ppt of Three phase fault analysis with auto reset for temporary fault and trip for permanent fault

THREE PHASE FAULT ANALYSIS WITH
AUTORESET FOR TEMPORARY FAULT
AND TRIP FOR PERMANENT FAULT
GUIDE :- DR. RAJASHEKAR P. MANDI
(PROFESSOR)
REVA INSTITUTE OF TECHNOLOGY ANDMANAGEMENT,
BANGALORE-560064
Electrical and Electronics Engineering Department
Name USN NO
SHASHANK SMAR
THAYEEB PASHA
UJJWAL KARN
VIKRAM KUMAR RAWANI
1RE12EE095
1RE12EE113
1RE12EE115
1RE12EE120
ACKNOWLEDGMENT
• We are highly indebted to Dr. Rajashekar P. Mandi for his guidance and constant
supervision as well as for providing necessary information regarding the project.
• We would like to express our gratitude to the HOD-Dr.Puttamadappa C for his
kind co-operation and encouragement.
• We would like to express our special gratitude and thanks to our PRINCIPAL- Dr.
Sunil S. Manvi for giving us such attention and time.
REVA INSTITUTE OF TECHNOLOGY ANDMANAGEMENT,
BANGALORE-560064
Electrical and Electronics Engineering Department
ABSTRACT
• This project provides automatic tripping mechanism for the three phase supply system
for prevention from damage due to faults.
• In case of temporary fault: the output resets automatically after a brief interruption.
• In case of permanent fault: the output remains in tripped condition .
• Faults like LG, LL, LLL and so on can be sensed and automatically disconnects
the supply to avoid large scale damages to the equipment connected.
• Step down transformers bring down the voltage from 230V to 12V.The concept of low
voltage testing of fault conditions is followed.
• A set of switches are used to create faults and 555 timers are used to handle short and
long duration fault condition.
REVA INSTITUTE OF TECHNOLOGY AND MANAGEMENT,
BANGALORE-560064
Electrical and Electronics Engineering Department
INTRODUCTION
REVA INSTITUTE OF TECHNOLOGY AND MANAGEMENT,
BANGALORE-560064
Electrical and Electronics Engineering Department
• Various studies have shown that anywhere from 70%, to as high as
90%, of faults on most overhead lines are transient .
• Faults tend to be less transient (near the 80% range) at lower
distribution voltages and more transient (near the90% range) at higher
sub transmission and transmission voltages .
• Causes of transient fault: Lightning, swinging wires, temporary
contacts with foreign objects.
• The remaining 10 - 30% of faults are semi-permanent or permanent in
nature.
• Transient faults can be cleared by momentarily de-energizing the line, in order to allow the fault to clear.
Auto-reclosing can then restore service to the line
• Permanent fault will not be cleared by tripping and auto-reclosing.
OBJECTIVES
REVA INSTITUTE OF TECHNOLOGY AND MANAGEMENT,
BANGALORE-560064
Electrical and Electronics Engineering Department
• To reduce the outage time due to faults and provide higher level of service continuity to the
customers.
• To maintain system stability.
• To send message to the authorities via sms by interfacing a GSM modem.
COMPONENTS:
• STEP DOWN TRANSFORMER
• 555 TIMER
• VOLTAGE REGULATOR(LM 7805)
• RELAYS
• COMPARATOR IC LM358
• OPTOCOUPLER (MCT 2E)
• CAPACITORS , DIODES, RESISTORS,TRANSISTORS, LEDS, PUSH BUTTON
• MICROCONTROLLER(89S52)
• MAX 232
• GSM MODEM
• LCD (16 X 2)
BLOCK DIAGRAM
CIRCUIT DIAGRAM
ppt of Three phase fault analysis with auto reset for temporary fault and trip for permanent fault
CONNECTIONS:
• Six number of step down transformers (220v to 12v) are used.
•The primaries of 3 transformers are connected to the supply in star configuration and their
secondaries are connected in star.
•The other set of 3 transformers are connected in star – delta configuration.
•The output of all transformers are rectified and filtered individually and are given to 6
relay coils
•6 push buttons are connected across each relay to create fault.
•The NC contacts are connected in parallel while all COM points are grounded.
•Parallel connected point of NC is connected to pin 2 of 555 timer (mono-stable mode)
•Output of this timer is given to the reset pin of next 555 timer(astable mode)
•From pin 3 of this timer output is given to the non-inverting input pin of comparator IC
LM358 , while the inverting input is kept at a fixed voltage by a potential divider.
•Pin 1 of LM358 is connected to 3 CO relay through the driver transistor Q1.
RELAY
• A relay is an electrically operated switch.
