MUPPANDAL
WIND FARM
BY
BALAKUMARAN J
MANIKARTIC G
PRASAD R V
AGENDA:
 History
 Geographical topology
 Muppandal wind farm
HISTORY:
• Muppandal in Tamil Nadu is home to India’s largest operational onshore wind
farm in terms of installed capacity. Over three decades, there are visible
social impacts on the people living in the districts of Tirunelveli, Thoothukudi
and Kanniyakumari.
• Crossing Valliyur town, the landscape begins to change. The lush green fields
surrounded by mountains, grazing goats and sheep, active morning birds and
pastoralists and farmers gearing up for the day, greet you to the countryside.
• And just when you would think the scenery could not get more impressive,
there emerges a backdrop of wind turbines, standing at average heights of
over 50-80 feet.This is near Muppandal, a village in the Kanniyakumari
district, home to India’s largest operational onshore wind farm in terms of
installed capacity, since 1986.
MUPPANDAL WIND FARM
Wind energy in india
• On average,across the country,the
generation cost of wind is around
rs.3.5-3.6kwh.
• The table show the installed wind
power capacity in india and also
shows that the state of tamil nadu
leads in installed capacity of wind
energy.
• Tamilnadu contributes about 25%
of total wind power generation in
india.
• Muppandal windfarm has a total
capacity of 1500MW
State Total
capacity(MW)
Tamil nadu 8197
Gujarat 5613
Maharashtra 4784
Karnataka 4509
Rajasthan 4296
Andhra Pradesh 3963
Madhya pradesh 2520
Telangna 101
Kerala 53
Total 34043
PROFILE OF MUPPANDAL WIND FARM
• Muppandal windfarm in kanyakumari
district lies in the range of 3.44-18m/s
wind velocity with wind power density
ranging from 193.3 W/m2 to 558.4 W/m2
at 30m hub height.
• Windmills of different capacities installed
in muppandal wind farm are given as
Windmill
rated
power(kw)
No .of
WTGs
Total
installed
capacity
in MW
Wind
turbine
rated
power(kw)
No . of
WTGs
Total
installed
capacity
in MW
225 126 28.35 225 83 18.67
250 308 77.00 250 182 45.50
300 2 0.6 300 2 0.60
350 2 0.7 350 - -
400 29 11.6 400 23 9.20
500 13 6.5 500 7 3.50
600 2 1.2 600 2 1.20
750 1 0.75 750 1 0.75
Total 483 126.70 Total 300 79.4277
Muppandal wind farm Sample selected
• The installation of lower rated wind mills
such as 225 KW and 250 KW wind mills is
found to be economically viable before 1999
and post-1999 only higher rated wind mills
are found to be economically viable.
• The unit cost of electricity(per KWh) has
stadily increased over the years due to the
rise in investment costs.
• The average discounted payback period for
all windmills is nine years and two months.
Year Rated
power
Unit
cost(KWh)
1993 225 1.94
1993 250 1.96
1994 225 1.95
1994 250 1.96
1995 225 1.99
1995 250 2.02
1995 500 1.94
1996 225 2.05
1996 250 2.07
1996 300 2.55
1996 400 2.08
1996 600 2.03
1999 225 2.26
1999 250 2.29
2003 225 2.66
2003 250 2.68
2003 500 2.46
2005 225 2.75
2005 750 2.43
2008 225 3.75
2008 250 3.85
2010 250 4.56
2010 600 2.78
• A higher rate of profitability was also seen from
installing higher rated power windmills
• The cost of generation is the lowest in the case of
higher rated power windmills.
• On average ,the muppandal wind farm has high
wind speed of 6.97 m/s and power density of
373.1.This does not hapopen at all wind farms .
• This leads to a higher capacity factor.This resulted
in higher generation of output from higher rated
power windmills as the average capacity factor
was taken to be 33%.
RESULTS AND DISCUSSIONS:
Performance of windmills:
• The unit cost of electricity produced from
windmills depends on the annual energy
output of the windmills.
• The output for all windmills is calculated by
taking average capacity factor of 33%.
• Below table shows the annual energy output of
each turbine along with the capacity factor.
WEGs(Hub Height) Mean annual power
output(KW/year)
225 650430
250 722700
300 867240
400 1156320
500 1445400
600 1734480
750 2168100
THANK YOU

More Related Content

Similar to muppandalwindfarmppt-230414101809-29fd4da6 (1).pdf (20)

Learn about Wind Energy
Learn about Wind EnergyLearn about Wind Energy
Learn about Wind Energy
 
