SlideShare uma empresa Scribd logo
1 de 10
Baixar para ler offline
Server Consolidation for
                                 Oracle E-Business Suite with
                                  IBM Power Systems Servers:



                                          Lowering Total Cost of Ownership




                                                       An Alinean White Paper
                                                 Greg Shanker - Vice President




This document was developed with IBM funding. Although the document may utilize publicly
available material from various vendors, including IBM, it does not necessarily reflect
the positions of such vendors on the issues addressed in this document.
Published by:
Alinean, Inc. • 201 S. Orange Ave • Suite 1210 • Orlando, FL 32801-12565
Tel: 407.382.0005 • Fax: 407.382.0906 • Email: info@alinean.com • Web: www.alinean.com


January 2010


© Copyright 2001-2010, Alinean, Inc. All rights reserved.

No part of this report may be reproduced or stored in a retrieval system or transmitted in any form or by any means, without prior written permission.
All other trademarks are the property of their respective owners




Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                                                            ii
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
EXECUTIVE SUMMARY ............................................................. 1
                                       Financial Overview .....................................................................1

                               ANNUAL OPERATING EXPENSES .................................................. 2
                               SERVER CONSOLIDATION CASE STUDY ............................................ 2
                                       Original Server Environment ........................................................2
                                       Proposed Server Hardware Configurations .......................................3
                                       Software Licensing.....................................................................4
                                       Systems and Database Administration Labor Costs ............................4
                                       Energy Costs and Environmental (Green) Impact...............................5
                                       Upgrade / Migration Costs ...........................................................6
                                       Improved Operational Agility .......................................................6
                                       Service Level Improvements .........................................................6

                               CONCLUSION ...................................................................... 7
                               EXPLORE FOR YOURSELF .......................................................... 7
                               ABOUT ALINEAN .................................................................. 7




Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                                 iii
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
EXECUTIVE SUMMARY
In these tight and uncertain economic times many organizations are exploring ways they can lower ongoing
operating costs and increase flexibility. With the economy teetering between a solid recovery and a
potential double dipped recession organizations are seeking strategies that will enable them to quickly scale
operations up or down to meet market demand. Reducing fixed operating costs and preserving cash
liquidity are key financial goals for improving this flexibility. This paper discusses how a professional
services firm recently streamlined their IT infrastructure by consolidating on IBM Power Systems servers to
help achieve these goals.
The paper examines in detail the financial case this organization put together for the decision to move
forward with a server consolidation project. The organization had grown significantly over the past several
years through a series of mergers and acquisitions. As the organization acquired new operating companies
it migrated the financial applications for those companies onto a standard set of Oracle E-Business Suite
applications. The organization deployed a new set of servers and application instances for each operating
company they acquired. This approach enabled the organization to quickly integrate new operating
companies with minimal interruption to ongoing operations.
Most of the servers supporting critical operations were now reaching the end of their optimal life span.
Performance and reliability were becoming a concern for some key functions. In examining its upgrade
options, the organization wondered whether it would be better to maintain its current IT architecture and
simply replace existing servers, or if it could achieve greater efficiencies through server consolidation. The
organization considered three upgrade alternatives.
      1) Replace current Sun Fire servers with the latest Sun SPARC Enterprise servers.
      2) Consolidate workloads onto more scalable Sun SPARC Enterprise servers using virtualization.
      3) Consolidate workloads onto IBM Power Systems servers using virtualization.

Financial Overview
Based on its financial assessment the organization determined that it could save $5,038,494 or 58% over
three years by consolidating its Oracle E-Business Suite onto IBM Power Systems servers compared to
upgrading its current architecture with Sun SPARC Enterprise servers. With superior price performance the
IBM Power Systems consolidation solution was also $2,895,109 less than a comparable Sun SPARC
Enterprise consolidation configuration. The primary advantage of the IBM Power Systems configuration
compared to the Sun SPARC consolidation option came from the cost of the server hardware.
Compared to upgrading the current Sun SPARC server configuration, the IBM Power Systems consolidation
plan was expected to yield a broad range of savings including; server hardware costs, software costs,
systems administration labor and datacenter expansion and energy costs. Table 1 shows the expected
costs for the three alternative proposals, and the savings of the IBM Power Systems consolidation option
compared to upgrading the Sun SPARC configuration over a three year analysis period.

                                                   Sun SPARC           Sun SPARC        IBM Power          IBM Power Savings vs.
  Three Year TCO Comparison                         Upgrade           Consolidation    Consolidation        Sun SPARC Upgrade
 Number of Servers                                              42                4                   4             38      90%
 Server Hardware Costs                                   $4,036,000       $4,257,600       $1,180,000        $2,856,000     71%
 Server Software Costs                                    $459,240         $169,200             $417,600       $41,640       9%
 Server Administration Labor                             $3,382,500       $1,732,500       $1,732,500        $1,650,000     49%
 Upgrade / Migration Costs                                $152,500         $173,750             $226,250      ($73,750)    (48%)
 Energy Costs                                             $424,913         $158,719              $40,310      $384,604      91%
 Datacenter Expansion Costs                               $180,000               $0                  $0       $180,000     100%
 Total Three Year Costs                              $8,635,153         $6,491,769       $3,596,660        $5,038,494       58%

Table 1: Three Year TCO Comparison Chart


Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                                      1
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
In addition to the direct hard cost savings identified in the TCO Comparison Table, the organization also
expected to achieve significant benefits through improved performance, systems availability and greater
agility from the server consolidation effort. Because the measurement of these benefits was more
subjective, the organization elected to exclude them from the financial analysis. All of these benefits are
explained in further detail in subsequent sections of this paper.

ANNUAL OPERATING EXPENSES
In addition to lowering its total costs of ownership (TCO) over time, the organization was also interested in
reducing annual operating expenses and preserving precious cash reserves. Once it determined that the
IBM Power Systems solution provided the lowest cost option, it discussed financing options with IBM Global
Finance. Based on the cash flow analysis the organization decided to enter into a three year lease for the
server hardware and to finance the software and migration services costs for a three year period. By
spreading its payments over time with attractive financing rates, the organization was able to improve its IT
operations and lower annual operating costs by 30% saving over $525,000 per year. Interestingly, the
savings in annual energy costs and software expenses were almost the same as the additional costs for the
new server hardware, basically offsetting those costs. Table 2 shows the annual operating cost comparison
between the original server environment and the IBM Power Systems solution leveraging the three year
contract with IBM Global Finance.

                                                              Original Server           IBM Power            Annual Savings
                 Annual Operating Costs                        Environment             Consolidation           with IBM

 Server Hardware Costs                                           $232,400                  $355,000              ($122,600)

 Server Software Costs                                           $181,500                  $150,000                $31,500

 Server Administration Labor                                    $1,127,500                 $577,500                $550,000
 Upgrade / Migration Costs                                             N/A                  $84,000                ($84,000)

 Energy Costs                                                    $104,755                   $13,437                $91,318

 Datacenter Expansion Costs                                       $60,000                       N/A                $60,000
 Total Annual Operating Costs                                  $1,706,555               $1,179,937               $526,218
Table 2: Annual operating costs

SERVER CONSOLIDATION CASE STUDY
Original Server Environment
The original server environment consisted of five sets of servers, one for each operating company, and a
set of servers for test and development. Each set of servers supported three tiers; a database tier, an
application tier and a web user interface tier. The configurations varied slightly based on the scale required
for the different operating companies. Overall, there were 8 Sun Fire v890 servers with 8 dual-core
UltraSPARC IV processors, 20 Sun Fire v490s with 2 dual-core UltraSPARC IV processors and 14 older Sun
Fire v440s with 4 single-core UltraSPARC IIIi processors. The Sun Fire v890s were used exclusively for the
database tier. The Sun Fire v490s were used for all three tiers. The older Sun Fire v440s were used for
the web tier. Table 3 below shows the original server configurations, original purchase prices and annual
hardware maintenance costs per server.

