Baganuur coal mine expansion
Opportunities for investors
Ulaanbaatar
Content
• Introduction
• Resources and reserves
• Coal production
• Market outlook
• Mine expansion plan
• Research and development
• Investment issues
Introduction
• ESTABLISHED IN1978.
• SE 130 KM FROM ULAANBAATAR.
CONNECTED TO PAVED ROAD AND
RAILWAY NETWORK.
• GOVERNMENT OWNS 75%, OTHERS 25%
OF SHARES RESPECTIVELY.
• EMPLOYEES 1100
• EXTRACTS 50% OF COAL CONSUMPTION
FOR PRODUCING ENERGY OF
MONGOLIA, 60% FOR CENTRAL REGION.
Coal quality standart
MNS 3818-2001
Type of coal
size
Ash
content /%/
<Aã
Moisture
/%/
<Wã
Sulfur
content
/%/ Sd
t
Volatile
matter
/%/V
Calorific value
<Qã
t
Kkal/kg KJ/kg
Brown coal
type -B2
17.5 37.5 0.5 45 3360 13.0
Main consumers
# Thermal power plants
Annual supply
/thous.tn/
Shares to total
consumption
1 TPP-4 1600.0 60%
2 TPP-3 1100.0 100%
3 TPP-2 210.0 100%
4 Darkhan TPP 250.0 60%
5 Erdenet TPP 120.0 50%
Resource and reserve
Proved in 1978 with 600.0 million tons.
 Updated in 1998 with 708.2 million tons as a result of detailed survey.
 In total, 88.4 million tons of coal has been extracted since 1978.
Norvest migrated the reserve model of 1978 into Minex in 3D.
2,00
2,50
3,00
3,50
4,00
4,50
5,00
-
100
200
300
400
500
600
700
800
900
0,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
1
1,1
1,2
1,3
1,4
1,5
1,6
1,7
1,8
1,9
2
Кхх,м3/тн
Millions
Minimum thicknesses of coal seam, m
2-р давхарга
2a-р давхарга
3-р давхарга
Хязгаарласан
хөрс хуулалтын
итгэлцүүр, м3/тн
Resource and reserve
Reserve can be elevated up to 700 million tones depending on the availability of minable coal seam
thicknesses.
Seam 2
Seam 2a
Seam 3
Limiting strip ratio m3/ton
Quality of survey results
Laboratory analysis:
In total samples from drilled boreholes
Ash analysis 47%
Caloric value analysis 24%
Sulphur content analysis 47%
Volatile analysis 29%
Core recovery – (60-70%)
Insufficient
quality of survey
to prepare a
Feasilibility
study for a bank
Requires detailed survey to choose proper mine technology for the mine.
Potentiality of resource increase up to 1.0 billion tones by conducting
additional geological survey in accordance with international standards.
-
2,00
4,00
6,00
8,00
10,00
12,00
14,00
16,00
0
500
1000
1500
2000
2500
3000
3500
4000
4500
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
Нүүрс олборлолт, м.тн Кхх, м3/тнCoal production, thous.tons
COAL PRODUCTION
Increase in earth moving.
Current situation
CHALLENGES
• Overdue overburden
• Water drainage issues
• Higher unit production cost than selling price
• Coal price set by government
• Outdated equipments and facilities - 90%, requires technical
renovation.
• Movement in internal stock piling
• Unreachable reserves due to geological conditions
• Increase in transport distance
• HR risks- lower salary
• Financial issues
Requires technical renovation and decrease in production cost
PROJECTED COAL CONSUMPTION
IN CENTRAL REGION
5,2 5,3 5,9 7,1
10,6 11,7 13,0
15,0
6,5 6,8 7,5
8,8
12,5
13,7
15,7
18,1
-
2,0
4,0
6,0
8,0
10,0
12,0
14,0
16,0
18,0
20,0
Milliontones
ТЭХС-ийн хэрэглээ Тєвийн бүсийн нийт хэрэглээ
2012 20172016201520142013 2018 2025
Central energy
system’s consumption
Total consumption
in central region
 Coal consumption of central region projected to be 6.5 million tones in 2012
while it will reach 15.7 million tones in 2018, 18.1 million tones in 2025 respectively.
Regarding the consumption projection, Baganuur mine needs to expand the mine
capacity.
Capacity expansion
3,30 3,57 3,52
4,30
5,51 5,51 5,51 5,64 6,05 6,00 6,13
5,2 5,3
5,9
7,1
10,6
11,7 12,2 12,5
13,0
13,5
14,0
-
2,00
4,00
6,00
8,00
10,00
12,00
14,00
16,00
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Багануурын
нийлүүлэлт
ТЭХС-ийн эрэлтDemand from CES
 30% of coal consumption to TPP-5 which will be built with 820 MW capacity in 2012-2016.
 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016.