• Many relays use an electromagnet to operate a switching mechanism mechanically, but other
operating principles are also used.
• Relays are used where it is necessary to control a circuit by a low-power signal (with complete
electrical isolation between control and controlled circuits), or where several circuits must be
controlled by one signal.
555 TIMER
PIN NAME PURPOSE
1 GND Ground , low level (0 V)
2 TRIG Output rises and interval starts when input falls below 1/3 Vcc
3 OUT This output is driven to +Vcc or Gnd
4 RESET A timing interval may be interrupted by driving this input to GND
5 CTRL Control access to the internal voltage divider(by default,2/3 Vcc
6 THR The interval ends when the voltage at THR is greater than at CTRL
7 DIS Open collector output, may discharge capacitor between intervals
8 V+, Vcc Positive supply voltage is usually between 3 and 15 V
ASTABLE MODE
MONOSTABLE MODE
COMPARATOR (IC LM358)
Pin Connection
1 - Output 1
2 - Inverting input
3 - Non-inverting input
4 – VCC-
5 - Non-inverting input 2
6 - Inverting input 2
7 - Output 2
8 – VCC+
• A comparator gives a logic output indicating the relative potentials on its two inputs
• An OP-AMP amplifies the differential voltage between its two inputs.
• It is designed always to be used in closed-loop application.
LCD
PINS DESCRIPTION
1 Ground
2 Vcc
3 Contrast voltage
4 “R/S”-Instruction/Register Select
5 “R/W”-Read/write LCD registers
6 “E” clock
7-14 Data input/output pins
• LCD are electronically modulated optical device shaped into a thin,flat panel made up of any number of colour or
monchrome pixels filled with liquid crystals. These crystals are arrayed in front of light source or reflector.
• Any LCD controller is used to provide a simple interface to an LCD,perhaps eight data inputs and one enable input
MICROCONTROLLER
The 89C52 is a single chip microcomputer with I/O port, timer,
clock generator, Data memory, program memory stack, ADC
and serial ports etc.
• 8 bit CPU with registers A and B.
• 16 bit Program Counter and Data Pointer.
• 8 bit Program Status Word.
• 8 bit stack pointer.
• Internal ROM of 8K bytes.
• Internal RAM of 256 bytes, 4 register banks each
containing 8registers.
• Two 16 bit timer / counter.
• Full duplex serial data receiver/transmitter.
• Special function registers like TCON, TMOD and SCON etc.
•Two external and three internal interrupt sources.
Microcontrollers are used in automatically controlled products and devices such as automobile engine control
systems, home security systems, hotel security and monitoring systems, remote controls, office machines,
appliances, power tools, and toys. By reducing the size and cost compared to a design that uses a separate
microprocessor, memory, and input/output devices, microcontrollers make it economical to digitally control even
more devices and processes.
GSM ARCHITECTURE
• A GSM network is composed of several functional entities, whose functions and interfaces are specified. Figure
4.16 shows the layout of a generic GSM network. The GSM network can be divided into three broad parts.
• The Mobile Station is carried by the subscriber. The Base Station Subsystem controls the radio link with the
Mobile Station. The Network Subsystem, the main part of which is the Mobile services Switching Center (MSC),
performs the switching of calls between the mobile users, and between mobile and fixed network users. The MSC
also handles the mobility management operations. Not shown is the Operations and Maintenance Center, which
oversees the proper operation and setup of the network.
MAX232
• MAX232 is an integrated circuit, dual driver/reciever and typically converts RX,TX,CTS and RTS
signals.
• When a MAX232 IC receives a TTL level to convert, it changes TTL logic 0 to between +3V and
+15V and changes TTL logic 1 to between -3V and -15V and vice versa for converting from
TIA232 to TTL.
WORKING AND OPERATING PROCEDURE
WORKING:
The project uses 6numbers step-down transformers for handling the entire circuit under low voltage conditions
of 12v only to test the 3 phase fault analysis. The primary of 3 transformers are connected to a 3 phase
supply in star configuration, while the secondary of the same is also connected in star configuration. The other
set of 3 transformers with its primary connected in star to 3 phase have their secondary„s connected in delta