                                                  Number of   Cores per          Memory               Purchase          Annual
              Server Type                          Servers     Server           per Server              Price           Support
 Sun Fire v890 – UltraSPARC IV                           8        16                32 GB               $125,000             $11,500
 Sun Fire v490 – UltraSPARC IV                           20        8                16 GB                $47,000               $4,950
 Sun Fire v440 – UltraSPARC IIIi                         14        4                6 GB                 $36,500               $3,850
 Total All Servers                                       42      344              660 GB              $2,451,000         $244,900
Table 3: Original server configurations



Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                                           2
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
Proposed Server Hardware Configurations
Going forward the organization considered three upgrade alternatives:
      1) Replace current Sun Fire servers with the latest Sun SPARC Enterprise servers.
      2) Consolidate workloads onto more scalable Sun SPARC Enterprise servers using virtualization.
      3) Consolidate workloads onto IBM Power Systems servers using virtualization.
The organization worked with engineers representing both hardware vendors to size the appropriate
configurations based on current workloads and the desire for greater processing power. For the first
option, the Sun Upgrade Configuration, the organization would replace the current Sun Fire v890 servers
with Sun SPARC Enterprise M5000 servers. Each M5000 server would be configured with 8 quad core
SPARC64 VII (2.53 GHz) processors and 64 GB of memory. The Sun Fire v490 servers would be replaced
with Sun SPARC Enterprise M4000 servers, each with 4 quad core SPARC64 VII (2.53 GHz) processors and
32 GB of memory. The Sun Fire v440 servers would be replaced with Sun SPARC Enterprise M4000
servers, each with 2 quad core SPARC64 VII (2.53 GHz) processors and 16 GB of memory.
For the server consolidation options the organization expected to be able to increase average system
utilization from 18.7% to over 45% by moving current processes from separate physical servers to virtual
machines on larger more scalable servers. For the Sun SPARC Consolidation configuration the organization
would need a cluster of four Sun SPARC Enterprise M8000 servers, each with 16 quad core Sun SPARC64
VII (2.53 GHz) processors and 256 GB of memory.
The IBM Power Consolidation configuration would have a similar architecture with four clustered IBM Power
780 servers. Each of the IBM Power 780 servers would be configured with 2 eight core IBM POWER7
(3.8GHz) processors and 256 GB of memory. Table 4 shows the configurations, purchase prices and annual
hardware support costs for the various options.

                                                         Number of     Processors      Memory      Purchase     Annual
                 Server Type                              Servers    (Chips/Cores)    per Server     Price      Support
 Sun SPARC Upgrade Configuration
    Sun SPARC Enterprise M5000                               8          (8 / 32)         64 GB       $150,000    $11,500
    Sun SPARC Enterprise M4000                              20          (4 / 16)         32 GB        $65,000     $7,000
    Sun SPARC Enterprise M4000                              14          (2 / 8)          16 GB        $45,000     $5,000
 Total Sun SPARC Upgrade                                    42        (172 / 688)      1376 GB     $3,130,000   $302,000
 Sun SPARC Consolidation Configuration
    Sun SPARC Enterprise M8000                               4         (16 / 64)        256 GB       $900,000    $54,800
 Total Sun SPARC Consolidation                              4         (64 / 256)       1024 GB     $3,600,000   $219,200
 IBM Power Consolidation Configuration
    IBM Power 780                                            4          (2 / 16)        256 GB       $250,000    $15,000
 Total IBM Power Consolidation                              4          (8 / 64)        1024 GB     $1,000,000    $60,000
Table 4: Proposed server configurations

The lowest cost option was the IBM Power Systems configuration. With a powerful system architecture and
highly efficient virtualization solution the IBM Power 780 servers were able to deliver superior performance
to the larger Sun SPARC Enterprise M8000 servers at 72% lower cost per server. Similarly, the higher
efficiency of the clustered IBM Power configuration resulted in $2,130,000 lower hardware costs than the
Sun SPARC Upgrade configuration.




Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                              3
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
Software Licensing
In addition to the server hardware costs, the organization also examined the software costs associated with
switching platforms. Changing platforms to IBM Power Systems would require new IBM AIX operating
system and IBM PowerVM virtualization software licenses, which would cost $64,000 per server for the
licenses and $16,000 per year for annual support. Compared with current annual software support costs of
$181,500, it turned out that the consolidation would actually reduce annual software maintenance costs by
59% per year. These savings would compensate for the additional license fees in just over two years and
reduce overall software costs by 23% over the three year analysis period saving $126,600.
The software cost comparison included the upfront license fees and ongoing annual support for operating
system software as well as systems management software. Typically database and application server
software are also included in the cost comparison. However, the costs for these components were the
same for all three configurations, since the Oracle database and Oracle application server licenses were
bundled with the Oracle E-Business Suite application software, which was priced on a per user basis rather
than a per server basis. Table 5 shows the upfront license costs for the new IBM AIX and PowerVM
licenses and the annual software support costs for all three options.

                                                               Sun SPARC                Sun SPARC       IBM Power
        Software License and Support Costs                      Upgrade                Consolidation   Consolidation
 Number of Servers                                                   42                          4          4
 Operating System License Cost per Server                           N/A                         N/A       $64,000
 Total Operating System License Costs                               N/A                         N/A      $256,000
 Annual Operating System Support per Server                        $2,211                   $8,500        $16,000
 Annual Systems Management Support per Server                      $1,433                  $5,600         $2,800
 Total Annual Software Support Costs                            $153,080                  $56,400        $75,200
 Total Three Year Software Costs                                $459,240                 $169,200       $417,600

Table 5: Three Year Software License and Support Cost Comparison

Systems and Database Administration Labor Costs
One of the major objectives for the server consolidation was to reduce ongoing operating expenses. While
the original architecture of separate standard implementations per operating company simplified systems
management, maintaining multiple servers required considerable overhead. Upgrades and patches needed
to be applied consistently to all servers. Performance tuning, availability management and access control
were also performed separately for each individual server.
The organization anticipated that it could reduce the server and database administration workloads by 50%
through server consolidation, reducing current staffing levels from nine down to four and a half staff. This
would allow the organization to shift these freed up resources from daily administration and operations
functions to more proactive roles of data management and reporting in support of business initiatives.
Table 6 shows the current staffing levels for Systems Administration, Database Administration and
Operations along with expected levels for a consolidated environment. By reducing the labor requirements
for infrastructure management from nine staff to four and a half, the organization expected to reduce
annual operating costs by $550,000 per year, saving $1,650,000 over the three year analysis period.




Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                          4
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
Original and              IBM or Sun
       Server Administration Labor Costs                  Upgrade Labor             Consolidation          Annual Savings
 Number of Servers                                                42                        4                    38
 Database Administrators                                          2.5                      1.5                   1.0
 Average Annual DBA Salary *                                  $145,000                 $145,000               $145,000
 Systems Administrators                                           4.0                      2.0                   2.0
 Average Annual System Administration Salary                  $135,000                 $135,000               $270,000
 Systems Operations Staff                                         2.5                      1.0                   1.5
 Average Systems Operations Salary                             $90,000                  $90,000               $135,000
 Annual Administration Costs                                $1,127,500                 $577,500               $550,000
 Total Three Year Admin Costs                               $3,382,500               $1,732,500              $1,650,000

Table 6: Three Year Server and Database Administration Labor Costs

* Note: All salaries reflect the fully burdened costs for staff including base salary, benefits, payroll taxes,
paid time off, and office expenses.

Energy Costs and Environmental (Green) Impact
With the recent focus on global warming and fluctuating energy costs the organization was interested in
reducing its energy requirements. This was particularly important because the datacenter had started
running rather warm in the past two years. If the organization could not reduce the energy consumption
and corresponding heat generation they would be forced to undergo a costly datacenter expansion and air
conditioning system upgrade.
The datacenter expansion and HVAC upgrade was expected to cost $600,000. Using a simple ten year
straight line depreciation schedule the amortized cost of the expansion came to $60,000 per year. For
every year to organization could avoid the upgrade they would save this $60,000 expense.
The proposed IBM Power solution was expected to reduce total energy consumption by an impressive 87%,
saving over 950,000 kWatts per year or $91,318 in electrical costs. This reduction in power consumption
and heat generation was sufficient to postpone the expansion of the datacenter. The alternative Sun
M8000 consolidation solution would also reduce energy requirements by almost 50%, but this configuration
would still require nearly three times more energy than the IBM proposal. Table 7 below shows the energy
requirements for the original server configuration and the three alternative proposals.

                                                               Original             Sun SPARC             Sun SPARC           IBM Power
             Annual Energy Consumption
                                                             Environment             Upgrade             Consolidation       Consolidation
 Number of Servers                                                          42                     42                   4                  4

 Average Power Consumption per Server (Watts)                             1,188                  1,606            6,300               1,600

 Annual Operating Hours                                                   8766                   8766             8766                   8766
 Data Center PUE Factor*                                                    2.5                    2.5                 2.5                2.5

 Annual Power Consumption (kWatts)                              1,1093,471              1,478,474             552,258             140,256

 Average Price per kWh                                                  $0.0958             $0.0958            $0.0958             $0.0958

 Annual Power and Cooling Costs                                    $104,755              $141,638             $52,906             $13,437

 Average CO2 Emissions (lbs/kWatt)                                        1.341                  1.341            1.341               1.341

 Annual CO2 Emissions (tons)                                               733                    991              370                    94

Table 7: Annual Energy Consumption and Cost Comparison




Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                                        5
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
* PUE – Power Usage Effectiveness is the measure of energy required by the data center as a whole for
each unit of energy delivered to servers. This measure includes cooling and other data center equipment.
Finally, from an environmental perspective, the reduction in energy consumption for power and cooling
would result in a decrease of approximately 639 tons of CO2 per year, or the equivalent of eliminating the
emissions of 106 cars per year. (On average cars produce 6 metric tons of CO2 per year.)

