Agenda
1. Sourcing Project Introduction
2. Sourcing Approach
3. Conclusions
• SUPPLIER PRE-
QUALIFICATION
Stage 1
• SAMPLING
Stage 2
• FACILITY
AUDIT
Stage 3
• CONTRACT
Stage 4
• Client Introduction & Project Objectives,
• Dragon Sourcing approach in 4 steps
 Client Introduction: Client is a leading French luxury brand selling high end footwear, bags and life style products.
Client want to qualify a price competitive supplier from emerging market in a short period of 4 weeks able to offer
cotton bags for life style product range.
 Project Objectives: Identify and qualify list of potential manufacturers in India by leveraging DS database and finding
new suppliers by running Request for Information/Request for Quote (RFI-RFQ) process through procurement and
sourcing direct from manufacturers for 11 SKU’s of cotton bags.
 Supplier key requirement: Supplier should have experience in developing cotton bags for luxury brands, must be
able to offer saving, export capability and able to develop samples.
 Quality Management and Social compliance certification will be considered as advantage.
- Total 11 SKU’s with and without gusset styles were included for RFI-RFQ
process with estimated volume to half a million pieces.
100% Soft Cotton - 1 side Brushed - Inside the Dust Bag Sizes of Pouches (mm) Estimated
Quantities in
PCSDescription Reference# Product Pictures Height Width Gussets
POUCH 1 150404 650 650 190 37,700
POUCH 2 XX XX XX XX XX
POUCH 3 XX XX XX XX XX
POUCH 4 XX XX XX XX XX
POUCH 13 XX XX XX XX XX
POUCH 5 XX 580 350 - XX
POUCH 6 XX XX XX - XX
POUCH 7 XX XX XX - XX
POUCH 8 XX XX XX - XX
POUCH 9 XX XX XX - XX
POUCH 12 XX XX XX - XX
55555555
Agenda
1. Sourcing Project Introduction
2. Sourcing Approach
3. Conclusions
1. STAGE 1: Supplier pre-qualification
2. STAGE 2: Sampling
3. STAGE 3: Facility Audit
4. STAGE 4: Contract
- Sourcing Approach,
- Following steps were covered under stage 1: Supplier Pre-Qualification
No. Step Deliverables
1.
Demand Analysis
Work with client to define and understand the Products and requirements (specs, volumes, current unit
prices, delivery destinations of delivery/consumption). Collect samples of the products in order to ensure
potential suppliers fully understand them
• Kick-Off Report
2.
Supply Market Analysis
Identify list of potential manufacturers in India leveraging DS database and finding new suppliers.
• Potential Supplier List
3.
Telephone Pre-screening
Selection of manufacturers to be included in the RFI/RFP process by telephone pre-screening based on
agreed simple criteria e.g. capability to make the product, can export, quality certifications, interest in
participating, etc.
• Shortlist for RFI-RFQ
process
4.
Develop RFI/RFQ document
Prepare an RFI/RFQ document that has the objective to pre-qualify the competitiveness and capabilities of
the manufacturers, including: background, financial, client and product experience, quality certification &
processes, social responsibility, manufacturing/technology capability, R&D capability.
• RFI-RFQ Template
5.
Administer RFI/RFQ:
The RFI/RFQ is distributed to the relevant manufacturers, with telephone follow-up to push for maximum
participation.
• Completed RFI-RFQ’s
6.
Analyze RFI/RFQ Responses:
Analysis of RFI/RFQ responses, estimation of logistics costs, and preparation of a report, which profiles &
objectively ranks the manufacturers by capability and competitiveness, including a recommendation for
those to be audited.
• RFI-RFQ Report
• Supplier Profiles
• Proposed shortlist for
sampling and audit.
Steps Week 1 Week 2 Week 3 Week 4
1. Demand Analysis
2. Supply Market Analysis
3. Telephone Pre-screening
4. Develop RFI/RFQ
5. Administer RFI/RFQ
6. Analyze RFI/RFQ Responses
1
RFI/RFQ approved
2
- Stage 1: Supplier Pre-Qualification timeframe.
- Project was completed within 4 weeks as per schedule.
Supplier profiles with
recommendations.
Not started Done
Inprocess Delay
1. Selected list of potential suppliers were added according to the category specific information,
2. Pre-screening was performed to filter the list of suppliers’ with the specific key requirement on
this project.
3. RFI-RFQ process was run with selected suppliers qualifying to the client requirement.
STEPS India
Potential suppliers added to the project 20
Suppliers passed pre-screen process based on must have criteria’s 5
RFI/RFQ Sent 5
Intend to respond 5
RFI/RFQ Received 5
- Stage 1- Supply Market Analysis:
- Process metrics follow up as per Country wise.
COMPANY INFORMATION
Company Name DS/SY/003
Factory Address XX
City XX
Province XX
Country India
Company Website XX
COMPANY BACKGROUND
Year Founded 1999
Business Type: Manufacturer, or trader ? Manufacturer
Printiingin-house / outsource In house
Number of sewing machines 300 Machines
Monthly production capacity for cotton
bags
0.5 M pcs of cotton bags
Export License ? (Y/N) Yes
Be able to export to Europe? (Y/N) Yes
Export Experience (Years) 20 Years
Work Floor Size ( Square meters) 15,000 Sqm
Total Employee Number 547
HUMAN RESOURCES
Factory
Workers
Quality Control
staff
Technical Staff
/ R&D Engineer
Sales &
Management
Others
Employee No. 450 20 10 20 47
ANNUAL TURNOVER
2018 2017
Total sales turnover (in M
USD)
USD XX M USD XX M
MAIN MARKET
Europe (%) US (%) Asia (%) Domestic (%)
Rest of the
world
(%)
% of Sales 45 XX XX XX XX
TOP 3 CUSTOMER