configuration. The output of all the 6 transformers are rectified and filtered individually and are given to 6 relay
coils. 6 push buttons, one each connected across the relay coil is meant to create a fault condition either at
star i.e. LL Fault or 3L Fault. The NC contacts of all the relays are made parallel while all the common points
are grounded. The parallel connected point of NC are given to pin2 through a resistor R5 to a 555 timer i.e.
wired in monostable mode. The output of the same timer is connected to the reset pin 4 of another 555 timer
wired in astable mode. LED„S are connected at their output to indicate their status. The output of the U3 555
timer from pin3 is given to an Op-amp LM358 through wire 11 and d12 to the non-inverting input pin3, while
the inverting input is kept at a fixed voltage by a potential divider RV2. The voltage at pin2 coming from the
potential divider is so held that it is higher than the pin3 of the Op-amp used as a comparator so that pin1
develops zero logic that fails to operate the relay through the driver transistor Q1. This relay Q1 is 3CO„ relay
i.e. is meant for disconnecting the load to indicate fault conditions.
OPERATING PROCEDURE:
While the board is powered from a 3phase supply all the 6 relay coils get DC voltage and their common point
disconnects from the NC and moves on to the NO points there by providing logic high at pin2 of 555 timer U1 i.e.
that is kept on monostable mode. While any push button across the relay is pressed it disconnects that relay and
in the process in common contacts moves to the NC position to provide a logic low at trigger pin of 555 timer to
develop an output that brings the U3 555 timer which is used in astable mode for its reset pin to high such that the
astable operation takes place at its output which is also indicated by flashing D11 LED. If the fault is off temporary
in nature i.e. if the push button pressed is released immediately the U1 monostable disables U3 the output of
which goes to zero in the event of any push button kept pressed for a longer duration the monostable output
provides a longer duration active situation for U3 the astable timer the output of which charges capacitor C13
through R11 such that the output of the comparator goes high that drives the relay to switch off three phase load.
The output of Op-amp remains high indefinitely through a positive feedback provided for its pin1 to pin3 through a
forward biased diode and a resistor in series. This results in the relay permanently switched on to disconnect the
load connected at its NC contacts permanently off. In order to maintain the flow of DC supply the star connected
secondary set DC„S are paralleled through D8,D9 & D10 for uninterrupted supply to the circuit voltage of 12v DC
and 5v DC derived out of voltage regulator IC 7805.
RESULT
• When push button across RG supply was pressed and released immediately , the bulbs turned off
and turned on automatically after 1.1sec (t=1.1R7.C9) . The message “RG temporary fault” was
displayed on the LCD and same message was sent via GSM to the given mobile number. Similar
results were obtained for YG/BG/RY/BY/RB temporary faults.
•When push button across RG supply was pressed for around 10 sec, the bulbs turned off but the
bulbs didn t turn on even after the push button was released. The message “RG permanent fault”‟
was displayed on the LCD and same message was sent via GSM to the given mobile number.
Similar results were obtained for YG/BG/RY/BY/RB permanent faults.
• ADVANTAGES:
1. Safety equipment
2. More reliable
3. More efficient
4. Reduce losses
APPLICATIONS:
Substation
Transmission lines
Industries
Apartments
Various faults have been created to develop an automatic tripping mechanism for the three phase supply
system while temporary fault and permanent faults occur. Here timer 555 has been used with relay for the fault
analysis. Short duration fault returns the supply to the load immediately called as temporary trip while long
duration shall result in permanent trip. Also we adjust the time duration for permanent fault by adjusting
capacitors charging periods. Whenever any type of fault: LG temporary/permanent or LL temporary / permanent
occurs message regarding faults is displayed on LCD and also message is sent to the concerned person via
GSM modem.
CONCLUSION
HARDWARE CIRCUIT WITH MODEL
PROGRESS REPORT NO:
1 de 27

