PMP Preparation

PROJECT INTEGRATION MANAGEMENT
Waleed El-Naggar, MBA, PMP
Integration … is What?
Its best described as putting all other
management processes of the project
into a cohesive whole.




   Waleed El-Naggar      PMP Integration Management   2
Project Integration management Processes




   Waleed El-Naggar     PMP Integration Management   3
Project Selection
   Cost/Benefit Analysis

   Cash Flow Analysis

   Scoring Models

   Payback Period

   Net Present Value

   Internal Rate of Return
    Waleed El-Naggar          PMP Integration Management   4
Scoring Models




  Waleed El-Naggar   PMP Integration Management   5
Payback Period
   Year              Project A Project B
     0                    -1,000    -1,000
     1                       500       100
     2                       400       300
     3                       300       400
     4                       100       600



  Waleed El-Naggar               PMP Integration Management   6
Project A




     Waleed El-Naggar   PMP Integration Management   7
Project B




     Waleed El-Naggar   PMP Integration Management   8
The Time Value of Money
 A dollar received today is worth more than a
  dollar received tomorrow
       This is because a dollar received today can be
        invested to earn interest
       The amount of interest earned depends on the
        rate of return that can be earned on the
        investment
 Time value of money quantifies the value of a
  dollar through time
       Waleed El-Naggar             PMP Integration Management   9
Example of PV Calculation


   0                  1    2              3                   4
            10%

                     100   300          300                   -50
 90.91
247.93
225.39
-34.15
530.08 = PV
  Waleed El-Naggar               PMP Integration Management    10
4.1 Develop Project Charter
   The process of developing a document that formally
    authorizes a project or a phase and documenting initial
    requirements
   Issued by an initiator or a sponsor.
   Projects are initiated as a result of the following:
       Market demand
       Business need
       Customer request
       Technological advance
       Legal requirement
       Social need
        Waleed El-Naggar           PMP Integration Management   11
4.1 Develop Project Charter Inputs
   Project Statement of Work
     Business  need
     Product Scope Description

     Strategic Plan

   Business Case
   Contract
   Enterprise Environment Factors
   Organization Process Assets

     Waleed El-Naggar             PMP Integration Management   12
4.1 Develop Project Charter Tools &
  Techniques
 Expert Judgment

  Other   units within the organization
  Consultants

  Stakeholders,        including customer or sponsor
  Professional        and technical associations
  Industry    groups
  Subject   matter experts
  Project   Management Office (PMO)
    Waleed El-Naggar                   PMP Integration Management   13
4.1 Develop Project Charter
Outputs
   Project Charter
     Project purpose or justification
     Measurable Project Objectives
     High-Level requirements
     High-Level Project Description
     High-Level Risks
     Summary milestone Schedule
     Summary Budget
     Project Approval Requirements
     Assigned Project Manager
     Name and Authority of the Sponsor
        Waleed El-Naggar        PMP Integration Management   14
Q: Integration is done by:

A.   Project Manager
B.   Team
C.   Senior Management
D.   Client




                        Answer A



     Waleed El-Naggar          PMP Integration Management   15
4.2 Develop Project Management
Plan
   The process of documenting the actions
    necessary to define, prepare, integrate, and
    coordinate all subsidiary plans




     Waleed El-Naggar         PMP Integration Management   16
4.2 Develop Project Management Plan
Inputs

    Project Charter

    Outputs From Planning Processes

    Enterprise Environmental Factors

    Organizational Process Assets


      Waleed El-Naggar        PMP Integration Management   17
4.2 Develop Project Management Plan
Tools & Techniques
   Expert Judgment
     Tailorthe process to meet the project needs
     Develop technical and management details to be
      included in the project management plan
     Determine resources and skill levels needed to
      perform project work
     Define the level of configuration management to
      apply on the project
     Determine which project documents will be
      subject to the formal change control process.
       Waleed El-Naggar           PMP Integration Management   18
4.2 Develop Project Management
    Plan Outputs
   Project Management Plan
       The management processes and level of
        implementation.

       Tools & techniques.

       How the work will be executed, monitored, controlled
        and closed.

       Communication requirements among stakeholders.

       Key management reviews.