Customer
Name
Industry Country % of Sales
Type of
Product
Top 3
Customers
XX Luxury Retail USA 18 Table Linen
XX Luxury Retail US & France 5 Cotton bags
XX Retail NL 9 Dust bags
CERTIFICATIONS
Certificate Y/N Date of Certificate
Date of
Expire
ISO 9001:2008
Quality management systems
Yes 07.09.2018 12.07.2021
Ccorporate Social Responsibility
SA 8000
Yes XX XX
QUALITY CONTROL MANAGEMENT
General Production Defective Rate (% rejected)? 1.2 %
Accept 3rd party QC? (Y/N) Yes
- Stage 1
- Supplier profile’s were shared with the client with our ranking,
RFI Score 90
RFI Ranking 1 / 5
FACTORY PHOTOS
Factory overview Inside the factory floor
Production floor Sewing Workshop Printing Workshop
Lab & Testing Warehouse Showroom
- Stage 1
- Supplier factory picture were shared with the client for overview of the
supplier facility.
- Price analysis was done for all the 5 suppliers,
1 2 3 4 5
Supplier name DS/TH/001 DS/EZ/002 DS/SY/003 DS/MA/004 DS/PP/005
Descriptio
n
Ref #
FOB Client
Buying Price
($)
FOB Price in
$US
Difference
(%)
FOB Price in
$US
Difference
(%)
FOB Price in
$US
Difference
(%)
FOB Price in
$US
Difference
(%)
FOB Price in
$US
Difference
(%)
POUCH 1 150404 XX $ 1.71 27% $ 2.28 2% $ 2.02 13% $ 2.70 - 16 % $ 3.05 - 31 %
POUCH 2 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 3 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 4 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 13 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 5 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 6 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 7 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 8 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 9 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
POUCH 12 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX
Descriptio
n
Quantities
Client spend
in $US
Supplier 1:
Spend in
$US
Savings in
$US
Supplier 2:
Spend in
$US
Savings in
$US
Supplier 3:
Spend in
$US
Savings in
$US
Supplier 4:
Spend in
$US
Savings in
$US
Supplier 5:
Spend in
$US
Savings in
$US
POUCH 1 37,700 $ XX XX $ 23,299 $ 85,956 $ 1,810 $ 76,116 $ 11,649 $ 101,790 - $ 14,024 $ 114,985 - $ 27,219
POUCH 2 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 3 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 4 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 13 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 5 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 6 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 7 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 8 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 9 XX XX XX XX XX XX XX XX XX XX XX XX
POUCH 12 XX XX XX XX XX XX XX XX XX XX XX XX
Current
spend
Supplier 1
total spend
Total saving
%
Supplier 2
total spend
Total saving
%
Supplier 3
total spend
Total saving
%
Supplier 4
total spend
Total saving
%
Supplier 5
total spend
Total saving
%
Total spend in $US $ XX $ XX 28.6% $ XX 6.2% $ XX 18% $ XX - 15. 8% $ XX - 23 %
Saving Value $ XX $ XX $ XX $ XX $ XX
Shortlisted for sampling.
1. STAGE 1: Supplier pre-qualification
2. STAGE 2: Sampling
3. STAGE 3: Facility Audit
4. STAGE 4: Contract
- Sourcing Approach,
DS/TH/001 DS/EZ/002 DS/SY/003
- High quality samples were developed from the shortlisted suppliers within
short period of time,
Samples were developed for selected styles with and without gusset,
Example of the developed sample from one the style.
1. STAGE 1: Supplier pre-qualification
2. STAGE 2: Sampling
3. STAGE 3: Facility Audit
4. STAGE 4: Contract
- Sourcing Approach,
- Post sample development, plan was framed to audit the recommended supplier.
- Following sections were covered in the hybrid model of audit process,
** Dragon Sourcing has experienced team for performing Technical and Social Corporate Responsibility (CSR)
audit or hybrid model combing both.
- Supplier business license and certification’s were collected during the audit
process and shared with the client,
- Supplier scoring with overall comments and corrective action plan was
shared with the client,
1. STAGE 1: Supplier pre-qualification
2. STAGE 2: Sampling
3. STAGE 3: Facility Audit
4. STAGE 4: Contract
- Sourcing Approach,
- Recommended supplier was passed in the audit,
- Proforma Invoice was raised to the client under buy/resell model,
- Purchase order was awarded to the shortlisted supplier post negotiation,
222222222222
Agenda
1. Sourcing Project Introduction
2. Sourcing Approach
3. Conclusions
Conclusions
 Whole project was carried out in 8 weeks (4 week for supplier qualification and another 4 weeks for
sampling, supplier facility audit and contract)
 Shortlisted suppliers for sampling were credential with the certification and production capability as per
client mandatory requirement.
 High quality samples were developed following original sample within a short period of time.
 Client was happy with the quality and workmanship of the samples developed and finalized one
supplier for next step.
 Audit was immediately planned and the supplier facility was approved based on the audit results.
 Audited supplier was awarded with the contract post price negotiation, production lead time, payment
terms and others.
 Overall based on DS strategic sourcing process, It helped client to place order on time with high
savings and samples to showcase.
24

