www.teekay.com
Falcon Spirit
CONVERSION OF A 1986
SHUTTLE TANKER TO A
FLOATING STORAGE
AND OFFLOADING UNIT
Client: Occidental Petroleum
Location: Al Rayyan Field, offshore Qartar
The Project
Occidental Petroleum was looking for an FSO vessel for
deployment on the Al Rayyan Field offshore Qatar. Teekay
was awarded the contract in April 2009 and delivery of
the Falcon Spirit took place 8 months later, in December
2009. This fast track project included procurement of the FSO
equipment and a conversion of the former shuttle tanker Sarita.
Al Rayyan is a large oil field located offshore Qatar. The field
is developed by a production jack-up rig and the Falcon Spirit
for storage. The FSO is moored to an SBM buoy using the
standard Bow Loading Equipment that has formerly been
used for 23 years on the vessel as a shuttle tanker.
Conventional tankers moor to the stern of the Falcon Spirit
for cargo transfer once every two months.
The Vessel
The vessel is a 125 000 dwt double hull Crude Oil Tanker built
by Daewoo Shipbuilding and Heavy Machinery, Korea in 1986.
Falcon SpiritVessel History
2009 – present FSO at the Al Rayyan
Field, Qatar
2006 – 2009 Shuttle tanker operating in
South Africa
1986 – 2006 Shuttle tanker SARITA
operating in the North Sea
FS0 Upgrade Work
•	 Extensive fatigue bracket installation
scope for life extension
•	 Grit and hydro blasting and painting of
cargo and ballast tanks
•	 Modification of main engines to run on
low load
•	 Installation of new ventilation and air
conditioning system
•	 Installation of new water maker
(reverse osmosis)
•	 Lifting of helicopter deck and general
upgrade
•	 Installation of new offshore crane
•	 Installation of new Gas detection and
emergency shut own system with
automatic ventilation dampers
•	 Upgrade and overhaul of Bow Loading
System
•	 Installation of a stern discharge system,
and chain stopper
•	 Modification of the cargo vent system
•	 Installation of new free fall life boat
including davit
•	 In water survey arrangement
•	 Full class survey and class renewal
Equipment Manufactures and
Major Subcontractors
•	 FSO Engineering and Design:
Icepronav, Romania
•	 New AC plant: Aeron, Norway
•	 Offshore Crane: Italgru, Italy
•	 FSU Upgrade yard: Drydocks World Dubai
•	 ESD system: Bjørge, Norway
Principal Dimensions
•	 Length, overall:..................... 260.0 m
•	 Breath, moulded: .................. 46.00 m
•	 Deapth, moulded:................. 21.80 m
•	 Draft, designed:.................... 14.80 m
•	 Deadweight, scantling:............. 124,472 tons
Capacities
•	 6 x 2 Cargo Tanks and 2 Slop Tanks
•	 Double Hull for Segregated Water Ballast
•	 Cargo Tanks incl. slop tanks: 165,83 m3
•	 Ballast Tanks incl. peak tanks: 54,961 m3
•	 Accommodation: 32 persons
•	 Main Engine: 2 x MAN 6L6OMCE
•	 Propellers: 2 controllable pitch propellers
Class Notation Registration and
Requirements
•	 DNV,+ 1A1 Ship-shaped Oil Storage Unit
Tanker for Oil, ESP HELDK, E0
•	 Bahamas Registration
Specific Client Requirements:
•	 All tank ventilation under special
procedures due to H2S
•	 Special tank ventilation system installed
•	 In line sampling for export oil
•	 New life boat: Norsafe, Norway
•	 Chain stopper: Harbour and Marine,
Australia
•	 Special air breathing system
Teekay Shipping Norway AS
Verven 4
N-4014 Stavanger
Norway
Tel: +47 51 44 27 00

Mais conteúdo relacionado

Mais procurados

Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 
Cost Effective Outcomes from FPSO Safety Case
Cost Effective Outcomes from FPSO Safety CaseCost Effective Outcomes from FPSO Safety Case
Cost Effective Outcomes from FPSO Safety CaseIQPC
 
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4PetroSync
 
Scaffold Safety Presentation.ppt
Scaffold Safety Presentation.pptScaffold Safety Presentation.ppt
Scaffold Safety Presentation.pptPakarabEngineering
 