Mais conteúdo relacionado

Mais procurados

INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERNitish NIT
9.8K visualizações15 slides
Power system fault analysis pptPower system fault analysis ppt
Power system fault analysis pptkarikalan123
31.8K visualizações79 slides
Automatic load frequency controlAutomatic load frequency control
Automatic load frequency controlBalaram Das
22.5K visualizações32 slides

Mais procurados(20)

3 phase half wave controlled converter with r Load3 phase half wave controlled converter with r Load
3 phase half wave controlled converter with r Load
mechatronics jf4.2K visualizações
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLER
Nitish NIT9.8K visualizações
Power system fault analysis pptPower system fault analysis ppt
Power system fault analysis ppt
karikalan12331.8K visualizações
Simplified analysis of graetz circuit   copy - copySimplified analysis of graetz circuit   copy - copy
Simplified analysis of graetz circuit copy - copy
Vert Wheeler19.8K visualizações
Interconnection issue in microgridInterconnection issue in microgrid
Interconnection issue in microgrid
Amarjeet S Pandey1.4K visualizações
Automatic load frequency controlAutomatic load frequency control
Automatic load frequency control
Balaram Das22.5K visualizações
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAY
Raviraj solanki6.4K visualizações
HVDC presentationHVDC presentation
HVDC presentation
sagnikroychowdhury58.3K visualizações
Thyristor switched capacitorThyristor switched capacitor
Thyristor switched capacitor
KLS' S GIT, BELGAUM10.5K visualizações
Power qualityPower quality
Power quality
Badar Aaqili929 visualizações
Fault Location of Overhead Transmission LineFault Location of Overhead Transmission Line
Fault Location of Overhead Transmission Line
CHIRANJEEB DASH13.7K visualizações
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protection
Salim Palayi18.7K visualizações
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensation
Ayyarao T S L V22.6K visualizações
Fault location  for transmission lineFault location  for transmission line
Fault location for transmission line
mohammed shareef4.1K visualizações
Fault detection using iot PRESENTATIONFault detection using iot PRESENTATION
Fault detection using iot PRESENTATION
AnjanKumarHanumantha6.7K visualizações
Braking methods of induction motorBraking methods of induction motor
Braking methods of induction motor
raviarmugam2.4K visualizações
Introduction of wide area mesurement syatemIntroduction of wide area mesurement syatem
Introduction of wide area mesurement syatem
PanditNitesh8.4K visualizações
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINEFAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
Dr. Babasaheb Ambedkar Technological University15.5K visualizações

Destaque(19)

SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
Partha Parida48.2K visualizações
distribution system fault mangementdistribution system fault mangement
distribution system fault mangement
Manjunath Ds2.5K visualizações
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
Mohit Awasthi19.8K visualizações
Earthing systemEarthing system
Earthing system
Achmad Zulkifli1.7K visualizações
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysis
kirkusawi12.8K visualizações
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2
R.K. Mathuria1.6K visualizações
Electrical grounding and earthingElectrical grounding and earthing
Electrical grounding and earthing
Nitesh Dash19.7K visualizações
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
Biswajit Pratihari100.7K visualizações
Earthing ConceptsEarthing Concepts
Earthing Concepts
mvrkprasad37.2K visualizações
Electrical earthingElectrical earthing
Electrical earthing
Denuka39.8K visualizações
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
moiz8997.9K visualizações
Importance of industrial safetyImportance of industrial safety
Importance of industrial safety
Sure Safety (I) Pvt Ltd27.2K visualizações
Electrical  Safety Electrical  Safety
Electrical Safety
Reliance95.6K visualizações
Top 10 rules for electric safetyTop 10 rules for electric safety
Top 10 rules for electric safety
Rock Wood23.5K visualizações
Electrical safety newElectrical safety new
Electrical safety new
PROEM_training20K visualizações
Industrial safetyIndustrial safety
Industrial safety
Anita Sharma194.1K visualizações
Substation overviewSubstation overview
Substation overview
BHAGWAN PRASAD82.6K visualizações

Similar a ppt of Three phase fault analysis with auto reset for temporary fault and trip for permanent fault

Grid synchronisationGrid synchronisation
Grid synchronisationmanogna gwen
3.9K visualizações37 slides
Cockpit White BoxCockpit White Box
Cockpit White Boxncct
2K visualizações36 slides

Similar a ppt of Three phase fault analysis with auto reset for temporary fault and trip for permanent fault (20)

