SlideShare uma empresa Scribd logo
1 de 6
СЭА                                 QUALITY MANAGEMENT SYSTEM
 The document
 name
                                  Procedure of the conclusion of the contract
                                                             Effective date:
 Code:                                 SEA P702              15.03.2006




                                        THE MAINTENANCE:



                                  1. THE PURPOSE
                                  2. SCOPE OF APPLICATION

                                  3. REFERENCES TO DOCUMENTS

                                  4. THE INSTRUCTION DESCRIPTION

                                  5. RESPONSIBILITY AND POWERS

                                  6. DESIGNATIONS AND REDUCTIONS

                                  7. APPENDICES




THE                      HAS PREPARED:            HAS CHECKED UP:              HAS CONFIRMED:
DOCUMENT
    Post:                  The chief
                                                  The chief engineer           The general director
                             ПТО
 FIRST NAME,               Varakin O.                 Lerner B.                    Lobach A.
   MIDDLE
INITIAL, LAST
    NAME:
The signature:

                 №                1.         2.            3.           4.               5.
Changes          Date:
                 The signature:

SEA P702 Sheet 1 1from 6
СЭА                    QUALITY MANAGEMENT SYSTEM
 The document
 name
                            Procedure of the conclusion of the contract
                                                      Effective date:
 Code:                        SEA P702                15.03.2006




                            Sheet of mailing of the document

 №             The name                                          Date      The
                                             Post
 пп           Divisions                                      Receptions   signature
 1     The top management      The general director           16.03.06
 2                             The chief engineer             16.03.06
 3                             Head СМК                       16.03.06
 4                             The chief accountant           16.03.06
 5                             The agent on supply            16.03.06
 6                             The manager on the personnel   16.03.06
 7     Technological           The chief of department        16.03.06
       department
 8                             The mechanic                   16.03.06
 9     Industrial site №1      The chief of a site            17.03.06
 10    Industrial site №2      The chief of a site            17.03.06




SEA P702 Sheet 1 2from 6
СЭА                           QUALITY MANAGEMENT SYSTEM
 The document
 name
                              Procedure of the conclusion of the contract
                                                               Effective date:
 Code:                           SEA P702                      15.03.2006




 1. THE PROCEDURE PURPOSE

   This procedure has the purpose to define process of the conclusion of the contract / the
 contract with contractors / customers / suppliers (counterparts).

 2. SCOPE OF APPLICATION

 This procedure is applied by preparation and the conclusion of contracts and contracts
 Electrical Instrumentation Construction Corporation.

 3. THE REFERENCE TO DOCUMENTS
           ISO 9001:2000, р7;

 4. THE PROCEDURE DESCRIPTION

 4.1. The account of requirements of the counterpart
 The counterpart at the desire of Electrical Instrumentation Construction Corporation the
 contract draught / the contract in which he completely states the conditions or requirements
 goes.
 4.2. The analysis of possible satisfaction of requirements of the counterpart
 The contract draught / the contract goes to divisions and departments for consideration and the
 analysis of conditions and the requirements exposed by the counterpart.
 Results of the analysis of the contract draught / the contract are marked in the form of SEA
 О701.01 "the ANALYSIS of CONTRACTS / CONTRACTS".
 4.3. The notice of the counterpart on conditions and possibilities of execution of the contract /
 the contract
 After reception of results of the analysis, the contract draught / the contract is discussed at the
 Chief engineer, and to the counterpart the written message on acceptance or change of its
 conditions and requirements goes.
 4.4 Preparation of the contract / the contract
 Having discussed conclusions of all departments involved in the analysis and Electrical
 Instrumentation Construction Corporation divisions, the technological department prepares the
 variant of the contract / the contract.
 4.5 Coordination of the contract / the contract with the counterpart

SEA P702 Sheet 1 3from 6
СЭА                          QUALITY MANAGEMENT SYSTEM
 The document
 name
                              Procedure of the conclusion of the contract
                                                               Effective date:
 Code:                           SEA P702                      15.03.2006

 The Technological   department (ПТО) / the contract directs the modified variant of the contract
 on the coordination to the Chief engineer. It considers the contract / the contract, co-ordinates it
 and directs to the counterpart on the coordination. If the counterpart co-ordinates the contract /
 the contract, there is its signing.
 4.6 Conclusion of the contract / the contract
 After the definitive coordination of all points of the contract / the contract, signing of 2 copies
 by both parties is made. The head of the company or the responsible person from each party
 the signature establish the fact of the conclusion of the contract / the contract. ПТО assigns
 number to the contract / to the contract and registers it.
 4.7 Delivery of the order about contract execution / the contract
 At reception of the original of the contract / the contract the General director gives out the
 order about its execution.
        In case of change of contract any of points / the contract in the conditions of its
 realisation, procedure of signing of addition to the contract / to the contract is carried out under
 the similar scheme.
 As a whole procedure of the conclusion of the contract / the contract is represented on the
 scheme 1.