 projected coal production of the mine is 6 million tons by 2020.
Supply from
Baganuur
Technological developments
 To entry Surface mining technology for Coal production
and overburden
 To build conveyor systems for both coal and waste
transport
 To start using underground mine technologies in some
coal seams.
 To reduce overburden volume and optimize mine earth
movements
COAL PRICE AND MINEABLE RESERVEs
140 186
392
683 717 731 749
1,98
2,16
2,43
2,72 2,74 2,75 2,80
1,00
1,20
1,40
1,60
1,80
2,00
2,20
2,40
2,60
2,80
3,00
-
500
1 000
1 500
2 000
2 500
3 000
0,7 0,8 0,9 1 1,1 1,2 1,3
Millions
Хөрс, м3
Нүүрс, тн
Кхх, м3/тн
Main option- Coal price
20500 tugriks/ton
Technology: Surface mining + Conveyor systems
Mineable reserve can be elevated to 749
million tones if selling price increased by
30% after technological renovation.
Minimum coal
thickness seam-
0.4 m
Waste, m3
Coal, ton
Strip ratio, m3/t
74 84
123 148 150 152 152
45
65
167
298 310 315 325
22
37
102
238
258 264 272
-
100
200
300
400
500
600
700
800
0,7 0,8 0,9 1 1,1 1,2 1,3
Millions
Factor impacting selling price
2-р давхарга
2a-р давхарга
3-р давхарга
Minimum
thickness of coal
seam- 0.4 m
Main option- Coal price
20500 tugriks/ton
COAL PRICE AND MINEABLE RESERVE
Technology: Surface mining+ conveyor system
Seam 2
Seam 2a
Seam 3
MINE PLAN 2012-2022
4,10
3,51
3,19
2,69
2,05
2,34
2,14 2,22 2,30 2,24
2,07
-
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
-
5
10
15
20
25 2012он
2013он
2014он
2015он
2016он
2017он
2018он
2019он
2020он
2021он
2022он
Stripratiom3/t
Million
Хөрс хуулалт, м3
Нийт нүүрс, тн
Хөрс хуулалтын
итгэлцүүр, м3/тн
Substantial decline in the
volume of vesting
waste, m3
Coal, ton
Strip
ratio, m3/t
PROJECTED COST
AFTER TECHNOLOGICAL RENOVATION
23,1
21,7
20,3
17,7
14,6
15,5 15,3 15,4 15,1 14,8
13,9
4,2
5,2 5,2 5,3 5,3 5,1 5,4 5,3 5,0 5,0 5,0
-
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
4,5
5,0
0,0
5,0
10,0
15,0
20,0
25,0
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Stripratio,m3/t
Thous.tugriks
1 тн нүүрсний бүрэн өөрийн өртөг 1 м3 Уулын цулд ноогдох зардал КххUnit cost/ton coal Unit cost/ m3 rock mass Strip ratio
Preparation to stock exchange (2012)
- Geophysical survey
- Detailed survey drilling
- Geotechnical survey
- Drainage survey
- Resource report in accordance with JORC
- Have the resource report in accordance with Mongolian standard approved by
Mineral Resource Authority.
- Have the feasibility study in accordance with Mongolian standard approved by
Mineral Resource Authority.
- Feasibility study for a bank
- Prepare documents for stock exchange
- Баяжуулах үйлдвэрийн туршилт судалгаа ТЭЗҮ боловсруулах
Additional shares to be sold at domestic stock exchange to raise the
necessary fund while keeping state owned shares at 51% in 2012.
Investment plan
14
71,6
1,5
4,1
11,1
3,9 2,9
9,4
2,9 1,5
7,1
1,5
(10)
-
10
20
30
40
50
60
70
80
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Хөрөнгийн биржд
гарах бэлтгэл
ажлын зардал
Уурхайн тоног
төхөөрөмж
Preparation
cost to stock
exchange
Mine
equipments
and facilities
(/in accordance with Feasibility study done by Glogex LLC)
Total investment of 131.4 million USD required between 2012 and 2022
ECONOMIC PARAMETERS
• Investment
– Facilities
• CAPEX 2012: USD85.5 million
• OPEX (2013-2015): USD16.7 million
• OPEX (2016-2022): USD29.2 million
• Total: USD117.5 million
– Preparation cost to stock exchange USD 13.9 million
– Total USD131.4 million
• Coal price/ton: 20500 tugriks in 2012, 22500 tugriks in 2013-2022
• Unit cost/ ton of coal
– in 2012: 23100 tugriks
– in 2014: 20300 tugriks
– in 2018: 15300 tugriks
– in 2022: 13900 tugriks
• Net present value (when NPV @ 10%): 35.6 billion tugriks
• Internal rate of return (IRR) - 13.4 %,
• Payback period – 7.91years or in 2018.
Thank you for your attention
We welcome any kind of cooperation

