SlideShare a Scribd company logo
1 of 57
BUPERS 32 Fleet RIDE Systems (REGA/PTS Brief) UPDATED 1/25/2012
REGA Rating Entry for General Apprentices
REGA Policy  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
REGA Policy (Cont) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
REGA   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Supports The Sailor and Simplifies The Process
Fleet RIDE-Sailor Browser Start at the Sailor Browser and select  your undesignated Sailor ALL DATA DISPLAYED IS FICTITIOUS
Fleet RIDE-Sailor Details Validate/fill in all Sailor details and then click Qualify Apprentice button ALL DATA DISPLAYED IS FICTITIOUS
Fleet RIDE-Rating Entry Qualified Jobs View Quotas Published (Applications ) by Type and then click Rating Entry button ALL DATA DISPLAYED IS FICTITIOUS
Fleet RIDE-Rating Entry Application Fill out relevant information for Rating Entry
Fleet RIDE-Rating Entry Application – Ineligible
–    Fleet RIDE-Rating Entry Application Not Recommended
Fleet RIDE-Rating Entry Application Declined
Fleet RIDE-Rating Entry Application Fill in up to 3 Rating/Path choices for Designation or 1 for Apprenticeship Change Fill in Rating Change Package Information and either Save or Submit Application
Fleet RIDE-Rating Entry Application -  Submitted CCCs can also UnSubmit a Submitted Application
Fleet RIDE-Rating Entry Application  UnSubmitted A Cancelled Submitted Application returns to the Saved state
Fleet RIDE-Rating Entry Application  Saved
Fleet RIDE-Rating Entry Application Browser From the REGA Application Browser, you can Edit an Application for a Sailor and View Application History for a Sailor ALL DATA DISPLAYED IS FICTITIOUS
REGA RESULTS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
December 2011 REGA Results
Year Group Breakdown
PTS Perform To Serve
Perform To Serve (PTS) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FR-PTS Overview ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FR-PTS Overview ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object]
Perform-To-Serve Retaining the right number and rating mix  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],PTS is a performance-based strength management tool 2003   Implemented for first-term Sailors (0-6 years of service) 2009 Expanded to second-term (6-10 years of service) and third-term Sailors (10-14 years of service) 2011 Navy’s primary tool to manage end strength and balance the force 1 2 3 4 5
FR-PTS Integration Overview ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
End-Strength versus Tone of Force ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Managing the Enlisted Force PTS is the primary tool to stay within End Strength while managing the inventory in each individual rating Controlling End Strength Stay within statutory and fiscal controls Balancing the Force Ensure proper manning across all ratings Optimal  Manning Level (FIT) 32 Undermanned Career Fields 38 Overmanned Career Fields ,[object Object],[object Object],[object Object],[object Object],[object Object],High retention Low attrition Budget pressures Force reductions ,[object Object],[object Object],[object Object],Enlisted End Strength +/- 2%
Recent Policy Changes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Total SEAOS FY13 SEAOS FY14 SEAOS FY15 SEAOS FY16+ 469 61 157 201 50
Recent Policy Changes (Cont) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
30 Jan 12 Business Rules Memorandum ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
30 Jan 12 Business Rules Memorandum (Continued) ,[object Object],[object Object],[object Object],[object Object]
 