SEA P702 Sheet 1 4from 6
СЭА                      QUALITY MANAGEMENT SYSTEM
 The document
 name
                             Procedure of the conclusion of the contract
                                                                     Effective date:
 Code:                          SEA P702                             15.03.2006

                                                 beginnin
THE SCHEME 1:                                       g
 The

                              Requirements              4.1
                              of the
 The                          counterpart       account of
                                              requirements of                             ПТО
                                              the counterpart

                                                        4.2
 The                          Requirements
                              of the           analysis возм.                            ,Divisions and
                              counterpart     удовлетв. треб.                             departments
                                              The counterpart     SEA О701.01


                                                                  4.3
                           SEA О701.01
The                                            notice of the                              ПТО
                                              counterpart on
The                                           conditions and         notice of the
                                              возм. Changes          counterpart

                                                                     4.4
                                         Contract preparation /
                                             the contract                                   ПТО


                                                        4.5
                                                         4.5
                                         contract coordination                         chief
                                             / the contract                            engineer
The The

The
                                                                                       counterpart
                                         No                                              agrees?

 The The                                                    Yes 4.6
                                                conclusion                             general director
                                          Contracts / the contract




                                                                     4.7
                                          order about execution                           general
 The The                                  Contracts / the contract                        director
 The


                                                 termination




SEA P702 Sheet 1 5from 6
СЭА                          QUALITY MANAGEMENT SYSTEM
 The document
 name
                              Procedure of the conclusion of the contract
                                                              Effective date:
 Code:                           SEA P702                     15.03.2006


 5. RESPONSIBILITY AND POWERS

                                                                            The responsibility table:


      №                     Services,                  Gene.       Гл.     ПТО Подразд.,
      пп                                Experts        The        The          Departme
              Action                                  director   engineer         nts
      4.1    The account of requirements of the           -         -     ABOUT    -
             counterpart
      4.2    The analysis of possible satisfaction of  AND   AND  ABOUT                     At
             requirements of the counterpart
      4.3    The notice of the counterpart on           -      -  ABOUT                   AND
             conditions and possible changes
      4.4    Contract preparation / the contract       AND   AND  ABOUT                    AT
      4.5    The contract coordination / the contract AND   ABOUT   AT                    AND
      4.6    The contract conclusion / the contract ABOUT    AND   AND                    AND
      4.7    The order about contract execution /     ABOUT   AT   AND                    AND
             the contract


 6. DESIGNATIONS AND REDUCTIONS

        About – responsibility, At – participation, And – it is informed.

 7. THE APPENDIX

    1. The appendix 1: "the ANALYSIS of CONTRACTS / CONTRACTS" – SEA О701.01
       (only 1 page).




SEA P702 Sheet 1 6from 6

Mais conteúdo relacionado

Destaque

3. quality management manual
3. quality management manual3. quality management manual
3. quality management manualzemm1
 
4. oh&s policy
4. oh&s policy4. oh&s policy
4. oh&s policyzemm1
 
13. company profile
13. company profile13. company profile
13. company profilezemm1
 
9. c vs of staff
9. c vs of staff9. c vs of staff
9. c vs of staffzemm1
 
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Tư vấn GMP, cGMP, ISO
 
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gspTư vấn GMP, cGMP, ISO
 
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Tư vấn GMP, cGMP, ISO
 
10. list of equipments
10. list of equipments10. list of equipments
10. list of equipmentszemm1
 
Validation of friability test apapraturs
Validation of friability test apapratursValidation of friability test apapraturs
Validation of friability test apapratursRam Mohan S R
 
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Tư vấn GMP, cGMP, ISO
 
Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015DQS Inc.
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3DQS Inc.
 
