SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
Approval Standard
        for
Quick Opening Devices
 (Accelerators and Exhausters)
      for Dry Pipe Valves



                                    Class Number 1031



                                                     May 1977
                              m
                          e.co
                         as
                     gb
                    in
                in
               ra
          et
        .fir
    w
    w
   w




                                  ©2002 FM Global Technologies LLC. All rights reserved.
TABLE OF CONTENTS

I. INTRODUCTION ...................................................................................................................................................................... 1
II. DESCRIPTION ........................................................................................................................................................................ 1
III PERFORMANCE REQUIREMENTS .................................................................................................................................. 2
     3.1 Operation ............................................................................................................................................................................. 2
     3.2 Maintenance ........................................................................................................................................................................ 2
     3.3 Materials ............................................................................................................................................................................. 2
IV MARKINGS ............................................................................................................................................................................... 2
V EXAMINATION AND TESTS ................................................................................................................................................ 3
   5.1 Preliminary Information ..................................................................................................................................................... 3
   5.2 Operation ............................................................................................................................................................................. 3
   5.3 Clogging .............................................................................................................................................................................. 3
   5.4 Ease of Cleaning ................................................................................................................................................................. 3
   5.5 Operating Diaphragm ......................................................................................................................................................... 3
   5.6 Strength ............................................................................................................................................................................... 3
   5.7 Other ................................................................................................................................................................................... 3
                                                              m
                                                          e.co
                                                         as
                                                     gb
                                                    in
                                                in
                                               ra
                                          et
                                        .fir
                                    w
                                    w
                                   w
May 1977                                                                                                  1031


I. INTRODUCTION
  1.1 This standard covers quick opening devices (accelerators and exhausters) used with dry pipe valves in fire
      protection systems to hasten the operation of the valves when one or more sprinklers operate.
        1.1.1 Accelerators hasten the operation of differential dry pipe valves by reducing the differential across
              the clapper. Antiflooding devices are used with accelerators to prevent foreign matter from clogging
              internal orifices. This device may be a separate component or an integral part of the accelerator.
        1.1.2 Exhausters hasten the valve operation by aiding in venting dry pipe systems to atmosphere. They are
              normally used with mechanical dry pipe valves.

  1.2 FM Approval is based upon satisfactory evaluation of the product and the manufacturer in three major areas:
        — Examination and tests of production samples are performed to evaluate (1) the suitability of the
          product, (2) the proper operation and performance of the product as specified by the manufacturer and
          required by FM Approvals and, as far as practical, (3) the durability and reliability of the product.
        — An examination of manufacturing facilities and quality control procedures is conducted to evaluate the
          manufacturer’s ability to produce the product which is examined and tested.
        — Satisfactory field experience is the final test of Approval. Unsatisfactory field experience may result
          in withdrawal of FM Approval.

  1.3 The requirements of this standard are guidelines reflecting current FM Approval tests and practices. Devices
      which do not conform to these requirements may be Approved if they meet the intent of this standard.
      Conversely, those that do conform may not be Approved if other conditions govern.




II. DESCRIPTION
  2.1 Quick opening devices usually employ a two-chamber configuration with a diaphragm as the common
      boundary. Movement of the diaphragm effects movement of a clapper which holds back sprinkler system air
      pressure. A small orifice connects the two air chambers. It is used for adjustment purposes and to equalize
      chamber pressures in systems which are not air-tight.

  2.2 The device is in the set position when both chambers are in equilibrium. When one or more sprinklers
                                             m
                                         e.co
                                        as
                                    gb
                                   in




      operate, air is vented from the system side of the quick opening device. Since the equalizing orifice cannot
                               in
                              ra
                         et
                       .fir
                   w
                   w
                  w




      compensate for the excessive air loss, a pressure differential is created across the diaphragm which moves
      the clapper off its seat. System air is vented to atmosphere or, as in differential type dry pipe valves,
      redirected to the intermediate chamber to destroy the pressure differential and trip the dry pipe valve.