ROTEX Controls Pneumatic Actuator Catalog Models DRC, DRS, and DRV
ROTEX Controls Pneumatic Actuator Catalog Models DRC, DRS, and DRVROTEX Controls Pneumatic Actuator Catalog Models DRC, DRS, and DRV
ROTEX Controls Pneumatic Actuator Catalog Models DRC, DRS, and DRVROTEX Controls USA
 
Trsv overview external
Trsv overview externalTrsv overview external
Trsv overview externalManuel Coxe
 
off-bottom cementing process used successfully with conventional liner-hanger...
off-bottom cementing process used successfully with conventional liner-hanger...off-bottom cementing process used successfully with conventional liner-hanger...
off-bottom cementing process used successfully with conventional liner-hanger...flch
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production SystemsSahyog Shishodia
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
14 use of plant graders and road rollers risk assessment templates
14 use of plant  graders and road rollers risk assessment templates14 use of plant  graders and road rollers risk assessment templates
14 use of plant graders and road rollers risk assessment templatesDwarika Bhushan Sharma
 
Scissor Lifts Powerpoint
Scissor Lifts PowerpointScissor Lifts Powerpoint
Scissor Lifts PowerpointBrad Schmidt
 

Mais procurados (20)

Rigging & slinging
Rigging & slingingRigging & slinging
Rigging & slinging
 
Cranes ppt
Cranes pptCranes ppt
Cranes ppt
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Rigging Engineering Basic
Rigging Engineering BasicRigging Engineering Basic
Rigging Engineering Basic
 
Scaffolding2. CO3.ppt
Scaffolding2. CO3.pptScaffolding2. CO3.ppt
Scaffolding2. CO3.ppt
 
Cost Effective Outcomes from FPSO Safety Case
Cost Effective Outcomes from FPSO Safety CaseCost Effective Outcomes from FPSO Safety Case
Cost Effective Outcomes from FPSO Safety Case
 
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
 
Scaffold Safety Presentation.ppt
Scaffold Safety Presentation.pptScaffold Safety Presentation.ppt
Scaffold Safety Presentation.ppt
 
ROTEX Controls Pneumatic Actuator Catalog Models DRC, DRS, and DRV
ROTEX Controls Pneumatic Actuator Catalog Models DRC, DRS, and DRVROTEX Controls Pneumatic Actuator Catalog Models DRC, DRS, and DRV
ROTEX Controls Pneumatic Actuator Catalog Models DRC, DRS, and DRV
 
Trsv overview external
Trsv overview externalTrsv overview external
Trsv overview external
 
Safety know your crane
Safety   know your craneSafety   know your crane
Safety know your crane
 
scaffold 2015
scaffold 2015scaffold 2015
scaffold 2015
 
off-bottom cementing process used successfully with conventional liner-hanger...
off-bottom cementing process used successfully with conventional liner-hanger...off-bottom cementing process used successfully with conventional liner-hanger...
off-bottom cementing process used successfully with conventional liner-hanger...
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Rig move safety
Rig move safety Rig move safety
Rig move safety
 
14 use of plant graders and road rollers risk assessment templates
14 use of plant  graders and road rollers risk assessment templates14 use of plant  graders and road rollers risk assessment templates
14 use of plant graders and road rollers risk assessment templates
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Lifting plan template
Lifting plan templateLifting plan template
Lifting plan template
 
Scissor Lifts Powerpoint
Scissor Lifts PowerpointScissor Lifts Powerpoint
Scissor Lifts Powerpoint
 

Semelhante a Falcon Spirit FSO

Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webPaul Heinrich
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webNora Kohlhase
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray FirstsMyLast1
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Walchandnagar Industries
Walchandnagar IndustriesWalchandnagar Industries
Walchandnagar Industriesketan.pole
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
MOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BMOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BVishak Gopi
 
How to build a platform
How to build a platformHow to build a platform
How to build a platformbp
 
Asia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardAsia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardInnovation Norway
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibilityguest651e92c
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdfKhalidJ6
 
PaxOcean Zhoushan Presentation 150727s
PaxOcean Zhoushan Presentation 150727sPaxOcean Zhoushan Presentation 150727s
PaxOcean Zhoushan Presentation 150727sQian faping
 

Semelhante a Falcon Spirit FSO (20)

