1. Personal Objectives
Seeking to get the entry-level position of an Engineer in a firm where I can use my knowledge and skills in
designing and implementing projects and plans, using cost-effective tools and techniques, dealing with
contractors, staffs and efficiency to solve complex problems in order to bring maximum efficiency to the
projects I manage.
Personal Particular & Contact Info
Full Name : Zahir Bin Ibrahim
Age : 29 years
Nationality : Malaysian
Marital Status : Married
Date of Birth : 22nd
December 1986
Gender : Male
IC No. : 861222-59-5017
Address : 755, Jln Forest Height 4/6 Precinct 4, Seremban Forest Height, 70450 Seremban,
Negeri Sembilan Darul Khusus
Mobile No : +6018-2933019
Email : zahiribrahim22@gmail.com
Educational Background
Highest Education
1) Master by Coursework (July 2010-Dec 2011)
Programme : Master of Science in Environmental Engineering
Field of Study : Environmental Engineering
Institute : Universiti Teknologi MARA (UiTM)
Located In : Shah Alam, Selangor
Graduation : May 2012
2) Degree (Dec 2007 – May 2010)
Programme : Bachelor Degree .Eng (Hons) in Civil Engineering
Field of Study : Civil Engineering
Institute : Universiti Teknologi MARA (UiTM)
Located In : Shah Alam, Selangor
Grade : 2nd
Class Hons (Upper)
Graduation : Nov 2010
Diploma (Nov 2004-Nov 2007)
Level : Diploma
Field of Study : Engineering (Civil Engineering)
Institute : Universiti Teknologi MARA (UiTM)
Located In : Arau, Perlis
Grade : 2nd
Class Hons (Upper)
Graduation : May 2008
2. SPM
Level : Sijil Pelajaran Malaysia
School Name : Sekolah Menengah Teknik Ampangan ,Negeri Sembilan.
Finish School : Nov 2003
Knowledge and Skills
• Design building structures
• Design Infrastructures
• Good understanding in environmental issues.
• Good understanding in waste water and solid waste management.(EQA 1974)
• Excellent in using engineering software (Esteem, Lusas Finite Element, AutoCAD, Stella
Programming)
• Excellent in using Microsoft office (Word, Excel, Frontpage, Publisher, Power Point, Project)
• Excellent in using SAP
Languages Proficiency
Spoken Written
English Good Good
Bahasa Malaysia Very Good Very Good
German Moderate Moderate
Experiences
Trainee at Ibu Pejabat JKR , Wisma Negeri, Negeri Sembilan (Apr – Aug, 2006)
• Participated on Site Investigation, attended site meetings, Report writing for site evaluation.
Trainee at construction firm (Apr-Aug, 2009).
Astaka Jitu Enterprise. Project handled ‘Bangunan Pejabat 3 tingkat Kompleks Belia & Sukan Negeri
Sembilan.’
• Conducted surveying activity, supervised on structures integrity, material handling into site,
Participated in Infrastructure works. Able to interpret engineering drawing, structural drawing and
architect drawing. Involved in preparing progress report and good understanding in project
management in construction.
• Being responsible to do checking of structural work including inspection of reinforcement, checking
defect and suggest method used to repair the defect. I am also responsible to check roof truss work to
make sure all work is done based on drawing plan.
• Handling infrastructure work including drainage, sewerage and road work. I am also responsible to
check the levels are as per approved drawing plan. Solving technical issues with consultant when
problem arise on site.
Graduate Engineer in BW Perunding Sdn.Bhd, (May 2012- Dec 2012)
• Specialist in water consultancy. Design the pipeline for water supply and distribution.
• Co-ordinate the tender preparation process from beginning until submission dates.
• Preparation of bill of quantity (BQ), technical data and specification.
• Design and quantity framework for Sewer pipeline.
List of project involved:
1. Projek Menaik Taraf Bekalan Air di seluruh Felda Negeri Pahang
Design the 200mm DN pipe alignment and profile, preparing taking off and BQ, document tender and
engineer estimate for pipeline works.
2. Pembinaan Rangkaian Paip Pembetungan, Klang Selangor- Design Sewer line.
a. Responsible for the complete design sewer line for design and built contractor. Involved in
preparation of design sewer line profile, to check and proposed suitable design and concept and
cost estimation.
3. Projek Menaik Taraf Tapak Pelupusan Sisa Pepejal di Ladang CEP 1, Simpang Renggam, Johor
Bahru.
3. a. Review and check for the detailed design of the leachate treatment process including plant
capacity, treatment process design, plant & equipment design, cost estimation on construction and
operation & maintenance complete with drawing, specification and bill of quantities.
Engineer – Indah Water Konsortium (Unit Office Seremban) (Jan 2013 - Present)
• Assist in planning strategies for effective operations & maintenance of sewage treatment plants
• Process Monitoring and troubleshooting sewage treatment plant (STP type: EA, LYEA, OD, SBR, IT,
NPS)
• Plan, organise and supervise a group of employees and contractors in the operations and maintenance
of sewage treatment plants in Mantin & Nilai area. Total subordinate: 6 staff, 20 staff outsources
vendors.)
• Preparing plant maintenance works and safety programs for 90 STP around Nilai and Mantin.
• Design and supervise the construction sewage systems. Main player in inspection of newly constructed
STP’s.
• Review and critique proposals, plans, or designs related to sewage treatment systems.
• Prepare annual financial budget for OPEX and CAPEX.
• Tender preparation and evaluation for any civil and M&E works.
• Design conversion of aeration system for sewage treatment plants. Completed project: Design
new conversion from Ejector to Blower type, Design new surface aerator system.
• Mechanical repair works (Aeration device, Mechanical screen, Clarification, Valves and
Pumps)
• Design and install aerators for oxidation ponds.
• Experience in upgrading construction projects in management work and execution of work as per
drawing and requirement. Completed projects: STP upgrading Nilai Utama(OD) 30k PE, STP
upgrading Bdr Enstek(IDEA) 40K PE, Nilai Perdana(OD) STP upgrading 5k PE and Desa Melati
(OD)Upgrading 10K PE.
• Main team player in technical inspection team for newly constructed STP. Inspect and review all
aspects of new completed projects. Ensured compliance with all project guidelines and regulations.
Additional Info
Subjects Taken (Master): Environmental Management, Environmental Assessment, Advanced Wastewater
Treatment and Technology, Environmental Monitoring, Groundwater Pollution and
Engineering, Hydraulic Structures, Operational Research.
Undergraduate Thesis : The Performance of Manganese and Iron on Mesophile Microorganism in
Wastewater under Aerobic Condition
Postgraduate Thesis : Phytoremediation of Leachate from Vegetables Waste
Training & Certifications: Registered as Graduate Engineer in Board of Engineers (BEM),Oct 2011),
Industrial Effluent Treatment System(IETS), Introduction to sewage treatment plant
operation (ITPO), Auditor OHSAS 18001 & MS 1722, Psychology in Managing
People, Certified ISO 50001 EnMS Internal Auditor.
Additional Information
Willing to Travel : Yes
Willing to Relocate : Yes
Possess Own Transport : Yes
Expected Salary : Negotiable
Current Benefits : Mileage, medical insurance, pager allowances, relief allowances, and
annual bonus- max 2 months.
Referee
1)
Name: Soffian Mohammed Amin
Telephone No. : + 606-6789050
Position: Head of Section,Treatment
Company: Indah Water Konsortium,Seremban
2)
Name: Ir.Dr. Aminuddin Baki
Position: Principal
Company: Envirab Services
Email: aminbaki2@gmail.com