WIND ENERGY.pptx
WIND ENERGY.pptxWIND ENERGY.pptx
WIND ENERGY.pptx
 
Wind power
Wind powerWind power
Wind power
 
WIND ENERGY .pptx
WIND ENERGY .pptxWIND ENERGY .pptx
WIND ENERGY .pptx
 
“ A walk to power scenario in INDIA”
“ A walk to power scenario in INDIA”“ A walk to power scenario in INDIA”
“ A walk to power scenario in INDIA”
 
Wind power plant
Wind power plantWind power plant
Wind power plant
 
Wind energy
Wind energyWind energy
Wind energy
 
Maglev windmill
Maglev windmillMaglev windmill
Maglev windmill
 
Resources and power development
Resources and power developmentResources and power development
Resources and power development
 
MARS(Magenn air rotor system)
MARS(Magenn air rotor system)MARS(Magenn air rotor system)
MARS(Magenn air rotor system)
 
Wind Energy
Wind EnergyWind Energy
Wind Energy
 
Presentation On Wind Power
Presentation On Wind PowerPresentation On Wind Power
Presentation On Wind Power
 
Wind Power Energy
Wind Power EnergyWind Power Energy
Wind Power Energy
 
Presentation On Wind Power
Presentation On Wind PowerPresentation On Wind Power
Presentation On Wind Power
 
Wind energy
Wind energyWind energy
Wind energy
 
Gas versus Wind as an Energy Source - Indi
Gas versus Wind as an Energy Source - IndiGas versus Wind as an Energy Source - Indi
Gas versus Wind as an Energy Source - Indi
 
Wind energy(Pakistan)
Wind energy(Pakistan)Wind energy(Pakistan)
Wind energy(Pakistan)
 
Wind farms
Wind farmsWind farms
Wind farms
 
Wind Energy potential.pptx
Wind Energy potential.pptxWind Energy potential.pptx
Wind Energy potential.pptx
 
wind energy Seminar
 wind energy Seminar wind energy Seminar
wind energy Seminar
 

More from theonionrouter

Ocean thermal energy (1).pptx
Ocean thermal energy (1).pptxOcean thermal energy (1).pptx
Ocean thermal energy (1).pptxtheonionrouter
 
APznzaaYzIfy7edAio-gFFxwQIPvWw9BjDxjUsJ6bL4LH7cldB0pXyDqvCoCgNs8m24mDhG2mPM4h...
APznzaaYzIfy7edAio-gFFxwQIPvWw9BjDxjUsJ6bL4LH7cldB0pXyDqvCoCgNs8m24mDhG2mPM4h...APznzaaYzIfy7edAio-gFFxwQIPvWw9BjDxjUsJ6bL4LH7cldB0pXyDqvCoCgNs8m24mDhG2mPM4h...
APznzaaYzIfy7edAio-gFFxwQIPvWw9BjDxjUsJ6bL4LH7cldB0pXyDqvCoCgNs8m24mDhG2mPM4h...theonionrouter
 
APznzabwCr0Eb73hV-uW5VEXaGz6H24XOaG4QwiZAsv3_oBxQ9MEkGhomJJQUFdk4DsVEX7R8M_9a...
APznzabwCr0Eb73hV-uW5VEXaGz6H24XOaG4QwiZAsv3_oBxQ9MEkGhomJJQUFdk4DsVEX7R8M_9a...APznzabwCr0Eb73hV-uW5VEXaGz6H24XOaG4QwiZAsv3_oBxQ9MEkGhomJJQUFdk4DsVEX7R8M_9a...
APznzabwCr0Eb73hV-uW5VEXaGz6H24XOaG4QwiZAsv3_oBxQ9MEkGhomJJQUFdk4DsVEX7R8M_9a...theonionrouter
 
APznzaY9cc7ZvEaGoVwfZ_TuwUgmwPjIPcG7TCE34QrPSgHEGD8_i0XsJXZhosRXYsZKr9hXo_Zjz...
APznzaY9cc7ZvEaGoVwfZ_TuwUgmwPjIPcG7TCE34QrPSgHEGD8_i0XsJXZhosRXYsZKr9hXo_Zjz...APznzaY9cc7ZvEaGoVwfZ_TuwUgmwPjIPcG7TCE34QrPSgHEGD8_i0XsJXZhosRXYsZKr9hXo_Zjz...
APznzaY9cc7ZvEaGoVwfZ_TuwUgmwPjIPcG7TCE34QrPSgHEGD8_i0XsJXZhosRXYsZKr9hXo_Zjz...theonionrouter
 