                                                                                         FM APPROVALS            1
1031                                                                                                    May 1977




III PERFORMANCE REQUIREMENTS

3.1 Operation
          3.1.1 The quick opening device shall trip the dry pipe valve within 30 s after the operation of one or more
                sprinklers at initial system air pressures ranging from 25 to 50 psi (172.4 to 344.7 kPa).
          3.1.2 Quick opening devices shall remain functional when exposed to air and water supply pressures up
                to the rated working pressure of the dry pipe valve.
          3.1.3 The anti-flooding component of the quick opening device shall not allow water or foreign matter to
                enter the accelerator.
          3.1.4 The anti-flooding component of the quick opening device shall not interfere with the accelerator’s
                normal operation.
          3.1.5 Orifices shall be protected from clogging.
          3.1.6 A gauge shall be provided to sense upper chamber pressure to facilitate the detection of a clogged
                pressure-equalizing orifice.


3.2 Maintenance
          3.2.1 The anti-flooding component of the quick opening devices shall be designed to permit quick
                cleaning and maintenance without the use of special tools.
          3.2.2 Provisions shall be made in the dry pipe valve trim for isolating the quick opening device in order
                that repairs can be made without affecting sprinkler system protection.


3.3 Materials
          3.3.1 All materials used shall be suitable for their intended application. Components susceptible to
                malfunction due to corrosion shall be constructed of materials with at least the corrosion resistance
                equal to a bronze alloy with a minimum 80% copper content.
          3.3.2 Special attention will be given to the possibility of corrosion being caused by galvanic action and
                the effects of such corrosion on reliable performance.
                                                            m
                                                        e.co
                                                       as
                                                   gb
                                                  in
                                              in
                                             ra
                                        et
                                      .fir
                                  w
                                  w
                                 w




IV MARKINGS
    4.1 The manufacturer’s name or trademark, model or type designation, rated working pressure, year of manu-
        facture and FM Approval Mark, if used, shall be cast on the body of the quick opening device or inscribed
        on a securely attached corrosion-resistant nameplate.

    4.2 The inlet and outlet shall also be clearly identified.




2     FM APPROVALS
May 1977                                                                                                                          1031


V EXAMINATION AND TESTS

5.1 Preliminary Information

   Prior to testing, the manufacturer shall provide general assembly drawings, detail drawings and material
   specifications for each part (ASTM designation, wherever applicable), expected performance data, and
   maintenance, operating and installation instructions with complete trim drawings. These shall be reviewed and
   compared with samples of the quick opening devices submitted for testing.


5.2 Operation

   The quick opening device shall effect dry pipe valve operation within 30 s when subjected to rates of pressure
   drop from 10 psi/min (69 kPa/min) through 80 psi/min (552 kPa/min).
   Note: To ensure that the velocity check will properly close when the accelerator operates, these components will be tested as a unit.



5.3 Clogging

   The following tests will be conducted to ensure that the antiflooding device will adequately protect the
   accelerator from clogging due to foreign matter within the system:
          — One tablespoon of organic matter, approximately the size and shape of sunflower seeds, will be placed
            in the accelerator’s pipe lines to simulate loosened debris making its way through the system during
            operation of the dry pipe valve.
          — The above procedure will be repeated using two tablespoons of wooden toothpick segments. The
            segments used shall be made by cutting a standard round pointed toothpick, approximately 0.1 in.
            (2.5 mm) in diameter, into approximately 0.13 in. (3.3 mm) lengths.
          — Each test will be repeated four times. The above debris shall not pass through the antiflooding device
            in all cases.


5.4 Ease of Cleaning

   Evaluation will be based on the time required to clean the antiflooding device of the debris left by the procedure
   outlined in Para. 5.3. A cleaning time of 20 minutes or less is satisfactory.
                                                  m
                                              e.co
                                             as
                                         gb
                                        in
                                    in
                                   ra
                              et
                            .fir
                        w
                        w
                       w




5.5 Operating Diaphragm

   The operating diaphragm shall be subjected to twice the rated working pressure for five minutes. Sensitivity and
   operation shall not be adversely affected, subsequent to this test.


5.6 Strength

   Quick opening devices and associated components, if any, shall withstand a hydrostatic pressure of four times
   the rated working pressure for five minutes without damage.


5.7 Other

   At the discretion of FM Approvals, other tests may be performed to verify the integrity and reliability of an
   unusual design or material application.

