New Government House
Complex, Uyo, Akwa Ibom
Client:
Akwa Ibom State 	
Government
Construction Period:
Phase I:
04/2008-09/2009
Services:
Construction of a 	
governor’s residence with 	
adjoining buildings and 	
infrastructure facilities
In 2008 Julius Berger Nigeria PLC was
awarded to build the first phase of the New
Governor`s Lodge Complex in Uyo.
The governor’s residence is the main
building of this complex having a spatial
dimension on two floors of approximately
40m x 40m. This main building, with 4,500m²
GFA, contains the ground floor with public
rooms and the first floor with private rooms
of His Excellency. The entrance hall, with a
fountain and its skylight dome above, flanks
to the Banquet Hall in the ground floor.
Two bureaux in the first floor - one for the
Governor and the other one for the First
Lady are attainable with the panorama lift.
The contract also included the erection of
several auxiliary buildings like a gate house
with electrical gates, a clinic, a pool building
including a fitness room, a squash court and
a Finnish hot steam bath, as well as a pool
and a children’s pool.
The constructed power house supplies
beside the total buildings, the potable water-
and pool water treatment. A chiller plant in
addition to the main building adjusts the
desirable room temperature.
As infrastructural works were realized:
green areas including tree/shrub planting,
pavement and the boundary wall.
Security is assured via the surveillance
tower and the certain camera systems.
Furthermore a chapel, two buildings for the
governor´s assistants and another adjoining
building were part of the contract.
The construction works started in April 2008
and were completed within 18 months in
September 2009.
JBNProjectBookNo.2007-038-00

Mais conteúdo relacionado

Destaque

1 the lesson plan
1 the lesson plan1 the lesson plan
1 the lesson planWanduk
 
Sebas el buen uso de el internet
Sebas el buen uso de el internetSebas el buen uso de el internet
Sebas el buen uso de el internetsantiago perdomo
 
Ppt filsafat sejarah yeni 2
Ppt filsafat sejarah yeni 2Ppt filsafat sejarah yeni 2
Ppt filsafat sejarah yeni 2novyeni02
 
Win XP, 7 and 8. Have them all!
Win XP, 7 and 8. Have them all!Win XP, 7 and 8. Have them all!
Win XP, 7 and 8. Have them all!dshinkfield
 
Clase 01 Direccion Estrategica En El Sector Publico
Clase 01 Direccion Estrategica En El Sector PublicoClase 01 Direccion Estrategica En El Sector Publico
Clase 01 Direccion Estrategica En El Sector PublicoMaximo Cervantes
 

Destaque (10)

Seminario 7
Seminario 7Seminario 7
Seminario 7
 
Final Paper
Final PaperFinal Paper
Final Paper
 
Neyi del c.z.f. proyecto
Neyi del c.z.f. proyectoNeyi del c.z.f. proyecto
Neyi del c.z.f. proyecto
 
1 the lesson plan
1 the lesson plan1 the lesson plan
1 the lesson plan
 
Sebas el buen uso de el internet
Sebas el buen uso de el internetSebas el buen uso de el internet
Sebas el buen uso de el internet
 
Ppt filsafat sejarah yeni 2
Ppt filsafat sejarah yeni 2Ppt filsafat sejarah yeni 2
Ppt filsafat sejarah yeni 2
 
Win XP, 7 and 8. Have them all!
Win XP, 7 and 8. Have them all!Win XP, 7 and 8. Have them all!
Win XP, 7 and 8. Have them all!
 