EXECUTED QUOTA - EAIS
December 2011 PTS Results  AC Sailors – All FY Final Actions: 4,508 Approved ( 80% )  1,102 Final Denied ( 20% ) Supersedes November 2011 PTS Rack-N-Stack Total Submitted: 24,826 Final Actions: 5,610 Looks Remaining 19,216
Streamlining the process … Support the Sailor and Simplify the Process ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Perform-to-Serve Monthly Quota process Quotas differ for every rate/year group and update monthly  Monthly PTS  Cycle ,[object Object],[object Object],[object Object],[object Object],[object Object],Updated based on actual retention behavior and quota utilization ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],THE PTS MONTHLY PROCESS CYCLE
FR- PTS Stacking Algorithm  Sailors in Highest Paygrades Sailors selected for advancement, but not yet advanced (frocked) Cumulative Average of up to the 5 most recent Evaluations Sailors who hold critical NECs/ OR RIDE score for Conversions * Approved to Reenlist in Current Rate * Approved to Convert to New Rate * Denied - No Quota Available (resubmit application ) * SELRES Option  * Denied Final Action  Entry Point: CO’s recommendation for Retention required to enter the PTS Stacking PTS OUTPUT ,[object Object],[object Object],[object Object],Proximity to EAOS PFA MILPERSMAN ART 1160-030 Members must be Promotable and recommended for advancement on the Last (2) Graded Evaluations to be Reenlistment Eligible  (Professional Growth Criteria)
PTS Ranking Criteria Scenario : Eight sailors are competing for  two  PTS Quotas Sailor A MAY12 Sailor F JAN12 Sailor B FEB12 Sailor C MAR12 Sailor D JAN12 Sailor E MAY12 Sailor G MAY12 Sailor H APR12 Sailor A All Pass Sailor F 2 Fail Sailor B All Pass Sailor C All Pass Sailor D 1 Fail Sailor E All Pass Sailor G All Pass Sailor H 1 Fail Sailor A E6 Sailor F Frocked E6 Sailor B E6 Sailor C E6 Sailor D E6 Sailor E E6 Sailor G E5 Sailor H E5 Sailor A Yes Sailor F Yes Sailor B Yes Sailor C Yes Sailor D Yes Sailor E No Sailor G No Sailor H Yes Sailor A 5 Sailor F 4 Sailor B 4.6 Sailor C 4.6 Sailor D 4.6 Sailor E 4.6 Sailor G 5 Sailor H 4
Perform-To-Serve Use and Timeline ,[object Object],[object Object],[object Object],[object Object],[object Object],24-15 15-12 12-6 6 5-3 ,[object Object],[object Object],[object Object],Submit PTS Application PTS Application Window Orders negotiation window 9-7 mo Final PTS determination made Reserve Component PTS application Months prior to Sailor’s End of Obligated Service (EAOS) as extended Application Timeline Results published monthly. Sailors receive notification of: Approved: In Rate Approved: Conversion Denied: Denied Quota but may resubmit monthly Denied Final Active: Denied quota and directed to separate at EAOS (as extended)
6 Months From SEAOS 12 Months From SEAOS MBRS looked at for Reenlistment or Conversion Up Until 6 Mos From SEAOS (or Until A Quota is Assigned) Whichever Occurs First Sailors not assigned A Quota by 6mos Prior to SEAOS Will be Separated 9 Months From SEAOS Normal Application Period (15-12 ) Mos Prior to SEAOS/PRD) 15 Months From SEAOS All Applications Received LESS than 6 months from SEAOS Will receive only (1) Look SEAOS Early Application Exceptions : All personnel who require OBLISERV for Orders may submit applications >15 mos.(ex.. PRD Prior to SEAOS) All Personnel Eligible for STAR Reenlistments or Eligible to reenlist greater than 12 months from SEAOS.  PTS PROCESS TIMELINE  SELRES applications can be submitted if AC is denied.
PTS and Detailing Ideal application period  for  personnel  who require OBLISERV.  Applications should be submitted 12 months Prior to PRD to allow maximum number  of looks prior to Detailing Window.   15 months from PRD 12 months from PRD 9 months from PRD PRD 7 months from PRD Commands should conduct Career Development Boards on all personnel who are within 12-15 months of PRD.  PTS Applications should be submitted 12 months prior to PRD for those who would be required to obligate for PCS orders. CMS-ID Detailing Window   All Sailors should be under orders No later than  7 months prior to PRD PTS APPLICATION WINDOW 6 months from PRD PTS window extends beyond CMS-ID application window ** PTS/CMS-ID overlap due to detailing window shift from 9-5 months to 9-7 months in OCT 09  ( NAVADMIN 249/09 )** NEEDS OF THE NAVY CMS-ID apply PTS SELECTION WINDOW 4 months from PRD SELRES applications can be submitted if AC is denied.
The following are the new PTS status codes and what they mean. NEW PTS STATUS CODES APPROVED - EXECUTED This means the PTS quota has been used; SEAOS has changed in the Enlisted Master File. (e.g., Reenlistment or Signed Extension paper work) APPROVED - EXPIRED This means the Sailor did not use the INRATE quota in the allotted time given (13 months from processing month) APPROVED - REVOKED The PTS quota was Revoked by the ECM. (e.g., NJP, Loss of Security Clearance, Intends to separate, etc...) APPROVED - SEPARATED Member separated from the service with an approval in hand. APPROVED - UNUSED This means the Sailor who had PTS approval allowed an existing extension go operative. (i.e., EAOS changes in Enlisted Master File)
FR-PTS Quota Approval/Expiration Matrix NOTE 1: Approvals prior to 01 OCT 2009, must contact the Enlisted Community Manager (ECM) prior to using quota.  (NAVADMIN 352/10). NOTE 2: PTS quotas will expire  2359  on the last day of the month of expiration. MONTH PTS APPROVED MONTH OF EXPIRATION PRIOR TO 1 OCT 2009 01 MARCH 2011 (SEE NOTE 1) OCT 2009 30 NOV 2010 (SEE NOTE 2) NOV 2009 31 DEC 2010 DEC 2009 31 JAN 2011 JAN 2010 28 FEB 2011 FEB 2010 31 MAR 2011 MAR 2010 30 APR 2011 APR 2010 31 MAY 2011 MAY 2010 30 JUN 2011 JUN 2010 31 JUL 2011 JUL 2010 31 AUG 2011 AUG 2010 30 SEP 2011 SEP 2010 31 OCT 2011
To De-Assign a Sailor from UIC when they PCS Change UIC to a blank UIC by clicking down arrow and selecting blank space
PTS Checklist for Success ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FR-PTS Current Enhancements ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PTS PHASE II ENHANCEMENTS ,[object Object],[object Object],[object Object],[object Object],[object Object]
FR-PTS Access Request ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],FLEET RIDE/PTS/REGA CONTACT  AND WEBSITE INFORMATION
[object Object],FR-PTS-REGA BRIEF
BACKUP SLIDES
REGA RESULTS (June – August 2011) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
REGA RESULTS (March – May 2011) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FY10 PTS SUMMARY ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
4 OCT 11 Business Plan Memorandum ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Previous guidance was to get to 100% inventory ASAP – changes should increase quotas and reduce separations (although not a direct relationship), while retaining good  “health”