Upgrade / Migration Costs
The installation of the new IBM Power Systems servers and application migration would be performed by a
combination of external professional services personnel and internal staff. The initial installation of the new
servers and application migration would take ten weeks including system design and planning. System
verification and testing would take an additional six weeks. Overall the organization budgeted $120,000 for
external professional services fees. They estimated internal migration costs at $106,250, based on 1700
hours of internal labor at an average fully burdened hourly rate of $62.50.

Improved Operational Agility
While the organization had a sound process in place for integrating new operating companies, the
deployment of new systems for each new acquisition or merger required considerable time and effort.
First, the organization would need to assess the current workload for the new operating company to
properly size the required servers. Since the operating companies were typically running different financial
applications, this required some analysis to translate current workloads over to the Oracle E-Business Suite.
To compensate for any sizing errors and to account for growth, the IT organization generally inflated the
system specifications and purchased larger servers than were truly needed.
In addition to the time and effort required for system sizing the organization also needed to procure the
servers, install the hardware and configure the systems. Once the physical hardware was in place and
operational, then the IT group could begin the application configuration and data migration. This process
took six to nine months on average.
With the new virtualized server infrastructure the organization could simply define new virtual servers on
the existing physical server cluster to accommodate new application instances. The organization expected
that eliminating the sizing, procurement, installation and configuration of additional servers would trim
three months off the time it took to integrate the financial systems for new operating companies.
Additionally, by leveraging a virtualized environment the organization could make more efficient use of
physical server resources. Rather than over-sizing server requirements, the organization could now define
virtual machines to more closely match expected processing needs, and easily adjust the allocation of these
resources over time to match actual processing requirements.

Service Level Improvements
Based on benchmark tests with the IBM Power Systems servers, the organization expected to improve
service levels for the organization by accelerating key business processes and improving system availability.
Over the years growth in computing requirements had started degrading the performance of both
interactive users of the applications as well as crucial period end financial processes. The new IBM Power
Systems were able to complete many of these processes up to four times faster than the previous systems.
The organization expected that these performance improvements would yield tangible productivity benefits
for the Finance group in being able to process weekly payroll, close month end financial statements and
process accounts receivable more efficiently.
The new clustered configuration with IBM PowerHA SystemMirror would also provide higher availability
through automated failover.
Although improving performance and reliability were key factors in the server consolidation decision, the
organization chose not to quantify these benefits for the financial analysis.


Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                 6
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
CONCLUSION
While standardization of core technologies and processes can contribute to improved operational efficiency
and increased service levels, this case study revealed that consolidation of IT resources can provide even
greater savings. By consolidating forty two servers down to only four physical servers our study participant
was able to lower ongoing operational costs for systems administration and energy by a combined 52%,
saving over $641,318 per year compared to upgrading existing servers. Additionally, the IBM Power
Systems consolidation solution offered superior price performance characteristics compared to the Sun
SPARC Enterprise M8000 proposal.
By switching architectures and consolidating on IBM Power 780 servers the organization featured in this
paper expected to reduce the total cost of ownership TCO for their server infrastructure by $526,218, or
30% over a three year analysis period. By modernizing their server hardware and implementing high
availability clustering, they also expected to decrease system downtime, improving service levels for the
business. The implementation of a virtualized server environment would also improve average resource
utilization and accelerate the deployment of new applications, thus increasing business agility.

EXPLORE FOR YOURSELF
As illustrated in this case study, the latest IBM Power Systems servers powered with the latest IBM
POWER7 processors offer tremendous opportunity for reducing energy consumption, shrinking your data
center footprint and lowering operational costs. Alinean has developed an easy to use Server Consolidation
TCO Calculator that will allow you to explore these potential savings for your unique environment. Learn
how you can achieve similar benefits with a payback in a little as nine months. Get your customized report
at: http://www-03.ibm.com/systems/migratetoibm/whyibm/campaigns/sconevaltool1.html

ABOUT ALINEAN
Since 1994, the Alinean team has been the pioneering builder of tools to help quantify and improve the ROI
and TCO of IT investments. Alinean was named for the Spanish word for “Align”, matching the Alinean
mission as the leading developer of analytical tools to help IT vendors, consultants and IT executives align
IT investments with business strategies.
The Alinean team has over a decade of experience in the practical development and application of ROI and
TCO methodologies, models and tools to optimizing IT investment decision making. In 1994, the Alinean
team formed Interpose, the original pioneers of ROI tools, developing analytical software for over 50 major
IT vendors and consulting companies worldwide, and creating the industry standard TCO Manager and TCO
Analyst software. Interpose was sold to Gartner in 1998, where the team continued their developments and
marketing of ROI and TCO software tools. The original team reunited to form Alinean in 2001, once again
becoming the leading pioneers and developers of ROI sales and analytical tools. Current customers include
leading IT solution providers such as HP, IBM, Dell, Intel, Symantec, NetIQ, EMC, SAP, Oracle, SBC, and
Microsoft, as well as leading consultancies and Global 1000 companies.
Additional information about Alinean and helpful ROI educational resources can be found at
http://www.alinean.com.




Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO                      7
Copyright 2001-2010 Alinean, Inc. All Rights Reserved.

                                                                                                POL03071-USEN-00

Mais conteúdo relacionado

Mais procurados

The fillmore-group-aese-presentation-111810
The fillmore-group-aese-presentation-111810The fillmore-group-aese-presentation-111810
The fillmore-group-aese-presentation-111810Gennaro (Rino) Persico
 
Whitepaper Server Virtualisation And Storage Management
Whitepaper   Server Virtualisation And Storage ManagementWhitepaper   Server Virtualisation And Storage Management
Whitepaper Server Virtualisation And Storage ManagementAlan McSweeney
 
Improve datacenter energy efficiency with Intel Node Manager
Improve datacenter energy efficiency with Intel Node ManagerImprove datacenter energy efficiency with Intel Node Manager
Improve datacenter energy efficiency with Intel Node ManagerPrincipled Technologies
 
Virtualization Performance on the IBM PureFlex System
Virtualization Performance on the IBM PureFlex SystemVirtualization Performance on the IBM PureFlex System
Virtualization Performance on the IBM PureFlex SystemIBM India Smarter Computing
 
Whitepaper Exchange 2007 Changes, Resilience And Storage Management
Whitepaper   Exchange 2007 Changes, Resilience And Storage ManagementWhitepaper   Exchange 2007 Changes, Resilience And Storage Management
Whitepaper Exchange 2007 Changes, Resilience And Storage ManagementAlan McSweeney
 
Energy Logic Presentation
Energy Logic PresentationEnergy Logic Presentation
Energy Logic PresentationRon_Bednar
 
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...IBM India Smarter Computing
 
SAP Consolidation: Improving reliability, performance and agility
SAP Consolidation: Improving reliability, performance and agilitySAP Consolidation: Improving reliability, performance and agility
SAP Consolidation: Improving reliability, performance and agilityIBM India Smarter Computing
 
IBM Flex System: A Solid Foundation for Microsoft Exchange Server 2010
IBM Flex System: A Solid Foundation for Microsoft Exchange Server 2010IBM Flex System: A Solid Foundation for Microsoft Exchange Server 2010
IBM Flex System: A Solid Foundation for Microsoft Exchange Server 2010IBM India Smarter Computing
 

Mais procurados (11)

The fillmore-group-aese-presentation-111810
The fillmore-group-aese-presentation-111810The fillmore-group-aese-presentation-111810
The fillmore-group-aese-presentation-111810
 
Whitepaper Server Virtualisation And Storage Management
Whitepaper   Server Virtualisation And Storage ManagementWhitepaper   Server Virtualisation And Storage Management
Whitepaper Server Virtualisation And Storage Management
 
Comp ben121enhancementswebinar
Comp ben121enhancementswebinarComp ben121enhancementswebinar
Comp ben121enhancementswebinar
 
Got ipads, android tablets and windows devices
Got ipads, android tablets and windows devicesGot ipads, android tablets and windows devices
Got ipads, android tablets and windows devices
 
Improve datacenter energy efficiency with Intel Node Manager
Improve datacenter energy efficiency with Intel Node ManagerImprove datacenter energy efficiency with Intel Node Manager
Improve datacenter energy efficiency with Intel Node Manager
 
Virtualization Performance on the IBM PureFlex System
Virtualization Performance on the IBM PureFlex SystemVirtualization Performance on the IBM PureFlex System
Virtualization Performance on the IBM PureFlex System
 
Whitepaper Exchange 2007 Changes, Resilience And Storage Management
Whitepaper   Exchange 2007 Changes, Resilience And Storage ManagementWhitepaper   Exchange 2007 Changes, Resilience And Storage Management
Whitepaper Exchange 2007 Changes, Resilience And Storage Management
 
Energy Logic Presentation
Energy Logic PresentationEnergy Logic Presentation
Energy Logic Presentation
 
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
 
SAP Consolidation: Improving reliability, performance and agility
SAP Consolidation: Improving reliability, performance and agilitySAP Consolidation: Improving reliability, performance and agility
SAP Consolidation: Improving reliability, performance and agility
 
IBM Flex System: A Solid Foundation for Microsoft Exchange Server 2010
IBM Flex System: A Solid Foundation for Microsoft Exchange Server 2010IBM Flex System: A Solid Foundation for Microsoft Exchange Server 2010
IBM Flex System: A Solid Foundation for Microsoft Exchange Server 2010
 

Destaque

Why Alinean? Profile by SiriusDecisions
Why Alinean? Profile by SiriusDecisionsWhy Alinean? Profile by SiriusDecisions
Why Alinean? Profile by SiriusDecisionsAlinean, Inc.
 