More Related Content

What's hot

Multi Category Sourcing in China, India, Vietnam and Turkey
Multi Category Sourcing in China, India, Vietnam and TurkeyMulti Category Sourcing in China, India, Vietnam and Turkey
Multi Category Sourcing in China, India, Vietnam and TurkeyDragon Sourcing
 
Creating Value with an Outsourced International Purchasing Office for a large...
Creating Value with an OutsourcedInternational Purchasing Office for a large...Creating Value with an OutsourcedInternational Purchasing Office for a large...
Creating Value with an Outsourced International Purchasing Office for a large...Dragon Sourcing
 
China-Retail-and-Product-Related-Issues New
China-Retail-and-Product-Related-Issues  NewChina-Retail-and-Product-Related-Issues  New
China-Retail-and-Product-Related-Issues Newkhaledali gap
 
Creating Value with an Outsourced International Purchasing Office in China
Creating Value with an Outsourced International Purchasing Office in ChinaCreating Value with an Outsourced International Purchasing Office in China
Creating Value with an Outsourced International Purchasing Office in ChinaDragon Sourcing
 
Case Study: Multi Category Sourcing in China, India, Vietnam and Turkey
Case Study: Multi Category Sourcing in China, India, Vietnam and TurkeyCase Study: Multi Category Sourcing in China, India, Vietnam and Turkey
Case Study: Multi Category Sourcing in China, India, Vietnam and TurkeyJohn William
 
Tapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingTapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingJohn William
 
Door Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingDoor Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingJohn William
 
Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudyJohn William
 
101011 Ron Stanley Resume
101011 Ron Stanley Resume101011 Ron Stanley Resume
101011 Ron Stanley Resumerstanley3388
 
Conan Lum- Resume 2015
Conan Lum- Resume 2015Conan Lum- Resume 2015
Conan Lum- Resume 2015conan lum
 
Strategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Strategic Sourcing Case Study on Aluminum Industry by Dragon SourcingStrategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Strategic Sourcing Case Study on Aluminum Industry by Dragon SourcingJohn William
 