More Related Content

What's hot

CDTC Topic 14
CDTC Topic 14 CDTC Topic 14
CDTC Topic 14 CCCJimenez
 
CDTC Topic 12
CDTC Topic 12 CDTC Topic 12
CDTC Topic 12 CCCJimenez
 
NC1 Evaluation Writing
NC1 Evaluation WritingNC1 Evaluation Writing
NC1 Evaluation WritingCCCJimenez
 
Donald Napier MOUK Drops Roll Out
Donald Napier MOUK Drops Roll OutDonald Napier MOUK Drops Roll Out
Donald Napier MOUK Drops Roll OutDonald Napier
 

What's hot (19)

Fleetride PTS FAQ
Fleetride PTS FAQFleetride PTS FAQ
Fleetride PTS FAQ
 
Perform To Serve (Navy Career Wise Training)
Perform To Serve (Navy Career Wise Training)Perform To Serve (Navy Career Wise Training)
Perform To Serve (Navy Career Wise Training)
 
PTS training brief v5
PTS training brief v5PTS training brief v5
PTS training brief v5
 
PERFORM TO SERVE Plain talk for sailors
PERFORM TO SERVE Plain talk for sailorsPERFORM TO SERVE Plain talk for sailors
PERFORM TO SERVE Plain talk for sailors
 
CDTC Topic 14
CDTC Topic 14 CDTC Topic 14
CDTC Topic 14
 
PTS_FLEETRIDE_FAQS_UPDATE
PTS_FLEETRIDE_FAQS_UPDATEPTS_FLEETRIDE_FAQS_UPDATE
PTS_FLEETRIDE_FAQS_UPDATE
 
Nca symposium slide deck (monday 24 june 1230)
Nca symposium slide deck (monday 24 june 1230)Nca symposium slide deck (monday 24 june 1230)
Nca symposium slide deck (monday 24 june 1230)
 
REGA TRAINING (UNDESIGNATED SAILOR
REGA TRAINING (UNDESIGNATED SAILORREGA TRAINING (UNDESIGNATED SAILOR
REGA TRAINING (UNDESIGNATED SAILOR
 
Bup 3 nca brief 13 june
Bup 3 nca brief 13 juneBup 3 nca brief 13 june
Bup 3 nca brief 13 june
 
CDTC Topic 12
CDTC Topic 12 CDTC Topic 12
CDTC Topic 12
 
Pts plain talk for sailors (new)
Pts   plain talk for sailors (new)Pts   plain talk for sailors (new)
Pts plain talk for sailors (new)
 
NC1 Evaluation Writing
NC1 Evaluation WritingNC1 Evaluation Writing
NC1 Evaluation Writing
 
4 perform to serve
4 perform to serve4 perform to serve
4 perform to serve
 
Cnp brief ccc 2010
Cnp brief ccc 2010Cnp brief ccc 2010
Cnp brief ccc 2010
 
Career progression by capt halton
Career progression by capt haltonCareer progression by capt halton
Career progression by capt halton
 
Npc force weekly 9 13 may 2011
Npc force weekly 9 13  may 2011Npc force weekly 9 13  may 2011
Npc force weekly 9 13 may 2011
 
ATM Concept 4D ASAS and TFM
ATM Concept 4D ASAS and TFMATM Concept 4D ASAS and TFM
ATM Concept 4D ASAS and TFM
 