Increase content marketing effectiveness via Content Marketing Assessment Tools
Increase content marketing effectiveness via Content Marketing Assessment ToolsIncrease content marketing effectiveness via Content Marketing Assessment Tools
Increase content marketing effectiveness via Content Marketing Assessment ToolsAlinean, Inc.
 
Product solution value - you decide
Product solution value - you decideProduct solution value - you decide
Product solution value - you decideAlinean, Inc.
 
Demand Generation Tools Webcast: Drive more leads with Alinean value-marketin...
Demand Generation Tools Webcast: Drive more leads with Alinean value-marketin...Demand Generation Tools Webcast: Drive more leads with Alinean value-marketin...
Demand Generation Tools Webcast: Drive more leads with Alinean value-marketin...Alinean, Inc.
 
Introducing the Alinean Social Media ROI Calculator
Introducing the Alinean Social Media ROI CalculatorIntroducing the Alinean Social Media ROI Calculator
Introducing the Alinean Social Media ROI CalculatorAlinean, Inc.
 
Webcast: Optimize Your Content Marketing to Facilitate the Buyer's Journey
Webcast: Optimize Your Content Marketing to Facilitate the Buyer's JourneyWebcast: Optimize Your Content Marketing to Facilitate the Buyer's Journey
Webcast: Optimize Your Content Marketing to Facilitate the Buyer's JourneyAlinean, Inc.
 
Interactive White Paper Webcast: Increase content marketing effectiveness
Interactive White Paper Webcast: Increase content marketing effectivenessInteractive White Paper Webcast: Increase content marketing effectiveness
Interactive White Paper Webcast: Increase content marketing effectivenessAlinean, Inc.
 
Webcast: How to improve sales tool adoption
Webcast: How to improve sales tool adoptionWebcast: How to improve sales tool adoption
Webcast: How to improve sales tool adoptionAlinean, Inc.
 
Storwize V7000 Solution Tco White Paper Alinean
Storwize V7000 Solution Tco White Paper AlineanStorwize V7000 Solution Tco White Paper Alinean
Storwize V7000 Solution Tco White Paper AlineanSuzyIBM
 
Sales Enablement Tools Webcast: Make sales more effective with Alinean value-...
Sales Enablement Tools Webcast: Make sales more effective with Alinean value-...Sales Enablement Tools Webcast: Make sales more effective with Alinean value-...
Sales Enablement Tools Webcast: Make sales more effective with Alinean value-...Alinean, Inc.
 
Connect and Engage Better with Provocation-based Selling
Connect and Engage Better with Provocation-based SellingConnect and Engage Better with Provocation-based Selling
Connect and Engage Better with Provocation-based SellingAlinean, Inc.
 
The Five Pillars of Value Marketing & Selling Success - Maximizing your ROI f...
The Five Pillars of Value Marketing & Selling Success - Maximizing your ROI f...The Five Pillars of Value Marketing & Selling Success - Maximizing your ROI f...
The Five Pillars of Value Marketing & Selling Success - Maximizing your ROI f...Alinean, Inc.
 
SiriusDecisions - The Value of Value Selling & Marketing - Using ROI / TCO To...
SiriusDecisions - The Value of Value Selling & Marketing - Using ROI / TCO To...SiriusDecisions - The Value of Value Selling & Marketing - Using ROI / TCO To...
SiriusDecisions - The Value of Value Selling & Marketing - Using ROI / TCO To...Alinean, Inc.
 
Value Selling & Realization VSR Summit - The Importance of Getting Value / RO...
Value Selling & Realization VSR Summit - The Importance of Getting Value / RO...Value Selling & Realization VSR Summit - The Importance of Getting Value / RO...
Value Selling & Realization VSR Summit - The Importance of Getting Value / RO...Alinean, Inc.
 
SiriusDecisions Sales Content Secrets - Aligning to Customer Needs and Challe...
SiriusDecisions Sales Content Secrets - Aligning to Customer Needs and Challe...SiriusDecisions Sales Content Secrets - Aligning to Customer Needs and Challe...
SiriusDecisions Sales Content Secrets - Aligning to Customer Needs and Challe...Alinean, Inc.
 

Destaque (16)

Why Alinean? Profile by SiriusDecisions
Why Alinean? Profile by SiriusDecisionsWhy Alinean? Profile by SiriusDecisions
Why Alinean? Profile by SiriusDecisions
 
Increase content marketing effectiveness via Content Marketing Assessment Tools
Increase content marketing effectiveness via Content Marketing Assessment ToolsIncrease content marketing effectiveness via Content Marketing Assessment Tools
Increase content marketing effectiveness via Content Marketing Assessment Tools
 
ValueStory for HTML
ValueStory for HTMLValueStory for HTML
ValueStory for HTML
 
Product solution value - you decide
Product solution value - you decideProduct solution value - you decide
Product solution value - you decide
 
Demand Generation Tools Webcast: Drive more leads with Alinean value-marketin...
Demand Generation Tools Webcast: Drive more leads with Alinean value-marketin...Demand Generation Tools Webcast: Drive more leads with Alinean value-marketin...
Demand Generation Tools Webcast: Drive more leads with Alinean value-marketin...
 
Introducing the Alinean Social Media ROI Calculator
Introducing the Alinean Social Media ROI CalculatorIntroducing the Alinean Social Media ROI Calculator
Introducing the Alinean Social Media ROI Calculator
 
Webcast: Optimize Your Content Marketing to Facilitate the Buyer's Journey
Webcast: Optimize Your Content Marketing to Facilitate the Buyer's JourneyWebcast: Optimize Your Content Marketing to Facilitate the Buyer's Journey
Webcast: Optimize Your Content Marketing to Facilitate the Buyer's Journey
 
Interactive White Paper Webcast: Increase content marketing effectiveness
Interactive White Paper Webcast: Increase content marketing effectivenessInteractive White Paper Webcast: Increase content marketing effectiveness
Interactive White Paper Webcast: Increase content marketing effectiveness
 
Webcast: How to improve sales tool adoption
Webcast: How to improve sales tool adoptionWebcast: How to improve sales tool adoption
Webcast: How to improve sales tool adoption
 
Storwize V7000 Solution Tco White Paper Alinean
Storwize V7000 Solution Tco White Paper AlineanStorwize V7000 Solution Tco White Paper Alinean
Storwize V7000 Solution Tco White Paper Alinean
 
Sales Enablement Tools Webcast: Make sales more effective with Alinean value-...
Sales Enablement Tools Webcast: Make sales more effective with Alinean value-...Sales Enablement Tools Webcast: Make sales more effective with Alinean value-...
Sales Enablement Tools Webcast: Make sales more effective with Alinean value-...
 
Connect and Engage Better with Provocation-based Selling
Connect and Engage Better with Provocation-based SellingConnect and Engage Better with Provocation-based Selling
Connect and Engage Better with Provocation-based Selling
 
The Five Pillars of Value Marketing & Selling Success - Maximizing your ROI f...
The Five Pillars of Value Marketing & Selling Success - Maximizing your ROI f...The Five Pillars of Value Marketing & Selling Success - Maximizing your ROI f...
The Five Pillars of Value Marketing & Selling Success - Maximizing your ROI f...
 
SiriusDecisions - The Value of Value Selling & Marketing - Using ROI / TCO To...
SiriusDecisions - The Value of Value Selling & Marketing - Using ROI / TCO To...SiriusDecisions - The Value of Value Selling & Marketing - Using ROI / TCO To...
SiriusDecisions - The Value of Value Selling & Marketing - Using ROI / TCO To...
 