Reede-Display presentation
Reede-Display presentationReede-Display presentation
Reede-Display presentationKaren Chen
 
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...Shadab Haider Zaidi
 
Sleep Suits Project for Airline Tender Case Study by Dragon Sourcing
Sleep Suits Project for Airline Tender Case Study by Dragon SourcingSleep Suits Project for Airline Tender Case Study by Dragon Sourcing
Sleep Suits Project for Airline Tender Case Study by Dragon SourcingJohn William
 
updated Kamal.S_Resume-Quality
updated Kamal.S_Resume-Qualityupdated Kamal.S_Resume-Quality
updated Kamal.S_Resume-QualityKamal Sugumaran
 
Peak Performance (Star Trek: The Next Generation)/ Responsibilities of PPF or...
Peak Performance (Star Trek: The Next Generation)/ Responsibilities of PPF or...Peak Performance (Star Trek: The Next Generation)/ Responsibilities of PPF or...
Peak Performance (Star Trek: The Next Generation)/ Responsibilities of PPF or...ABU TALEB TARAQUE
 

What's hot (20)

Multi Category Sourcing in China, India, Vietnam and Turkey
Multi Category Sourcing in China, India, Vietnam and TurkeyMulti Category Sourcing in China, India, Vietnam and Turkey
Multi Category Sourcing in China, India, Vietnam and Turkey
 
Creating Value with an Outsourced International Purchasing Office for a large...
Creating Value with an OutsourcedInternational Purchasing Office for a large...Creating Value with an OutsourcedInternational Purchasing Office for a large...
Creating Value with an Outsourced International Purchasing Office for a large...
 
China-Retail-and-Product-Related-Issues New
China-Retail-and-Product-Related-Issues  NewChina-Retail-and-Product-Related-Issues  New
China-Retail-and-Product-Related-Issues New
 
PROCUREMENT
PROCUREMENTPROCUREMENT
PROCUREMENT
 
Creating Value with an Outsourced International Purchasing Office in China
Creating Value with an Outsourced International Purchasing Office in ChinaCreating Value with an Outsourced International Purchasing Office in China
Creating Value with an Outsourced International Purchasing Office in China
 
Case Study: Multi Category Sourcing in China, India, Vietnam and Turkey
Case Study: Multi Category Sourcing in China, India, Vietnam and TurkeyCase Study: Multi Category Sourcing in China, India, Vietnam and Turkey
Case Study: Multi Category Sourcing in China, India, Vietnam and Turkey
 
Tapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingTapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon Sourcing
 
Door Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingDoor Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon Sourcing
 
Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case Study
 
role of merchandising due to covid-converted
role of merchandising due to covid-convertedrole of merchandising due to covid-converted
role of merchandising due to covid-converted
 
101011 Ron Stanley Resume
101011 Ron Stanley Resume101011 Ron Stanley Resume
101011 Ron Stanley Resume
 
Conan Lum- Resume 2015
Conan Lum- Resume 2015Conan Lum- Resume 2015
Conan Lum- Resume 2015
 
NK Tech Profile
NK Tech ProfileNK Tech Profile
NK Tech Profile
 
Strategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Strategic Sourcing Case Study on Aluminum Industry by Dragon SourcingStrategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Strategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
 
Reede-Display presentation
Reede-Display presentationReede-Display presentation
Reede-Display presentation
 
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
 
Sleep Suits Project for Airline Tender Case Study by Dragon Sourcing
Sleep Suits Project for Airline Tender Case Study by Dragon SourcingSleep Suits Project for Airline Tender Case Study by Dragon Sourcing
Sleep Suits Project for Airline Tender Case Study by Dragon Sourcing
 
updated Kamal.S_Resume-Quality
updated Kamal.S_Resume-Qualityupdated Kamal.S_Resume-Quality
updated Kamal.S_Resume-Quality
 
Peak Performance (Star Trek: The Next Generation)/ Responsibilities of PPF or...
Peak Performance (Star Trek: The Next Generation)/ Responsibilities of PPF or...Peak Performance (Star Trek: The Next Generation)/ Responsibilities of PPF or...
Peak Performance (Star Trek: The Next Generation)/ Responsibilities of PPF or...
 