                                                                                                            FM APPROVALS                   3

Mais conteúdo relacionado

Semelhante a Nfpa 1031

Static, Thermal and CFD Analysis of Bleeder in Steam Turbine Casing Using Ansys
Static, Thermal and CFD Analysis of Bleeder in Steam Turbine Casing Using AnsysStatic, Thermal and CFD Analysis of Bleeder in Steam Turbine Casing Using Ansys
Static, Thermal and CFD Analysis of Bleeder in Steam Turbine Casing Using AnsysIRJET Journal
 
Paper id 24201467
Paper id 24201467Paper id 24201467
Paper id 24201467IJRAT
 
IRJET-Second Throat Diffuser System at Different Back Pressure for High Altit...
IRJET-Second Throat Diffuser System at Different Back Pressure for High Altit...IRJET-Second Throat Diffuser System at Different Back Pressure for High Altit...
IRJET-Second Throat Diffuser System at Different Back Pressure for High Altit...IRJET Journal
 
Second Throat Diffuser System at Different Back Pressure for High Altitude Test
Second Throat Diffuser System at Different Back Pressure for High Altitude TestSecond Throat Diffuser System at Different Back Pressure for High Altitude Test
Second Throat Diffuser System at Different Back Pressure for High Altitude TestIRJET Journal
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaUdhayakumar Venkataraman
 
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET Journal
 
ABB CEF Current Limiting Fuses 3.6, 7.2, 12kV, 6-200A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 3.6, 7.2, 12kV, 6-200A High Voltage Fuse LinksABB CEF Current Limiting Fuses 3.6, 7.2, 12kV, 6-200A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 3.6, 7.2, 12kV, 6-200A High Voltage Fuse LinksThorne & Derrick International
 
ABB CEF Current Limiting Fuses 17.5, 24kV, 6-125A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 17.5, 24kV, 6-125A High Voltage Fuse LinksABB CEF Current Limiting Fuses 17.5, 24kV, 6-125A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 17.5, 24kV, 6-125A High Voltage Fuse LinksThorne & Derrick International
 
ABB High Voltage Fuses - CMF Range, Motor Fuses 3.3kV -11kV
ABB High Voltage Fuses - CMF Range, Motor Fuses 3.3kV -11kVABB High Voltage Fuses - CMF Range, Motor Fuses 3.3kV -11kV
ABB High Voltage Fuses - CMF Range, Motor Fuses 3.3kV -11kVThorne & Derrick International
 
ABB High Voltage Fuses - WBT Range, DC Railway Fuses 1.9kV - 4kV
ABB High Voltage Fuses - WBT Range, DC Railway Fuses 1.9kV - 4kVABB High Voltage Fuses - WBT Range, DC Railway Fuses 1.9kV - 4kV
ABB High Voltage Fuses - WBT Range, DC Railway Fuses 1.9kV - 4kVThorne & Derrick International
 
ABB CEF Current Limiting Fuses 36kV, 6-40A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 36kV, 6-40A High Voltage Fuse LinksABB CEF Current Limiting Fuses 36kV, 6-40A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 36kV, 6-40A High Voltage Fuse LinksThorne & Derrick International
 
ABB High Voltage Fuses - WBP Range, Voltage Transformer Fuses 7.2-33kV
ABB High Voltage Fuses - WBP Range, Voltage Transformer Fuses 7.2-33kVABB High Voltage Fuses - WBP Range, Voltage Transformer Fuses 7.2-33kV
ABB High Voltage Fuses - WBP Range, Voltage Transformer Fuses 7.2-33kVThorne & Derrick International
 
ABB CEF Current Limiting Fuses 27kV, 6-100A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 27kV, 6-100A High Voltage Fuse LinksABB CEF Current Limiting Fuses 27kV, 6-100A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 27kV, 6-100A High Voltage Fuse LinksThorne & Derrick International
 
Review paper on study and implementation of steam traps
Review paper on study and implementation of steam trapsReview paper on study and implementation of steam traps
Review paper on study and implementation of steam trapsIRJET Journal
 

Semelhante a Nfpa 1031 (20)