More Related Content

What's hot

APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEzubeditufail
 
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...EOI Escuela de Organización Industrial
 
Buenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Buenaventura Regasification Plant and Pipeline Yumbo BuenaventuraBuenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Buenaventura Regasification Plant and Pipeline Yumbo BuenaventuraAura Díaz
 
BlueScape AB32 GHG Reporting in California: What has Changed for 2014? Webina...
BlueScape AB32 GHG Reporting in California: What has Changed for 2014? Webina...BlueScape AB32 GHG Reporting in California: What has Changed for 2014? Webina...
BlueScape AB32 GHG Reporting in California: What has Changed for 2014? Webina...BlueScape
 
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONGEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONIEI GSC
 
IRJET- GEO- Mining based Reliability Assessment of Continuous Surface Miners–...
IRJET- GEO- Mining based Reliability Assessment of Continuous Surface Miners–...IRJET- GEO- Mining based Reliability Assessment of Continuous Surface Miners–...
IRJET- GEO- Mining based Reliability Assessment of Continuous Surface Miners–...IRJET Journal
 
Adco presentation june 4 2013
Adco presentation june 4 2013Adco presentation june 4 2013
Adco presentation june 4 2013shivendragautam21
 
Underground Coal Mine Emission Inventory Tool
Underground Coal Mine Emission Inventory ToolUnderground Coal Mine Emission Inventory Tool
Underground Coal Mine Emission Inventory ToolAECOM
 
Project mgmt set up of cement plant
Project mgmt set up of cement plantProject mgmt set up of cement plant
Project mgmt set up of cement plantNihar Routray
 
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4Mihai Dragne
 
Use of fly ash in road flyover embankment construction on nh works reg dt on ...
Use of fly ash in road flyover embankment construction on nh works reg dt on ...Use of fly ash in road flyover embankment construction on nh works reg dt on ...
Use of fly ash in road flyover embankment construction on nh works reg dt on ...ssuserbf7f52
 
Coal Trading in Pakistan Market
Coal Trading in Pakistan MarketCoal Trading in Pakistan Market
Coal Trading in Pakistan MarketRehan Lakhani
 
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...Albania Energy Association
 

What's hot (16)

Adnoc and masdar project may 2013
Adnoc and masdar project   may 2013Adnoc and masdar project   may 2013
Adnoc and masdar project may 2013
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
 
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Ijciet 06 10_015
Ijciet 06 10_015Ijciet 06 10_015
Ijciet 06 10_015
 
Buenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Buenaventura Regasification Plant and Pipeline Yumbo BuenaventuraBuenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Buenaventura Regasification Plant and Pipeline Yumbo Buenaventura
 
BlueScape AB32 GHG Reporting in California: What has Changed for 2014? Webina...
BlueScape AB32 GHG Reporting in California: What has Changed for 2014? Webina...BlueScape AB32 GHG Reporting in California: What has Changed for 2014? Webina...
BlueScape AB32 GHG Reporting in California: What has Changed for 2014? Webina...
 
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONGEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
 
IRJET- GEO- Mining based Reliability Assessment of Continuous Surface Miners–...
IRJET- GEO- Mining based Reliability Assessment of Continuous Surface Miners–...IRJET- GEO- Mining based Reliability Assessment of Continuous Surface Miners–...
IRJET- GEO- Mining based Reliability Assessment of Continuous Surface Miners–...
 
Adco presentation june 4 2013
Adco presentation june 4 2013Adco presentation june 4 2013
Adco presentation june 4 2013
 
Underground Coal Mine Emission Inventory Tool
Underground Coal Mine Emission Inventory ToolUnderground Coal Mine Emission Inventory Tool
Underground Coal Mine Emission Inventory Tool
 
Project mgmt set up of cement plant
Project mgmt set up of cement plantProject mgmt set up of cement plant
Project mgmt set up of cement plant
 
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
 
Use of fly ash in road flyover embankment construction on nh works reg dt on ...
Use of fly ash in road flyover embankment construction on nh works reg dt on ...Use of fly ash in road flyover embankment construction on nh works reg dt on ...
Use of fly ash in road flyover embankment construction on nh works reg dt on ...
 
