SlideShare a Scribd company logo
Enviar pesquisa
Carregar
Entrar
Cadastre-se
8 Steps to Success in Building Green in a Poor Economy
Denunciar
tmstaffordlbfg
Seguir
23 de Apr de 2013
•
0 gostou
•
404 visualizações
1
de
42
8 Steps to Success in Building Green in a Poor Economy
23 de Apr de 2013
•
0 gostou
•
404 visualizações
Denunciar
Negócios
Tecnologia
tmstaffordlbfg
Seguir
Recomendados
TACC Presentation - Risks of Green Buildings
tmstaffordlbfg
484 visualizações
•
57 slides
LEEDigation: LEEDs Impact on the Practice of Law
Scott Wolfe
467 visualizações
•
35 slides
Bringing Green Home Silcock EMBA Project Oct 2008
Jonathan Silcock, MBA, PMP
236 visualizações
•
116 slides
Green building solutions-powder contribution 09.2018
Nguyen Cao Viet
69 visualizações
•
39 slides
Green Building Presentation
Richcartlidge
4.3K visualizações
•
19 slides
Breeam+vs+leed
Frank Deluca
6.1K visualizações
•
11 slides
Mais conteúdo relacionado
Mais procurados
A Long View of Electronic-Product Sustainability
Antea Group
165 visualizações
•
20 slides
Leed green associate pool d question
Bilal Mohamed
107 visualizações
•
28 slides
Leed green associate pool e - question
Bilal Mohamed
85 visualizações
•
28 slides
Leed green associate ii. project site factors answer
Bilal Mohamed
89 visualizações
•
65 slides
Leed green associate pool b - answer
Bilal Mohamed
259 visualizações
•
49 slides
Leed green associate pool g - question
Bilal Mohamed
108 visualizações
•
29 slides
Mais procurados
(19)
A Long View of Electronic-Product Sustainability
Antea Group
•
165 visualizações
Leed green associate pool d question
Bilal Mohamed
•
107 visualizações
Leed green associate pool e - question
Bilal Mohamed
•
85 visualizações
Leed green associate ii. project site factors answer
Bilal Mohamed
•
89 visualizações
Leed green associate pool b - answer
Bilal Mohamed
•
259 visualizações
Leed green associate pool g - question
Bilal Mohamed
•
108 visualizações
What is LEED Certification and Why is it Important?
BOSS Controls
•
69 visualizações
Leed green associate v. acquisition, installation, and management of project ...
Bilal Mohamed
•
134 visualizações
Leed green associate pool a - question
Bilal Mohamed
•
152 visualizações
Leed green associate vii. project surroundings and public outreach answer
Bilal Mohamed
•
572 visualizações
Leed green associate pool f - answer
Bilal Mohamed
•
120 visualizações
Social Experimentation
muhammad shoaib
•
5.3K visualizações
Integrated Asset Management & Geen Buildings
tess Dada
•
341 visualizações
Anthony Linka Green Building Design, Construction, and Safety BCN4709C
Anthony Linka
•
625 visualizações
LEED 2009 Rating System and Credentials Overview
Allison Beer
•
1.2K visualizações
June 30 Green Built Presentation
prdrueke
•
290 visualizações
Leed green associate vi. stakeholder involvement in innovation question
Bilal Mohamed
•
226 visualizações
Leed ga answer
Bilal Mohamed
•
594 visualizações
Ece481 lecture4engsocexp
Velmathi Saravanan
•
443 visualizações
Destaque
Kwiz pakodah 1-50-by mr.bay leaf-2007
www.marchahead.co.in
597 visualizações
•
4 slides
Kwiz pakodah 151-200-by mr.bay leaf
www.marchahead.co.in
713 visualizações
•
5 slides
NCCET Webinar - Understanding the Green Economy: A Community College Perspect...
WorkSmart Integrated Marketing
639 visualizações
•
51 slides
Kwiz pakodah tech kwiz-prelims-questions & answers
www.marchahead.co.in
344 visualizações
•
3 slides
Iit.2012
www.marchahead.co.in
927 visualizações
•
137 slides
Kiit.9 -12
www.marchahead.co.in
390 visualizações
•
176 slides
Destaque
(9)
Kwiz pakodah 1-50-by mr.bay leaf-2007
www.marchahead.co.in
•
597 visualizações
Kwiz pakodah 151-200-by mr.bay leaf
www.marchahead.co.in
•
713 visualizações
NCCET Webinar - Understanding the Green Economy: A Community College Perspect...
