected as the minimum required rate of return called cut off rate or discount rate. The rate should be the minimum rate of return below which the investor considers that it doesn’t pay him to invest. The discount rate should be the actual rate of interest in therate should be the actual rate of interest in the market on long-term loans or it should reflect the opportunity cost of capital of the investor. • Compute the present value of the total investment outlay, i.e. cash outflows at the determined discount rate. If the total investment is to be made in the initial year, the present value shall be the same as the cost of investment. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 34. • Compute the present values of total investment proceeds, i.e., cash inflows, (profit before depreciation and after tax) at the above determined discount rate. • Calculate the net present value of each project by substracting the present value of cash inflows from the present value of cash outflows for eachfrom the present value of cash outflows for each project. • If the NPV is positive or zero the proposal may be accepted and vice versa. • In case of mutually exclusive projects, projects should be ranked in order of net present values. The project with high NPV should be given highest rank and so on. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 35. The Present Value of Re 1 due in any number of years can be found with the use of the following mathematical formula: PV = 1/(1+r)n Where, PV = Present value r = rate of interest / discount rate n = number of yearsn = number of years The present value for all the cash inflows for a number of years is thus found as follows: However as n becomes large, the calculation of (1+r)n become difficult. PV can also be found by the use of PV tables. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 36. Internal Rate of Return • Under this method, the cash flow of a project are discounted at a suitable rate by hit and trial method, which equates the NPV so calculated to the amount of the investment. Under this method, since the discount rate isUnder this method, since the discount rate is determined internally, this method is called as the internal rate of return method. The IRR can be defined as that rate of discount at which the PV of cash inflows is equal to the PV of cash outflows. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 37. It can be calculated with the help of following formula: • C = initial outlay at time zero • A1, A2, A3… An = future net cash flows at• A1, A2, A3… An = future net cash flows at different periods • 2, 3……, = number of years • r = Rate of discount of IRR PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 38. The IRR can also be cal. with the help of PV tables. The following steps are required to practice the IRR method. • Determine the future net cash flows during the entire economic life of project. The cash inflows are estimated for future profits before depreciation but after tax • Determine the rate of discount at which the value of cash inflows is equal to the values of cash outflows. • Determine the rate of discount at which the value of cash inflows is equal to the values of cash outflows. • Accept the proposal if the IRR is higher than or equal to the minimum required rate of return i.e. the cost of capital or cut off rate and reject the proposal if the IRR is lower than the cost of cut off rate. • In case of alternative proposals select the proposal with the highest rate of return as the rates are higher than the cost of capital or cut-off rate. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 39. Determination of IRR • When the annual cash flows are equal over the life of the asset: firstly, find out present value factor by dividing initial outlay (cost of the investment) by annual cash flow, i.e. Present Value Factor = Initial Outlay / Annual cash flow PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 40. • In case annual cash flows are unequal over the life of the asset, the IRR cant be determined according to the technique suggested above. In such cases, the IRR is calculated by hit and trial an that is why this method is also known as hit and trial yield method. We may start any assumed that is why this method is also known as hit and trial yield method. We may start any assumed discount rate and find out the total PV of cash outflows which is equal to the cost of initial investment where total investment is to be made in the beginning. The rate at which the total PV of all cash inflows equals the initial outlay, is the IRR. Several discount rates may have to be tried until the appropriate rate is found. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 41. The calculation process may be summed up as follows: • Prepare the cash flow table using arbitrary assumed discount rate to discount the net cash flows to the PV. • Find out the NPV by deducting from the PV of total cash flows calculated in above the initial cost of investmentinvestment • If the NPV is positive, apply higher rate of discount • If the higher discount rate still gives a positive NPV, increase the discount rate further until the NPV becomes negative • If the NPV is negative at this higher rate, the internal rate of return must be between these 2 rates. PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 42. Profitability Index • NPV is an absolute value and therefore is not appropriate for comparing the relative profitability between different projects. In order to overcome this limitation of NPV, we make one modification in it to make it amake one modification in it to make it a relative measurement. This is called Profitability Index (P.I.) or Benefit Cost Ratio (B-C Ratio). The P.I. is as follows: PDF created with pdfFactory Pro trial version www.pdffactory.com
  • 43. PDF created with pdfFactory Pro trial version www.pdffactory.com