          Waleed El-Naggar             PMP Integration Management   19
4.3 Direct and Manage Project Execution
   The process of performing the work defined in the project
    management plan to achieve the project's objectives.
   It includes but are not limited to:
       Activities to accomplish requirements
       Create project deliverables
       Staff, train & manage the team members assigned to the project
       Establish and manage project communication channels
       Generate project data, such as cost, schedule, technical and quality
        progress
       Issue change requests
       Manage risks
       Manage sellers and suppliers
       Collect and document lessons learned
          Waleed El-Naggar                    PMP Integration Management   20
4.3 Direct and Manage Project Execution
Inputs, Tools & Techniques and Outputs




   Waleed El-Naggar     PMP Integration Management   21
4.3 Direct and Manage Project
Execution Inputs

   Project Management Plan

   Approved Change Requests

   Enterprise Environmental Factors

   Organizational Process Assets



     Waleed El-Naggar         PMP Integration Management   22
4.3 Direct and Manage Project
Execution Tools and Techniques

   Expert Judgment

   Project management Information System




      Waleed El-Naggar      PMP Integration Management   23
4.3 Direct and Manage Project
Execution Outputs
   Deliverables
   Work Performance Information
       Deliverable status
       Schedule Progress
       Cost Incurred
   Change Requests
       Corrective action
       Preventive action
       Defect repair
       Updates
   Project Management Plan Updates
   Project Document Updates
        Waleed El-Naggar           PMP Integration Management   24
4.4 Monitor and Control Project Work
   The process of tracking, reviewing and
    regulating the progress to meet the
    performance objectives defined in the project
    management plan.




     Waleed El-Naggar         PMP Integration Management   25
4.4 Monitor and Control Project
Inputs
   Project Management Plan

   Performance Reports

   Enterprise Environmental Factors

   Organizational Process Assets


     Waleed El-Naggar         PMP Integration Management   26
4.4 Monitor and Control Project Tools &
Techniques

   Expert Judgment




      Waleed El-Naggar   PMP Integration Management   27
4.4 Monitor and Control Project Outputs (1)
   Change Requests
     Corrective        action
       Work  to bring expected future performance in line
        with plans.
     Preventive        action
       Activity
               that can reduce the probability of negative
        consequences.
     Defect    Repair
       Identificationof a defect in project component with a
        recommendation to either repair the defect or
        completely replace the component.

     Waleed El-Naggar               PMP Integration Management   28
4.4 Monitor and Control Project Outputs (2)


   Project Management Plan Updates

   Project Document Updates




     Waleed El-Naggar      PMP Integration Management   29
4.5 Perform Integrated Change Control
   The process of reviewing all change requests,
    approving changes & managing changes to the
    deliverables, organizational process assets, project
    documents & the project management plan.
   Change Control Board (CCB) is responsible for
    approving or rejecting change requests
   Roles and responsibilities of CCB are defined within
    configuration control and change control procedure


      Waleed El-Naggar             PMP Integration Management   30
4.5 Perform Integrated Change Control
Inputs, Tools& Techniques and Outputs




    Waleed El-Naggar     PMP Integration Management   31
Perform Integrated Change Control Inputs
   Project Management Plan

   Work Performance Information

   Change Requests

   Enterprise Environmental Factors

   Organizational Process Assets


     Waleed El-Naggar         PMP Integration Management   32
Perform Integrated Change Control Tools &
Techniques


   Expert Judgment


   Change Control Meetings




      Waleed El-Naggar        PMP Integration Management   33
Perform Integrated Change Control Outputs


   Change Requests Status Updates


   Project Management Plan Updates


   Project Document Updates


      Waleed El-Naggar         PMP Integration Management   34
4.6 Close Project or Phase
   The process of finalizing al activities across all
    of the project management process groups to
    formally close the project or phase




     Waleed El-Naggar           PMP Integration Management   35
Close Project or Phase Inputs

   Project management Plan

   Accepted Deliverables

   Organizational Process Assets




      Waleed El-Naggar        PMP Integration Management   36
Close Project or Phase Tools &
    Techniques

   Expert Judgment




       Waleed El-Naggar   PMP Integration Management   37
Close Project or Phase Outputs