WorkSmart Integrated Marketing
•
639 visualizações
Kwiz pakodah tech kwiz-prelims-questions & answers
www.marchahead.co.in
•
344 visualizações
Iit.2012
www.marchahead.co.in
•
927 visualizações
Kiit.9 -12
www.marchahead.co.in
•
390 visualizações
DSBM.GENESIS 2012
www.marchahead.co.in
•
1.3K visualizações
Kwizpakodah biz buzz-finale-utkal univ
www.marchahead.co.in
•
778 visualizações
Rising Green at the 2012 Massachusetts Green Careers Conference
Adrian Dahlin
•
581 visualizações
Similar a 8 Steps to Success in Building Green in a Poor Economy
Materials and specs - Paula Bowley
Toronto 2030 District
959 visualizações
•
78 slides
July2013 ghnyc -alternatives to leed-7-17-13
GreenHomeNYC
604 visualizações
•
79 slides
Intent: The Real LEED Requirements
Scott DeGaro
856 visualizações
•
32 slides
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
rcnewcomer
528 visualizações
•
44 slides
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
Angela Lopez
891 visualizações
•
9 slides
Green building codes, programs & rating systems
laneycollege
812 visualizações
•
42 slides
Similar a 8 Steps to Success in Building Green in a Poor Economy
(20)
Materials and specs - Paula Bowley
Toronto 2030 District
•
959 visualizações
July2013 ghnyc -alternatives to leed-7-17-13
GreenHomeNYC
•
604 visualizações
Intent: The Real LEED Requirements
Scott DeGaro
•
856 visualizações
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
rcnewcomer
•
528 visualizações
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
Angela Lopez
•
891 visualizações
Green building codes, programs & rating systems
laneycollege
•
812 visualizações
Damian Trevor - Materials and Methods of Construction
Damian Trevor USA | Damian Trevor CEO
•
436 visualizações
Lecture 9 green architecture
Nedhal Al-Tamimi
•
157 visualizações
Leed.2018
smithcindyk
•
115 visualizações
Sustainable Design Part Five: Assessment Systems
Terri Meyer Boake
•
12K visualizações
Overview of U.S. Building Energy Regulations
International Energy Agency
•
720 visualizações
High performance buildings & rating tools
Ken Thomson
•
1.5K visualizações
July2013 ghnyc -alternatives to leed
GreenHomeNYC
•
519 visualizações
LEED & Indoor Air Quality John P. Lapotaire, CIEC
John P. Lapotaire, CIEC.
•
5.2K visualizações
Innovation technique in construction
School of Planning and Architecture, new delhi
•
164 visualizações
Clean Development Mechanism
Nayan Bhatia
•
10.7K visualizações
USGBC LEED and Indoor Air Quality John P. Lapotaire, CIEC, Microshield IAQ
John P. Lapotaire, CIEC.
•
2K visualizações
Green Retrofitting 101
Strategic Sustainability Consulting
•
2K visualizações
Green Buildings – Climate Change Heroes for a Sustainable Future
Sustainability Knowledge Group
•
50 visualizações
Caba Green Buildings Conf 2006
CABA
•
327 visualizações
Último
voice logger analog.pdf
Nirmal Sharma
20 visualizações
•
1 slide
Commercial Growth Strategies for Startups (Sep 20th, 2023) by RevX
Dino Jugo
41 visualizações
•
11 slides
EQX Corporate Presentation
Equinox Gold Corp.
676 visualizações
•
28 slides
Marv Wexler - Transform Your with AI.pdf
SOLTUIONSpeople, THINKubators, THINKathons
148 visualizações
•
22 slides
140 Book Marketing Ideas to Help Authors Increase Sales
Adrienne Jack
5.9K visualizações
•
159 slides
2011-2017: NTN Americas Town Hall Meeting & Leadership Academy
TETSUYA SOGO
4.4K visualizações
•
6 slides
Último
(20)
voice logger analog.pdf
Nirmal Sharma
•
20 visualizações
Commercial Growth Strategies for Startups (Sep 20th, 2023) by RevX
Dino Jugo
•
41 visualizações
EQX Corporate Presentation
Equinox Gold Corp.
•
676 visualizações
Marv Wexler - Transform Your with AI.pdf
SOLTUIONSpeople, THINKubators, THINKathons
•
148 visualizações
140 Book Marketing Ideas to Help Authors Increase Sales
Adrienne Jack
•
5.9K visualizações
2011-2017: NTN Americas Town Hall Meeting & Leadership Academy
TETSUYA SOGO
•
4.4K visualizações
THE FUTURE OF TRADE : SPECIAL LAB-GROWN DIAMOND EDITION.pptx
Dubai Multi Commodity Centre
•
375 visualizações
Transforming Smartsheet into a Strategic Portfolio Management Solution with O...