Value Selling & Realization VSR Summit - The Importance of Getting Value / RO...
Value Selling & Realization VSR Summit - The Importance of Getting Value / RO...Value Selling & Realization VSR Summit - The Importance of Getting Value / RO...
Value Selling & Realization VSR Summit - The Importance of Getting Value / RO...
 
SiriusDecisions Sales Content Secrets - Aligning to Customer Needs and Challe...
SiriusDecisions Sales Content Secrets - Aligning to Customer Needs and Challe...SiriusDecisions Sales Content Secrets - Aligning to Customer Needs and Challe...
SiriusDecisions Sales Content Secrets - Aligning to Customer Needs and Challe...
 

Semelhante a Alinean whitepaper: Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO

Quantifying_the_impact_of_AWS_on_your_business
Quantifying_the_impact_of_AWS_on_your_businessQuantifying_the_impact_of_AWS_on_your_business
Quantifying_the_impact_of_AWS_on_your_businessAmazon Web Services
 
Po3660 Krogstad Vm World 2008
Po3660 Krogstad Vm World 2008Po3660 Krogstad Vm World 2008
Po3660 Krogstad Vm World 2008kkroggy
 
Presentation v mware roi tco calculator
Presentation   v mware roi tco calculatorPresentation   v mware roi tco calculator
Presentation v mware roi tco calculatorsolarisyourep
 
Consolidating X86 Lotus Domino To Power
Consolidating X86 Lotus Domino To PowerConsolidating X86 Lotus Domino To Power
Consolidating X86 Lotus Domino To Powerbondjoac
 
The business value o f la ge scal e serve r consol i d a t i o n
The business value o f la ge  scal e serve r consol i d a t i o nThe business value o f la ge  scal e serve r consol i d a t i o n
The business value o f la ge scal e serve r consol i d a t i o nIBM India Smarter Computing
 
Creazione del business case per l'adozione del cloud nella tua azienda
Creazione del business case per l'adozione del cloud nella tua aziendaCreazione del business case per l'adozione del cloud nella tua azienda
Creazione del business case per l'adozione del cloud nella tua aziendaAmazon Web Services
 
Achieving Business Value with AWS
Achieving Business Value with AWSAchieving Business Value with AWS
Achieving Business Value with AWSAmazon Web Services
 
Achieving Business Value with AWS - AWS Transformation Day 2018: Detroit
Achieving Business Value with AWS - AWS Transformation Day 2018: DetroitAchieving Business Value with AWS - AWS Transformation Day 2018: Detroit
Achieving Business Value with AWS - AWS Transformation Day 2018: DetroitAmazon Web Services
 
Reducing tco white paper rev5
Reducing tco white paper rev5Reducing tco white paper rev5
Reducing tco white paper rev5Manoj Punamia
 
Achieving Business Value with AWS - AWS Transformation Day: Santa Clara 2018
Achieving Business Value with AWS - AWS Transformation Day: Santa Clara 2018Achieving Business Value with AWS - AWS Transformation Day: Santa Clara 2018
Achieving Business Value with AWS - AWS Transformation Day: Santa Clara 2018Amazon Web Services
 
Suse service virtualization_image_set up_guide_140214
Suse service virtualization_image_set up_guide_140214Suse service virtualization_image_set up_guide_140214
Suse service virtualization_image_set up_guide_140214Darrel Rader
 
Server TCO Showdown -- Lenovo x3950 X6 and IBM Storwize V7000 vs HP superdome
Server TCO Showdown -- Lenovo x3950 X6 and IBM Storwize V7000 vs  HP superdomeServer TCO Showdown -- Lenovo x3950 X6 and IBM Storwize V7000 vs  HP superdome
Server TCO Showdown -- Lenovo x3950 X6 and IBM Storwize V7000 vs HP superdomeLenovo Data Center
 
Lenovo System x3950 X6 vs HP Superdome 2
Lenovo System x3950 X6 vs  HP Superdome 2Lenovo System x3950 X6 vs  HP Superdome 2
Lenovo System x3950 X6 vs HP Superdome 2Lenovo Data Center
 
IBM i for Midsize Businesses Minimizing Costs and Risks for Midsize Businesses
IBM i for Midsize Businesses Minimizing Costs and Risks for Midsize BusinessesIBM i for Midsize Businesses Minimizing Costs and Risks for Midsize Businesses
IBM i for Midsize Businesses Minimizing Costs and Risks for Midsize BusinessesIBM India Smarter Computing
 
Cloud Computing Payback An Explanation Of Where The ROI Comes From
Cloud Computing Payback An Explanation Of Where The ROI Comes FromCloud Computing Payback An Explanation Of Where The ROI Comes From
Cloud Computing Payback An Explanation Of Where The ROI Comes FromIBM India Smarter Computing
 
AWS Cloud Value Framework - AWS Transformation Days Raleigh 2018.pdf
AWS Cloud Value Framework - AWS Transformation Days Raleigh 2018.pdfAWS Cloud Value Framework - AWS Transformation Days Raleigh 2018.pdf
AWS Cloud Value Framework - AWS Transformation Days Raleigh 2018.pdfAmazon Web Services
 
ENT204 The AWS Cloud Value Framework
ENT204 The AWS Cloud Value FrameworkENT204 The AWS Cloud Value Framework
ENT204 The AWS Cloud Value FrameworkAmazon Web Services
 
Achieving Business Value - Transformation Day Philadelphia 2018
Achieving Business Value - Transformation Day Philadelphia 2018Achieving Business Value - Transformation Day Philadelphia 2018
Achieving Business Value - Transformation Day Philadelphia 2018Amazon Web Services
 

Semelhante a Alinean whitepaper: Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO (20)

Quantifying_the_impact_of_AWS_on_your_business
Quantifying_the_impact_of_AWS_on_your_businessQuantifying_the_impact_of_AWS_on_your_business
Quantifying_the_impact_of_AWS_on_your_business
 
Po3660 Krogstad Vm World 2008
Po3660 Krogstad Vm World 2008Po3660 Krogstad Vm World 2008
Po3660 Krogstad Vm World 2008
 
Presentation v mware roi tco calculator
Presentation   v mware roi tco calculatorPresentation   v mware roi tco calculator
Presentation v mware roi tco calculator
 
Consolidating X86 Lotus Domino To Power
Consolidating X86 Lotus Domino To PowerConsolidating X86 Lotus Domino To Power
Consolidating X86 Lotus Domino To Power
 
The business value o f la ge scal e serve r consol i d a t i o n
The business value o f la ge  scal e serve r consol i d a t i o nThe business value o f la ge  scal e serve r consol i d a t i o n
The business value o f la ge scal e serve r consol i d a t i o n
 
Creazione del business case per l'adozione del cloud nella tua azienda
Creazione del business case per l'adozione del cloud nella tua aziendaCreazione del business case per l'adozione del cloud nella tua azienda
Creazione del business case per l'adozione del cloud nella tua azienda
 
Achieving Business Value with AWS
Achieving Business Value with AWSAchieving Business Value with AWS
Achieving Business Value with AWS
 
Achieving Business Value with AWS - AWS Transformation Day 2018: Detroit
Achieving Business Value with AWS - AWS Transformation Day 2018: DetroitAchieving Business Value with AWS - AWS Transformation Day 2018: Detroit
Achieving Business Value with AWS - AWS Transformation Day 2018: Detroit
 
Logrando valor de negocio con AWS
Logrando valor de negocio con AWSLogrando valor de negocio con AWS
Logrando valor de negocio con AWS
 
Reducing tco white paper rev5
Reducing tco white paper rev5Reducing tco white paper rev5
Reducing tco white paper rev5
 
Achieving Business Value with AWS - AWS Transformation Day: Santa Clara 2018
Achieving Business Value with AWS - AWS Transformation Day: Santa Clara 2018Achieving Business Value with AWS - AWS Transformation Day: Santa Clara 2018
Achieving Business Value with AWS - AWS Transformation Day: Santa Clara 2018
 
Suse service virtualization_image_set up_guide_140214
Suse service virtualization_image_set up_guide_140214Suse service virtualization_image_set up_guide_140214
Suse service virtualization_image_set up_guide_140214
 
Server TCO Showdown -- Lenovo x3950 X6 and IBM Storwize V7000 vs HP superdome
Server TCO Showdown -- Lenovo x3950 X6 and IBM Storwize V7000 vs  HP superdomeServer TCO Showdown -- Lenovo x3950 X6 and IBM Storwize V7000 vs  HP superdome
Server TCO Showdown -- Lenovo x3950 X6 and IBM Storwize V7000 vs HP superdome
 
Lenovo System x3950 X6 vs HP Superdome 2
Lenovo System x3950 X6 vs  HP Superdome 2Lenovo System x3950 X6 vs  HP Superdome 2
Lenovo System x3950 X6 vs HP Superdome 2
 