Nfpa 1020
Nfpa 1020Nfpa 1020
Nfpa 1020
 
Nfpa 1021
Nfpa 1021Nfpa 1021
Nfpa 1021
 
Nfpa 1032
Nfpa 1032Nfpa 1032
Nfpa 1032
 
Static, Thermal and CFD Analysis of Bleeder in Steam Turbine Casing Using Ansys
Static, Thermal and CFD Analysis of Bleeder in Steam Turbine Casing Using AnsysStatic, Thermal and CFD Analysis of Bleeder in Steam Turbine Casing Using Ansys
Static, Thermal and CFD Analysis of Bleeder in Steam Turbine Casing Using Ansys
 
Nfpa 1042
Nfpa 1042Nfpa 1042
Nfpa 1042
 
Paper id 24201467
Paper id 24201467Paper id 24201467
Paper id 24201467
 
IRJET-Second Throat Diffuser System at Different Back Pressure for High Altit...
IRJET-Second Throat Diffuser System at Different Back Pressure for High Altit...IRJET-Second Throat Diffuser System at Different Back Pressure for High Altit...
IRJET-Second Throat Diffuser System at Different Back Pressure for High Altit...
 
Second Throat Diffuser System at Different Back Pressure for High Altitude Test
Second Throat Diffuser System at Different Back Pressure for High Altitude TestSecond Throat Diffuser System at Different Back Pressure for High Altitude Test
Second Throat Diffuser System at Different Back Pressure for High Altitude Test
 
Air compressor operation care
Air compressor operation careAir compressor operation care
Air compressor operation care
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
 
ABB CEF Current Limiting Fuses 3.6, 7.2, 12kV, 6-200A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 3.6, 7.2, 12kV, 6-200A High Voltage Fuse LinksABB CEF Current Limiting Fuses 3.6, 7.2, 12kV, 6-200A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 3.6, 7.2, 12kV, 6-200A High Voltage Fuse Links
 
ABB CEF Current Limiting Fuses 17.5, 24kV, 6-125A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 17.5, 24kV, 6-125A High Voltage Fuse LinksABB CEF Current Limiting Fuses 17.5, 24kV, 6-125A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 17.5, 24kV, 6-125A High Voltage Fuse Links
 
ABB High Voltage Fuses - CMF Range, Motor Fuses 3.3kV -11kV
ABB High Voltage Fuses - CMF Range, Motor Fuses 3.3kV -11kVABB High Voltage Fuses - CMF Range, Motor Fuses 3.3kV -11kV
ABB High Voltage Fuses - CMF Range, Motor Fuses 3.3kV -11kV
 
ABB High Voltage Fuses - WBT Range, DC Railway Fuses 1.9kV - 4kV
ABB High Voltage Fuses - WBT Range, DC Railway Fuses 1.9kV - 4kVABB High Voltage Fuses - WBT Range, DC Railway Fuses 1.9kV - 4kV
ABB High Voltage Fuses - WBT Range, DC Railway Fuses 1.9kV - 4kV
 
ABB CEF Current Limiting Fuses 36kV, 6-40A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 36kV, 6-40A High Voltage Fuse LinksABB CEF Current Limiting Fuses 36kV, 6-40A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 36kV, 6-40A High Voltage Fuse Links
 
ABB High Voltage Fuses - WBP Range, Voltage Transformer Fuses 7.2-33kV
ABB High Voltage Fuses - WBP Range, Voltage Transformer Fuses 7.2-33kVABB High Voltage Fuses - WBP Range, Voltage Transformer Fuses 7.2-33kV
ABB High Voltage Fuses - WBP Range, Voltage Transformer Fuses 7.2-33kV
 
ABB CEF Current Limiting Fuses 27kV, 6-100A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 27kV, 6-100A High Voltage Fuse LinksABB CEF Current Limiting Fuses 27kV, 6-100A High Voltage Fuse Links
ABB CEF Current Limiting Fuses 27kV, 6-100A High Voltage Fuse Links
 
Ac4506156158
Ac4506156158Ac4506156158
Ac4506156158
 
Review paper on study and implementation of steam traps
Review paper on study and implementation of steam trapsReview paper on study and implementation of steam traps
Review paper on study and implementation of steam traps
 