Donald Napier MOUK Drops Roll Out
Donald Napier MOUK Drops Roll OutDonald Napier MOUK Drops Roll Out
Donald Napier MOUK Drops Roll Out
 
Assessments nccs mel reaves
Assessments nccs mel reavesAssessments nccs mel reaves
Assessments nccs mel reaves
 

Viewers also liked

Viewers also liked (14)

Asian pacific 2013
Asian pacific 2013Asian pacific 2013
Asian pacific 2013
 
Career wise march 2010
Career wise march 2010Career wise march 2010
Career wise march 2010
 
1ST TERM SUCCESS WORKSHOP TRANSITIONING
1ST TERM SUCCESS WORKSHOP TRANSITIONING1ST TERM SUCCESS WORKSHOP TRANSITIONING
1ST TERM SUCCESS WORKSHOP TRANSITIONING
 
Gates cms
Gates cmsGates cms
Gates cms
 
CDP Career Development Program msc ccc crash course
CDP Career Development Program msc ccc crash courseCDP Career Development Program msc ccc crash course
CDP Career Development Program msc ccc crash course
 
2012 Military installation directory
2012 Military installation directory2012 Military installation directory
2012 Military installation directory
 
NAVY PRT Instructions 6110.1 j
NAVY PRT Instructions 6110.1 jNAVY PRT Instructions 6110.1 j
NAVY PRT Instructions 6110.1 j
 
Fleet engagement brief NPC (15 aug 2013)
Fleet engagement brief NPC (15 aug 2013)Fleet engagement brief NPC (15 aug 2013)
Fleet engagement brief NPC (15 aug 2013)
 
2011 navy diversity
2011 navy diversity2011 navy diversity
2011 navy diversity
 
Preseparation counseling dd form 2648
Preseparation counseling dd form 2648Preseparation counseling dd form 2648
Preseparation counseling dd form 2648
 
Social gram 12
Social gram 12Social gram 12
Social gram 12
 
Enl advancement board brief for pers 803 webpage (25 oct 2012)
Enl advancement board brief for pers 803 webpage (25 oct 2012)Enl advancement board brief for pers 803 webpage (25 oct 2012)
Enl advancement board brief for pers 803 webpage (25 oct 2012)
 
Detailer fet brief (15 aug 2013)
Detailer fet brief (15 aug 2013)Detailer fet brief (15 aug 2013)
Detailer fet brief (15 aug 2013)
 
ABAHR Fusion Meet September 6 KickOff
ABAHR Fusion Meet September 6 KickOffABAHR Fusion Meet September 6 KickOff
ABAHR Fusion Meet September 6 KickOff
 

Similar to Fleet ride systems pts rega training brief (updated 31 jan 12)

FTSW - Stay Navy document to us navy .pptx
FTSW - Stay Navy document to us navy  .pptxFTSW - Stay Navy document to us navy  .pptx
FTSW - Stay Navy document to us navy .pptxmuhammadsamroz
 

Similar to Fleet ride systems pts rega training brief (updated 31 jan 12) (19)

Pts fleet ride fa qs
Pts fleet ride fa qsPts fleet ride fa qs
Pts fleet ride fa qs
 
Perform to Serve msc ccc crash course
Perform to Serve msc ccc crash coursePerform to Serve msc ccc crash course
Perform to Serve msc ccc crash course
 
Cto 2011 nca symposium
Cto 2011 nca symposiumCto 2011 nca symposium
Cto 2011 nca symposium
 
FTSW - Stay Navy document to us navy .pptx
FTSW - Stay Navy document to us navy  .pptxFTSW - Stay Navy document to us navy  .pptx
FTSW - Stay Navy document to us navy .pptx
 
Pts plain talk for sailors (draft-3)
Pts   plain talk for sailors (draft-3)Pts   plain talk for sailors (draft-3)
Pts plain talk for sailors (draft-3)
 
Topic 1.15 Reenlistment & Extensions
Topic 1.15 Reenlistment & ExtensionsTopic 1.15 Reenlistment & Extensions
Topic 1.15 Reenlistment & Extensions
 
Cnaf newsletter 20 dec 2010
Cnaf newsletter 20 dec 2010Cnaf newsletter 20 dec 2010
Cnaf newsletter 20 dec 2010
 
Pts step by step guide
Pts step by step guidePts step by step guide
Pts step by step guide
 
PTS step by step guide
PTS step by step guidePTS step by step guide
PTS step by step guide
 
PTS step by step guide
PTS step by step guidePTS step by step guide
PTS step by step guide
 
Pts step by step guide
Pts step by step guidePts step by step guide
Pts step by step guide
 
Career Development Brief_Xo_ cmc brief
Career Development Brief_Xo_ cmc  briefCareer Development Brief_Xo_ cmc  brief
Career Development Brief_Xo_ cmc brief
 
