Critical Path Method
Critical Path Method
▪ Scheduling and Project Management tool developed in the 1950’s

▪ Allow us to plan all tasks which must be completed in a project
▪ Aids time scheduling and resource planning

▪ They allow progress towards project goals to be tracked
Using the Critical Path Method
▪ Some activities cannot be started until previous activities have been completed

▪ Activities in a critical path method need to be completed in sequence
▪ These activities are known as sequential activities
▪ In addition to these, other tasks can be completed at any time
▪ These activities are known as non-dependent or parallel tasks
Drawing a CPM Chart: Step 1

• This can be done using a Work Breakdown Structure
• For each task state:
• The earliest start date
•The estimated time it will take
Drawing a CPM Chart: Step 2

Establish sequence by looking at:
• Which tasks should take place before this task happens.
• Which tasks should be completed at the same time as this task.

• Which tasks should happen immediately after this task.
Drawing a CPM Chart: Step 3

▪ Each circle/node should show a task within the project;
▪ Each circle/node should give start and finish times;
▪ Each circle/node should be numbered;
▪ The arrows/arcs should the sequence of the tasks;
▪ A description and duration of the task should be written under the arrows;

▪ Arrows should always run left to right
Examples of Critical Path Method
Drawing a CPM Chart: Step 4
▪ Determining the four parameters of each task in the network
1.
2.
3.
4.

Earliest start time (ES) - The earliest time an activity can start once the previous dependent
activities are over.
Earliest finish time (EF) - ES + activity duration.
Latest finish time (LF) - The latest time an activity can finish without delaying the project.
Latest start time (LS) - LF - activity duration.

▪ The float time for an activity is the time between the earliest (ES) and the latest (LS)
start time or between the earliest (EF) and latest (LF) finish times.
▪ During the float time, an activity can be delayed without delaying the project finish
date.
▪ The activities in the critical path have an effect on the deadline of the project.
▪ If an activity of this path is delayed, the project will be delayed.
Benefits of the Critical Path Method
▪ Visual representation
▪ The project plan can be tested to ensure it is well thought out

▪ It identifies key tasks which could cause delays to the project if not completed
on time
▪ It identifies tasks which could be delayed in order to complete other tasks which
are more time crucial

▪ It identifies the minimum amount of time a project will take to complete
▪ It identifies any project steps which can be completed faster in order to
complete the project on time
Disadvantages of Critical Path Method

▪ Can be more difficult to understand than Gantt Charts
▪ The time needed for tasks is not as clear as with Gantt Charts
More Information on Critical Path Method
This is a useful video which sums the information given in the slides and
will aid understanding of the critical path method

http://www.youtube.com/watch?v=SF53ZZsP4ik
Further Reading
▪ Kelley, J. E. (1963). The critical-path method: Resources planning and
scheduling. Industrial scheduling, 347-365.
▪ Leach, L. P. (1999). Critical chain project management improves
project performance. Project Management Journal, 30, 39-51.
▪ Maylor, Project Management. Chapter 7
References
▪ Maylor, H., 2010. Project Management. 4th Ed. Chester: Pearson.

▪ MindTools, 2013. Critical Path Analysis and PERT Charts. [Online] Available at:
http://www.mindtools.com/critpath.html [Accessed on 07/11/13]
▪ Margaret Rouse, 2011. Critical Path Method (CPM). [Online] Available at:
http://whatis.techtarget.com/definition/critical-path-method-CPM [Accessed
on 07/11/13]
▪ Tutorialspoint, 2013. Critical Path Method. [Online] Available at:
http://www.tutorialspoint.com/management_concepts/critical_path_method.h
tm [Accessed on 07/11/13]

Mais conteúdo relacionado

Mais procurados

Precedence Diagramming Method PDM
Precedence Diagramming Method PDMPrecedence Diagramming Method PDM
Precedence Diagramming Method PDM
Shaiful Amri Mansur
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
Nicola2903
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
Serdar Temiz
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
Nicola2903
 
Network Diagrams
Network DiagramsNetwork Diagrams
Network Diagrams
Nicola2903
 

Mais procurados (20)

Critical path method(cpm)
Critical path method(cpm)Critical path method(cpm)
Critical path method(cpm)
 
Pert
PertPert
Pert
 
Precedence Diagramming Method PDM
Precedence Diagramming Method PDMPrecedence Diagramming Method PDM
Precedence Diagramming Method PDM
 