RSL new project
RSL new projectRSL new project
RSL new project
 

Similar to Cotton Bags for Luxury Retail Brand Case Study

Apparels Sourcing from Emerging Markets
Apparels Sourcing from Emerging MarketsApparels Sourcing from Emerging Markets
Apparels Sourcing from Emerging MarketsJohn William
 
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing  Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing John William
 
Electric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon SourcingElectric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon SourcingJohn William
 
Construction categories case study
Construction categories case studyConstruction categories case study
Construction categories case studyDragon Sourcing
 
Know the various facts in hat sourcing.
Know the various facts in hat sourcing.Know the various facts in hat sourcing.
Know the various facts in hat sourcing.John William
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case StudyJohn William
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case StudyDragon Sourcing
 
Nutritional Company Case Study by Dragon Sourcing
Nutritional Company Case Study by Dragon SourcingNutritional Company Case Study by Dragon Sourcing
Nutritional Company Case Study by Dragon SourcingJohn William
 
Precision Machining Sourcing Case Study
Precision Machining Sourcing Case StudyPrecision Machining Sourcing Case Study
Precision Machining Sourcing Case StudyJohn William
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationDeekshitha HS
 
Textile Products Sourcing Project - Turkey
Textile Products Sourcing Project - TurkeyTextile Products Sourcing Project - Turkey
Textile Products Sourcing Project - TurkeyDragon Sourcing
 
Case Study-Textile Products Sourcing Project in Turkey
Case Study-Textile Products Sourcing Project in TurkeyCase Study-Textile Products Sourcing Project in Turkey
Case Study-Textile Products Sourcing Project in TurkeyJohn William
 
Case Study-Kitchenware for Brazil
Case Study-Kitchenware for BrazilCase Study-Kitchenware for Brazil
Case Study-Kitchenware for BrazilJohn William
 
Kitchenware for Brazil Case
Kitchenware for Brazil Case Kitchenware for Brazil Case
Kitchenware for Brazil Case Dragon Sourcing
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingJohn William
 
Case Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectCase Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectJohn William
 
Strategic Sourcing Process
Strategic Sourcing ProcessStrategic Sourcing Process
Strategic Sourcing ProcessJunaid Mulani
 

Similar to Cotton Bags for Luxury Retail Brand Case Study (20)

Apparels Sourcing from Emerging Markets
Apparels Sourcing from Emerging MarketsApparels Sourcing from Emerging Markets
Apparels Sourcing from Emerging Markets
 
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing  Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
 
Electric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon SourcingElectric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon Sourcing
 
Construction categories case study
Construction categories case studyConstruction categories case study
Construction categories case study
 
Know the various facts in hat sourcing.
Know the various facts in hat sourcing.Know the various facts in hat sourcing.
Know the various facts in hat sourcing.
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case Study
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case Study
 
Nutritional Company Case Study by Dragon Sourcing
Nutritional Company Case Study by Dragon SourcingNutritional Company Case Study by Dragon Sourcing
Nutritional Company Case Study by Dragon Sourcing
 
Precision Machining Sourcing Case Study
Precision Machining Sourcing Case StudyPrecision Machining Sourcing Case Study
Precision Machining Sourcing Case Study
 
Procurement Strategy Development
Procurement Strategy DevelopmentProcurement Strategy Development
Procurement Strategy Development
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Textile Products Sourcing Project - Turkey
Textile Products Sourcing Project - TurkeyTextile Products Sourcing Project - Turkey
Textile Products Sourcing Project - Turkey
 
Case Study-Textile Products Sourcing Project in Turkey
Case Study-Textile Products Sourcing Project in TurkeyCase Study-Textile Products Sourcing Project in Turkey
Case Study-Textile Products Sourcing Project in Turkey
 
Case Study-Kitchenware for Brazil
Case Study-Kitchenware for BrazilCase Study-Kitchenware for Brazil
Case Study-Kitchenware for Brazil
 
Kitchenware for Brazil Case
Kitchenware for Brazil Case Kitchenware for Brazil Case
Kitchenware for Brazil Case
 
Sipoc.pptx
Sipoc.pptxSipoc.pptx
Sipoc.pptx
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon Sourcing
 
Sipoc
SipocSipoc
Sipoc
 
Case Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectCase Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing Project
 
Strategic Sourcing Process
Strategic Sourcing ProcessStrategic Sourcing Process
Strategic Sourcing Process
 

More from John William

Sanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudySanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudyJohn William
 
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUNewsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUJohn William
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyJohn William
 
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamStudy on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamJohn William
 
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilStudy on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilJohn William
 
