BUILDINGS
AIRBUS OFFICE, FILTON
New office building at the Airbus Filton site
LOCATION
Bristol
CLIENT
Miller
ARCHITECT
AWW
VALUE
£20m
COMPLETION DATE
2013
ENGINEERING SERVICES
Civil, Structural, Acoustic
Project Description
Ramboll was appointed by
Miller Construction to carry
out the design of new offices
for Airbus at Filton.
The multi-discipline project
incorporated structural, civil,
and acoustic design.
The client was keen to
maintain multiple open plan
office floors opening onto a
central 4 story high atrium
with a large cafeteria at the
ground floor.
The acoustic design needed to
maintain good levels of
privacy between working
zones and minimize floor to
floor noise transfer.
It was also a requirement of
the brief to achieve all
available BREEAM credits under
Hea13 and Pol8, which relate
to acoustic design conditions
and environmental noise
emissions.
Careful design and detailing
was required for partitions
between meeting rooms and
cellular offices to ensure good
standards of acoustic privacy
were achieved.
Ramboll undertook pre-
completion acoustic testing to
demonstrate compliance with
the BREEAM credits.
PP_STL_V1_102011

Mais conteúdo relacionado

Semelhante a Airbus Offices - Filton

Integral Build Portfolio v1.0
Integral Build Portfolio v1.0Integral Build Portfolio v1.0
Integral Build Portfolio v1.0
Tim Stringer
 
Jonathan Rose CV
Jonathan Rose CV Jonathan Rose CV
Jonathan Rose CV
Jonny Rose
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
Tim Read
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
Tim Read
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
Chhay Teng
 
Caseyfierro brochure web
Caseyfierro brochure webCaseyfierro brochure web
Caseyfierro brochure web
caseyfierro
 
Selected Industrial Projects
Selected Industrial ProjectsSelected Industrial Projects
Selected Industrial Projects
Perry Becker
 
Buro Happold - Hotel Capability Statement 2010
Buro Happold - Hotel Capability Statement 2010Buro Happold - Hotel Capability Statement 2010
Buro Happold - Hotel Capability Statement 2010
Redbarron47
 

Semelhante a Airbus Offices - Filton (18)

Integral Build Portfolio v1.0
Integral Build Portfolio v1.0Integral Build Portfolio v1.0
Integral Build Portfolio v1.0
 
62 Buckingham Gate
62 Buckingham Gate62 Buckingham Gate
62 Buckingham Gate
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
Jonathan Rose CV
Jonathan Rose CV Jonathan Rose CV
Jonathan Rose CV
 
Hörmann Manufacturing Facility
Hörmann Manufacturing FacilityHörmann Manufacturing Facility
Hörmann Manufacturing Facility
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Zoofenster
ZoofensterZoofenster
Zoofenster
 
Creating smart solutions within restricted boundaries
Creating smart solutions within restricted boundariesCreating smart solutions within restricted boundaries
Creating smart solutions within restricted boundaries
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
Caseyfierro brochure web
Caseyfierro brochure webCaseyfierro brochure web
Caseyfierro brochure web
 
Selected Industrial Projects
Selected Industrial ProjectsSelected Industrial Projects
Selected Industrial Projects
 
Singular Projects Gibraltar
Singular Projects GibraltarSingular Projects Gibraltar
Singular Projects Gibraltar
 
Hanger 3 A Case Study
Hanger 3 A Case StudyHanger 3 A Case Study
Hanger 3 A Case Study
 
Adf may-2015-building-envelope-supp-superlo
Adf may-2015-building-envelope-supp-superloAdf may-2015-building-envelope-supp-superlo
Adf may-2015-building-envelope-supp-superlo
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9
 
cofieldresume
cofieldresumecofieldresume
cofieldresume
 
Buro Happold - Hotel Capability Statement 2010
Buro Happold - Hotel Capability Statement 2010Buro Happold - Hotel Capability Statement 2010
Buro Happold - Hotel Capability Statement 2010
 

Airbus Offices - Filton

  • 1. BUILDINGS AIRBUS OFFICE, FILTON New office building at the Airbus Filton site LOCATION Bristol CLIENT Miller ARCHITECT AWW VALUE £20m COMPLETION DATE 2013 ENGINEERING SERVICES Civil, Structural, Acoustic Project Description Ramboll was appointed by Miller Construction to carry out the design of new offices for Airbus at Filton. The multi-discipline project incorporated structural, civil, and acoustic design. The client was keen to maintain multiple open plan office floors opening onto a central 4 story high atrium with a large cafeteria at the ground floor. The acoustic design needed to maintain good levels of privacy between working zones and minimize floor to floor noise transfer. It was also a requirement of the brief to achieve all available BREEAM credits under Hea13 and Pol8, which relate to acoustic design conditions and environmental noise emissions. Careful design and detailing was required for partitions between meeting rooms and cellular offices to ensure good standards of acoustic privacy were achieved. Ramboll undertook pre- completion acoustic testing to demonstrate compliance with the BREEAM credits. PP_STL_V1_102011