Bupers 32 leadership brief
Bupers 32 leadership briefBupers 32 leadership brief
Bupers 32 leadership brief
 
Adv manual ch 1 and 2
Adv manual ch 1 and 2Adv manual ch 1 and 2
Adv manual ch 1 and 2
 
FLEETRIDE pts rules of engagement2
FLEETRIDE pts rules of engagement2FLEETRIDE pts rules of engagement2
FLEETRIDE pts rules of engagement2
 
Fr pts rules of engagement2
Fr pts rules of engagement2Fr pts rules of engagement2
Fr pts rules of engagement2
 
CDTC Topic 5
CDTC Topic 5  CDTC Topic 5
CDTC Topic 5
 
Fleet ride pts training brief update & guidance 12 oct 10
Fleet ride pts training brief update & guidance  12 oct 10Fleet ride pts training brief update & guidance  12 oct 10
Fleet ride pts training brief update & guidance 12 oct 10
 
Npc force weekly 19 23 jul
Npc force weekly 19 23 julNpc force weekly 19 23 jul
Npc force weekly 19 23 jul
 

More from Tony Astro - Veteran Counselor & Entrepreneur

More from Tony Astro - Veteran Counselor & Entrepreneur (20)

CareerWise: Why A Company Needs a Career Service Program
CareerWise:  Why A Company Needs a Career Service ProgramCareerWise:  Why A Company Needs a Career Service Program
CareerWise: Why A Company Needs a Career Service Program
 
Prime Safe: A FusionTalk on Personal Wellness by Dr. Astro
Prime Safe:  A FusionTalk on Personal Wellness by Dr. AstroPrime Safe:  A FusionTalk on Personal Wellness by Dr. Astro
Prime Safe: A FusionTalk on Personal Wellness by Dr. Astro
 
Cultural Intelligence: Why We Need to Develop & How (Basic on CQ)
Cultural Intelligence:  Why We Need to Develop & How (Basic on CQ)Cultural Intelligence:  Why We Need to Develop & How (Basic on CQ)
Cultural Intelligence: Why We Need to Develop & How (Basic on CQ)
 
FusionTalk by Dr. Astro (Video Supplement: Crazy Rich Asian)
FusionTalk by Dr. Astro (Video Supplement: Crazy Rich Asian) FusionTalk by Dr. Astro (Video Supplement: Crazy Rich Asian)
FusionTalk by Dr. Astro (Video Supplement: Crazy Rich Asian)
 
CQ Myth: Age and Identifying your Cultural Intelligence (Version 2)
CQ Myth:  Age and Identifying your Cultural Intelligence (Version 2)CQ Myth:  Age and Identifying your Cultural Intelligence (Version 2)
CQ Myth: Age and Identifying your Cultural Intelligence (Version 2)
 
Cultural Intelligence (CQ) Myth: Age and Identifying your CQ
Cultural Intelligence (CQ) Myth:  Age and Identifying your CQCultural Intelligence (CQ) Myth:  Age and Identifying your CQ
Cultural Intelligence (CQ) Myth: Age and Identifying your CQ
 
The Internet of C Things: Career, Commerce and Culture
The Internet of C Things:  Career, Commerce and CultureThe Internet of C Things:  Career, Commerce and Culture
The Internet of C Things: Career, Commerce and Culture
 
Paid Heart by Tony Astro
Paid Heart by Tony AstroPaid Heart by Tony Astro
Paid Heart by Tony Astro
 
Mvoss presentation 1
Mvoss presentation 1Mvoss presentation 1
Mvoss presentation 1
 
Chiefpreneur's Role on Military and veteran career issues
Chiefpreneur's Role on Military and veteran career issuesChiefpreneur's Role on Military and veteran career issues
Chiefpreneur's Role on Military and veteran career issues
 
Regent Training Presentation 1
Regent Training Presentation 1Regent Training Presentation 1
Regent Training Presentation 1
 
Selection Board Brief FY15-16
Selection Board Brief FY15-16Selection Board Brief FY15-16
Selection Board Brief FY15-16
 
RC Ldo cwo application brief - apr 2015a
RC Ldo cwo application brief - apr 2015aRC Ldo cwo application brief - apr 2015a
RC Ldo cwo application brief - apr 2015a
 
Ldo and cwo recruit your relief brief (3)
Ldo and cwo recruit your relief brief (3)Ldo and cwo recruit your relief brief (3)
Ldo and cwo recruit your relief brief (3)
 
Post 9 11 gi bill april 2015 final
Post 9 11 gi bill april 2015 finalPost 9 11 gi bill april 2015 final
Post 9 11 gi bill april 2015 final
 