Study on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaStudy on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaJohn William
 
Sourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaSourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaJohn William
 
Study on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanStudy on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanJohn William
 
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaCase Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaJohn William
 
Case Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarCase Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarJohn William
 
Study on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaStudy on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaJohn William
 
Battery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingBattery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingJohn William
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingJohn William
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingJohn William
 
Decorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingDecorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingJohn William
 
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudySafety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudyJohn William
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing John William
 
Nutrition Product Manufacturers Sourcing in Indonesia Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case StudyNutrition Product Manufacturers Sourcing in Indonesia Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case StudyJohn William
 
Pressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Pressure Vessle and Heat Exchanger Case Study by Dragon SourcingPressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Pressure Vessle and Heat Exchanger Case Study by Dragon SourcingJohn William
 

More from John William (20)

Sanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudySanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief Study
 
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUNewsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
 
Newsletter on PPE
Newsletter on PPENewsletter on PPE
Newsletter on PPE
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case Study
 
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamStudy on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in Vietnam
 
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilStudy on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in Brazil
 
Study on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaStudy on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in Ethiopia
 
Sourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaSourcing Opportunities in Malaysia
Sourcing Opportunities in Malaysia
 
Study on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanStudy on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in Pakistan
 
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaCase Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South Africa
 
Case Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarCase Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in Myanmar
 
Study on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaStudy on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in Indonesia
 
Battery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingBattery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon Sourcing
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon Sourcing
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon Sourcing
 
Decorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingDecorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon Sourcing
 
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudySafety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
 
Nutrition Product Manufacturers Sourcing in Indonesia Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case StudyNutrition Product Manufacturers Sourcing in Indonesia Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case Study
 
Pressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Pressure Vessle and Heat Exchanger Case Study by Dragon SourcingPressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Pressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
 

Recently uploaded

Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...tanu pandey
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationLeonardo
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...SUHANI PANDEY
 
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋nirzagarg
 
Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Philip Rabenok
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...mriyagarg453
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)kojalkojal131
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024gstubel
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationPaul West-Sells
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
 

Recently uploaded (20)

Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 
Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings Results
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
 