Controlling of DC Motor using IC 555 TimerControlling of DC Motor using IC 555 Timer
Controlling of DC Motor using IC 555 Timer
Upendra Chokka6.9K visualizações
Grid synchronisationGrid synchronisation
Grid synchronisation
manogna gwen3.9K visualizações
INTERRUPT DRIVEN MULTIPLEXED 7 SEGMENT DIGITAL CLOCKINTERRUPT DRIVEN MULTIPLEXED 7 SEGMENT DIGITAL CLOCK
INTERRUPT DRIVEN MULTIPLEXED 7 SEGMENT DIGITAL CLOCK
Santanu Chatterjee3.3K visualizações
Cockpit White BoxCockpit White Box
Cockpit White Box
ncct2K visualizações
HOME APPLICATION REGULATION USING TV REMOTEHOME APPLICATION REGULATION USING TV REMOTE
HOME APPLICATION REGULATION USING TV REMOTE
shiv kapil100 visualizações
BHH POWER PLANT ppt.pptxBHH POWER PLANT ppt.pptx
BHH POWER PLANT ppt.pptx
Anil7647676 visualizações
Visiter counter docVisiter counter doc
Visiter counter doc
Prem Kumar115 visualizações
Lec 8,9,10 (interfacing)Lec 8,9,10 (interfacing)
Lec 8,9,10 (interfacing)
Mohamed Atef1.7K visualizações
power grid synchronization failure detectionpower grid synchronization failure detection
power grid synchronization failure detection
Jay Hind2.6K visualizações
Fy3610821086Fy3610821086
Fy3610821086
IJERA Editor483 visualizações
MPC of TWT based TransmitterMPC of TWT based Transmitter
MPC of TWT based Transmitter
Abhishek Sutrave1.9K visualizações
AUTOMATIC GRID ON SENSING BAD VOLTAGE OR FREQUENCYAUTOMATIC GRID ON SENSING BAD VOLTAGE OR FREQUENCY
AUTOMATIC GRID ON SENSING BAD VOLTAGE OR FREQUENCY
Gaurav Singh236 visualizações
File 1389427052File 1389427052
File 1389427052
Aman_preet112 visualizações
Report on minor projectReport on minor project
Report on minor project
Anil Maurya2.5K visualizações
Speed control of motorSpeed control of motor
Speed control of motor
Pankaj Kumar Nayak2K visualizações
INTELIGENT RAILWAY SYSTEMINTELIGENT RAILWAY SYSTEM
INTELIGENT RAILWAY SYSTEM
Ghanshyam Dusane269 visualizações
Prince jai nproject reportPrince jai nproject report
Prince jai nproject report
Prince Dungarpur3.3K visualizações

Mais de Vikram Rawani

Kirsty simone bonner resumeKirsty simone bonner resume
Kirsty simone bonner resumeVikram Rawani
114 visualizações3 slides
Student template-v3Student template-v3
Student template-v3Vikram Rawani
62 visualizações2 slides
Kirsty bonner coverKirsty bonner cover
Kirsty bonner coverVikram Rawani
47 visualizações1 slide
Resume for experienced EnginneerResume for experienced Enginneer
Resume for experienced EnginneerVikram Rawani
157 visualizações3 slides
Fresher java j2ee resumeFresher java j2ee resume
Fresher java j2ee resumeVikram Rawani
6.3K visualizações2 slides
Top 10 interview q&amsTop 10 interview q&ams
Top 10 interview q&amsVikram Rawani
546 visualizações8 slides

Mais de Vikram Rawani(10)

Kirsty simone bonner resumeKirsty simone bonner resume
Kirsty simone bonner resume
Vikram Rawani114 visualizações
Student template-v3Student template-v3
Student template-v3
Vikram Rawani62 visualizações
Kirsty bonner coverKirsty bonner cover
Kirsty bonner cover
Vikram Rawani47 visualizações
Resume for experienced EnginneerResume for experienced Enginneer
Resume for experienced Enginneer
Vikram Rawani157 visualizações
Fresher java j2ee resumeFresher java j2ee resume
Fresher java j2ee resume
Vikram Rawani6.3K visualizações
Top 10 interview q&amsTop 10 interview q&ams
Top 10 interview q&ams
Vikram Rawani546 visualizações
Improvement of the electric power quality usingImprovement of the electric power quality using
Improvement of the electric power quality using
Vikram Rawani159 visualizações

Último(20)