How to get nsips access
How to get nsips accessHow to get nsips access
How to get nsips access
 
Navy Career Tools Afloat NKO 5 tips (2014 sep) cta
Navy Career Tools Afloat NKO 5 tips (2014 sep) ctaNavy Career Tools Afloat NKO 5 tips (2014 sep) cta
Navy Career Tools Afloat NKO 5 tips (2014 sep) cta
 
Navy college information september 2014
Navy college information  september 2014Navy college information  september 2014
Navy college information september 2014
 
Exceptional Family Member Efm training2 - efmrpt
Exceptional Family Member Efm training2  - efmrptExceptional Family Member Efm training2  - efmrpt
Exceptional Family Member Efm training2 - efmrpt
 
Survivor Benefit Plan Sbp
Survivor Benefit Plan SbpSurvivor Benefit Plan Sbp
Survivor Benefit Plan Sbp
 

Recently uploaded

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 

Recently uploaded (20)

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 

Fleet ride systems pts rega training brief (updated 31 jan 12)

  • 1. BUPERS 32 Fleet RIDE Systems (REGA/PTS Brief) UPDATED 1/25/2012
  • 2. REGA Rating Entry for General Apprentices
  • 3.
  • 4.
  • 5.
  • 6. Fleet RIDE-Sailor Browser Start at the Sailor Browser and select your undesignated Sailor ALL DATA DISPLAYED IS FICTITIOUS
  • 7. Fleet RIDE-Sailor Details Validate/fill in all Sailor details and then click Qualify Apprentice button ALL DATA DISPLAYED IS FICTITIOUS
  • 8. Fleet RIDE-Rating Entry Qualified Jobs View Quotas Published (Applications ) by Type and then click Rating Entry button ALL DATA DISPLAYED IS FICTITIOUS
  • 9. Fleet RIDE-Rating Entry Application Fill out relevant information for Rating Entry
  • 10. Fleet RIDE-Rating Entry Application – Ineligible
  • 11. Fleet RIDE-Rating Entry Application Not Recommended
  • 12. Fleet RIDE-Rating Entry Application Declined
  • 13. Fleet RIDE-Rating Entry Application Fill in up to 3 Rating/Path choices for Designation or 1 for Apprenticeship Change Fill in Rating Change Package Information and either Save or Submit Application
  • 14. Fleet RIDE-Rating Entry Application - Submitted CCCs can also UnSubmit a Submitted Application
  • 15. Fleet RIDE-Rating Entry Application UnSubmitted A Cancelled Submitted Application returns to the Saved state
  • 16. Fleet RIDE-Rating Entry Application Saved
  • 17. Fleet RIDE-Rating Entry Application Browser From the REGA Application Browser, you can Edit an Application for a Sailor and View Application History for a Sailor ALL DATA DISPLAYED IS FICTITIOUS
  • 18.
  • 21. PTS Perform To Serve
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.  
  • 36. December 2011 PTS Results AC Sailors – All FY Final Actions: 4,508 Approved ( 80% ) 1,102 Final Denied ( 20% ) Supersedes November 2011 PTS Rack-N-Stack Total Submitted: 24,826 Final Actions: 5,610 Looks Remaining 19,216
  • 37.
  • 38.
  • 39.
  • 40. PTS Ranking Criteria Scenario : Eight sailors are competing for two PTS Quotas Sailor A MAY12 Sailor F JAN12 Sailor B FEB12 Sailor C MAR12 Sailor D JAN12 Sailor E MAY12 Sailor G MAY12 Sailor H APR12 Sailor A All Pass Sailor F 2 Fail Sailor B All Pass Sailor C All Pass Sailor D 1 Fail Sailor E All Pass Sailor G All Pass Sailor H 1 Fail Sailor A E6 Sailor F Frocked E6 Sailor B E6 Sailor C E6 Sailor D E6 Sailor E E6 Sailor G E5 Sailor H E5 Sailor A Yes Sailor F Yes Sailor B Yes Sailor C Yes Sailor D Yes Sailor E No Sailor G No Sailor H Yes Sailor A 5 Sailor F 4 Sailor B 4.6 Sailor C 4.6 Sailor D 4.6 Sailor E 4.6 Sailor G 5 Sailor H 4