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 

Cotton Bags for Luxury Retail Brand Case Study

  • 1. Dragon Sourcing - 龙 源 Delivering sustainable sourcing value from emerging markets Cotton Bags For Luxury Retail Brand Case Study
  • 2. 22222222 Agenda 1. Sourcing Project Introduction 2. Sourcing Approach 3. Conclusions
  • 3. • SUPPLIER PRE- QUALIFICATION Stage 1 • SAMPLING Stage 2 • FACILITY AUDIT Stage 3 • CONTRACT Stage 4 • Client Introduction & Project Objectives, • Dragon Sourcing approach in 4 steps  Client Introduction: Client is a leading French luxury brand selling high end footwear, bags and life style products. Client want to qualify a price competitive supplier from emerging market in a short period of 4 weeks able to offer cotton bags for life style product range.  Project Objectives: Identify and qualify list of potential manufacturers in India by leveraging DS database and finding new suppliers by running Request for Information/Request for Quote (RFI-RFQ) process through procurement and sourcing direct from manufacturers for 11 SKU’s of cotton bags.  Supplier key requirement: Supplier should have experience in developing cotton bags for luxury brands, must be able to offer saving, export capability and able to develop samples.  Quality Management and Social compliance certification will be considered as advantage.
  • 4. - Total 11 SKU’s with and without gusset styles were included for RFI-RFQ process with estimated volume to half a million pieces. 100% Soft Cotton - 1 side Brushed - Inside the Dust Bag Sizes of Pouches (mm) Estimated Quantities in PCSDescription Reference# Product Pictures Height Width Gussets POUCH 1 150404 650 650 190 37,700 POUCH 2 XX XX XX XX XX POUCH 3 XX XX XX XX XX POUCH 4 XX XX XX XX XX POUCH 13 XX XX XX XX XX POUCH 5 XX 580 350 - XX POUCH 6 XX XX XX - XX POUCH 7 XX XX XX - XX POUCH 8 XX XX XX - XX POUCH 9 XX XX XX - XX POUCH 12 XX XX XX - XX
  • 5. 55555555 Agenda 1. Sourcing Project Introduction 2. Sourcing Approach 3. Conclusions
  • 6. 1. STAGE 1: Supplier pre-qualification 2. STAGE 2: Sampling 3. STAGE 3: Facility Audit 4. STAGE 4: Contract - Sourcing Approach,
  • 7. - Following steps were covered under stage 1: Supplier Pre-Qualification No. Step Deliverables 1. Demand Analysis Work with client to define and understand the Products and requirements (specs, volumes, current unit prices, delivery destinations of delivery/consumption). Collect samples of the products in order to ensure potential suppliers fully understand them • Kick-Off Report 2. Supply Market Analysis Identify list of potential manufacturers in India leveraging DS database and finding new suppliers. • Potential Supplier List 3. Telephone Pre-screening Selection of manufacturers to be included in the RFI/RFP process by telephone pre-screening based on agreed simple criteria e.g. capability to make the product, can export, quality certifications, interest in participating, etc. • Shortlist for RFI-RFQ process 4. Develop RFI/RFQ document Prepare an RFI/RFQ document that has the objective to pre-qualify the competitiveness and capabilities of the manufacturers, including: background, financial, client and product experience, quality certification & processes, social responsibility, manufacturing/technology capability, R&D capability. • RFI-RFQ Template 5. Administer RFI/RFQ: The RFI/RFQ is distributed to the relevant manufacturers, with telephone follow-up to push for maximum participation. • Completed RFI-RFQ’s 6. Analyze RFI/RFQ Responses: Analysis of RFI/RFQ responses, estimation of logistics costs, and preparation of a report, which profiles & objectively ranks the manufacturers by capability and competitiveness, including a recommendation for those to be audited. • RFI-RFQ Report • Supplier Profiles • Proposed shortlist for sampling and audit.
  • 8. Steps Week 1 Week 2 Week 3 Week 4 1. Demand Analysis 2. Supply Market Analysis 3. Telephone Pre-screening 4. Develop RFI/RFQ 5. Administer RFI/RFQ 6. Analyze RFI/RFQ Responses 1 RFI/RFQ approved 2 - Stage 1: Supplier Pre-Qualification timeframe. - Project was completed within 4 weeks as per schedule. Supplier profiles with recommendations. Not started Done Inprocess Delay
  • 9. 1. Selected list of potential suppliers were added according to the category specific information, 2. Pre-screening was performed to filter the list of suppliers’ with the specific key requirement on this project. 3. RFI-RFQ process was run with selected suppliers qualifying to the client requirement. STEPS India Potential suppliers added to the project 20 Suppliers passed pre-screen process based on must have criteria’s 5 RFI/RFQ Sent 5 Intend to respond 5 RFI/RFQ Received 5 - Stage 1- Supply Market Analysis: - Process metrics follow up as per Country wise.
  • 10. COMPANY INFORMATION Company Name DS/SY/003 Factory Address XX City XX Province XX Country India Company Website XX COMPANY BACKGROUND Year Founded 1999 Business Type: Manufacturer, or trader ? Manufacturer Printiingin-house / outsource In house Number of sewing machines 300 Machines Monthly production capacity for cotton bags 0.5 M pcs of cotton bags Export License ? (Y/N) Yes Be able to export to Europe? (Y/N) Yes Export Experience (Years) 20 Years Work Floor Size ( Square meters) 15,000 Sqm Total Employee Number 547 HUMAN RESOURCES Factory Workers Quality Control staff Technical Staff / R&D Engineer Sales & Management Others Employee No. 450 20 10 20 47 ANNUAL TURNOVER 2018 2017 Total sales turnover (in M USD) USD XX M USD XX M MAIN MARKET Europe (%) US (%) Asia (%) Domestic (%) Rest of the world (%) % of Sales 45 XX XX XX XX TOP 3 CUSTOMER Customer Name Industry Country % of Sales Type of Product Top 3 Customers XX Luxury Retail USA 18 Table Linen XX Luxury Retail US & France 5 Cotton bags XX Retail NL 9 Dust bags CERTIFICATIONS Certificate Y/N Date of Certificate Date of Expire ISO 9001:2008 Quality management systems Yes 07.09.2018 12.07.2021 Ccorporate Social Responsibility SA 8000 Yes XX XX QUALITY CONTROL MANAGEMENT General Production Defective Rate (% rejected)? 1.2 % Accept 3rd party QC? (Y/N) Yes - Stage 1 - Supplier profile’s were shared with the client with our ranking, RFI Score 90 RFI Ranking 1 / 5