IBM i for Midsize Businesses Minimizing Costs and Risks for Midsize Businesses
IBM i for Midsize Businesses Minimizing Costs and Risks for Midsize BusinessesIBM i for Midsize Businesses Minimizing Costs and Risks for Midsize Businesses
IBM i for Midsize Businesses Minimizing Costs and Risks for Midsize Businesses
 
Cloud Computing Payback
Cloud Computing PaybackCloud Computing Payback
Cloud Computing Payback
 
Cloud Computing Payback An Explanation Of Where The ROI Comes From
Cloud Computing Payback An Explanation Of Where The ROI Comes FromCloud Computing Payback An Explanation Of Where The ROI Comes From
Cloud Computing Payback An Explanation Of Where The ROI Comes From
 
AWS Cloud Value Framework - AWS Transformation Days Raleigh 2018.pdf
AWS Cloud Value Framework - AWS Transformation Days Raleigh 2018.pdfAWS Cloud Value Framework - AWS Transformation Days Raleigh 2018.pdf
AWS Cloud Value Framework - AWS Transformation Days Raleigh 2018.pdf
 
ENT204 The AWS Cloud Value Framework
ENT204 The AWS Cloud Value FrameworkENT204 The AWS Cloud Value Framework
ENT204 The AWS Cloud Value Framework
 
Achieving Business Value - Transformation Day Philadelphia 2018
Achieving Business Value - Transformation Day Philadelphia 2018Achieving Business Value - Transformation Day Philadelphia 2018
Achieving Business Value - Transformation Day Philadelphia 2018
 

Mais de IBM India Smarter Computing

Using the IBM XIV Storage System in OpenStack Cloud Environments
Using the IBM XIV Storage System in OpenStack Cloud Environments Using the IBM XIV Storage System in OpenStack Cloud Environments
Using the IBM XIV Storage System in OpenStack Cloud Environments IBM India Smarter Computing
 
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...IBM India Smarter Computing
 
A Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceA Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceIBM India Smarter Computing
 
IBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM India Smarter Computing
 

Mais de IBM India Smarter Computing (20)

Using the IBM XIV Storage System in OpenStack Cloud Environments
Using the IBM XIV Storage System in OpenStack Cloud Environments Using the IBM XIV Storage System in OpenStack Cloud Environments
Using the IBM XIV Storage System in OpenStack Cloud Environments
 
All-flash Needs End to End Storage Efficiency
All-flash Needs End to End Storage EfficiencyAll-flash Needs End to End Storage Efficiency
All-flash Needs End to End Storage Efficiency
 
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
 
IBM FlashSystem 840 Product Guide
IBM FlashSystem 840 Product GuideIBM FlashSystem 840 Product Guide
IBM FlashSystem 840 Product Guide
 
IBM System x3250 M5
IBM System x3250 M5IBM System x3250 M5
IBM System x3250 M5
 
IBM NeXtScale nx360 M4
IBM NeXtScale nx360 M4IBM NeXtScale nx360 M4
IBM NeXtScale nx360 M4
 
IBM System x3650 M4 HD
IBM System x3650 M4 HDIBM System x3650 M4 HD
IBM System x3650 M4 HD
 
IBM System x3300 M4
IBM System x3300 M4IBM System x3300 M4
IBM System x3300 M4
 
IBM System x iDataPlex dx360 M4
IBM System x iDataPlex dx360 M4IBM System x iDataPlex dx360 M4
IBM System x iDataPlex dx360 M4
 
IBM System x3500 M4
IBM System x3500 M4IBM System x3500 M4
IBM System x3500 M4
 
IBM System x3550 M4
IBM System x3550 M4IBM System x3550 M4
IBM System x3550 M4
 
IBM System x3650 M4
IBM System x3650 M4IBM System x3650 M4
IBM System x3650 M4
 
IBM System x3500 M3
IBM System x3500 M3IBM System x3500 M3
IBM System x3500 M3
 
IBM System x3400 M3
IBM System x3400 M3IBM System x3400 M3
IBM System x3400 M3
 
IBM System x3250 M3
IBM System x3250 M3IBM System x3250 M3
IBM System x3250 M3
 
IBM System x3200 M3
IBM System x3200 M3IBM System x3200 M3
IBM System x3200 M3
 
IBM PowerVC Introduction and Configuration
IBM PowerVC Introduction and ConfigurationIBM PowerVC Introduction and Configuration
IBM PowerVC Introduction and Configuration
 
A Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceA Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization Performance
 
IBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architecture
 
X6: The sixth generation of EXA Technology
X6: The sixth generation of EXA TechnologyX6: The sixth generation of EXA Technology
X6: The sixth generation of EXA Technology
 