APznzaYhmn2hcf1Vm-3P54gkQ2A3GWlfzq9prqyE8XiOF8iXEScl95LPb7G5C-WekPx9kx4ASOqMX...
APznzaYhmn2hcf1Vm-3P54gkQ2A3GWlfzq9prqyE8XiOF8iXEScl95LPb7G5C-WekPx9kx4ASOqMX...APznzaYhmn2hcf1Vm-3P54gkQ2A3GWlfzq9prqyE8XiOF8iXEScl95LPb7G5C-WekPx9kx4ASOqMX...
APznzaYhmn2hcf1Vm-3P54gkQ2A3GWlfzq9prqyE8XiOF8iXEScl95LPb7G5C-WekPx9kx4ASOqMX...theonionrouter
 
APznzabXTws9ka__VoakulmseSH9VVr4BtLsaQNHJHpcEv9OlHmib22U1EqQNEnZAJCHZYfFlrdsL...
APznzabXTws9ka__VoakulmseSH9VVr4BtLsaQNHJHpcEv9OlHmib22U1EqQNEnZAJCHZYfFlrdsL...APznzabXTws9ka__VoakulmseSH9VVr4BtLsaQNHJHpcEv9OlHmib22U1EqQNEnZAJCHZYfFlrdsL...
APznzabXTws9ka__VoakulmseSH9VVr4BtLsaQNHJHpcEv9OlHmib22U1EqQNEnZAJCHZYfFlrdsL...theonionrouter
 

More from theonionrouter (7)

Team 1.pdf
Team 1.pdfTeam 1.pdf
Team 1.pdf
 
Ocean thermal energy (1).pptx
Ocean thermal energy (1).pptxOcean thermal energy (1).pptx
Ocean thermal energy (1).pptx
 
APznzaaYzIfy7edAio-gFFxwQIPvWw9BjDxjUsJ6bL4LH7cldB0pXyDqvCoCgNs8m24mDhG2mPM4h...
APznzaaYzIfy7edAio-gFFxwQIPvWw9BjDxjUsJ6bL4LH7cldB0pXyDqvCoCgNs8m24mDhG2mPM4h...APznzaaYzIfy7edAio-gFFxwQIPvWw9BjDxjUsJ6bL4LH7cldB0pXyDqvCoCgNs8m24mDhG2mPM4h...
APznzaaYzIfy7edAio-gFFxwQIPvWw9BjDxjUsJ6bL4LH7cldB0pXyDqvCoCgNs8m24mDhG2mPM4h...
 
APznzabwCr0Eb73hV-uW5VEXaGz6H24XOaG4QwiZAsv3_oBxQ9MEkGhomJJQUFdk4DsVEX7R8M_9a...
APznzabwCr0Eb73hV-uW5VEXaGz6H24XOaG4QwiZAsv3_oBxQ9MEkGhomJJQUFdk4DsVEX7R8M_9a...APznzabwCr0Eb73hV-uW5VEXaGz6H24XOaG4QwiZAsv3_oBxQ9MEkGhomJJQUFdk4DsVEX7R8M_9a...
APznzabwCr0Eb73hV-uW5VEXaGz6H24XOaG4QwiZAsv3_oBxQ9MEkGhomJJQUFdk4DsVEX7R8M_9a...
 
APznzaY9cc7ZvEaGoVwfZ_TuwUgmwPjIPcG7TCE34QrPSgHEGD8_i0XsJXZhosRXYsZKr9hXo_Zjz...
APznzaY9cc7ZvEaGoVwfZ_TuwUgmwPjIPcG7TCE34QrPSgHEGD8_i0XsJXZhosRXYsZKr9hXo_Zjz...APznzaY9cc7ZvEaGoVwfZ_TuwUgmwPjIPcG7TCE34QrPSgHEGD8_i0XsJXZhosRXYsZKr9hXo_Zjz...
APznzaY9cc7ZvEaGoVwfZ_TuwUgmwPjIPcG7TCE34QrPSgHEGD8_i0XsJXZhosRXYsZKr9hXo_Zjz...
 
APznzaYhmn2hcf1Vm-3P54gkQ2A3GWlfzq9prqyE8XiOF8iXEScl95LPb7G5C-WekPx9kx4ASOqMX...
APznzaYhmn2hcf1Vm-3P54gkQ2A3GWlfzq9prqyE8XiOF8iXEScl95LPb7G5C-WekPx9kx4ASOqMX...APznzaYhmn2hcf1Vm-3P54gkQ2A3GWlfzq9prqyE8XiOF8iXEScl95LPb7G5C-WekPx9kx4ASOqMX...
APznzaYhmn2hcf1Vm-3P54gkQ2A3GWlfzq9prqyE8XiOF8iXEScl95LPb7G5C-WekPx9kx4ASOqMX...
 