CPM/PERT and Gantt charts
CPM/PERT and Gantt chartsCPM/PERT and Gantt charts
CPM/PERT and Gantt charts
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Lecture5---Gantt Chart
Lecture5---Gantt ChartLecture5---Gantt Chart
Lecture5---Gantt Chart
 
Lect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPMLect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPM
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project managemen PERT VS CPM
Project managemen  PERT VS CPMProject managemen  PERT VS CPM
Project managemen PERT VS CPM
 
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
 
Network Diagrams
Network DiagramsNetwork Diagrams
Network Diagrams
 
crashing of project
crashing of project crashing of project
crashing of project
 

Destaque

Advantages of swot analysis
Advantages of swot analysisAdvantages of swot analysis
Advantages of swot analysis
Dhivya S Dhvi
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
Areef Khan
 
Establishing performance standards
Establishing performance standardsEstablishing performance standards
Establishing performance standards
Rajendra Nabar
 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)
Debanjan15
 
Management and it's functions
Management and it's functionsManagement and it's functions
Management and it's functions
George Cherian
 
Program evaluation review technique (pert)
Program evaluation review technique (pert)Program evaluation review technique (pert)
Program evaluation review technique (pert)
tomeh
 

Destaque (20)

Internal Auditing - Performance Standards
Internal Auditing - Performance StandardsInternal Auditing - Performance Standards
Internal Auditing - Performance Standards
 
Advantages of swot analysis
Advantages of swot analysisAdvantages of swot analysis
Advantages of swot analysis
 
Critical Path Method presentation.
Critical Path Method presentation.Critical Path Method presentation.
Critical Path Method presentation.
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Establishing performance standards
Establishing performance standardsEstablishing performance standards
Establishing performance standards
 
P E R T
P E R TP E R T
P E R T
 
Swot analysis , its importance and limitations
Swot analysis , its importance and limitationsSwot analysis , its importance and limitations
Swot analysis , its importance and limitations
 
Eindtermen en leerplannen wo natuur - Walter Dons
Eindtermen en leerplannen wo natuur - Walter DonsEindtermen en leerplannen wo natuur - Walter Dons
Eindtermen en leerplannen wo natuur - Walter Dons
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applications
 
Critical Path Method(CPM)
Critical Path Method(CPM)Critical Path Method(CPM)
Critical Path Method(CPM)
 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)
 
Management and it's functions
Management and it's functionsManagement and it's functions
Management and it's functions
 
Posdcorb
PosdcorbPosdcorb
Posdcorb
 
Posdcorb
PosdcorbPosdcorb
Posdcorb
 
Program evaluation review technique (pert)
Program evaluation review technique (pert)Program evaluation review technique (pert)
Program evaluation review technique (pert)
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review Technique
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 

Semelhante a Critical path method

The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
Nicola2903
 
Critical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docxCritical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docx
annettsparrow
 

Semelhante a Critical path method (20)

The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
 
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementCPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource management
 
pm--basic.pptx
pm--basic.pptxpm--basic.pptx
pm--basic.pptx
 
Unit v mha project evaluation review technique (pert)
Unit  v  mha project evaluation review technique (pert)Unit  v  mha project evaluation review technique (pert)
Unit v mha project evaluation review technique (pert)
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdf
 
PM-Problems.pptx
PM-Problems.pptxPM-Problems.pptx
PM-Problems.pptx
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling Diagrams
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Pmp study: time
Pmp study: timePmp study: time
Pmp study: time
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Unit IV-Project Management
Unit IV-Project ManagementUnit IV-Project Management
Unit IV-Project Management
 
PM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxPM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptx
 
PM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxPM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptx
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management Upload
 
C03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfC03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdf
 
Lecture -19 & 20.ppt.pdf
Lecture -19 & 20.ppt.pdfLecture -19 & 20.ppt.pdf
Lecture -19 & 20.ppt.pdf
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Critical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docxCritical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docx
 

Mais de Nicola2903

Network diagrams
Network diagramsNetwork diagrams
Network diagrams
Nicola2903
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
Nicola2903
 
Resource Scheduling
Resource Scheduling  Resource Scheduling
Resource Scheduling
Nicola2903
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
Nicola2903
 