Turismo de negocios
Turismo de negociosTurismo de negocios
Turismo de negocios
 
Clase 01 Direccion Estrategica En El Sector Publico
Clase 01 Direccion Estrategica En El Sector PublicoClase 01 Direccion Estrategica En El Sector Publico
Clase 01 Direccion Estrategica En El Sector Publico
 
profesor_El s. XXI
profesor_El s. XXIprofesor_El s. XXI
profesor_El s. XXI
 

Mais de Sven Maedler

PIS Infrastructure Abuja
PIS Infrastructure AbujaPIS Infrastructure Abuja
PIS Infrastructure AbujaSven Maedler
 
PIS Obajana - Cement Factory
PIS Obajana - Cement FactoryPIS Obajana - Cement Factory
PIS Obajana - Cement FactorySven Maedler
 
PIS Uyo - Government House Phase III
PIS Uyo - Government House Phase IIIPIS Uyo - Government House Phase III
PIS Uyo - Government House Phase IIISven Maedler
 
PIS Uyo - Government House Phase II
PIS Uyo - Government House Phase IIPIS Uyo - Government House Phase II
PIS Uyo - Government House Phase IISven Maedler
 
PIS Uyo - Stadium Complex
PIS Uyo - Stadium ComplexPIS Uyo - Stadium Complex
PIS Uyo - Stadium ComplexSven Maedler
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase ISven Maedler
 
PIS Uyo - Abak Road
PIS Uyo - Abak RoadPIS Uyo - Abak Road
PIS Uyo - Abak RoadSven Maedler
 
PIS Uyo - Abak River Bridge
PIS Uyo - Abak River BridgePIS Uyo - Abak River Bridge
PIS Uyo - Abak River BridgeSven Maedler
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases ISven Maedler
 

Mais de Sven Maedler (10)

PIS Infrastructure Abuja
PIS Infrastructure AbujaPIS Infrastructure Abuja
PIS Infrastructure Abuja
 
PIS AAR
PIS AARPIS AAR
PIS AAR
 
PIS Obajana - Cement Factory
PIS Obajana - Cement FactoryPIS Obajana - Cement Factory
PIS Obajana - Cement Factory
 
PIS Uyo - Government House Phase III
PIS Uyo - Government House Phase IIIPIS Uyo - Government House Phase III
PIS Uyo - Government House Phase III
 
PIS Uyo - Government House Phase II
PIS Uyo - Government House Phase IIPIS Uyo - Government House Phase II
PIS Uyo - Government House Phase II
 
PIS Uyo - Stadium Complex
PIS Uyo - Stadium ComplexPIS Uyo - Stadium Complex
PIS Uyo - Stadium Complex
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase I
 
PIS Uyo - Abak Road
PIS Uyo - Abak RoadPIS Uyo - Abak Road
PIS Uyo - Abak Road
 
PIS Uyo - Abak River Bridge
PIS Uyo - Abak River BridgePIS Uyo - Abak River Bridge
PIS Uyo - Abak River Bridge
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
 

PIS Uyo - Government House Phase I

  • 1. New Government House Complex, Uyo, Akwa Ibom Client: Akwa Ibom State Government Construction Period: Phase I: 04/2008-09/2009 Services: Construction of a governor’s residence with adjoining buildings and infrastructure facilities In 2008 Julius Berger Nigeria PLC was awarded to build the first phase of the New Governor`s Lodge Complex in Uyo. The governor’s residence is the main building of this complex having a spatial dimension on two floors of approximately 40m x 40m. This main building, with 4,500m² GFA, contains the ground floor with public rooms and the first floor with private rooms of His Excellency. The entrance hall, with a fountain and its skylight dome above, flanks to the Banquet Hall in the ground floor. Two bureaux in the first floor - one for the Governor and the other one for the First Lady are attainable with the panorama lift. The contract also included the erection of several auxiliary buildings like a gate house with electrical gates, a clinic, a pool building including a fitness room, a squash court and a Finnish hot steam bath, as well as a pool and a children’s pool. The constructed power house supplies beside the total buildings, the potable water- and pool water treatment. A chiller plant in addition to the main building adjusts the desirable room temperature. As infrastructural works were realized: green areas including tree/shrub planting, pavement and the boundary wall. Security is assured via the surveillance tower and the certain camera systems. Furthermore a chapel, two buildings for the governor´s assistants and another adjoining building were part of the contract. The construction works started in April 2008 and were completed within 18 months in September 2009. JBNProjectBookNo.2007-038-00