Último

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 

Último (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 

Alinean whitepaper: Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO

  • 1. Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering Total Cost of Ownership An Alinean White Paper Greg Shanker - Vice President This document was developed with IBM funding. Although the document may utilize publicly available material from various vendors, including IBM, it does not necessarily reflect the positions of such vendors on the issues addressed in this document.
  • 2. Published by: Alinean, Inc. • 201 S. Orange Ave • Suite 1210 • Orlando, FL 32801-12565 Tel: 407.382.0005 • Fax: 407.382.0906 • Email: info@alinean.com • Web: www.alinean.com January 2010 © Copyright 2001-2010, Alinean, Inc. All rights reserved. No part of this report may be reproduced or stored in a retrieval system or transmitted in any form or by any means, without prior written permission. All other trademarks are the property of their respective owners Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO ii Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
  • 3. EXECUTIVE SUMMARY ............................................................. 1 Financial Overview .....................................................................1 ANNUAL OPERATING EXPENSES .................................................. 2 SERVER CONSOLIDATION CASE STUDY ............................................ 2 Original Server Environment ........................................................2 Proposed Server Hardware Configurations .......................................3 Software Licensing.....................................................................4 Systems and Database Administration Labor Costs ............................4 Energy Costs and Environmental (Green) Impact...............................5 Upgrade / Migration Costs ...........................................................6 Improved Operational Agility .......................................................6 Service Level Improvements .........................................................6 CONCLUSION ...................................................................... 7 EXPLORE FOR YOURSELF .......................................................... 7 ABOUT ALINEAN .................................................................. 7 Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO iii Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
  • 4. EXECUTIVE SUMMARY In these tight and uncertain economic times many organizations are exploring ways they can lower ongoing operating costs and increase flexibility. With the economy teetering between a solid recovery and a potential double dipped recession organizations are seeking strategies that will enable them to quickly scale operations up or down to meet market demand. Reducing fixed operating costs and preserving cash liquidity are key financial goals for improving this flexibility. This paper discusses how a professional services firm recently streamlined their IT infrastructure by consolidating on IBM Power Systems servers to help achieve these goals. The paper examines in detail the financial case this organization put together for the decision to move forward with a server consolidation project. The organization had grown significantly over the past several years through a series of mergers and acquisitions. As the organization acquired new operating companies it migrated the financial applications for those companies onto a standard set of Oracle E-Business Suite applications. The organization deployed a new set of servers and application instances for each operating company they acquired. This approach enabled the organization to quickly integrate new operating companies with minimal interruption to ongoing operations. Most of the servers supporting critical operations were now reaching the end of their optimal life span. Performance and reliability were becoming a concern for some key functions. In examining its upgrade options, the organization wondered whether it would be better to maintain its current IT architecture and simply replace existing servers, or if it could achieve greater efficiencies through server consolidation. The organization considered three upgrade alternatives. 1) Replace current Sun Fire servers with the latest Sun SPARC Enterprise servers. 2) Consolidate workloads onto more scalable Sun SPARC Enterprise servers using virtualization. 3) Consolidate workloads onto IBM Power Systems servers using virtualization. Financial Overview Based on its financial assessment the organization determined that it could save $5,038,494 or 58% over three years by consolidating its Oracle E-Business Suite onto IBM Power Systems servers compared to upgrading its current architecture with Sun SPARC Enterprise servers. With superior price performance the IBM Power Systems consolidation solution was also $2,895,109 less than a comparable Sun SPARC Enterprise consolidation configuration. The primary advantage of the IBM Power Systems configuration compared to the Sun SPARC consolidation option came from the cost of the server hardware. Compared to upgrading the current Sun SPARC server configuration, the IBM Power Systems consolidation plan was expected to yield a broad range of savings including; server hardware costs, software costs, systems administration labor and datacenter expansion and energy costs. Table 1 shows the expected costs for the three alternative proposals, and the savings of the IBM Power Systems consolidation option compared to upgrading the Sun SPARC configuration over a three year analysis period. Sun SPARC Sun SPARC IBM Power IBM Power Savings vs. Three Year TCO Comparison Upgrade Consolidation Consolidation Sun SPARC Upgrade Number of Servers 42 4 4 38 90% Server Hardware Costs $4,036,000 $4,257,600 $1,180,000 $2,856,000 71% Server Software Costs $459,240 $169,200 $417,600 $41,640 9% Server Administration Labor $3,382,500 $1,732,500 $1,732,500 $1,650,000 49% Upgrade / Migration Costs $152,500 $173,750 $226,250 ($73,750) (48%) Energy Costs $424,913 $158,719 $40,310 $384,604 91% Datacenter Expansion Costs $180,000 $0 $0 $180,000 100% Total Three Year Costs $8,635,153 $6,491,769 $3,596,660 $5,038,494 58% Table 1: Three Year TCO Comparison Chart Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO 1 Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
  • 5. In addition to the direct hard cost savings identified in the TCO Comparison Table, the organization also expected to achieve significant benefits through improved performance, systems availability and greater agility from the server consolidation effort. Because the measurement of these benefits was more subjective, the organization elected to exclude them from the financial analysis. All of these benefits are explained in further detail in subsequent sections of this paper. ANNUAL OPERATING EXPENSES In addition to lowering its total costs of ownership (TCO) over time, the organization was also interested in reducing annual operating expenses and preserving precious cash reserves. Once it determined that the IBM Power Systems solution provided the lowest cost option, it discussed financing options with IBM Global Finance. Based on the cash flow analysis the organization decided to enter into a three year lease for the server hardware and to finance the software and migration services costs for a three year period. By spreading its payments over time with attractive financing rates, the organization was able to improve its IT operations and lower annual operating costs by 30% saving over $525,000 per year. Interestingly, the savings in annual energy costs and software expenses were almost the same as the additional costs for the new server hardware, basically offsetting those costs. Table 2 shows the annual operating cost comparison between the original server environment and the IBM Power Systems solution leveraging the three year contract with IBM Global Finance. Original Server IBM Power Annual Savings Annual Operating Costs Environment Consolidation with IBM Server Hardware Costs $232,400 $355,000 ($122,600) Server Software Costs $181,500 $150,000 $31,500 Server Administration Labor $1,127,500 $577,500 $550,000 Upgrade / Migration Costs N/A $84,000 ($84,000) Energy Costs $104,755 $13,437 $91,318 Datacenter Expansion Costs $60,000 N/A $60,000 Total Annual Operating Costs $1,706,555 $1,179,937 $526,218 Table 2: Annual operating costs SERVER CONSOLIDATION CASE STUDY Original Server Environment The original server environment consisted of five sets of servers, one for each operating company, and a set of servers for test and development. Each set of servers supported three tiers; a database tier, an application tier and a web user interface tier. The configurations varied slightly based on the scale required for the different operating companies. Overall, there were 8 Sun Fire v890 servers with 8 dual-core UltraSPARC IV processors, 20 Sun Fire v490s with 2 dual-core UltraSPARC IV processors and 14 older Sun Fire v440s with 4 single-core UltraSPARC IIIi processors. The Sun Fire v890s were used exclusively for the database tier. The Sun Fire v490s were used for all three tiers. The older Sun Fire v440s were used for the web tier. Table 3 below shows the original server configurations, original purchase prices and annual hardware maintenance costs per server. Number of Cores per Memory Purchase Annual Server Type Servers Server per Server Price Support Sun Fire v890 – UltraSPARC IV 8 16 32 GB $125,000 $11,500 Sun Fire v490 – UltraSPARC IV 20 8 16 GB $47,000 $4,950 Sun Fire v440 – UltraSPARC IIIi 14 4 6 GB $36,500 $3,850 Total All Servers 42 344 660 GB $2,451,000 $244,900 Table 3: Original server configurations Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO 2 Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
  • 6. Proposed Server Hardware Configurations Going forward the organization considered three upgrade alternatives: 1) Replace current Sun Fire servers with the latest Sun SPARC Enterprise servers. 2) Consolidate workloads onto more scalable Sun SPARC Enterprise servers using virtualization. 3) Consolidate workloads onto IBM Power Systems servers using virtualization. The organization worked with engineers representing both hardware vendors to size the appropriate configurations based on current workloads and the desire for greater processing power. For the first option, the Sun Upgrade Configuration, the organization would replace the current Sun Fire v890 servers with Sun SPARC Enterprise M5000 servers. Each M5000 server would be configured with 8 quad core SPARC64 VII (2.53 GHz) processors and 64 GB of memory. The Sun Fire v490 servers would be replaced with Sun SPARC Enterprise M4000 servers, each with 4 quad core SPARC64 VII (2.53 GHz) processors and 32 GB of memory. The Sun Fire v440 servers would be replaced with Sun SPARC Enterprise M4000 servers, each with 2 quad core SPARC64 VII (2.53 GHz) processors and 16 GB of memory. For the server consolidation options the organization expected to be able to increase average system utilization from 18.7% to over 45% by moving current processes from separate physical servers to virtual machines on larger more scalable servers. For the Sun SPARC Consolidation configuration the organization would need a cluster of four Sun SPARC Enterprise M8000 servers, each with 16 quad core Sun SPARC64 VII (2.53 GHz) processors and 256 GB of memory. The IBM Power Consolidation configuration would have a similar architecture with four clustered IBM Power 780 servers. Each of the IBM Power 780 servers would be configured with 2 eight core IBM POWER7 (3.8GHz) processors and 256 GB of memory. Table 4 shows the configurations, purchase prices and annual hardware support costs for the various options. Number of Processors Memory Purchase Annual Server Type Servers (Chips/Cores) per Server Price Support Sun SPARC Upgrade Configuration Sun SPARC Enterprise M5000 8 (8 / 32) 64 GB $150,000 $11,500 Sun SPARC Enterprise M4000 20 (4 / 16) 32 GB $65,000 $7,000 Sun SPARC Enterprise M4000 14 (2 / 8) 16 GB $45,000 $5,000 Total Sun SPARC Upgrade 42 (172 / 688) 1376 GB $3,130,000 $302,000 Sun SPARC Consolidation Configuration Sun SPARC Enterprise M8000 4 (16 / 64) 256 GB $900,000 $54,800 Total Sun SPARC Consolidation 4 (64 / 256) 1024 GB $3,600,000 $219,200 IBM Power Consolidation Configuration IBM Power 780 4 (2 / 16) 256 GB $250,000 $15,000 Total IBM Power Consolidation 4 (8 / 64) 1024 GB $1,000,000 $60,000 Table 4: Proposed server configurations The lowest cost option was the IBM Power Systems configuration. With a powerful system architecture and highly efficient virtualization solution the IBM Power 780 servers were able to deliver superior performance to the larger Sun SPARC Enterprise M8000 servers at 72% lower cost per server. Similarly, the higher efficiency of the clustered IBM Power configuration resulted in $2,130,000 lower hardware costs than the Sun SPARC Upgrade configuration. Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO 3 Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