Estimating in Project Scheduling
Estimating in Project SchedulingEstimating in Project Scheduling
Estimating in Project Scheduling
Nicola2903
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
Nicola2903
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
Nicola2903
 

Mais de Nicola2903 (9)

Network diagrams
Network diagramsNetwork diagrams
Network diagrams
 
Estimating
EstimatingEstimating
Estimating
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 
Resource Scheduling
Resource Scheduling  Resource Scheduling
Resource Scheduling
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Estimating
EstimatingEstimating
Estimating
 
Estimating in Project Scheduling
Estimating in Project SchedulingEstimating in Project Scheduling
Estimating in Project Scheduling
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
 

Último

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Último (20)

FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 

Critical path method

  • 2. Critical Path Method ▪ Scheduling and Project Management tool developed in the 1950’s ▪ Allow us to plan all tasks which must be completed in a project ▪ Aids time scheduling and resource planning ▪ They allow progress towards project goals to be tracked
  • 3. Using the Critical Path Method ▪ Some activities cannot be started until previous activities have been completed ▪ Activities in a critical path method need to be completed in sequence ▪ These activities are known as sequential activities ▪ In addition to these, other tasks can be completed at any time ▪ These activities are known as non-dependent or parallel tasks
  • 4. Drawing a CPM Chart: Step 1 • This can be done using a Work Breakdown Structure • For each task state: • The earliest start date •The estimated time it will take
  • 5. Drawing a CPM Chart: Step 2 Establish sequence by looking at: • Which tasks should take place before this task happens. • Which tasks should be completed at the same time as this task. • Which tasks should happen immediately after this task.
  • 6. Drawing a CPM Chart: Step 3 ▪ Each circle/node should show a task within the project; ▪ Each circle/node should give start and finish times; ▪ Each circle/node should be numbered; ▪ The arrows/arcs should the sequence of the tasks; ▪ A description and duration of the task should be written under the arrows; ▪ Arrows should always run left to right
  • 7. Examples of Critical Path Method
  • 8. Drawing a CPM Chart: Step 4 ▪ Determining the four parameters of each task in the network 1. 2. 3. 4. Earliest start time (ES) - The earliest time an activity can start once the previous dependent activities are over. Earliest finish time (EF) - ES + activity duration. Latest finish time (LF) - The latest time an activity can finish without delaying the project. Latest start time (LS) - LF - activity duration. ▪ The float time for an activity is the time between the earliest (ES) and the latest (LS) start time or between the earliest (EF) and latest (LF) finish times. ▪ During the float time, an activity can be delayed without delaying the project finish date. ▪ The activities in the critical path have an effect on the deadline of the project. ▪ If an activity of this path is delayed, the project will be delayed.
  • 9. Benefits of the Critical Path Method ▪ Visual representation ▪ The project plan can be tested to ensure it is well thought out ▪ It identifies key tasks which could cause delays to the project if not completed on time ▪ It identifies tasks which could be delayed in order to complete other tasks which are more time crucial ▪ It identifies the minimum amount of time a project will take to complete ▪ It identifies any project steps which can be completed faster in order to complete the project on time
  • 10. Disadvantages of Critical Path Method ▪ Can be more difficult to understand than Gantt Charts ▪ The time needed for tasks is not as clear as with Gantt Charts
  • 11. More Information on Critical Path Method This is a useful video which sums the information given in the slides and will aid understanding of the critical path method http://www.youtube.com/watch?v=SF53ZZsP4ik
  • 12. Further Reading ▪ Kelley, J. E. (1963). The critical-path method: Resources planning and scheduling. Industrial scheduling, 347-365. ▪ Leach, L. P. (1999). Critical chain project management improves project performance. Project Management Journal, 30, 39-51. ▪ Maylor, Project Management. Chapter 7
  • 13. References ▪ Maylor, H., 2010. Project Management. 4th Ed. Chester: Pearson. ▪ MindTools, 2013. Critical Path Analysis and PERT Charts. [Online] Available at: http://www.mindtools.com/critpath.html [Accessed on 07/11/13] ▪ Margaret Rouse, 2011. Critical Path Method (CPM). [Online] Available at: http://whatis.techtarget.com/definition/critical-path-method-CPM [Accessed on 07/11/13] ▪ Tutorialspoint, 2013. Critical Path Method. [Online] Available at: http://www.tutorialspoint.com/management_concepts/critical_path_method.h tm [Accessed on 07/11/13]