cloud computing-virtualization.pptxcloud computing-virtualization.pptx
cloud computing-virtualization.pptx
RajaulKarim2078 visualizações
Investor PresentationInvestor Presentation
Investor Presentation
eser sevinç15 visualizações
Deutsch CrimpingDeutsch Crimping
Deutsch Crimping
Iwiss Tools Co.,Ltd15 visualizações
SICTECH CORPORATE PRESENTATIONSICTECH CORPORATE PRESENTATION
SICTECH CORPORATE PRESENTATION
SiCtechInduction16 visualizações
SEMI CONDUCTORSSEMI CONDUCTORS
SEMI CONDUCTORS
pavaniaalla200516 visualizações
SNMPxSNMPx
SNMPx
Amatullahbutt12 visualizações
Activated sludge process .pdfActivated sludge process .pdf
Activated sludge process .pdf
8832RafiyaAltaf6 visualizações
What is Unit TestingWhat is Unit Testing
What is Unit Testing
Sadaaki Emura21 visualizações
Electrical CrimpingElectrical Crimping
Electrical Crimping
Iwiss Tools Co.,Ltd19 visualizações
Saikat Chakraborty Java Oracle Certificate.pdfSaikat Chakraborty Java Oracle Certificate.pdf
Saikat Chakraborty Java Oracle Certificate.pdf
SaikatChakraborty78714811 visualizações
Paper 3.pdfPaper 3.pdf
Paper 3.pdf
Javad Kadkhodapour6 visualizações
String.pptxString.pptx
String.pptx
Ananthi Palanisamy47 visualizações
Pointers.pptxPointers.pptx
Pointers.pptx
Ananthi Palanisamy62 visualizações
CHI-SQUARE ( χ2) TESTS.pptxCHI-SQUARE ( χ2) TESTS.pptx
CHI-SQUARE ( χ2) TESTS.pptx
ssusera597c514 visualizações

ppt of Three phase fault analysis with auto reset for temporary fault and trip for permanent fault