  • 11. FACTORY PHOTOS Factory overview Inside the factory floor Production floor Sewing Workshop Printing Workshop Lab & Testing Warehouse Showroom - Stage 1 - Supplier factory picture were shared with the client for overview of the supplier facility.
  • 12. - Price analysis was done for all the 5 suppliers, 1 2 3 4 5 Supplier name DS/TH/001 DS/EZ/002 DS/SY/003 DS/MA/004 DS/PP/005 Descriptio n Ref # FOB Client Buying Price ($) FOB Price in $US Difference (%) FOB Price in $US Difference (%) FOB Price in $US Difference (%) FOB Price in $US Difference (%) FOB Price in $US Difference (%) POUCH 1 150404 XX $ 1.71 27% $ 2.28 2% $ 2.02 13% $ 2.70 - 16 % $ 3.05 - 31 % POUCH 2 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 3 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 4 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 13 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 5 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 6 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 7 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 8 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 9 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX POUCH 12 XX XX $ XX XX $ XX XX $ XX XX $ XX XX $ XX XX Descriptio n Quantities Client spend in $US Supplier 1: Spend in $US Savings in $US Supplier 2: Spend in $US Savings in $US Supplier 3: Spend in $US Savings in $US Supplier 4: Spend in $US Savings in $US Supplier 5: Spend in $US Savings in $US POUCH 1 37,700 $ XX XX $ 23,299 $ 85,956 $ 1,810 $ 76,116 $ 11,649 $ 101,790 - $ 14,024 $ 114,985 - $ 27,219 POUCH 2 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 3 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 4 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 13 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 5 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 6 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 7 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 8 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 9 XX XX XX XX XX XX XX XX XX XX XX XX POUCH 12 XX XX XX XX XX XX XX XX XX XX XX XX Current spend Supplier 1 total spend Total saving % Supplier 2 total spend Total saving % Supplier 3 total spend Total saving % Supplier 4 total spend Total saving % Supplier 5 total spend Total saving % Total spend in $US $ XX $ XX 28.6% $ XX 6.2% $ XX 18% $ XX - 15. 8% $ XX - 23 % Saving Value $ XX $ XX $ XX $ XX $ XX Shortlisted for sampling.
  • 13. 1. STAGE 1: Supplier pre-qualification 2. STAGE 2: Sampling 3. STAGE 3: Facility Audit 4. STAGE 4: Contract - Sourcing Approach,
  • 14. DS/TH/001 DS/EZ/002 DS/SY/003 - High quality samples were developed from the shortlisted suppliers within short period of time, Samples were developed for selected styles with and without gusset, Example of the developed sample from one the style.
  • 15. 1. STAGE 1: Supplier pre-qualification 2. STAGE 2: Sampling 3. STAGE 3: Facility Audit 4. STAGE 4: Contract - Sourcing Approach,
  • 16. - Post sample development, plan was framed to audit the recommended supplier. - Following sections were covered in the hybrid model of audit process, ** Dragon Sourcing has experienced team for performing Technical and Social Corporate Responsibility (CSR) audit or hybrid model combing both.
  • 17. - Supplier business license and certification’s were collected during the audit process and shared with the client,
  • 18. - Supplier scoring with overall comments and corrective action plan was shared with the client,
  • 19. 1. STAGE 1: Supplier pre-qualification 2. STAGE 2: Sampling 3. STAGE 3: Facility Audit 4. STAGE 4: Contract - Sourcing Approach,
  • 20. - Recommended supplier was passed in the audit, - Proforma Invoice was raised to the client under buy/resell model,
  • 21. - Purchase order was awarded to the shortlisted supplier post negotiation,
  • 22. 222222222222 Agenda 1. Sourcing Project Introduction 2. Sourcing Approach 3. Conclusions
  • 23. Conclusions  Whole project was carried out in 8 weeks (4 week for supplier qualification and another 4 weeks for sampling, supplier facility audit and contract)  Shortlisted suppliers for sampling were credential with the certification and production capability as per client mandatory requirement.  High quality samples were developed following original sample within a short period of time.  Client was happy with the quality and workmanship of the samples developed and finalized one supplier for next step.  Audit was immediately planned and the supplier facility was approved based on the audit results.  Audited supplier was awarded with the contract post price negotiation, production lead time, payment terms and others.  Overall based on DS strategic sourcing process, It helped client to place order on time with high savings and samples to showcase. 24