  • 41.
  • 42. 6 Months From SEAOS 12 Months From SEAOS MBRS looked at for Reenlistment or Conversion Up Until 6 Mos From SEAOS (or Until A Quota is Assigned) Whichever Occurs First Sailors not assigned A Quota by 6mos Prior to SEAOS Will be Separated 9 Months From SEAOS Normal Application Period (15-12 ) Mos Prior to SEAOS/PRD) 15 Months From SEAOS All Applications Received LESS than 6 months from SEAOS Will receive only (1) Look SEAOS Early Application Exceptions : All personnel who require OBLISERV for Orders may submit applications >15 mos.(ex.. PRD Prior to SEAOS) All Personnel Eligible for STAR Reenlistments or Eligible to reenlist greater than 12 months from SEAOS. PTS PROCESS TIMELINE SELRES applications can be submitted if AC is denied.
  • 43. PTS and Detailing Ideal application period for personnel who require OBLISERV. Applications should be submitted 12 months Prior to PRD to allow maximum number of looks prior to Detailing Window. 15 months from PRD 12 months from PRD 9 months from PRD PRD 7 months from PRD Commands should conduct Career Development Boards on all personnel who are within 12-15 months of PRD. PTS Applications should be submitted 12 months prior to PRD for those who would be required to obligate for PCS orders. CMS-ID Detailing Window All Sailors should be under orders No later than 7 months prior to PRD PTS APPLICATION WINDOW 6 months from PRD PTS window extends beyond CMS-ID application window ** PTS/CMS-ID overlap due to detailing window shift from 9-5 months to 9-7 months in OCT 09 ( NAVADMIN 249/09 )** NEEDS OF THE NAVY CMS-ID apply PTS SELECTION WINDOW 4 months from PRD SELRES applications can be submitted if AC is denied.
  • 44. The following are the new PTS status codes and what they mean. NEW PTS STATUS CODES APPROVED - EXECUTED This means the PTS quota has been used; SEAOS has changed in the Enlisted Master File. (e.g., Reenlistment or Signed Extension paper work) APPROVED - EXPIRED This means the Sailor did not use the INRATE quota in the allotted time given (13 months from processing month) APPROVED - REVOKED The PTS quota was Revoked by the ECM. (e.g., NJP, Loss of Security Clearance, Intends to separate, etc...) APPROVED - SEPARATED Member separated from the service with an approval in hand. APPROVED - UNUSED This means the Sailor who had PTS approval allowed an existing extension go operative. (i.e., EAOS changes in Enlisted Master File)
  • 45. FR-PTS Quota Approval/Expiration Matrix NOTE 1: Approvals prior to 01 OCT 2009, must contact the Enlisted Community Manager (ECM) prior to using quota. (NAVADMIN 352/10). NOTE 2: PTS quotas will expire 2359 on the last day of the month of expiration. MONTH PTS APPROVED MONTH OF EXPIRATION PRIOR TO 1 OCT 2009 01 MARCH 2011 (SEE NOTE 1) OCT 2009 30 NOV 2010 (SEE NOTE 2) NOV 2009 31 DEC 2010 DEC 2009 31 JAN 2011 JAN 2010 28 FEB 2011 FEB 2010 31 MAR 2011 MAR 2010 30 APR 2011 APR 2010 31 MAY 2011 MAY 2010 30 JUN 2011 JUN 2010 31 JUL 2011 JUL 2010 31 AUG 2011 AUG 2010 30 SEP 2011 SEP 2010 31 OCT 2011
  • 46. To De-Assign a Sailor from UIC when they PCS Change UIC to a blank UIC by clicking down arrow and selecting blank space
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 54.
  • 55.
  • 56.
  • 57.