  • 1. THREE PHASE FAULT ANALYSIS WITH AUTORESET FOR TEMPORARY FAULT AND TRIP FOR PERMANENT FAULT GUIDE :- DR. RAJASHEKAR P. MANDI (PROFESSOR) REVA INSTITUTE OF TECHNOLOGY ANDMANAGEMENT, BANGALORE-560064 Electrical and Electronics Engineering Department Name USN NO SHASHANK SMAR THAYEEB PASHA UJJWAL KARN VIKRAM KUMAR RAWANI 1RE12EE095 1RE12EE113 1RE12EE115 1RE12EE120
  • 2. ACKNOWLEDGMENT • We are highly indebted to Dr. Rajashekar P. Mandi for his guidance and constant supervision as well as for providing necessary information regarding the project. • We would like to express our gratitude to the HOD-Dr.Puttamadappa C for his kind co-operation and encouragement. • We would like to express our special gratitude and thanks to our PRINCIPAL- Dr. Sunil S. Manvi for giving us such attention and time. REVA INSTITUTE OF TECHNOLOGY ANDMANAGEMENT, BANGALORE-560064 Electrical and Electronics Engineering Department
  • 3. ABSTRACT • This project provides automatic tripping mechanism for the three phase supply system for prevention from damage due to faults. • In case of temporary fault: the output resets automatically after a brief interruption. • In case of permanent fault: the output remains in tripped condition . • Faults like LG, LL, LLL and so on can be sensed and automatically disconnects the supply to avoid large scale damages to the equipment connected. • Step down transformers bring down the voltage from 230V to 12V.The concept of low voltage testing of fault conditions is followed. • A set of switches are used to create faults and 555 timers are used to handle short and long duration fault condition. REVA INSTITUTE OF TECHNOLOGY AND MANAGEMENT, BANGALORE-560064 Electrical and Electronics Engineering Department
  • 4. INTRODUCTION REVA INSTITUTE OF TECHNOLOGY AND MANAGEMENT, BANGALORE-560064 Electrical and Electronics Engineering Department • Various studies have shown that anywhere from 70%, to as high as 90%, of faults on most overhead lines are transient . • Faults tend to be less transient (near the 80% range) at lower distribution voltages and more transient (near the90% range) at higher sub transmission and transmission voltages . • Causes of transient fault: Lightning, swinging wires, temporary contacts with foreign objects. • The remaining 10 - 30% of faults are semi-permanent or permanent in nature.
  • 5. • Transient faults can be cleared by momentarily de-energizing the line, in order to allow the fault to clear. Auto-reclosing can then restore service to the line • Permanent fault will not be cleared by tripping and auto-reclosing.
  • 6. OBJECTIVES REVA INSTITUTE OF TECHNOLOGY AND MANAGEMENT, BANGALORE-560064 Electrical and Electronics Engineering Department • To reduce the outage time due to faults and provide higher level of service continuity to the customers. • To maintain system stability. • To send message to the authorities via sms by interfacing a GSM modem.
  • 7. COMPONENTS: • STEP DOWN TRANSFORMER • 555 TIMER • VOLTAGE REGULATOR(LM 7805) • RELAYS • COMPARATOR IC LM358 • OPTOCOUPLER (MCT 2E) • CAPACITORS , DIODES, RESISTORS,TRANSISTORS, LEDS, PUSH BUTTON • MICROCONTROLLER(89S52) • MAX 232 • GSM MODEM • LCD (16 X 2)
  • 11. CONNECTIONS: • Six number of step down transformers (220v to 12v) are used. •The primaries of 3 transformers are connected to the supply in star configuration and their secondaries are connected in star. •The other set of 3 transformers are connected in star – delta configuration. •The output of all transformers are rectified and filtered individually and are given to 6 relay coils •6 push buttons are connected across each relay to create fault. •The NC contacts are connected in parallel while all COM points are grounded. •Parallel connected point of NC is connected to pin 2 of 555 timer (mono-stable mode) •Output of this timer is given to the reset pin of next 555 timer(astable mode) •From pin 3 of this timer output is given to the non-inverting input pin of comparator IC LM358 , while the inverting input is kept at a fixed voltage by a potential divider. •Pin 1 of LM358 is connected to 3 CO relay through the driver transistor Q1.
  • 12. RELAY • A relay is an electrically operated switch. • Many relays use an electromagnet to operate a switching mechanism mechanically, but other operating principles are also used. • Relays are used where it is necessary to control a circuit by a low-power signal (with complete electrical isolation between control and controlled circuits), or where several circuits must be controlled by one signal.
  • 13. 555 TIMER PIN NAME PURPOSE 1 GND Ground , low level (0 V) 2 TRIG Output rises and interval starts when input falls below 1/3 Vcc 3 OUT This output is driven to +Vcc or Gnd 4 RESET A timing interval may be interrupted by driving this input to GND 5 CTRL Control access to the internal voltage divider(by default,2/3 Vcc 6 THR The interval ends when the voltage at THR is greater than at CTRL 7 DIS Open collector output, may discharge capacitor between intervals 8 V+, Vcc Positive supply voltage is usually between 3 and 15 V
  • 15. COMPARATOR (IC LM358) Pin Connection 1 - Output 1 2 - Inverting input 3 - Non-inverting input 4 – VCC- 5 - Non-inverting input 2 6 - Inverting input 2 7 - Output 2 8 – VCC+ • A comparator gives a logic output indicating the relative potentials on its two inputs • An OP-AMP amplifies the differential voltage between its two inputs. • It is designed always to be used in closed-loop application.
  • 16. LCD PINS DESCRIPTION 1 Ground 2 Vcc 3 Contrast voltage 4 “R/S”-Instruction/Register Select 5 “R/W”-Read/write LCD registers 6 “E” clock 7-14 Data input/output pins • LCD are electronically modulated optical device shaped into a thin,flat panel made up of any number of colour or monchrome pixels filled with liquid crystals. These crystals are arrayed in front of light source or reflector. • Any LCD controller is used to provide a simple interface to an LCD,perhaps eight data inputs and one enable input