  • 7. Software Licensing In addition to the server hardware costs, the organization also examined the software costs associated with switching platforms. Changing platforms to IBM Power Systems would require new IBM AIX operating system and IBM PowerVM virtualization software licenses, which would cost $64,000 per server for the licenses and $16,000 per year for annual support. Compared with current annual software support costs of $181,500, it turned out that the consolidation would actually reduce annual software maintenance costs by 59% per year. These savings would compensate for the additional license fees in just over two years and reduce overall software costs by 23% over the three year analysis period saving $126,600. The software cost comparison included the upfront license fees and ongoing annual support for operating system software as well as systems management software. Typically database and application server software are also included in the cost comparison. However, the costs for these components were the same for all three configurations, since the Oracle database and Oracle application server licenses were bundled with the Oracle E-Business Suite application software, which was priced on a per user basis rather than a per server basis. Table 5 shows the upfront license costs for the new IBM AIX and PowerVM licenses and the annual software support costs for all three options. Sun SPARC Sun SPARC IBM Power Software License and Support Costs Upgrade Consolidation Consolidation Number of Servers 42 4 4 Operating System License Cost per Server N/A N/A $64,000 Total Operating System License Costs N/A N/A $256,000 Annual Operating System Support per Server $2,211 $8,500 $16,000 Annual Systems Management Support per Server $1,433 $5,600 $2,800 Total Annual Software Support Costs $153,080 $56,400 $75,200 Total Three Year Software Costs $459,240 $169,200 $417,600 Table 5: Three Year Software License and Support Cost Comparison Systems and Database Administration Labor Costs One of the major objectives for the server consolidation was to reduce ongoing operating expenses. While the original architecture of separate standard implementations per operating company simplified systems management, maintaining multiple servers required considerable overhead. Upgrades and patches needed to be applied consistently to all servers. Performance tuning, availability management and access control were also performed separately for each individual server. The organization anticipated that it could reduce the server and database administration workloads by 50% through server consolidation, reducing current staffing levels from nine down to four and a half staff. This would allow the organization to shift these freed up resources from daily administration and operations functions to more proactive roles of data management and reporting in support of business initiatives. Table 6 shows the current staffing levels for Systems Administration, Database Administration and Operations along with expected levels for a consolidated environment. By reducing the labor requirements for infrastructure management from nine staff to four and a half, the organization expected to reduce annual operating costs by $550,000 per year, saving $1,650,000 over the three year analysis period. Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO 4 Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
  • 8. Original and IBM or Sun Server Administration Labor Costs Upgrade Labor Consolidation Annual Savings Number of Servers 42 4 38 Database Administrators 2.5 1.5 1.0 Average Annual DBA Salary * $145,000 $145,000 $145,000 Systems Administrators 4.0 2.0 2.0 Average Annual System Administration Salary $135,000 $135,000 $270,000 Systems Operations Staff 2.5 1.0 1.5 Average Systems Operations Salary $90,000 $90,000 $135,000 Annual Administration Costs $1,127,500 $577,500 $550,000 Total Three Year Admin Costs $3,382,500 $1,732,500 $1,650,000 Table 6: Three Year Server and Database Administration Labor Costs * Note: All salaries reflect the fully burdened costs for staff including base salary, benefits, payroll taxes, paid time off, and office expenses. Energy Costs and Environmental (Green) Impact With the recent focus on global warming and fluctuating energy costs the organization was interested in reducing its energy requirements. This was particularly important because the datacenter had started running rather warm in the past two years. If the organization could not reduce the energy consumption and corresponding heat generation they would be forced to undergo a costly datacenter expansion and air conditioning system upgrade. The datacenter expansion and HVAC upgrade was expected to cost $600,000. Using a simple ten year straight line depreciation schedule the amortized cost of the expansion came to $60,000 per year. For every year to organization could avoid the upgrade they would save this $60,000 expense. The proposed IBM Power solution was expected to reduce total energy consumption by an impressive 87%, saving over 950,000 kWatts per year or $91,318 in electrical costs. This reduction in power consumption and heat generation was sufficient to postpone the expansion of the datacenter. The alternative Sun M8000 consolidation solution would also reduce energy requirements by almost 50%, but this configuration would still require nearly three times more energy than the IBM proposal. Table 7 below shows the energy requirements for the original server configuration and the three alternative proposals. Original Sun SPARC Sun SPARC IBM Power Annual Energy Consumption Environment Upgrade Consolidation Consolidation Number of Servers 42 42 4 4 Average Power Consumption per Server (Watts) 1,188 1,606 6,300 1,600 Annual Operating Hours 8766 8766 8766 8766 Data Center PUE Factor* 2.5 2.5 2.5 2.5 Annual Power Consumption (kWatts) 1,1093,471 1,478,474 552,258 140,256 Average Price per kWh $0.0958 $0.0958 $0.0958 $0.0958 Annual Power and Cooling Costs $104,755 $141,638 $52,906 $13,437 Average CO2 Emissions (lbs/kWatt) 1.341 1.341 1.341 1.341 Annual CO2 Emissions (tons) 733 991 370 94 Table 7: Annual Energy Consumption and Cost Comparison Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO 5 Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
  • 9. * PUE – Power Usage Effectiveness is the measure of energy required by the data center as a whole for each unit of energy delivered to servers. This measure includes cooling and other data center equipment. Finally, from an environmental perspective, the reduction in energy consumption for power and cooling would result in a decrease of approximately 639 tons of CO2 per year, or the equivalent of eliminating the emissions of 106 cars per year. (On average cars produce 6 metric tons of CO2 per year.) Upgrade / Migration Costs The installation of the new IBM Power Systems servers and application migration would be performed by a combination of external professional services personnel and internal staff. The initial installation of the new servers and application migration would take ten weeks including system design and planning. System verification and testing would take an additional six weeks. Overall the organization budgeted $120,000 for external professional services fees. They estimated internal migration costs at $106,250, based on 1700 hours of internal labor at an average fully burdened hourly rate of $62.50. Improved Operational Agility While the organization had a sound process in place for integrating new operating companies, the deployment of new systems for each new acquisition or merger required considerable time and effort. First, the organization would need to assess the current workload for the new operating company to properly size the required servers. Since the operating companies were typically running different financial applications, this required some analysis to translate current workloads over to the Oracle E-Business Suite. To compensate for any sizing errors and to account for growth, the IT organization generally inflated the system specifications and purchased larger servers than were truly needed. In addition to the time and effort required for system sizing the organization also needed to procure the servers, install the hardware and configure the systems. Once the physical hardware was in place and operational, then the IT group could begin the application configuration and data migration. This process took six to nine months on average. With the new virtualized server infrastructure the organization could simply define new virtual servers on the existing physical server cluster to accommodate new application instances. The organization expected that eliminating the sizing, procurement, installation and configuration of additional servers would trim three months off the time it took to integrate the financial systems for new operating companies. Additionally, by leveraging a virtualized environment the organization could make more efficient use of physical server resources. Rather than over-sizing server requirements, the organization could now define virtual machines to more closely match expected processing needs, and easily adjust the allocation of these resources over time to match actual processing requirements. Service Level Improvements Based on benchmark tests with the IBM Power Systems servers, the organization expected to improve service levels for the organization by accelerating key business processes and improving system availability. Over the years growth in computing requirements had started degrading the performance of both interactive users of the applications as well as crucial period end financial processes. The new IBM Power Systems were able to complete many of these processes up to four times faster than the previous systems. The organization expected that these performance improvements would yield tangible productivity benefits for the Finance group in being able to process weekly payroll, close month end financial statements and process accounts receivable more efficiently. The new clustered configuration with IBM PowerHA SystemMirror would also provide higher availability through automated failover. Although improving performance and reliability were key factors in the server consolidation decision, the organization chose not to quantify these benefits for the financial analysis. Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO 6 Copyright 2001-2010 Alinean, Inc. All Rights Reserved.
  • 10. CONCLUSION While standardization of core technologies and processes can contribute to improved operational efficiency and increased service levels, this case study revealed that consolidation of IT resources can provide even greater savings. By consolidating forty two servers down to only four physical servers our study participant was able to lower ongoing operational costs for systems administration and energy by a combined 52%, saving over $641,318 per year compared to upgrading existing servers. Additionally, the IBM Power Systems consolidation solution offered superior price performance characteristics compared to the Sun SPARC Enterprise M8000 proposal. By switching architectures and consolidating on IBM Power 780 servers the organization featured in this paper expected to reduce the total cost of ownership TCO for their server infrastructure by $526,218, or 30% over a three year analysis period. By modernizing their server hardware and implementing high availability clustering, they also expected to decrease system downtime, improving service levels for the business. The implementation of a virtualized server environment would also improve average resource utilization and accelerate the deployment of new applications, thus increasing business agility. EXPLORE FOR YOURSELF As illustrated in this case study, the latest IBM Power Systems servers powered with the latest IBM POWER7 processors offer tremendous opportunity for reducing energy consumption, shrinking your data center footprint and lowering operational costs. Alinean has developed an easy to use Server Consolidation TCO Calculator that will allow you to explore these potential savings for your unique environment. Learn how you can achieve similar benefits with a payback in a little as nine months. Get your customized report at: http://www-03.ibm.com/systems/migratetoibm/whyibm/campaigns/sconevaltool1.html ABOUT ALINEAN Since 1994, the Alinean team has been the pioneering builder of tools to help quantify and improve the ROI and TCO of IT investments. Alinean was named for the Spanish word for “Align”, matching the Alinean mission as the leading developer of analytical tools to help IT vendors, consultants and IT executives align IT investments with business strategies. The Alinean team has over a decade of experience in the practical development and application of ROI and TCO methodologies, models and tools to optimizing IT investment decision making. In 1994, the Alinean team formed Interpose, the original pioneers of ROI tools, developing analytical software for over 50 major IT vendors and consulting companies worldwide, and creating the industry standard TCO Manager and TCO Analyst software. Interpose was sold to Gartner in 1998, where the team continued their developments and marketing of ROI and TCO software tools. The original team reunited to form Alinean in 2001, once again becoming the leading pioneers and developers of ROI sales and analytical tools. Current customers include leading IT solution providers such as HP, IBM, Dell, Intel, Symantec, NetIQ, EMC, SAP, Oracle, SBC, and Microsoft, as well as leading consultancies and Global 1000 companies. Additional information about Alinean and helpful ROI educational resources can be found at http://www.alinean.com. Server Consolidation for Oracle E-Business Suite with IBM Power Systems Servers: Lowering TCO 7 Copyright 2001-2010 Alinean, Inc. All Rights Reserved. POL03071-USEN-00