APznzabXTws9ka__VoakulmseSH9VVr4BtLsaQNHJHpcEv9OlHmib22U1EqQNEnZAJCHZYfFlrdsL...
APznzabXTws9ka__VoakulmseSH9VVr4BtLsaQNHJHpcEv9OlHmib22U1EqQNEnZAJCHZYfFlrdsL...APznzabXTws9ka__VoakulmseSH9VVr4BtLsaQNHJHpcEv9OlHmib22U1EqQNEnZAJCHZYfFlrdsL...
APznzabXTws9ka__VoakulmseSH9VVr4BtLsaQNHJHpcEv9OlHmib22U1EqQNEnZAJCHZYfFlrdsL...
 

Recently uploaded

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 

Recently uploaded (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

muppandalwindfarmppt-230414101809-29fd4da6 (1).pdf

  • 2. AGENDA:  History  Geographical topology  Muppandal wind farm
  • 3. HISTORY: • Muppandal in Tamil Nadu is home to India’s largest operational onshore wind farm in terms of installed capacity. Over three decades, there are visible social impacts on the people living in the districts of Tirunelveli, Thoothukudi and Kanniyakumari. • Crossing Valliyur town, the landscape begins to change. The lush green fields surrounded by mountains, grazing goats and sheep, active morning birds and pastoralists and farmers gearing up for the day, greet you to the countryside. • And just when you would think the scenery could not get more impressive, there emerges a backdrop of wind turbines, standing at average heights of over 50-80 feet.This is near Muppandal, a village in the Kanniyakumari district, home to India’s largest operational onshore wind farm in terms of installed capacity, since 1986.
  • 5.
  • 6. Wind energy in india • On average,across the country,the generation cost of wind is around rs.3.5-3.6kwh. • The table show the installed wind power capacity in india and also shows that the state of tamil nadu leads in installed capacity of wind energy. • Tamilnadu contributes about 25% of total wind power generation in india. • Muppandal windfarm has a total capacity of 1500MW State Total capacity(MW) Tamil nadu 8197 Gujarat 5613 Maharashtra 4784 Karnataka 4509 Rajasthan 4296 Andhra Pradesh 3963 Madhya pradesh 2520 Telangna 101 Kerala 53 Total 34043
  • 7. PROFILE OF MUPPANDAL WIND FARM • Muppandal windfarm in kanyakumari district lies in the range of 3.44-18m/s wind velocity with wind power density ranging from 193.3 W/m2 to 558.4 W/m2 at 30m hub height. • Windmills of different capacities installed in muppandal wind farm are given as
  • 8. Windmill rated power(kw) No .of WTGs Total installed capacity in MW Wind turbine rated power(kw) No . of WTGs Total installed capacity in MW 225 126 28.35 225 83 18.67 250 308 77.00 250 182 45.50 300 2 0.6 300 2 0.60 350 2 0.7 350 - - 400 29 11.6 400 23 9.20 500 13 6.5 500 7 3.50 600 2 1.2 600 2 1.20 750 1 0.75 750 1 0.75 Total 483 126.70 Total 300 79.4277 Muppandal wind farm Sample selected
  • 9. • The installation of lower rated wind mills such as 225 KW and 250 KW wind mills is found to be economically viable before 1999 and post-1999 only higher rated wind mills are found to be economically viable. • The unit cost of electricity(per KWh) has stadily increased over the years due to the rise in investment costs. • The average discounted payback period for all windmills is nine years and two months.
  • 10. Year Rated power Unit cost(KWh) 1993 225 1.94 1993 250 1.96 1994 225 1.95 1994 250 1.96 1995 225 1.99 1995 250 2.02 1995 500 1.94 1996 225 2.05 1996 250 2.07 1996 300 2.55 1996 400 2.08 1996 600 2.03 1999 225 2.26 1999 250 2.29 2003 225 2.66 2003 250 2.68 2003 500 2.46 2005 225 2.75 2005 750 2.43 2008 225 3.75 2008 250 3.85 2010 250 4.56 2010 600 2.78
  • 11. • A higher rate of profitability was also seen from installing higher rated power windmills • The cost of generation is the lowest in the case of higher rated power windmills. • On average ,the muppandal wind farm has high wind speed of 6.97 m/s and power density of 373.1.This does not hapopen at all wind farms . • This leads to a higher capacity factor.This resulted in higher generation of output from higher rated power windmills as the average capacity factor was taken to be 33%.
  • 12. RESULTS AND DISCUSSIONS: Performance of windmills: • The unit cost of electricity produced from windmills depends on the annual energy output of the windmills. • The output for all windmills is calculated by taking average capacity factor of 33%. • Below table shows the annual energy output of each turbine along with the capacity factor.
  • 13. WEGs(Hub Height) Mean annual power output(KW/year) 225 650430 250 722700 300 867240 400 1156320 500 1445400 600 1734480 750 2168100