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY  INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY Ram Mohan S R
 
ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5DQS Inc.
 
problems in tablet manufacturing and coating
problems in tablet manufacturing and coatingproblems in tablet manufacturing and coating
problems in tablet manufacturing and coatingvenkatesh thota
 

Destaque (20)

3. quality management manual
3. quality management manual3. quality management manual
3. quality management manual
 
design qualification
design qualification design qualification
design qualification
 
4. oh&s policy
4. oh&s policy4. oh&s policy
4. oh&s policy
 
13. company profile
13. company profile13. company profile
13. company profile
 
Market complaints
Market complaintsMarket complaints
Market complaints
 
9. c vs of staff
9. c vs of staff9. c vs of staff
9. c vs of staff
 
Tunnel thermographs
Tunnel thermographsTunnel thermographs
Tunnel thermographs
 
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
 
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
 
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
 
10. list of equipments
10. list of equipments10. list of equipments
10. list of equipments
 
Design qualification
Design qualificationDesign qualification
Design qualification
 
Huong dan quan ly chat luong thuoc.
Huong dan quan ly chat luong thuoc.Huong dan quan ly chat luong thuoc.
Huong dan quan ly chat luong thuoc.
 
Validation of friability test apapraturs
Validation of friability test apapratursValidation of friability test apapraturs
Validation of friability test apapraturs
 
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
 
Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3
 
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY  INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 
ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5
 
problems in tablet manufacturing and coating
problems in tablet manufacturing and coatingproblems in tablet manufacturing and coating
problems in tablet manufacturing and coating
 

Semelhante a 7. purchase order handling

OL1-2O71-0027-0-Handover and Punch List Procedure.PDF
OL1-2O71-0027-0-Handover and Punch List Procedure.PDFOL1-2O71-0027-0-Handover and Punch List Procedure.PDF
OL1-2O71-0027-0-Handover and Punch List Procedure.PDFThinEmir
 
masco Proxy Statements 2007
masco Proxy Statements 2007 masco Proxy Statements 2007
masco Proxy Statements 2007 finance23
 
masco Proxy Statements 2006-
masco Proxy Statements 2006- masco Proxy Statements 2006-
masco Proxy Statements 2006- finance23
 
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTSHossamNegidaPMPRMPPS
 
masco Proxy Statements 2008
masco Proxy Statements 2008 masco Proxy Statements 2008
masco Proxy Statements 2008 finance23
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Tahir B Mirza
 

Semelhante a 7. purchase order handling (8)

OL1-2O71-0027-0-Handover and Punch List Procedure.PDF
OL1-2O71-0027-0-Handover and Punch List Procedure.PDFOL1-2O71-0027-0-Handover and Punch List Procedure.PDF
OL1-2O71-0027-0-Handover and Punch List Procedure.PDF
 
masco Proxy Statements 2007
masco Proxy Statements 2007 masco Proxy Statements 2007
masco Proxy Statements 2007
 
masco Proxy Statements 2006-
masco Proxy Statements 2006- masco Proxy Statements 2006-
masco Proxy Statements 2006-
 
Nwc usry
Nwc usryNwc usry
Nwc usry
 
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 
masco Proxy Statements 2008
masco Proxy Statements 2008 masco Proxy Statements 2008
masco Proxy Statements 2008
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
 
Inspection and Test Plan_D.pdf
Inspection and Test Plan_D.pdfInspection and Test Plan_D.pdf
Inspection and Test Plan_D.pdf
 

Último

20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 

Último (20)