OnePlan Solutions
•
29 visualizações
IMD World Talent Report 2023.pdf
Paperjam_redaction
•
280 visualizações
Top 10 Tax Return Strategies
DoshiAccountants1
•
21 visualizações
2023-09 Bloomerang Academy Text Fundraising Presentation.pdf
Bloomerang
•
75 visualizações
Home24 Webinar Mirakl Session.pptx
Mirakl
•
163 visualizações
PersonalBrandCanvas
Aariana1
•
26 visualizações
LPS_updated.pdf
ManinderK5
•
15 visualizações
California Carpet Stewardship Program Q2 2023 Results
Carpet America Recovery Effort
•
42 visualizações
Grand Challenges & Platform Ecosystems
Paavo Ritala
•
213 visualizações
James Feldman - AII Powered Business Tools.pdf
SOLTUIONSpeople, THINKubators, THINKathons
•
163 visualizações
Property Sale in Lahore A Comprehensive Guide (1).pdf
Quratulain878434
•
13 visualizações
Theresa Fesinstine - AI Forward.pdf
SOLTUIONSpeople, THINKubators, THINKathons
•
214 visualizações
FINAL_Bloomerang Volunteer .pdf
Bloomerang
•
32 visualizações
8 Steps to Success in Building Green in a Poor Economy
1.
1 Successfully Building Green
in A poor Economy: 8 Requirements for Your Next Green Project George H. DuBose, CGC Liberty Building Forensics Group ® 407-703-1317 www.libertybuilding.com ©2012 Liberty Building Forensics Group® - All Rights Reserved
2.
2 Premises of the
Presentation • Building green is a noble goal • Risks – Some are obvious but most are obscure. • Failures range from acute to chronic • ―Good practices‖ have not been well integrated ©2012 Liberty Building Forensics Group® - All Rights Reserved
3.
Green Building Risks Project
Risks Technical Risks 3 ©2012 Liberty Building Forensics Group® - All Rights Reserved
4.
Project Risks for
Green Buildings • Schedule overruns due to delivery problems with new products or construction impacts of green requirements • Cost impacts of sole source products • Not clearly defining what is meant by ―green‖ • Contractors, subcontractors, and designers who are unfamiliar with green products and innovative approaches • Specifying green products that have minimal in- field testing and poor warranties • Problems that are not covered by insurance— E&O 4 ©2012 Liberty Building Forensics Group® - All Rights Reserved
5.
Building at a
Glance Name: MA. Maritime Academy Residence Hall Location: Buzzards Bay, MA. Size: 90k ft2 Completed: 2007 Cost: $14.1M Certification: LEED® Gold 5 .Source: April 2009 issue of ED+C magazine ©2012 Liberty Building Forensics Group® - All Rights Reserved
6.
Points Item Cost
Comment 0 Prereq. 1: Fundamental Commissioning $22,000 Cost of independent commissioning agent 0 Prereq. 2: Minimum Energy Performance $0 Basic energy-code requirements 0 Prereq. 3: CFC Reduction $0 Basic code requirement 10 Optimize Energy Performance $641,120 Prescriptive approach and minimal system requirements 3 On-site Renewable Energy $8,000 100% of electricity required by building provided by photovoltaic array and existing wind turbine 1 Additional Commissioning $8,000 Cost of independent commissioning agent 1 Ozone Depletion $0 No refrigerants utilized 6 Energy and Atmosphere: LEED® Points .Source: April 2009 issue of ED+C magazine ©2012 Liberty Building Forensics Group® - All Rights Reserved
7.
Points Item Cost
Comment 0 Prereq. 1: Minimum IAQ performance $0 No cost – basic code requirement 0 Prereq. 2: Tobacco Smoke Control $0 No cost to prohibit smoking at a campus facility 1 IAQ Management Plan: Construction Phase $0 No real cost, just best construction practice 1 IAQ Management Plan: Occupancy $500 Estimate for energy costs during flush-out procedure before occupancy 1 Low-Emitting Adhesives and Sealants $0 No real costs – now readily available 1 Low-Emitting Paints and Coatings $0 No real costs – now readily available 1 Low-Emitting Carpet Systems $0 No real costs – now readily available 1 Chemical and Pollutant Source Control $500 Added costs for MERV 13 filters 1 Controllability of Perimeter Systems $0 No real cost due to dormitory room layout. Switch on room wall and operable windows. 1 Daylight & Views: Views for 90% $0 No cost dueto dormitory room layout 7 Indoor Environmental Quality: LEED® Points .Source: April 2009 issue of ED+C magazine ©2012 Liberty Building Forensics Group® - All Rights Reserved
8.