Coal Trading in Pakistan Market
Coal Trading in Pakistan MarketCoal Trading in Pakistan Market
Coal Trading in Pakistan Market
 
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
 

Similar to 09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuur Sc

Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road aheadVR M
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaasaifuddinkhan34
 
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.ZoljargalThe Business Council of Mongolia
 
Mini cement
Mini cementMini cement
Mini cementhadymem
 
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...The Business Council of Mongolia
 
Energy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesEnergy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesDr Ramhari Poudyal
 
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...The Business Council of Mongolia
 
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh BatkhuuThe Business Council of Mongolia
 
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh BatkhuuThe Business Council of Mongolia
 
State of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesState of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesMD.Suresh Kumar
 
Results of KGHM International in 2013
Results of KGHM International in 2013Results of KGHM International in 2013
Results of KGHM International in 2013KGHM
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectationsVR M
 
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoSantie Gouws
 

Similar to 09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuur Sc (20)

Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road ahead
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
 
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
 
Nitin
NitinNitin
Nitin
 
IRON SAND
IRON SANDIRON SAND
IRON SAND
 
Imperatives For Iron Ore Exports
Imperatives For Iron Ore ExportsImperatives For Iron Ore Exports
Imperatives For Iron Ore Exports
 
Mini cement
Mini cementMini cement
Mini cement
 
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
 
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
 
Energy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesEnergy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement Industries
 
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
21.02.1013 Current state of coal sector of Mongolia and it's future trends, D...
 
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
 
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
 
State of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesState of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground mines
 
Results of KGHM International in 2013
Results of KGHM International in 2013Results of KGHM International in 2013
Results of KGHM International in 2013
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectations
 
presentation
presentationpresentation
presentation
 
Reservoir Corporate PDAC
Reservoir Corporate PDACReservoir Corporate PDAC
Reservoir Corporate PDAC
 
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
 
Los bronces 2007
Los bronces 2007Los bronces 2007
Los bronces 2007
 

More from The Business Council of Mongolia

N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12The Business Council of Mongolia
 

More from The Business Council of Mongolia (20)

Three Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itineraryThree Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itinerary
 
Three Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itineraryThree Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itinerary
 
BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020
 
Digital Enterprise 2019
Digital Enterprise 2019Digital Enterprise 2019
Digital Enterprise 2019
 
Faro Foundation presentation
Faro Foundation presentationFaro Foundation presentation
Faro Foundation presentation
 
Business Council of Mongolia presentation
Business Council of Mongolia presentationBusiness Council of Mongolia presentation
Business Council of Mongolia presentation
 
National Development Association of Mongolia presentation
National Development Association of Mongolia presentationNational Development Association of Mongolia presentation
National Development Association of Mongolia presentation
 
Gobi Green Energy Gankhuyag
Gobi Green Energy GankhuyagGobi Green Energy Gankhuyag
Gobi Green Energy Gankhuyag
 
Ch.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sectorCh.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sector
 
A.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sectorA.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sector
 
B.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of MongoliaB.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of Mongolia
 
Munkhzorig - Digital Transformation
Munkhzorig - Digital TransformationMunkhzorig - Digital Transformation
Munkhzorig - Digital Transformation
 
Tseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for InnovationTseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for Innovation
 
System analysis study on the Constitution of Mongolia
System analysis study on the Constitution of MongoliaSystem analysis study on the Constitution of Mongolia
System analysis study on the Constitution of Mongolia
 
Kincora Copper March 2019
Kincora Copper March 2019Kincora Copper March 2019
Kincora Copper March 2019
 
Erdenes Mongol presentation
Erdenes Mongol presentationErdenes Mongol presentation
Erdenes Mongol presentation
 
Tatsuya Hamada presentation
Tatsuya Hamada presentationTatsuya Hamada presentation
Tatsuya Hamada presentation
 
BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019
 
N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12
 
Procurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcmProcurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcm
 

Recently uploaded

TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 

Recently uploaded (20)

TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 

09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuur Sc

  • 1. Baganuur coal mine expansion Opportunities for investors Ulaanbaatar
  • 2. Content • Introduction • Resources and reserves • Coal production • Market outlook • Mine expansion plan • Research and development • Investment issues
  • 3. Introduction • ESTABLISHED IN1978. • SE 130 KM FROM ULAANBAATAR. CONNECTED TO PAVED ROAD AND RAILWAY NETWORK. • GOVERNMENT OWNS 75%, OTHERS 25% OF SHARES RESPECTIVELY. • EMPLOYEES 1100 • EXTRACTS 50% OF COAL CONSUMPTION FOR PRODUCING ENERGY OF MONGOLIA, 60% FOR CENTRAL REGION.
  • 4. Coal quality standart MNS 3818-2001 Type of coal size Ash content /%/ <Aã Moisture /%/ <Wã Sulfur content /%/ Sd t Volatile matter /%/V Calorific value <Qã t Kkal/kg KJ/kg Brown coal type -B2 17.5 37.5 0.5 45 3360 13.0
  • 5. Main consumers # Thermal power plants Annual supply /thous.tn/ Shares to total consumption 1 TPP-4 1600.0 60% 2 TPP-3 1100.0 100% 3 TPP-2 210.0 100% 4 Darkhan TPP 250.0 60% 5 Erdenet TPP 120.0 50%
  • 6. Resource and reserve Proved in 1978 with 600.0 million tons.  Updated in 1998 with 708.2 million tons as a result of detailed survey.  In total, 88.4 million tons of coal has been extracted since 1978. Norvest migrated the reserve model of 1978 into Minex in 3D.
  • 7. 2,00 2,50 3,00 3,50 4,00 4,50 5,00 - 100 200 300 400 500 600 700 800 900 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1 1,1 1,2 1,3 1,4 1,5 1,6 1,7 1,8 1,9 2 Кхх,м3/тн Millions Minimum thicknesses of coal seam, m 2-р давхарга 2a-р давхарга 3-р давхарга Хязгаарласан хөрс хуулалтын итгэлцүүр, м3/тн Resource and reserve Reserve can be elevated up to 700 million tones depending on the availability of minable coal seam thicknesses. Seam 2 Seam 2a Seam 3 Limiting strip ratio m3/ton
  • 8. Quality of survey results Laboratory analysis: In total samples from drilled boreholes Ash analysis 47% Caloric value analysis 24% Sulphur content analysis 47% Volatile analysis 29% Core recovery – (60-70%) Insufficient quality of survey to prepare a Feasilibility study for a bank Requires detailed survey to choose proper mine technology for the mine. Potentiality of resource increase up to 1.0 billion tones by conducting additional geological survey in accordance with international standards.
  • 11. CHALLENGES • Overdue overburden • Water drainage issues • Higher unit production cost than selling price • Coal price set by government • Outdated equipments and facilities - 90%, requires technical renovation. • Movement in internal stock piling • Unreachable reserves due to geological conditions • Increase in transport distance • HR risks- lower salary • Financial issues Requires technical renovation and decrease in production cost
  • 12. PROJECTED COAL CONSUMPTION IN CENTRAL REGION 5,2 5,3 5,9 7,1 10,6 11,7 13,0 15,0 6,5 6,8 7,5 8,8 12,5 13,7 15,7 18,1 - 2,0 4,0 6,0 8,0 10,0 12,0 14,0 16,0 18,0 20,0 Milliontones ТЭХС-ийн хэрэглээ Тєвийн бүсийн нийт хэрэглээ 2012 20172016201520142013 2018 2025 Central energy system’s consumption Total consumption in central region  Coal consumption of central region projected to be 6.5 million tones in 2012 while it will reach 15.7 million tones in 2018, 18.1 million tones in 2025 respectively. Regarding the consumption projection, Baganuur mine needs to expand the mine capacity.
  • 13. Capacity expansion 3,30 3,57 3,52 4,30 5,51 5,51 5,51 5,64 6,05 6,00 6,13 5,2 5,3 5,9 7,1 10,6 11,7 12,2 12,5 13,0 13,5 14,0 - 2,00 4,00 6,00 8,00 10,00 12,00 14,00 16,00 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Багануурын нийлүүлэлт ТЭХС-ийн эрэлтDemand from CES  30% of coal consumption to TPP-5 which will be built with 820 MW capacity in 2012-2016.  100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016.  projected coal production of the mine is 6 million tons by 2020. Supply from Baganuur