   Final Product, Service, or Result Transition

   Organizational Process Assets Updates

     Project    file

     Project    or phase closure documents

     Historical        information
     Waleed El-Naggar                 PMP Integration Management   38
Thank you

         waleed_k@aucegypt.edu
Facebook: http://www.facebook.com/waleede

PMPEgypt Group:
http://www.facebook.com/group.php?gid=7273274765

                          PMP Preparation - Risk Management   39

More Related Content

What's hot

PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
Think For A Change
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio Management
Anand Subramaniam
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 

What's hot (20)

PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
PMP_Project Integration Management
PMP_Project Integration ManagementPMP_Project Integration Management
PMP_Project Integration Management
 
Project scope and requirements management
Project scope and requirements managementProject scope and requirements management
Project scope and requirements management
 
Project Management Professional (PMP)
Project Management Professional (PMP) Project Management Professional (PMP)
Project Management Professional (PMP)
 
Pmp exam changes march 2021) webinar
Pmp exam changes march 2021) webinarPmp exam changes march 2021) webinar
Pmp exam changes march 2021) webinar
 
Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | Edureka
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
 
Want to be a (PMP)® with 1250 memorizing notes
Want to be a (PMP)® with 1250 memorizing notesWant to be a (PMP)® with 1250 memorizing notes
Want to be a (PMP)® with 1250 memorizing notes
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio Management
 
Project management
Project managementProject management
Project management
 
PMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioPMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visio
 
PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
 
Instructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionInstructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th Edition
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformation
 
Project management
Project managementProject management
Project management
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Project scope management
Project scope managementProject scope management
Project scope management
 

Viewers also liked

2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
Irefuser1
 

Viewers also liked (20)

2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
We Trained You Why Didnt You Learn A Case Study In Change Management
We Trained You Why Didnt You Learn   A Case Study In Change ManagementWe Trained You Why Didnt You Learn   A Case Study In Change Management
We Trained You Why Didnt You Learn A Case Study In Change Management
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
Path to PMP II - Project Integration Management
Path to PMP II -  Project Integration ManagementPath to PMP II -  Project Integration Management
Path to PMP II - Project Integration Management
 
Project Closing Process
Project Closing ProcessProject Closing Process
Project Closing Process
 
Partnering: Minimize Failure and Enhance the Chance of Success
Partnering: Minimize Failure and Enhance the Chance of SuccessPartnering: Minimize Failure and Enhance the Chance of Success
Partnering: Minimize Failure and Enhance the Chance of Success
 
Project stakeholders
Project stakeholdersProject stakeholders
Project stakeholders
 
Project management certifications
Project management certificationsProject management certifications
Project management certifications
 
T353 Web
T353 WebT353 Web
T353 Web
 
The SUKAD Way™ | CAM2P™ Model | Project Success: A Different Perspective for ...
The SUKAD Way™ | CAM2P™ Model | Project Success: A Different Perspective for ...The SUKAD Way™ | CAM2P™ Model | Project Success: A Different Perspective for ...
The SUKAD Way™ | CAM2P™ Model | Project Success: A Different Perspective for ...
 
T326
T326T326
T326
 
08 pmp communication management
08 pmp communication management08 pmp communication management
08 pmp communication management
 
Overview of project management in engineering environment
Overview of project management in engineering environmentOverview of project management in engineering environment
Overview of project management in engineering environment
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
03 project time managment
03 project time managment03 project time managment
03 project time managment
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Project Management Certifications
Project Management CertificationsProject Management Certifications
Project Management Certifications
 
Project Management Model for Entrepreneurs
Project Management Model for EntrepreneursProject Management Model for Entrepreneurs
Project Management Model for Entrepreneurs
 
Pmp exam prep Pdf- 2
Pmp exam prep Pdf- 2Pmp exam prep Pdf- 2
Pmp exam prep Pdf- 2
 
02 project scope management
02 project scope management02 project scope management
02 project scope management
 

Similar to Pmp integration management

2.04 integration management
2.04 integration management2.04 integration management
2.04 integration management
reddvise
 
Project+ updated prsntn 2012
Project+ updated prsntn 2012Project+ updated prsntn 2012
Project+ updated prsntn 2012
CAMTIC
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
houserdah
 

Similar to Pmp integration management (20)