Technical Risks for
Green Buildings 8 Green Buildings Low Risk Buildings More Outside Air (>ASHRAE by 30+%) Minimum Outside Air (Does not exceed ASHRAE) Emphasis on energy conservation Emphasis on humidity control Stresses VOC reduction --Emphasizes exhaust (>5 Pa) --Promotes building flush-out Minimal VOC concern --Very tight control of exhaust --Rejects building flush-out Stresses new, innovative materials Stresses proven materials Carbohydrate based materials Hydrocarbon based materials Stresses extra envelope insulation Stresses drying potential of envelope (walls and roof) Minimally addresses air barriers Stresses air barriers Green Buildings vs. Low Risk Buildings ©2012 Liberty Building Forensics Group® - All Rights Reserved
9.
MARSH Green Building
Report 2009 9 ©2012 Liberty Building Forensics Group® - All Rights Reserved
10.
MARSH Green Building
Report 2009 10 ©2012 Liberty Building Forensics Group® - All Rights Reserved
11.
Design & Construction
Deficiencies of a Large Theme Park Owner from 1995-2000 Thermal & Moisture Mechanical Finishes Conveying Systems General Requirements Site Work Electrical Doors & Windows 35% 16% 14% (>$2B in Construction of Lodging Facilities) ©2012 Liberty Building Forensics Group® - All Rights Reserved 11
12.
5 Code Drivers
Increasing Green Building Risks 1. Emerging requirements for long-term performance guarantees 2. Increased Risk of from Building Complexity 3. New and innovative product performance risks 4. Risks from New Practices with Little Experience 5. Codification of green ratings systems 12 ©2012 Liberty Building Forensics Group® - All Rights Reserved
13.
FACTOR 1: Emerging Green
Building Requirements 13 1. Owner’s commit to sharing use data (energy/water) 2. LEED certification can be revoked 3. Third parties can initiate USGBC non- compliance action ©2012 Liberty Building Forensics Group® - All Rights Reserved
14.
121 Building Study
by USGBC 14 ©2012 Liberty Building Forensics Group® - All Rights Reserved
15.
15 ©2012 Liberty Building
Forensics Group® - All Rights Reserved
16.
FACTOR 2: Protection Against
Risks for Increased Construction Defects 1. Compare the building to the risk table 2. Identify the green objectives and rate them for increased risk 3. Develop risk and QA management plan targeting those higher risk objectives 16 ©2012 Liberty Building Forensics Group® - All Rights Reserved
17.
17 Complex Building +
Strong Drivers = ―High Risk‖ Buildings Complexity DRIVERSMild Intense Source: 1996 Florida Solar Energy Center (FSEC) Study. I ―low‖ II ―moderate‖ III ―high‖ ©2012 Liberty Building Forensics Group® - All Rights Reserved
18.
18 ©2012 Liberty Building
Forensics Group® - All Rights Reserved
19.
19 ©2012 Liberty Building
Forensics Group® - All Rights Reserved
20.
20 Four Inches of Water ©2012 Liberty
Building Forensics Group® - All Rights Reserved
21.
21 “New materials are
unproven by definition. Like most experiments they tend to fail. If the experiment is the whole exterior of the building [or the entire HVAC system], they fail big.” Quote from ―How Buildings Learn: What happens after they’re built‖ by Stewart Brand FACTOR 3: Innovative Green Products ©2012 Liberty Building Forensics Group® - All Rights Reserved
22.
22 New Bio Based
Insulation ©2012 Liberty Building Forensics Group® - All Rights Reserved
23.
Risks Associated With
New Materials • Vapor retarder vs. air barrier vs. secondary rainwater barrier • Dew point location • Interrelationship with HVAC • Transitions and terminations • Interaction with other materials-compatibility • Moisture Absorption Challenge: Understanding performance of new materials and systems in high risk areas of envelope assembly 23 ©2012 Liberty Building Forensics Group® - All Rights Reserved
24.
24 Interaction with Other
Materials • If unfamiliar with new material’s individual performance…. …probably know less about material’s interaction with other components • Recognize additional risk in innovative products…. …and apply higher degree of rigor in evaluation ©2012 Liberty Building Forensics Group® - All Rights Reserved
25.
25 ©2012 Liberty Building
Forensics Group® - All Rights Reserved
26.
“In design engineering
there are two resources available: The laws of physics and the products of the market. The designer of excellence works with the former and the designer of mediocrity works with the latter.” Quote: Kevin Dickens/Jacobs Corp. 26 ©2012 Liberty Building Forensics Group® - All Rights Reserved
27.