Mais de Jianping Wong

Yang ming to_launch_japan_koreachinavietnam_service_kcv
Yang ming to_launch_japan_koreachinavietnam_service_kcvYang ming to_launch_japan_koreachinavietnam_service_kcv
Yang ming to_launch_japan_koreachinavietnam_service_kcvJianping Wong
 
Ym uasc and_cscl_merge_tp_services_for_winter_season
Ym uasc and_cscl_merge_tp_services_for_winter_seasonYm uasc and_cscl_merge_tp_services_for_winter_season
Ym uasc and_cscl_merge_tp_services_for_winter_seasonJianping Wong
 
Schneider logistics honors holland with 2013 ltl carrier of the year award
Schneider logistics honors holland with 2013 ltl carrier of the year awardSchneider logistics honors holland with 2013 ltl carrier of the year award
Schneider logistics honors holland with 2013 ltl carrier of the year awardJianping Wong
 
Reuse ny kcontainers_via_apcs_platform
Reuse ny kcontainers_via_apcs_platformReuse ny kcontainers_via_apcs_platform
Reuse ny kcontainers_via_apcs_platformJianping Wong
 
Nyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformNyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformJianping Wong
 
Seamless transitions are_they_possible
Seamless transitions are_they_possibleSeamless transitions are_they_possible
Seamless transitions are_they_possibleJianping Wong
 
521 announcement 29102013 interim financial report q3 2013
521  announcement 29102013  interim financial report q3 2013521  announcement 29102013  interim financial report q3 2013
521 announcement 29102013 interim financial report q3 2013Jianping Wong
 
Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Jianping Wong
 
Estes express lines announces general rate increase
Estes express lines announces general rate increaseEstes express lines announces general rate increase
Estes express lines announces general rate increaseJianping Wong
 
Top 10 popular express companies in us
Top 10 popular express companies in usTop 10 popular express companies in us
Top 10 popular express companies in usJianping Wong
 

Mais de Jianping Wong (20)

Yang ming to_launch_japan_koreachinavietnam_service_kcv
Yang ming to_launch_japan_koreachinavietnam_service_kcvYang ming to_launch_japan_koreachinavietnam_service_kcv
Yang ming to_launch_japan_koreachinavietnam_service_kcv
 
Ym uasc and_cscl_merge_tp_services_for_winter_season
Ym uasc and_cscl_merge_tp_services_for_winter_seasonYm uasc and_cscl_merge_tp_services_for_winter_season
Ym uasc and_cscl_merge_tp_services_for_winter_season
 
Schneider logistics honors holland with 2013 ltl carrier of the year award
Schneider logistics honors holland with 2013 ltl carrier of the year awardSchneider logistics honors holland with 2013 ltl carrier of the year award
Schneider logistics honors holland with 2013 ltl carrier of the year award
 
Reuse ny kcontainers_via_apcs_platform
Reuse ny kcontainers_via_apcs_platformReuse ny kcontainers_via_apcs_platform
Reuse ny kcontainers_via_apcs_platform
 
Nyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformNyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platform
 
Seamless transitions are_they_possible
Seamless transitions are_they_possibleSeamless transitions are_they_possible
Seamless transitions are_they_possible
 
521 announcement 29102013 interim financial report q3 2013
521  announcement 29102013  interim financial report q3 2013521  announcement 29102013  interim financial report q3 2013
521 announcement 29102013 interim financial report q3 2013
 
Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72
 
Estes express lines announces general rate increase
Estes express lines announces general rate increaseEstes express lines announces general rate increase
Estes express lines announces general rate increase
 
Top 10 popular express companies in us
Top 10 popular express companies in usTop 10 popular express companies in us
Top 10 popular express companies in us
 
Nfpa 1210
Nfpa 1210Nfpa 1210
Nfpa 1210
 
Nfpa 1111
Nfpa 1111Nfpa 1111
Nfpa 1111
 
Nfpa 1110
Nfpa 1110Nfpa 1110
Nfpa 1110
 
Nfpa 1055
Nfpa 1055Nfpa 1055
Nfpa 1055
 
Nfpa 1051
Nfpa 1051Nfpa 1051
Nfpa 1051
 
Nfpa 1046
Nfpa 1046Nfpa 1046
Nfpa 1046
 
Nfpa 1041
Nfpa 1041Nfpa 1041
Nfpa 1041
 
Nfpa 557
Nfpa 557Nfpa 557
Nfpa 557
 
Nfpa 1221
Nfpa 1221Nfpa 1221
Nfpa 1221
 
Nfpa 1045
Nfpa 1045Nfpa 1045
Nfpa 1045
 

Último

Presentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphPresentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphNetziValdelomar1
 
Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.EnglishCEIPdeSigeiro
 
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfMaximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfTechSoup
 
How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17Celine George
 
M-2- General Reactions of amino acids.pptx
M-2- General Reactions of amino acids.pptxM-2- General Reactions of amino acids.pptx
M-2- General Reactions of amino acids.pptxDr. Santhosh Kumar. N
 
Prescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxPrescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxraviapr7
 
3.21.24 The Origins of Black Power.pptx
3.21.24  The Origins of Black Power.pptx3.21.24  The Origins of Black Power.pptx
3.21.24 The Origins of Black Power.pptxmary850239
 
2024.03.23 What do successful readers do - Sandy Millin for PARK.pptx
2024.03.23 What do successful readers do - Sandy Millin for PARK.pptx2024.03.23 What do successful readers do - Sandy Millin for PARK.pptx
2024.03.23 What do successful readers do - Sandy Millin for PARK.pptxSandy Millin
 
UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE
 
Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...raviapr7
 
CapTechU Doctoral Presentation -March 2024 slides.pptx
CapTechU Doctoral Presentation -March 2024 slides.pptxCapTechU Doctoral Presentation -March 2024 slides.pptx
CapTechU Doctoral Presentation -March 2024 slides.pptxCapitolTechU
 
Philosophy of Education and Educational Philosophy
Philosophy of Education  and Educational PhilosophyPhilosophy of Education  and Educational Philosophy
Philosophy of Education and Educational PhilosophyShuvankar Madhu
 
5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...CaraSkikne1
 
How to Show Error_Warning Messages in Odoo 17
How to Show Error_Warning Messages in Odoo 17How to Show Error_Warning Messages in Odoo 17
How to Show Error_Warning Messages in Odoo 17Celine George
 
The Stolen Bacillus by Herbert George Wells
The Stolen Bacillus by Herbert George WellsThe Stolen Bacillus by Herbert George Wells
The Stolen Bacillus by Herbert George WellsEugene Lysak
 
Patterns of Written Texts Across Disciplines.pptx
Patterns of Written Texts Across Disciplines.pptxPatterns of Written Texts Across Disciplines.pptx
Patterns of Written Texts Across Disciplines.pptxMYDA ANGELICA SUAN
 
Education and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxEducation and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxraviapr7
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxheathfieldcps1
 
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfP4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfYu Kanazawa / Osaka University
 

Último (20)

Presentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphPresentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a Paragraph
 
Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.
 
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfMaximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
 
How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17
 
M-2- General Reactions of amino acids.pptx
M-2- General Reactions of amino acids.pptxM-2- General Reactions of amino acids.pptx
M-2- General Reactions of amino acids.pptx
 
Prescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxPrescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptx
 
3.21.24 The Origins of Black Power.pptx
3.21.24  The Origins of Black Power.pptx3.21.24  The Origins of Black Power.pptx
3.21.24 The Origins of Black Power.pptx
 
2024.03.23 What do successful readers do - Sandy Millin for PARK.pptx
2024.03.23 What do successful readers do - Sandy Millin for PARK.pptx2024.03.23 What do successful readers do - Sandy Millin for PARK.pptx
2024.03.23 What do successful readers do - Sandy Millin for PARK.pptx
 
UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024
 
Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...
 
CapTechU Doctoral Presentation -March 2024 slides.pptx
CapTechU Doctoral Presentation -March 2024 slides.pptxCapTechU Doctoral Presentation -March 2024 slides.pptx
CapTechU Doctoral Presentation -March 2024 slides.pptx
 
Philosophy of Education and Educational Philosophy
Philosophy of Education  and Educational PhilosophyPhilosophy of Education  and Educational Philosophy
Philosophy of Education and Educational Philosophy
 
5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...
 
