More Related Content
Similar to 6.18.2013 System Development - Change/Configuration and Collaboration - RTC (20)
More from IBM Rational (15)
6.18.2013 System Development - Change/Configuration and Collaboration - RTC
- 2. © 2012 IBM Corporation
2
IBM Systems and Software Symposium – February 2013
Agenda
Quick overview of Rational Team Concert
Strategic direction with regard to Systems development
Highlights from recent releases, focus on Systems
Enhancing your current CCM environment with Team Concert
2013 priorities
- 3. © 2012 IBM Corporation
3
IBM Systems and Software Symposium – February 2013
Be lean at scale. Work together. Deliver quality results.
Process your way – Scrum, waterfall or
hybrid; adapt planning to meet your team
needs and rhythm.
Friction free communication by smart
linking of tasks, code changes, builds and
releases as you work
Transparency through live dashboards -
write code not status reports – live web based
dashboards tell everyone the story
Empower developers - Juggle tasks, patch
in seconds, easily add or remove features as
required to meet business needs
Runs anywhere – open platform Works
with your existing tools and data for
incremental adoption
Agile
Formal
- 4. © 2012 IBM Corporation
4
IBM Systems and Software Symposium – February 2013
Team advisor for defining / refining “rules”
and enabling continuous improvement
Process enactment and enforcement
In-context collaboration enables team members
to communicate in context of their work
Single structure for project related artifacts
World-class team on-boarding / offboarding
including team membership, sub-teams and
project inheritance
Role-based operational control for flexible
definition of process and capabilities
Jazz Team Server
Component based SCM
enables reuse across projects
Change set based for easy
addition or removal of features
Server-based sandboxes
SCM Work Items
Defects, enhancements
and conversations
View and share query results
Support for approvals and
discussions
Query editor interface
Automated Work item and
change set traceability
Build definitions for team
and personal builds
Local or remote build servers
Multi-level continuous
integration
Build
Planning
Integrated release/iteration planning
Effort estimation & progress tracking taskboards
Out of the box process templates: formal or agile
Project Transparency
Customizable web based dashboards
Real time metrics and reports
Project milestone tracking and status
Rational Team Concert functionality
- 5. © 2012 IBM Corporation
5
IBM Systems and Software Symposium – February 2013
Dynamic planning with multiple views
5
• Provide both traditional and agile views on the same plan
Taskboard
Gantt/Roadmaps
Support any planning method
Enable success w/ transparency
- 6. © 2012 IBM Corporation
6
IBM Systems and Software Symposium – February 2013
Add process improvement – Scrum, waterfall, …
Making process executable and repeatable
Process
Architect
Variant #1
Step 1:
Customize
Step 2:
Enact
Variant #2
Variant #3
Project
Manager
Scrum
Waterfall
Iterative
Project C
Waterfall
Analyst Release
EngineerDeveloper Quality
Professional
Project B
Analyst Release
EngineerDeveloper Quality
Professional
Project A
Product Owner Scrum Master Team Member
Agile
Iterative
FormalprojectmgttemplateScrumagiletemplate
- 7. © 2012 IBM Corporation
7
IBM Systems and Software Symposium – February 2013
Provide transparency and automated status for everyone
Every stakeholder knows project status without having to ask
- 8. © 2012 IBM Corporation
8
IBM Systems and Software Symposium – February 2013
Improve team collaboration across silos
8
• Silo’d teams; disconnected data
• Important discussions are lost to email
-project records are missing the “real
reason” for decisions
• Unified team shares linked data
• ALM environment tracks what is
important for delivering
• “Am I blocking others”
• “Are others waiting for my approval”
www
Every artifact is a web link. Traceability is automated as you perform work.
Empower teams and provide flexibility to utilize resources from anywhere.