Ed4 P4 Project Integration Management
Ed4 P4 Project Integration ManagementEd4 P4 Project Integration Management
Ed4 P4 Project Integration Management
 
Day 2-1 PMP.pptx
Day 2-1 PMP.pptxDay 2-1 PMP.pptx
Day 2-1 PMP.pptx
 
Day 2 PMP.pptx
Day 2 PMP.pptxDay 2 PMP.pptx
Day 2 PMP.pptx
 
PMP CAPM study-guide-integration
PMP CAPM study-guide-integrationPMP CAPM study-guide-integration
PMP CAPM study-guide-integration
 
CAPM Muzette Charles Chapter3-4
CAPM Muzette Charles Chapter3-4CAPM Muzette Charles Chapter3-4
CAPM Muzette Charles Chapter3-4
 
4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL
 
Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4
 
Project Scope Management | Project Management Tutorial | PMP® Certification T...
Project Scope Management | Project Management Tutorial | PMP® Certification T...Project Scope Management | Project Management Tutorial | PMP® Certification T...
Project Scope Management | Project Management Tutorial | PMP® Certification T...
 
Prince I Iand Babok Ver1 0
Prince I Iand Babok Ver1 0Prince I Iand Babok Ver1 0
Prince I Iand Babok Ver1 0
 
PMP Prep Handout_Integration
PMP Prep Handout_IntegrationPMP Prep Handout_Integration
PMP Prep Handout_Integration
 
PMP Muzette Charles_Sp2019_Week2_Chapter4_5
PMP Muzette Charles_Sp2019_Week2_Chapter4_5PMP Muzette Charles_Sp2019_Week2_Chapter4_5
PMP Muzette Charles_Sp2019_Week2_Chapter4_5
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration management
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...
 
Project+ updated prsntn 2012
Project+ updated prsntn 2012Project+ updated prsntn 2012
Project+ updated prsntn 2012
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
 
Project Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaProject Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | Edureka
 
Project Management V1
Project Management V1Project Management V1
Project Management V1
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 
PMP CAPM study guide Scope
PMP CAPM study guide ScopePMP CAPM study guide Scope
PMP CAPM study guide Scope
 
Pm training day 2
Pm training   day 2Pm training   day 2
Pm training day 2
 

More from Tu Nguyen, PMP®,PMI-RMP®

More from Tu Nguyen, PMP®,PMI-RMP® (20)

4.contracting
4.contracting4.contracting
4.contracting
 
3.estimating
3.estimating3.estimating
3.estimating
 
2.tendering
2.tendering2.tendering
2.tendering
 
1.introduction
1.introduction1.introduction
1.introduction
 
Session 8 gdas pmp study group presentation
Session 8   gdas pmp study group presentationSession 8   gdas pmp study group presentation
Session 8 gdas pmp study group presentation
 
Session 7 gdas pmp study group presentation
Session 7   gdas pmp study group presentationSession 7   gdas pmp study group presentation
Session 7 gdas pmp study group presentation
 
Session 6 gdas pmp study group presentation
Session 6   gdas pmp study group presentationSession 6   gdas pmp study group presentation
Session 6 gdas pmp study group presentation
 
Session 5 gdas pmp study group presentation
Session 5   gdas pmp study group presentationSession 5   gdas pmp study group presentation
Session 5 gdas pmp study group presentation
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 
Session 10 gdas pmp study group presentation
Session 10   gdas pmp study group presentationSession 10   gdas pmp study group presentation
Session 10 gdas pmp study group presentation
 
Session 3 gdas pmp study group presentation
Session 3   gdas pmp study group presentationSession 3   gdas pmp study group presentation
Session 3 gdas pmp study group presentation
 
Session 2 gdas pmp study group presentation
Session 2   gdas pmp study group presentationSession 2   gdas pmp study group presentation
Session 2 gdas pmp study group presentation
 