  • 17. MICROCONTROLLER The 89C52 is a single chip microcomputer with I/O port, timer, clock generator, Data memory, program memory stack, ADC and serial ports etc. • 8 bit CPU with registers A and B. • 16 bit Program Counter and Data Pointer. • 8 bit Program Status Word. • 8 bit stack pointer. • Internal ROM of 8K bytes. • Internal RAM of 256 bytes, 4 register banks each containing 8registers. • Two 16 bit timer / counter. • Full duplex serial data receiver/transmitter. • Special function registers like TCON, TMOD and SCON etc. •Two external and three internal interrupt sources. Microcontrollers are used in automatically controlled products and devices such as automobile engine control systems, home security systems, hotel security and monitoring systems, remote controls, office machines, appliances, power tools, and toys. By reducing the size and cost compared to a design that uses a separate microprocessor, memory, and input/output devices, microcontrollers make it economical to digitally control even more devices and processes.
  • 18. GSM ARCHITECTURE • A GSM network is composed of several functional entities, whose functions and interfaces are specified. Figure 4.16 shows the layout of a generic GSM network. The GSM network can be divided into three broad parts. • The Mobile Station is carried by the subscriber. The Base Station Subsystem controls the radio link with the Mobile Station. The Network Subsystem, the main part of which is the Mobile services Switching Center (MSC), performs the switching of calls between the mobile users, and between mobile and fixed network users. The MSC also handles the mobility management operations. Not shown is the Operations and Maintenance Center, which oversees the proper operation and setup of the network.
  • 19. MAX232 • MAX232 is an integrated circuit, dual driver/reciever and typically converts RX,TX,CTS and RTS signals. • When a MAX232 IC receives a TTL level to convert, it changes TTL logic 0 to between +3V and +15V and changes TTL logic 1 to between -3V and -15V and vice versa for converting from TIA232 to TTL.
  • 20. WORKING AND OPERATING PROCEDURE WORKING: The project uses 6numbers step-down transformers for handling the entire circuit under low voltage conditions of 12v only to test the 3 phase fault analysis. The primary of 3 transformers are connected to a 3 phase supply in star configuration, while the secondary of the same is also connected in star configuration. The other set of 3 transformers with its primary connected in star to 3 phase have their secondary„s connected in delta configuration. The output of all the 6 transformers are rectified and filtered individually and are given to 6 relay coils. 6 push buttons, one each connected across the relay coil is meant to create a fault condition either at star i.e. LL Fault or 3L Fault. The NC contacts of all the relays are made parallel while all the common points are grounded. The parallel connected point of NC are given to pin2 through a resistor R5 to a 555 timer i.e. wired in monostable mode. The output of the same timer is connected to the reset pin 4 of another 555 timer wired in astable mode. LED„S are connected at their output to indicate their status. The output of the U3 555 timer from pin3 is given to an Op-amp LM358 through wire 11 and d12 to the non-inverting input pin3, while the inverting input is kept at a fixed voltage by a potential divider RV2. The voltage at pin2 coming from the potential divider is so held that it is higher than the pin3 of the Op-amp used as a comparator so that pin1 develops zero logic that fails to operate the relay through the driver transistor Q1. This relay Q1 is 3CO„ relay i.e. is meant for disconnecting the load to indicate fault conditions.
  • 21. OPERATING PROCEDURE: While the board is powered from a 3phase supply all the 6 relay coils get DC voltage and their common point disconnects from the NC and moves on to the NO points there by providing logic high at pin2 of 555 timer U1 i.e. that is kept on monostable mode. While any push button across the relay is pressed it disconnects that relay and in the process in common contacts moves to the NC position to provide a logic low at trigger pin of 555 timer to develop an output that brings the U3 555 timer which is used in astable mode for its reset pin to high such that the astable operation takes place at its output which is also indicated by flashing D11 LED. If the fault is off temporary in nature i.e. if the push button pressed is released immediately the U1 monostable disables U3 the output of which goes to zero in the event of any push button kept pressed for a longer duration the monostable output provides a longer duration active situation for U3 the astable timer the output of which charges capacitor C13 through R11 such that the output of the comparator goes high that drives the relay to switch off three phase load. The output of Op-amp remains high indefinitely through a positive feedback provided for its pin1 to pin3 through a forward biased diode and a resistor in series. This results in the relay permanently switched on to disconnect the load connected at its NC contacts permanently off. In order to maintain the flow of DC supply the star connected secondary set DC„S are paralleled through D8,D9 & D10 for uninterrupted supply to the circuit voltage of 12v DC and 5v DC derived out of voltage regulator IC 7805.
  • 22. RESULT • When push button across RG supply was pressed and released immediately , the bulbs turned off and turned on automatically after 1.1sec (t=1.1R7.C9) . The message “RG temporary fault” was displayed on the LCD and same message was sent via GSM to the given mobile number. Similar results were obtained for YG/BG/RY/BY/RB temporary faults. •When push button across RG supply was pressed for around 10 sec, the bulbs turned off but the bulbs didn t turn on even after the push button was released. The message “RG permanent fault”‟ was displayed on the LCD and same message was sent via GSM to the given mobile number. Similar results were obtained for YG/BG/RY/BY/RB permanent faults.
  • 23. • ADVANTAGES: 1. Safety equipment 2. More reliable 3. More efficient 4. Reduce losses
  • 25. Various faults have been created to develop an automatic tripping mechanism for the three phase supply system while temporary fault and permanent faults occur. Here timer 555 has been used with relay for the fault analysis. Short duration fault returns the supply to the load immediately called as temporary trip while long duration shall result in permanent trip. Also we adjust the time duration for permanent fault by adjusting capacitors charging periods. Whenever any type of fault: LG temporary/permanent or LL temporary / permanent occurs message regarding faults is displayed on LCD and also message is sent to the concerned person via GSM modem. CONCLUSION