- 9. © 2012 IBM Corporation
9
IBM Systems and Software Symposium – February 2013
Strategic Direction
- 10. © 2012 IBM Corporation
10
IBM Systems and Software Symposium – February 2013
Rational Addresses Two Key Market Segments - Systems and IT
Complex and Embedded Systems
Software and systems engineering and lifecycle mgt for products and complex systems
• WW shipment leader in 3 categories; Embedded requirements #1, modeling #1, and testing #3
• Grew ecosystem of partners, eg new ISV solutions +34% yty
• Strategic alliances for adjacent market reach & industry solutions: National Instruments for HW/SW
test integration; Siemens PLM for integrated product development
Accelerating
Product
and Service
Innovation
Application Lifecycle
Management (ALM)
Software application lifecycle mgt, multiplatform development and modernization for IT
applications
• #1 market share in Application Development and Lifecycle Management Software (11
consecutive years, Gartner)
• User’s Choice Award in software development platforms for the last 5 years (Evans Data)
• 7 category leader/visionary recognitions by analysts
• Expanded open, standards-based lifecycle platform via OSLC specs and workgroups
• Grew community and user base to of Jazz.net members +45% yty
& Enterprise
Modernization (EM)
- 11. © 2012 IBM Corporation
11
IBM Systems and Software Symposium – February 2013
Trends: Development Complexity and Delivery Cycles are Increasing
Heterogeneous Environments
Public Cloud
Private Cloud
Data Warehouse Mainframe
Enterprise
Service Bus
Directory
Identity
File
systems
Collaboration
Web/
Internet
Routing
Service
Third-party
Services Portals
Content
Providers
EJB
Shared
ServicesArchives
Business
Partners
Messaging
Services
Product and application
complexity and size
are increasing
Development delivery is
more rapid, with impacts to
how we test and release.
Increasing
Development Complexity
Increasing
Delivery Cycles
- 12. © 2012 IBM Corporation
12
IBM Systems and Software Symposium – February 2013
Rational Team Concert for Systems
Focus on meeting the needs of Systems clients
High rigor
– Rigorous specifications and intensive testing
– Safety critical or expensive to fix failures
– Security and compliance
High variance
– Complex component-based development
– Extensive reuse
– Variant management
– Product lines
Software and systems engineering and lifecycle management for products and complex systems
- 13. © 2012 IBM Corporation
13
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
- 14. © 2012 IBM Corporation
14
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Improved planning
Cross-project planning
– New plan type: Cross Project Plan
– New type of link: Work item can track other work items
– Roll up the schedule across projects
Kanban task board visualization support
– Visualize the flow of work through the process
– Easily see bottlenecks and inefficiencies
- 15. © 2012 IBM Corporation
15
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Compliance and Security
Finer grained security control
– Define roles with specific capabilities
SCM read permissions and IP security
– Ability to set SCM read permissions at the file/folder level
– Delete file contents from source control
CLI support for compliance audit
– Extract BOM and content
- 16. © 2012 IBM Corporation
16
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Variant management
Managing deliveries to many streams
Find which release streams contain a set of changes
Select change sets you want to
search for
Select streams you want to search
- 17. © 2012 IBM Corporation
17
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Usability and flexibility – users can work where they are comfortable
New! Windows 7 Explorer integration
– Simple file menus for versioning and locking
– Icons show version status
– Good for users who don’t need Eclipse or Visual Studio
New! Microsoft Source Code Control Interface (MSCCI) interface
– Integrate with Rhapsody, Matlab Simulink
Integrated with Rational Engineering Lifecycle Manager (RELM)
– Visualize, navigate, and query on work items and their relationships
Improved CLI for scripting and automation
- 18. © 2012 IBM Corporation
18
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Enterprise scalability
High availability with clustering (WAS-ND)
N-1 Client compatibility
– Supports incremental adoption of new releases
– Upgrade the server first
– Teams can upgrade their clients at their pace
Ability to rename a server URL and update the links
- 19. © 2012 IBM Corporation
19
IBM Systems and Software Symposium – February 2013
Highlights: Rational Team Concert 4.0.1 - November 2012
- 20. © 2012 IBM Corporation
20
IBM Systems and Software Symposium – February 2013
IBM Rational Team Concert v4.0.1 Highlights - November 2012
Improved performance and usability - Up to
25% faster plan rendering; And new auto-scrolling
support
Process sharing and customization - Inherit
process across projects and add local project
customizations
Better support for code reviews – View
cumulative file changes in a feature – Change
Summary view
Extended platform support – Mac OS X clients,
Visual Studio 2012 IDE, and Chrome browser
Rational LifeCycle Adaptors – Integrate w/
HPQC, Git, Jira, Visual Studio Team System and
more!