Node
NodeNode
Node
 
Contract
ContractContract
Contract
 
Cash flow
Cash flowCash flow
Cash flow
 
Bar chart
Bar chartBar chart
Bar chart
 
Arrow computation
Arrow computationArrow computation
Arrow computation
 
Arrow
ArrowArrow
Arrow
 
Administration
AdministrationAdministration
Administration
 
Time cost-trade-off
Time cost-trade-offTime cost-trade-off
Time cost-trade-off
 

Pmp integration management

  • 1. PMP Preparation PROJECT INTEGRATION MANAGEMENT Waleed El-Naggar, MBA, PMP
  • 2. Integration … is What? Its best described as putting all other management processes of the project into a cohesive whole. Waleed El-Naggar PMP Integration Management 2
  • 3. Project Integration management Processes Waleed El-Naggar PMP Integration Management 3
  • 4. Project Selection  Cost/Benefit Analysis  Cash Flow Analysis  Scoring Models  Payback Period  Net Present Value  Internal Rate of Return Waleed El-Naggar PMP Integration Management 4
  • 5. Scoring Models Waleed El-Naggar PMP Integration Management 5
  • 6. Payback Period Year Project A Project B 0 -1,000 -1,000 1 500 100 2 400 300 3 300 400 4 100 600 Waleed El-Naggar PMP Integration Management 6
  • 7. Project A Waleed El-Naggar PMP Integration Management 7
  • 8. Project B Waleed El-Naggar PMP Integration Management 8
  • 9. The Time Value of Money  A dollar received today is worth more than a dollar received tomorrow  This is because a dollar received today can be invested to earn interest  The amount of interest earned depends on the rate of return that can be earned on the investment  Time value of money quantifies the value of a dollar through time Waleed El-Naggar PMP Integration Management 9
  • 10. Example of PV Calculation 0 1 2 3 4 10% 100 300 300 -50 90.91 247.93 225.39 -34.15 530.08 = PV Waleed El-Naggar PMP Integration Management 10
  • 11. 4.1 Develop Project Charter  The process of developing a document that formally authorizes a project or a phase and documenting initial requirements  Issued by an initiator or a sponsor.  Projects are initiated as a result of the following:  Market demand  Business need  Customer request  Technological advance  Legal requirement  Social need Waleed El-Naggar PMP Integration Management 11
  • 12. 4.1 Develop Project Charter Inputs  Project Statement of Work  Business need  Product Scope Description  Strategic Plan  Business Case  Contract  Enterprise Environment Factors  Organization Process Assets Waleed El-Naggar PMP Integration Management 12
  • 13. 4.1 Develop Project Charter Tools & Techniques  Expert Judgment  Other units within the organization  Consultants  Stakeholders, including customer or sponsor  Professional and technical associations  Industry groups  Subject matter experts  Project Management Office (PMO) Waleed El-Naggar PMP Integration Management 13
  • 14. 4.1 Develop Project Charter Outputs  Project Charter  Project purpose or justification  Measurable Project Objectives  High-Level requirements  High-Level Project Description  High-Level Risks  Summary milestone Schedule  Summary Budget  Project Approval Requirements  Assigned Project Manager  Name and Authority of the Sponsor Waleed El-Naggar PMP Integration Management 14
  • 15. Q: Integration is done by: A. Project Manager B. Team C. Senior Management D. Client Answer A Waleed El-Naggar PMP Integration Management 15
  • 16. 4.2 Develop Project Management Plan  The process of documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans Waleed El-Naggar PMP Integration Management 16
  • 17. 4.2 Develop Project Management Plan Inputs  Project Charter  Outputs From Planning Processes  Enterprise Environmental Factors  Organizational Process Assets Waleed El-Naggar PMP Integration Management 17
  • 18. 4.2 Develop Project Management Plan Tools & Techniques  Expert Judgment  Tailorthe process to meet the project needs  Develop technical and management details to be included in the project management plan  Determine resources and skill levels needed to perform project work  Define the level of configuration management to apply on the project  Determine which project documents will be subject to the formal change control process. Waleed El-Naggar PMP Integration Management 18
  • 19. 4.2 Develop Project Management Plan Outputs  Project Management Plan  The management processes and level of implementation.  Tools & techniques.  How the work will be executed, monitored, controlled and closed.  Communication requirements among stakeholders.  Key management reviews. Waleed El-Naggar PMP Integration Management 19