Prelims of Kant get Marx 2.0: a general politics quiz
Prelims of Kant get Marx 2.0: a general politics quizPrelims of Kant get Marx 2.0: a general politics quiz
Prelims of Kant get Marx 2.0: a general politics quiz
 
How to Show Error_Warning Messages in Odoo 17
How to Show Error_Warning Messages in Odoo 17How to Show Error_Warning Messages in Odoo 17
How to Show Error_Warning Messages in Odoo 17
 
The Stolen Bacillus by Herbert George Wells
The Stolen Bacillus by Herbert George WellsThe Stolen Bacillus by Herbert George Wells
The Stolen Bacillus by Herbert George Wells
 
Patterns of Written Texts Across Disciplines.pptx
Patterns of Written Texts Across Disciplines.pptxPatterns of Written Texts Across Disciplines.pptx
Patterns of Written Texts Across Disciplines.pptx
 
Education and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxEducation and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptx
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptx
 
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfP4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
 

Nfpa 1031

  • 1. Approval Standard for Quick Opening Devices (Accelerators and Exhausters) for Dry Pipe Valves Class Number 1031 May 1977 m e.co as gb in in ra et .fir w w w ©2002 FM Global Technologies LLC. All rights reserved.
  • 2. TABLE OF CONTENTS I. INTRODUCTION ...................................................................................................................................................................... 1 II. DESCRIPTION ........................................................................................................................................................................ 1 III PERFORMANCE REQUIREMENTS .................................................................................................................................. 2 3.1 Operation ............................................................................................................................................................................. 2 3.2 Maintenance ........................................................................................................................................................................ 2 3.3 Materials ............................................................................................................................................................................. 2 IV MARKINGS ............................................................................................................................................................................... 2 V EXAMINATION AND TESTS ................................................................................................................................................ 3 5.1 Preliminary Information ..................................................................................................................................................... 3 5.2 Operation ............................................................................................................................................................................. 3 5.3 Clogging .............................................................................................................................................................................. 3 5.4 Ease of Cleaning ................................................................................................................................................................. 3 5.5 Operating Diaphragm ......................................................................................................................................................... 3 5.6 Strength ............................................................................................................................................................................... 3 5.7 Other ................................................................................................................................................................................... 3 m e.co as gb in in ra et .fir w w w
  • 3. May 1977 1031 I. INTRODUCTION 1.1 This standard covers quick opening devices (accelerators and exhausters) used with dry pipe valves in fire protection systems to hasten the operation of the valves when one or more sprinklers operate. 1.1.1 Accelerators hasten the operation of differential dry pipe valves by reducing the differential across the clapper. Antiflooding devices are used with accelerators to prevent foreign matter from clogging internal orifices. This device may be a separate component or an integral part of the accelerator. 1.1.2 Exhausters hasten the valve operation by aiding in venting dry pipe systems to atmosphere. They are normally used with mechanical dry pipe valves. 1.2 FM Approval is based upon satisfactory evaluation of the product and the manufacturer in three major areas: — Examination and tests of production samples are performed to evaluate (1) the suitability of the product, (2) the proper operation and performance of the product as specified by the manufacturer and required by FM Approvals and, as far as practical, (3) the durability and reliability of the product. — An examination of manufacturing facilities and quality control procedures is conducted to evaluate the manufacturer’s ability to produce the product which is examined and tested. — Satisfactory field experience is the final test of Approval. Unsatisfactory field experience may result in withdrawal of FM Approval. 