- 21. © 2012 IBM Corporation
21
IBM Systems and Software Symposium – February 2013
Rational Team Concert 4.0.1
Usability and Getting Started
Display plans up to 25% faster Working with large
plans now render faster
Up to 25% faster than 4.0 release
Auto-scrolling for plans makes it easier to move work
items across plans
New zip install for RTC standalone installs Gets
you up and running with RTC faster, with smaller
footprint
Need to install just RTC?
Just download the zip install
201320122011
- 22. © 2012 IBM Corporation
22
IBM Systems and Software Symposium – February 2013
Rational Team Concert 4.0.1
Process Sharing and Customization
Allows project areas to extend a shared process
without cutting off inheritance from the parent.
Project areas can now define configuration deltas
to a shared work item configuration.
Initial customizations supported
Adding a new attribute to a work item type and
adding that attribute to the work item editor for
that type
Adding a new literal to an existing
enumeration
Adding a new enumeration type
201320122011
“We are maintaining a common process
template for all projects, however many
project owners have requested minor
process changes to their projects.”
- 23. © 2012 IBM Corporation
23
IBM Systems and Software Symposium – February 2013
Rational Team Concert 4.0.1
Code Reviews and Audits
New Change Summary view
Makes code reviews easier
Details pane
Shows cumulative file changes in a feature
Dependency graph can help identify errors
201320122011
- 24. © 2012 IBM Corporation
24
IBM Systems and Software Symposium – February 2013
Rational Team Concert 4.0.1
Automate more – New SCM CLI commands
View and update workspace properties such as name, owned
by, visibility and description
View and update workspace flow targets
Component properties such as name, owned by and visibility
can be viewed and updated
View and update baseline and snapshot properties
Diff the state of artifacts in a snapshot with their state in a
workspace, stream, or another snapshot
Diff the state of artifacts in a baseline with their state in a
component, contained in a workspace, stream, or snapshot; or
another baseline
Display property differences
Scope diff by component
201320122011
- 25. © 2012 IBM Corporation
25
IBM Systems and Software Symposium – February 2013
Introducing the Rational Lifecycle Integration Adapters
Both Editions have IBM Rational branding and work with RTC/CLM 4.0 and 4.0.1
Both Editions are sold through standard IBM sales channels
Both Editions are supported by standard IBM customer support channels
Available 11/27/12Available 11/27/12Available 10/12/12Available 10/12/12
Standard EditionStandard Edition Tasktop EditionTasktop Edition
- 26. © 2012 IBM Corporation
26
IBM Systems and Software Symposium – February 2013
Open Lifecycle Integration and Services
Management Platform
IBM Rational Team Concert v4.0.3
Deliver faster with improved performance
– Load plans in the web UI up to 50% faster
Focus on developer productivity
– Rank plans simpler and faster with explicit ranking options
– New customizable developer view across all projects for
Visual Studio developers. Track my to do list and
approvals
Report and act on more data
– Out of the box reports to track time spent
– Ability to report on approval descriptions and complex
attributes such as team structure, components and
iterations
Get started quicker than ever
– New Jenkins plug-in with traceability to Rational Team
Concert work items and SCM to allow faster adoption
without having to change your existing build tooling.
– Easier importing of ClearCase data with support for multi-
branch, multi-baseline version history.
Build better software and products with an all-in-one development environment
Rational Team Concert
“Plans load much faster, ranking is simpler and now I can
expand our adoption of Rational Team Concert to teams
using Jenkins”
Development Team Lead
DRAFT: IBM Confidential Until June 2, 201326
Agile
Formal
- 27. © 2012 IBM Corporation
Software and Systems Engineering | Rational
Rational Team Concert 4.0.3 Performance
Performance: User Productivity
SCM command line:
10% boost in CLI execution
Plan loading performance: Phase II
In RTC 4.0.1 we improved performance by 25%
In RTC 4.0.3 plan loading uses a new “pay as you go” model and other optimizations that
improve performance by up to 40 to 50 percent. For example, the Rational Team Concert
product backlog now loads in 10 seconds, compared to 20 seconds in 4.0.3 M3, over a
network latency shown in the image above using browser Mozilla Firefox 17.0.5.