  • 20. 4.3 Direct and Manage Project Execution  The process of performing the work defined in the project management plan to achieve the project's objectives.  It includes but are not limited to:  Activities to accomplish requirements  Create project deliverables  Staff, train & manage the team members assigned to the project  Establish and manage project communication channels  Generate project data, such as cost, schedule, technical and quality progress  Issue change requests  Manage risks  Manage sellers and suppliers  Collect and document lessons learned Waleed El-Naggar PMP Integration Management 20
  • 21. 4.3 Direct and Manage Project Execution Inputs, Tools & Techniques and Outputs Waleed El-Naggar PMP Integration Management 21
  • 22. 4.3 Direct and Manage Project Execution Inputs  Project Management Plan  Approved Change Requests  Enterprise Environmental Factors  Organizational Process Assets Waleed El-Naggar PMP Integration Management 22
  • 23. 4.3 Direct and Manage Project Execution Tools and Techniques  Expert Judgment  Project management Information System Waleed El-Naggar PMP Integration Management 23
  • 24. 4.3 Direct and Manage Project Execution Outputs  Deliverables  Work Performance Information  Deliverable status  Schedule Progress  Cost Incurred  Change Requests  Corrective action  Preventive action  Defect repair  Updates  Project Management Plan Updates  Project Document Updates Waleed El-Naggar PMP Integration Management 24
  • 25. 4.4 Monitor and Control Project Work  The process of tracking, reviewing and regulating the progress to meet the performance objectives defined in the project management plan. Waleed El-Naggar PMP Integration Management 25
  • 26. 4.4 Monitor and Control Project Inputs  Project Management Plan  Performance Reports  Enterprise Environmental Factors  Organizational Process Assets Waleed El-Naggar PMP Integration Management 26
  • 27. 4.4 Monitor and Control Project Tools & Techniques  Expert Judgment Waleed El-Naggar PMP Integration Management 27
  • 28. 4.4 Monitor and Control Project Outputs (1)  Change Requests  Corrective action  Work to bring expected future performance in line with plans.  Preventive action  Activity that can reduce the probability of negative consequences.  Defect Repair  Identificationof a defect in project component with a recommendation to either repair the defect or completely replace the component. Waleed El-Naggar PMP Integration Management 28
  • 29. 4.4 Monitor and Control Project Outputs (2)  Project Management Plan Updates  Project Document Updates Waleed El-Naggar PMP Integration Management 29
  • 30. 4.5 Perform Integrated Change Control  The process of reviewing all change requests, approving changes & managing changes to the deliverables, organizational process assets, project documents & the project management plan.  Change Control Board (CCB) is responsible for approving or rejecting change requests  Roles and responsibilities of CCB are defined within configuration control and change control procedure Waleed El-Naggar PMP Integration Management 30
  • 31. 4.5 Perform Integrated Change Control Inputs, Tools& Techniques and Outputs Waleed El-Naggar PMP Integration Management 31
  • 32. Perform Integrated Change Control Inputs  Project Management Plan  Work Performance Information  Change Requests  Enterprise Environmental Factors  Organizational Process Assets Waleed El-Naggar PMP Integration Management 32
  • 33. Perform Integrated Change Control Tools & Techniques  Expert Judgment  Change Control Meetings Waleed El-Naggar PMP Integration Management 33
  • 34. Perform Integrated Change Control Outputs  Change Requests Status Updates  Project Management Plan Updates  Project Document Updates Waleed El-Naggar PMP Integration Management 34
  • 35. 4.6 Close Project or Phase  The process of finalizing al activities across all of the project management process groups to formally close the project or phase Waleed El-Naggar PMP Integration Management 35
  • 36. Close Project or Phase Inputs  Project management Plan  Accepted Deliverables  Organizational Process Assets Waleed El-Naggar PMP Integration Management 36
  • 37. Close Project or Phase Tools & Techniques  Expert Judgment Waleed El-Naggar PMP Integration Management 37
  • 38. Close Project or Phase Outputs  Final Product, Service, or Result Transition  Organizational Process Assets Updates  Project file  Project or phase closure documents  Historical information Waleed El-Naggar PMP Integration Management 38
  • 39. Thank you waleed_k@aucegypt.edu Facebook: http://www.facebook.com/waleede PMPEgypt Group: http://www.facebook.com/group.php?gid=7273274765 PMP Preparation - Risk Management 39