20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 

7. purchase order handling

  • 1. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of the conclusion of the contract Effective date: Code: SEA P702 15.03.2006 THE MAINTENANCE: 1. THE PURPOSE 2. SCOPE OF APPLICATION 3. REFERENCES TO DOCUMENTS 4. THE INSTRUCTION DESCRIPTION 5. RESPONSIBILITY AND POWERS 6. DESIGNATIONS AND REDUCTIONS 7. APPENDICES THE HAS PREPARED: HAS CHECKED UP: HAS CONFIRMED: DOCUMENT Post: The chief The chief engineer The general director ПТО FIRST NAME, Varakin O. Lerner B. Lobach A. MIDDLE INITIAL, LAST NAME: The signature: № 1. 2. 3. 4. 5. Changes Date: The signature: SEA P702 Sheet 1 1from 6
  • 2. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of the conclusion of the contract Effective date: Code: SEA P702 15.03.2006 Sheet of mailing of the document № The name Date The Post пп Divisions Receptions signature 1 The top management The general director 16.03.06 2 The chief engineer 16.03.06 3 Head СМК 16.03.06 4 The chief accountant 16.03.06 5 The agent on supply 16.03.06 6 The manager on the personnel 16.03.06 7 Technological The chief of department 16.03.06 department 8 The mechanic 16.03.06 9 Industrial site №1 The chief of a site 17.03.06 10 Industrial site №2 The chief of a site 17.03.06 SEA P702 Sheet 1 2from 6
  • 3. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of the conclusion of the contract Effective date: Code: SEA P702 15.03.2006 1. THE PROCEDURE PURPOSE This procedure has the purpose to define process of the conclusion of the contract / the contract with contractors / customers / suppliers (counterparts). 2. SCOPE OF APPLICATION This procedure is applied by preparation and the conclusion of contracts and contracts Electrical Instrumentation Construction Corporation. 3. THE REFERENCE TO DOCUMENTS  ISO 9001:2000, р7; 4. THE PROCEDURE DESCRIPTION 4.1. The account of requirements of the counterpart The counterpart at the desire of Electrical Instrumentation Construction Corporation the contract draught / the contract in which he completely states the conditions or requirements goes. 4.2. The analysis of possible satisfaction of requirements of the counterpart The contract draught / the contract goes to divisions and departments for consideration and the analysis of conditions and the requirements exposed by the counterpart. Results of the analysis of the contract draught / the contract are marked in the form of SEA О701.01 "the ANALYSIS of CONTRACTS / CONTRACTS". 4.3. The notice of the counterpart on conditions and possibilities of execution of the contract / the contract After reception of results of the analysis, the contract draught / the contract is discussed at the Chief engineer, and to the counterpart the written message on acceptance or change of its conditions and requirements goes. 4.4 Preparation of the contract / the contract Having discussed conclusions of all departments involved in the analysis and Electrical Instrumentation Construction Corporation divisions, the technological department prepares the variant of the contract / the contract. 4.5 Coordination of the contract / the contract with the counterpart SEA P702 Sheet 1 3from 6
  • 4. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of the conclusion of the contract Effective date: Code: SEA P702 15.03.2006 The Technological department (ПТО) / the contract directs the modified variant of the contract on the coordination to the Chief engineer. It considers the contract / the contract, co-ordinates it and directs to the counterpart on the coordination. If the counterpart co-ordinates the contract / the contract, there is its signing. 4.6 Conclusion of the contract / the contract After the definitive coordination of all points of the contract / the contract, signing of 2 copies by both parties is made. The head of the company or the responsible person from each party the signature establish the fact of the conclusion of the contract / the contract. ПТО assigns number to the contract / to the contract and registers it. 4.7 Delivery of the order about contract execution / the contract At reception of the original of the contract / the contract the General director gives out the order about its execution. In case of change of contract any of points / the contract in the conditions of its realisation, procedure of signing of addition to the contract / to the contract is carried out under the similar scheme. As a whole procedure of the conclusion of the contract / the contract is represented on the scheme 1. SEA P702 Sheet 1 4from 6
  • 5. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of the conclusion of the contract Effective date: Code: SEA P702 15.03.2006 beginnin THE SCHEME 1: g The Requirements 4.1 of the The counterpart account of requirements of ПТО the counterpart 4.2 The Requirements of the analysis возм. ,Divisions and counterpart удовлетв. треб. departments The counterpart SEA О701.01 4.3 SEA О701.01 The notice of the ПТО counterpart on The conditions and notice of the возм. Changes counterpart 4.4 Contract preparation / the contract ПТО 4.5 4.5 contract coordination chief / the contract engineer The The The counterpart No agrees? The The Yes 4.6 conclusion general director Contracts / the contract 4.7 order about execution general The The Contracts / the contract director The termination SEA P702 Sheet 1 5from 6
  • 6. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure of the conclusion of the contract Effective date: Code: SEA P702 15.03.2006 5. RESPONSIBILITY AND POWERS The responsibility table: № Services, Gene. Гл. ПТО Подразд., пп Experts The The Departme Action director engineer nts 4.1 The account of requirements of the - - ABOUT - counterpart 4.2 The analysis of possible satisfaction of AND AND ABOUT At requirements of the counterpart 4.3 The notice of the counterpart on - - ABOUT AND conditions and possible changes 4.4 Contract preparation / the contract AND AND ABOUT AT 4.5 The contract coordination / the contract AND ABOUT AT AND 4.6 The contract conclusion / the contract ABOUT AND AND AND 4.7 The order about contract execution / ABOUT AT AND AND the contract 6. DESIGNATIONS AND REDUCTIONS About – responsibility, At – participation, And – it is informed. 7. THE APPENDIX 1. The appendix 1: "the ANALYSIS of CONTRACTS / CONTRACTS" – SEA О701.01 (only 1 page). SEA P702 Sheet 1 6from 6