Pay as you go: When we load a plan, not all plan view data is loaded until you ask for it.
Parallelize requests: Parallel requests when loading data rather than sequential requests
201320122011
- 28. © 2012 IBM Corporation
Software and Systems Engineering | Rational
Rational Team Concert 4.0.3: Usability
Usability: Simple and fast agile ranking
Simplify ranking (218174)
Today:
We support automated stack based ranking in
backlogs, which can sometimes lead to ranking
gaps during drag operations.
Now we allow more explicit control over ranking.
New explicit actions to assign row numbers
as rank numbers
Make the rank number manually editable
Improve drag and drop behavior
Make it much faster to rank order a large
backlog and maintain consecutive rank when
using drag and drop.
201320122011
- 29. © 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 : Apply Rank Action Examples
“I’ve got the plan ordered the way I want. One click to apply rank across the plan”
“I’ve moved a group of lower priority tasks
to the bottom of the backlog, apply an ordered
rank below, from my current selected task”
201320122011
- 30. © 2012 IBM Corporation
Software and Systems Engineering | Rational
201320122011
Rational Team Concert 4.0.3 : Usability
Usability: Visual Studio Developers see all their work
organized in one place
[CCM] As a user make it easy for me to see what I'm
working on, in the VS Client (227379)
We improved the current “My Dashboard” UI to make it very
easy for a developer to see:
Current Work - my to do list of work items in the current
iteration
Future Work - my to do list of work items grouped by future
iterations
Pending Approvals – my work items owned by me in
“pending” approval state
Pending Requests - All work items that require my
approval
User customization of these views (sort order, bar charts, rich
hovers)
- 31. © 2012 IBM Corporation
Software and Systems Engineering | Rational
Rational Team Concert 3.x and 4.x – New Jenkins OSS plug-in.
Available from the Jenkins plug-in site.
Incremental Adoption: New Jenkins plug-in
Installs into Jenkins as a Jenkins plug-in, not shipped with the RTC
product
Runs SCM phase of a Jenkins build when you’re using RTC SCM
Supports integration at both SCM level and Build level with traceability
from RTC build result.
Works with multiple versions of RTC (RTC 3.0.1.5 and 4.x and later)
Benefits:
Simpler to set up – provides incremental adoption of RTC
Automatically creates an RTC build result for you
Provides traceability to build workspace, snapshot, SCM
changes link and “included in build” work item links
Leverage other Jenkins plug-ins / ecosystem
More details about obtaining the plug-in see our wiki page:
https://wiki.jenkins-ci.org/display/JENKINS/Team+Concert+Plugin
201320122011
- 32. © 2012 IBM Corporation
Software and Systems Engineering | Rational
New Jenkins plug-in for Rational Team Concert
After the SCM phase has run, the build change log captures:
SCM change sets and snapshot, with links to associated work items
201320122011
- 33. © 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 Plans : Enhanced ClearCase Importer
ClearCase Multi-branch Importer Improvements
Import baselines for multiple related releases or branches
– Must import streams in dependency order
Baselines are created in RTC automatically
– Now the version trees of imported files are comparable across ClearCase and RTC
Main line R8.0
R7 branch
R7.x
R6 branch
R6.x
201320122011
- 34. © 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 Plans - Reporting
Regulatory Reporting: Report on Time Spent, approval descriptors and
Modified By custom attributes
[CCM] Improve ability to report on time spent / lean metrics (213855)
[CCM] Make complex custom work item attributes, approval descriptors and Modified By dat
Data collected in time sheets (via time tracking) can be reported on using RPE
– Time sheet data has a REST interface (4.0.1) for RPE
– Time sheet data is available for live reporting using BIRT reports
New out of the box timesheet reports
201320122011
- 35. © 2012 IBM Corporation
Software and Systems Engineering | Rational
Details: New Approvals and Attribute Data Available for Reporting
ETL for "modified by" data
RICALM.REQUEST_HISTORY (Field: MODIFIER_ID)
ETL for approvals and approval descriptors
RICALM.REQUEST_APPROVAL_STATE
RICALM.REQUEST_APPROVAL_TYPE
RICALM.REQUEST_APPROVAL
RICALM.REQUEST_APPROVAL_DESCRIPTOR
ETL for complex custom attributes
The complex custom attributes data is now loaded into the data warehouse. The data includes complex
custom attributes of these types: Category, Contributor, Deliverable, Item, Iteration, Process Area, Project
Area, Team Area, Timeline, Work Item, and SCM Component.