1.3 The requirements of this standard are guidelines reflecting current FM Approval tests and practices. Devices which do not conform to these requirements may be Approved if they meet the intent of this standard. Conversely, those that do conform may not be Approved if other conditions govern. II. DESCRIPTION 2.1 Quick opening devices usually employ a two-chamber configuration with a diaphragm as the common boundary. Movement of the diaphragm effects movement of a clapper which holds back sprinkler system air pressure. A small orifice connects the two air chambers. It is used for adjustment purposes and to equalize chamber pressures in systems which are not air-tight. 2.2 The device is in the set position when both chambers are in equilibrium. When one or more sprinklers m e.co as gb in operate, air is vented from the system side of the quick opening device. Since the equalizing orifice cannot in ra et .fir w w w compensate for the excessive air loss, a pressure differential is created across the diaphragm which moves the clapper off its seat. System air is vented to atmosphere or, as in differential type dry pipe valves, redirected to the intermediate chamber to destroy the pressure differential and trip the dry pipe valve. FM APPROVALS 1
  • 4. 1031 May 1977 III PERFORMANCE REQUIREMENTS 3.1 Operation 3.1.1 The quick opening device shall trip the dry pipe valve within 30 s after the operation of one or more sprinklers at initial system air pressures ranging from 25 to 50 psi (172.4 to 344.7 kPa). 3.1.2 Quick opening devices shall remain functional when exposed to air and water supply pressures up to the rated working pressure of the dry pipe valve. 3.1.3 The anti-flooding component of the quick opening device shall not allow water or foreign matter to enter the accelerator. 3.1.4 The anti-flooding component of the quick opening device shall not interfere with the accelerator’s normal operation. 3.1.5 Orifices shall be protected from clogging. 3.1.6 A gauge shall be provided to sense upper chamber pressure to facilitate the detection of a clogged pressure-equalizing orifice. 3.2 Maintenance 3.2.1 The anti-flooding component of the quick opening devices shall be designed to permit quick cleaning and maintenance without the use of special tools. 3.2.2 Provisions shall be made in the dry pipe valve trim for isolating the quick opening device in order that repairs can be made without affecting sprinkler system protection. 3.3 Materials 3.3.1 All materials used shall be suitable for their intended application. Components susceptible to malfunction due to corrosion shall be constructed of materials with at least the corrosion resistance equal to a bronze alloy with a minimum 80% copper content. 3.3.2 Special attention will be given to the possibility of corrosion being caused by galvanic action and the effects of such corrosion on reliable performance. m e.co as gb in in ra et .fir w w w IV MARKINGS 4.1 The manufacturer’s name or trademark, model or type designation, rated working pressure, year of manu- facture and FM Approval Mark, if used, shall be cast on the body of the quick opening device or inscribed on a securely attached corrosion-resistant nameplate. 4.2 The inlet and outlet shall also be clearly identified. 2 FM APPROVALS
  • 5. May 1977 1031 V EXAMINATION AND TESTS 5.1 Preliminary Information Prior to testing, the manufacturer shall provide general assembly drawings, detail drawings and material specifications for each part (ASTM designation, wherever applicable), expected performance data, and maintenance, operating and installation instructions with complete trim drawings. These shall be reviewed and compared with samples of the quick opening devices submitted for testing. 5.2 Operation The quick opening device shall effect dry pipe valve operation within 30 s when subjected to rates of pressure drop from 10 psi/min (69 kPa/min) through 80 psi/min (552 kPa/min). Note: To ensure that the velocity check will properly close when the accelerator operates, these components will be tested as a unit. 5.3 Clogging The following tests will be conducted to ensure that the antiflooding device will adequately protect the accelerator from clogging due to foreign matter within the system: — One tablespoon of organic matter, approximately the size and shape of sunflower seeds, will be placed in the accelerator’s pipe lines to simulate loosened debris making its way through the system during operation of the dry pipe valve. — The above procedure will be repeated using two tablespoons of wooden toothpick segments. The segments used shall be made by cutting a standard round pointed toothpick, approximately 0.1 in. (2.5 mm) in diameter, into approximately 0.13 in. (3.3 mm) lengths. — Each test will be repeated four times. The above debris shall not pass through the antiflooding device in all cases. 5.4 Ease of Cleaning Evaluation will be based on the time required to clean the antiflooding device of the debris left by the procedure outlined in Para. 5.3. A cleaning time of 20 minutes or less is satisfactory. m e.co as gb in in ra et .fir w w w 5.5 Operating Diaphragm The operating diaphragm shall be subjected to twice the rated working pressure for five minutes. Sensitivity and operation shall not be adversely affected, subsequent to this test. 5.6 Strength Quick opening devices and associated components, if any, shall withstand a hydrostatic pressure of four times the rated working pressure for five minutes without damage. 5.7 Other At the discretion of FM Approvals, other tests may be performed to verify the integrity and reliability of an unusual design or material application. FM APPROVALS 3