There’s one sure
way to kill an idea: Sue it to death.” 27 July 14, 2008 ENR article ©2012 Liberty Building Forensics Group® - All Rights Reserved
28.
FACTOR 4: Risks from
New Technical Practices 28 ©2012 Liberty Building Forensics Group® - All Rights Reserved
29.
Elements of a
Comprehensive Peer Review Plan 29 Design Construction Occupancy Decreasing Options for Solutions Cost of Action/ Solution LevelofInfluence 100% 0.0% Source: Adapted from Quality in the Constructed Project, American Society of Civil Engineers, 1988. HVAC Review Envelope Reviews VE Input Contractor Submittals T&B Input Post Construction Performance Verification ©2012 Liberty Building Forensics Group® - All Rights Reserved
30.
What a Peer
Review Is 1. Inserting SME into the process 2. Mirrors the healthcare industry 3. Green drives need for SME on products 30 ©2012 Liberty Building Forensics Group® - All Rights Reserved
31.
What a Peer
Review Is NOT 1. Additional insurance policy 2. Contracted to Owner 3. Requested by any project team member 4. Does not replace LEED Consultant 31 ©2012 Liberty Building Forensics Group® - All Rights Reserved
32.
Innovation & Design
Credit Possible LEED® Innovation in Design Credit ©2012 Liberty Building Forensics Group® - All Rights Reserved 32
33.
33 .Source:DraftASHRAEStandard189.1,ThirdPublicReview(May2009) FACTOR 3: Codification ©2012
Liberty Building Forensics Group® - All Rights Reserved
34.
10.3.1.2 Building Project Commissioning: A
commissioning process shall be incorporated into the pre-design, design, construction, and first year occupancy of the building project that verifies that the delivered building and its components, assemblies, and systems comply with the documented owner's project requirements. 34 .Source:DraftASHRAEStandard189.1,ThirdPublicReview(May2009) ©2012 Liberty Building Forensics Group® - All Rights Reserved
35.
10.3.1.2.4 Systems: The following
systems shall be commissioned: -Building envelope systems, components and assemblies to verify the thermal and moisture integrity. -Building envelope pressurization to confirm air- tightness. 35 .Source:DraftASHRAEStandard189.1,ThirdPublicReview(May2009) ©2012 Liberty Building Forensics Group® - All Rights Reserved
36.
10.3.1.4 Indoor Air
Quality (IAQ) Construction Managements: After construction ends, prior to occupancy and with all interior finishes installed, a post-construction, pre- occupancy building flush- out shall be performed: 36 .Source:DraftASHRAEStandard189.1,ThirdPublicReview(May2009) ©2012 Liberty Building Forensics Group® - All Rights Reserved
37.
2. Continuous Post-Construction,
Pre- Occupancy/Post-Occupancy Flush-out: If occupancy is desired prior to completion of the flush-out, the space is allowed to be occupied following delivery of half of the total air changes 37 .Source:DraftASHRAEStandard189.1,ThirdPublicReview(May2009) ©2012 Liberty Building Forensics Group® - All Rights Reserved
38.
California Green Building
Code • Administrative items • Commissioning • Other areas – Air leakage – Flush out 38 ©2012 Liberty Building Forensics Group® - All Rights Reserved
39.
ICC Green Building
Code • Administrative items • Commissioning • Other areas – Air leakage – Flush out 39 ©2012 Liberty Building Forensics Group® - All Rights Reserved
40.
Green Codification Causes
Unintended Consequences $1.5MM Remediation vs. $5MM Replacement 40 ©2012 Liberty Building Forensics Group® - All Rights Reserved
41.
Conclusions • Green building
risks can be predicted by knowing the complexity and driver status of the building • Perform multiple technical peer reviews during design focusing on: oPredicting interaction of the various building systems oPredicting the building’s post-construction performance oAnalyzing the envelope performance oDesign team must incorporate the ―best practices‖ in the fields of waterproofing, humidity control, and building envelope performance. 41 ©2012 Liberty Building Forensics Group® - All Rights Reserved
42.
Conclusions • Designers &
contractors must place regionally- specific climate criteria ahead of LEED credits • Closely analyze new products touted as ―green‖ or innovative, especially products used in the HVAC and building envelope systems. Carefully review warranties, disclaimers, length of in-service testing, and data sheets. • Development of a Green Building Risk Management Plan to address high risk areas • Energy consumption/prediction is not well understood and some LEED buildings will not perform as predicted 42 ©2012 Liberty Building Forensics Group® - All Rights Reserved
Notas do Editor
Credits that can be sought are:Rapidly renewableEnergy performanceLow emitting materialThermal comfortInnovation in Design