RICALM.REQUEST_COMPONENT_EXT
RICALM.REQUEST_CATEGORY_EXT
RICALM.REQUEST_RESOURCE_EXT
RICALM.REQUEST_RELEASE_EXT
RICALM.REQUEST_ITERATION_EXT
RICALM.REQUEST_PROJECT_EXT
RICALM.REQUEST_TEAM_EXT
35
IBM Confidential
- 36. © 2012 IBM Corporation
Software and Systems Engineering | Rational
Improved Process Permissions Configuration – Web UI
The contents of the Permissions tab were replaced with a new Permissions editor. Features
include merging of project and team permissions, inheritance of permissions from the parent
when customizing, filtering by operation name, and visibility of roles and time periods configured
36
201320122011
- 37. © 2012 IBM Corporation
Software and Systems Engineering | Rational
Process Area History
History tab in the web UI, shows the history for project and team areas: who made each
change, when it was made, and what was changed.
UI details what’s currently included (membership, roles, iterations, process xml)
37
201320122011
- 38. © 2012 IBM Corporation
Software and Systems Engineering | Rational
Process Guidance in Work Items
38
201320122011
- 39. © 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 Plans – Complex Cross Project Plans
Increased hierarchy levels for drill down
– Previously cross-project plans displayed a single hierarchy level. Now, they support multiple hierarchy
levels for items that are tracked in the plan. The level is configurable.
201320122011
- 40. © 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 Plans – Complex Cross Project Plans
Cross-project plans support three new plan checks for items that are tracked in a plan.
– Visual warnings are displayed when the following situations occur:
• The rolled-up schedule for an item in the plan exceeds the end date of the iteration that the plan is
associated with.
• The "planned for" date of a plan item exceeds the plan's iteration end date.
• The rolled-up schedule for an item in the plan exceeds the due date that is specified for the item.
Colorizers and filters now support date expressions
– To highlight or hide items in the plan by date
201320122011
- 41. © 2012 IBM Corporation
41
IBM Systems and Software Symposium – February 2013
Enhance your CCM environment with Team Concert
- 42. © 2012 IBM Corporation
42
IBM Systems and Software Symposium – February 2013
Team Concert
State of the art
collaborative
development
solution
Goes beyond traditional CCM
State-of-the-art collaborative
development platform
Integration hub with Jazz OSLC
One product with integrated CM
and SCM + planning, build and
reporting
Designed for web and high
performance over WAN’s
Easier to use and low administration
Ideal for Agile development
Scalable from small to large globally
distributed teams
Can also “surround” other SCM’s:
Subversion, Git, ClearCase, Synergy
CM functionality available separately
How do you get the most out of your CCM investment?