Editor's Notes

  1. 02/14/12 19:36
  2. A new Rating Entry Application page
  3. A new Rating Entry Application page
  4. A new Rating Entry Application page
  5. A new Rating Entry Application page
  6. Rating Entry Application page with Designation choices filled in
  7. Rating Entry Application has been submitted
  8. Unsubmitting a “Submitted Application “ will cancel the application, and create a “Saved” copy. The Saved copy can be updated and submitted.
  9. A Saved application can be updated and submitted.
  10. You can click on the “Edit” button to view the latest REGA application for the Sailor
  11. Separations for : April - 505 May – 322 June - 452 July – 449 August – 553 No processing for September October – 447 November – 769 December – 768 January – 772 352/10 PTS-Fleet RIDE Integration and procedures 128/10 Perform To Serve Policy Changes and Procedure Updates 242/09 Modification of Obligated Service and Extension Policy(MPN 1160-040 update) 161/09 PTS Update and Zone C Implementation Procedures 017/09 PTS Update and Zone B Implementation Procedures 007/09 Control of Short Term Extensions (MPM 1160-040 update)
  12. PTS is our primary force shaping tool. Other tools we can employ are changing the number of new accessions we recruit, the amount and skills we offer reenlistment bonuses to, and the voluntary separation programs we offer. PTS: Helps manage End Strength with the opposing forces of fiscal pressure and sailor behavior. It is critical to our ability to reduce Navy End Strength, which is required over the next two fiscal years. Primary tool used to help balance the force by reducing manning in overmanned ratings, and converting Sailors from overmanned ratings to undermanned ratings that they qualify for.
  13. HYT example – HYT waiver granted for to complete training
  14. HYT example – HYT waiver granted for to complete training
  15. Note: “Intend to Separate” comprises Sailors who submitted an application of one of the following types on their last look : Intends to Separate No Apply this Month Not Eligible Failed to Submit Requested SELRES Option (not approved) Sailors who intend to separate may request SELRES Option in the following month. (up to 3 months from SEAOS)
  16. On a macro-level, this is how the PTS cycle works: On an annual basis, we approve a PTS quota plan by rating and years of service. However, in order to respond to actual behavior trends, it is reconciled monthly to remain relevant, and not over or under-shoot the mark. Monthly, PTS quotas are loaded into the system and made visible to the Navy. Sailors can see what their competitive opportunity is for the month they are applying. Applications are submitted throughout the month, and accepted until the final day of the month. Most applications are for a Sailor’s end of obligated service (to include any extensions). However, there are some special circumstance applications that are also required, typically to obtain enough obligated service to negotiate PCS orders, or for a program requirement such as reenlistment bonuses, or Post 911 GI Bill transferability. All applications are ranked using a performance based algorithm (see slide 8) and decisions are made on who will and won’t receive quotas (Rack-N-Stack process). Sailors compete for in-rate quotas first, and then for up to 3 ratings with conversion opportunity in series based on the Sailor’s stated preference. Based on quota utilization and reenlistment rates the Quota Plan is reconciled for the next month’s available quotas.
  17. PTS is used for various reasons: It is primarily a performance based quota reservation system to control continuation behavior. It allows the Sailor to apply for three main types of quotas to continue their Naval Service: In-Rate (stay in current rate), Conversion (to undermanned Rating or FTS), SELRES (affiliate in SELRES). It balances ratings by facilitating conversions from overmanned ratings into undermanned It helps control Zone manning and continuation across the various year groups It helps control end strength The PTS Algorithm ranks Sailors based on performance (see algorithm slide 8). On a micro-level, this is how a PTS Application Timeline looks for the Sailor: The Sailor’s end of obligated service (to include any extensions) determines when the Sailor enters the PTS window. Note: There are other reasons why the Sailor could enter PTS (see slide 7), but this is the primary reason. All Sailors must enter into PTS, even if they intend to separate. If they intend to separate, they do not compete for a quota. Commands conduct a career development board up to two years prior to a Sailors end of obligated service. The RIDE service can be used to support this counseling session, and offer insight into what the competition is like within the Sailors current rating and to identify what other ratings a Sailor is eligible for or interested in. Commands can provide opportunity to retake the ASVAB to increase the number of other ratings a Sailor is eligible for. Sailors can apply up to 6 times for a quota. They can begin their application up to 3 months in advance of their first competitive cycle which happens at the 12 month mark. If they do not receive approval during a competitive cycle, but still have time remaining prior to the 6 month mark, they receive a denied status, but can re-apply. Sailors may be negotiating orders during the same window, which will not be approved until/unless they receive PTS approval. If Sailors rank highly based on the PTS algorithm, they may receive a quota after their first or second look. Every Sailor will know if they received a quota at the six month mark. If they are not approved, they will receive a “final denied” status, and separation letter. Sailors who are not approved to reenlist have an additional three months to compete for an opportunity to affiliate in the SELRES. If not, they will be directed to separate at the end of their obligated service.
  18. PTS Applications should occur beginning 15 mos prior to EAOS. Sailors should be allowed to apply up to 12 mos prior to separation. If notification of approval is not received by 6 mos prior to EAOS, Sailors are to be notified that they will be separated at EAOS, and should begin separation transition.
  19. Approve – Unused: A Sailor had a previous extension (i.e., 5-yo/6-yo program) and subsequently received a PTS quota and then allowed the existing extension to go operative vice executing (signing a new extension or reenlisting). This will still use the PTS quota but will be listed as “Approved – Unused” due to the fact the extension was allowed to go operative.
  20. CIMS Unit Tracking has not interfaced yet. Will be forthcoming. Provide Sailors with Plain Talk for Sailors at Reporting CDB Review each Sailor’s respective Community Health slide (under NPC’s Community Management, Enlisted) to see what their chances are for remaining INRATE. Review Sailor’s ASVAB scores at Reporting CDB vice waiting until they’re in their PTS window to determine the need to retake AFCT (MPM 1236-010).
  21. Additional 5000 applications per month have been processed since integration, appr. 46%