  • 14. Technological developments  To entry Surface mining technology for Coal production and overburden  To build conveyor systems for both coal and waste transport  To start using underground mine technologies in some coal seams.  To reduce overburden volume and optimize mine earth movements
  • 15. COAL PRICE AND MINEABLE RESERVEs 140 186 392 683 717 731 749 1,98 2,16 2,43 2,72 2,74 2,75 2,80 1,00 1,20 1,40 1,60 1,80 2,00 2,20 2,40 2,60 2,80 3,00 - 500 1 000 1 500 2 000 2 500 3 000 0,7 0,8 0,9 1 1,1 1,2 1,3 Millions Хөрс, м3 Нүүрс, тн Кхх, м3/тн Main option- Coal price 20500 tugriks/ton Technology: Surface mining + Conveyor systems Mineable reserve can be elevated to 749 million tones if selling price increased by 30% after technological renovation. Minimum coal thickness seam- 0.4 m Waste, m3 Coal, ton Strip ratio, m3/t
  • 16. 74 84 123 148 150 152 152 45 65 167 298 310 315 325 22 37 102 238 258 264 272 - 100 200 300 400 500 600 700 800 0,7 0,8 0,9 1 1,1 1,2 1,3 Millions Factor impacting selling price 2-р давхарга 2a-р давхарга 3-р давхарга Minimum thickness of coal seam- 0.4 m Main option- Coal price 20500 tugriks/ton COAL PRICE AND MINEABLE RESERVE Technology: Surface mining+ conveyor system Seam 2 Seam 2a Seam 3
  • 17. MINE PLAN 2012-2022 4,10 3,51 3,19 2,69 2,05 2,34 2,14 2,22 2,30 2,24 2,07 - 0,50 1,00 1,50 2,00 2,50 3,00 3,50 4,00 4,50 - 5 10 15 20 25 2012он 2013он 2014он 2015он 2016он 2017он 2018он 2019он 2020он 2021он 2022он Stripratiom3/t Million Хөрс хуулалт, м3 Нийт нүүрс, тн Хөрс хуулалтын итгэлцүүр, м3/тн Substantial decline in the volume of vesting waste, m3 Coal, ton Strip ratio, m3/t
  • 18. PROJECTED COST AFTER TECHNOLOGICAL RENOVATION 23,1 21,7 20,3 17,7 14,6 15,5 15,3 15,4 15,1 14,8 13,9 4,2 5,2 5,2 5,3 5,3 5,1 5,4 5,3 5,0 5,0 5,0 - 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 0,0 5,0 10,0 15,0 20,0 25,0 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Stripratio,m3/t Thous.tugriks 1 тн нүүрсний бүрэн өөрийн өртөг 1 м3 Уулын цулд ноогдох зардал КххUnit cost/ton coal Unit cost/ m3 rock mass Strip ratio
  • 19. Preparation to stock exchange (2012) - Geophysical survey - Detailed survey drilling - Geotechnical survey - Drainage survey - Resource report in accordance with JORC - Have the resource report in accordance with Mongolian standard approved by Mineral Resource Authority. - Have the feasibility study in accordance with Mongolian standard approved by Mineral Resource Authority. - Feasibility study for a bank - Prepare documents for stock exchange - Баяжуулах үйлдвэрийн туршилт судалгаа ТЭЗҮ боловсруулах Additional shares to be sold at domestic stock exchange to raise the necessary fund while keeping state owned shares at 51% in 2012.
  • 20. Investment plan 14 71,6 1,5 4,1 11,1 3,9 2,9 9,4 2,9 1,5 7,1 1,5 (10) - 10 20 30 40 50 60 70 80 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Хөрөнгийн биржд гарах бэлтгэл ажлын зардал Уурхайн тоног төхөөрөмж Preparation cost to stock exchange Mine equipments and facilities (/in accordance with Feasibility study done by Glogex LLC) Total investment of 131.4 million USD required between 2012 and 2022
  • 21. ECONOMIC PARAMETERS • Investment – Facilities • CAPEX 2012: USD85.5 million • OPEX (2013-2015): USD16.7 million • OPEX (2016-2022): USD29.2 million • Total: USD117.5 million – Preparation cost to stock exchange USD 13.9 million – Total USD131.4 million • Coal price/ton: 20500 tugriks in 2012, 22500 tugriks in 2013-2022 • Unit cost/ ton of coal – in 2012: 23100 tugriks – in 2014: 20300 tugriks – in 2018: 15300 tugriks – in 2022: 13900 tugriks • Net present value (when NPV @ 10%): 35.6 billion tugriks • Internal rate of return (IRR) - 13.4 %, • Payback period – 7.91years or in 2018.
  • 22. Thank you for your attention We welcome any kind of cooperation