ClearCase /
ClearQuest
Very large scale
enterprise
development
solutions
Build on your current investments to realize a collaborative
change and configuration management solution
Build on your current investments to realize a collaborative
change and configuration management solution
Very large development projects
Very complex and customized
workflows
Build auditing and optimized build
avoidance
Two products: ClearCase (SCM),
ClearQuest (CM)
Stringent compliance requirements
(eg CMMi, SPICE)
Complex requirements
management through DOORS
integration
Specialized systems software
development
Two products: Synergy (SCM),
Change (CM)
Synergy / Change
Stringent compliance
requirements for very
specialized systems
development
- 43. © 2012 IBM Corporation
43
IBM Systems and Software Symposium – February 2013
Jazz is…
A scalable, extensible team collaboration platform
A community at Jazz.net, where you can see Jazz-based products built in the open
An open architecture for lifecycle integration (OSLC - www.open-services.net)
Co-existence: Unifying Rational CCM product usage
Enabled by Jazz: an open platform with a shared set of services
ClearCase &
ClearQuest Synergy &
Change
Build Forge
3rd
-Party
Jazz
Capabilities
Future
IBM
Capabilities
Storage
Collaboration
QueryDiscovery
Administration:
Users, projects,
process
Best Practice Processes
Presentation:
Mashups
Requisite
Pro
& DOORS
HP Quality
CenterSubversion
Co-existence...
Enables teams to reuse enterprise
assets, process and investment in
ClearCase/ClearQuest or
Synergy/Change
Leverage new Collaborative Lifecycle
Management in an evolutionary way
with lower business risk
Use the “right-sized” governance solution for different project needs.
Teams can collaborate and exchange Change Requests and Code
- 44. © 2012 IBM Corporation
44
IBM Systems and Software Symposium – February 2013
2013 Directions for Rational Team Concert
- 45. © 2012 IBM Corporation
45
IBM Systems and Software Symposium – February 2013
Follow Systems priorities in the RTC backlog on Jazz.net
Monitor progress here:
https://jazz.net/jazz/web/projects/Rational%20Team%20Concert#action=com.ibm.team.apt.viewPlan&page=
com.ibm.team.apt.web.ui.plannedItems&id=_vbiXZqC5EeCGUsd9CqIfuw&planMode=
com.ibm.team.apt.viewmodes.internal.productBacklog.ranking
- 46. © 2012 IBM Corporation
46
IBM Systems and Software Symposium – February 2013
www.ibm.com/software/rational
- 47. © 2012 IBM Corporation
47
IBM Systems and Software Symposium – February 2013
Acknowledgements and Disclaimers:
© Copyright IBM Corporation 2012. All rights reserved.
– U.S. Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract
with IBM Corp.
IBM, the IBM logo, ibm.com, Rational, the Rational logo, Telelogic, the Telelogic logo, Green Hat, the Green Hat logo, and other IBM
products and services are trademarks or registered trademarks of International Business Machines Corporation in the United States,
other countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a
trademark symbol (® or ™), these symbols indicate U.S. registered or common law trademarks owned by IBM at the time this information
was published. Such trademarks may also be registered or common law trademarks in other countries. A current list of IBM trademarks
is available on the Web at “Copyright and trademark information” at www.ibm.com/legal/copytrade.shtml
Other company, product, or service names may be trademarks or service marks of others.
Availability. References in this presentation to IBM products, programs, or services do not imply that they will be available in all
countries in which IBM operates.
The workshops, sessions and materials have been prepared by IBM or the session speakers and reflect their own views. They are
provided for informational purposes only, and are neither intended to, nor shall have the effect of being, legal or other guidance or advice
to any participant. While efforts were made to verify the completeness and accuracy of the information contained in this presentation, it
is provided AS-IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use
of, or otherwise related to, this presentation or any other materials. Nothing contained in this presentation is intended to, nor shall have
the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the
applicable license agreement governing the use of IBM software.
All customer examples described are presented as illustrations of how those customers have used IBM products and the results they
may have achieved. Actual environmental costs and performance characteristics may vary by customer. Nothing contained in these
materials is intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific
sales, revenue growth or other results.
- 48. © 2012 IBM Corporation
48
IBM Systems and Software Symposium – February 2013
© Copyright IBM Corporation 2012. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind,
express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have
the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM
software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities
referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature
availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines
Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others.
www.ibm.com/software/rational
Editor's Notes
- File Name Here.ppt File Name Here.ppt File Name Here.ppt
- File Name Here.ppt File Name Here.ppt File Name Here.ppt
- IBM IOD 2011 06/21/13 Prensenter name here.ppt 06/21/13 15:56