Navion Saga FSO
Navion Saga FSONavion Saga FSO
Navion Saga FSO
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Walchandnagar Industries
Walchandnagar IndustriesWalchandnagar Industries
Walchandnagar Industries
 
OFFSHORE ACTIVITIES
OFFSHORE ACTIVITIESOFFSHORE ACTIVITIES
OFFSHORE ACTIVITIES
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Spotlight 1Astander
Spotlight 1AstanderSpotlight 1Astander
Spotlight 1Astander
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
NovaAlgoma
NovaAlgomaNovaAlgoma
NovaAlgoma
 
MOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BMOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev B
 
Azerbaijani Shipyards
Azerbaijani ShipyardsAzerbaijani Shipyards
Azerbaijani Shipyards
 
How to build a platform
How to build a platformHow to build a platform
How to build a platform
 
Asia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardAsia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin Shipyard
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf
 
PaxOcean Zhoushan Presentation 150727s
PaxOcean Zhoushan Presentation 150727sPaxOcean Zhoushan Presentation 150727s
PaxOcean Zhoushan Presentation 150727s
 
201411tsnteagle-barents
201411tsnteagle-barents201411tsnteagle-barents
201411tsnteagle-barents
 

Mais de Teekay Corporation

Teekay Corporation Q4-23 and Annual 2023 ER Document
Teekay Corporation  Q4-23 and Annual 2023 ER DocumentTeekay Corporation  Q4-23 and Annual 2023 ER Document
Teekay Corporation Q4-23 and Annual 2023 ER DocumentTeekay Corporation
 
Teekay Corporation Q3-23 ER Document
Teekay Corporation Q3-23 ER DocumentTeekay Corporation Q3-23 ER Document
Teekay Corporation Q3-23 ER DocumentTeekay Corporation
 
Teekay Corporation Q2-23 ER Document
Teekay Corporation Q2-23 ER DocumentTeekay Corporation Q2-23 ER Document
Teekay Corporation Q2-23 ER DocumentTeekay Corporation
 
Teekay Corporation Q1-23 ER Document.pdf
Teekay Corporation Q1-23 ER Document.pdfTeekay Corporation Q1-23 ER Document.pdf
Teekay Corporation Q1-23 ER Document.pdfTeekay Corporation
 
Teekay Corporation Q4-22 Earning Release Document
Teekay Corporation Q4-22 Earning Release DocumentTeekay Corporation Q4-22 Earning Release Document
Teekay Corporation Q4-22 Earning Release DocumentTeekay Corporation
 
TNK Q3 2021 Earnings Presentation
TNK Q3 2021 Earnings PresentationTNK Q3 2021 Earnings Presentation
TNK Q3 2021 Earnings PresentationTeekay Corporation
 
TK Q3 2021 Earnings Presentation
TK Q3 2021 Earnings PresentationTK Q3 2021 Earnings Presentation
TK Q3 2021 Earnings PresentationTeekay Corporation
 
TGP Q2-21 Earnings Presentation
TGP Q2-21 Earnings PresentationTGP Q2-21 Earnings Presentation
TGP Q2-21 Earnings PresentationTeekay Corporation
 
TNK Q2-21 Earnings Presentation
TNK Q2-21 Earnings PresentationTNK Q2-21 Earnings Presentation
TNK Q2-21 Earnings PresentationTeekay Corporation
 
TK Q2-21 Earnings Presentation
TK Q2-21 Earnings PresentationTK Q2-21 Earnings Presentation
TK Q2-21 Earnings PresentationTeekay Corporation
 
TK Q1-21 Earnings Presentation
TK Q1-21 Earnings PresentationTK Q1-21 Earnings Presentation
TK Q1-21 Earnings PresentationTeekay Corporation
 
TGP Q1-21 Earnings Presentation
TGP Q1-21 Earnings PresentationTGP Q1-21 Earnings Presentation
TGP Q1-21 Earnings PresentationTeekay Corporation
 
TNK Q1-21 Earnings Presentation
TNK Q1-21 Earnings PresentationTNK Q1-21 Earnings Presentation
TNK Q1-21 Earnings PresentationTeekay Corporation
 
TNK Q4-20 Earnings Presentation
TNK Q4-20 Earnings PresentationTNK Q4-20 Earnings Presentation
TNK Q4-20 Earnings PresentationTeekay Corporation
 
TK Q4-20 Earnings Presentation
TK Q4-20 Earnings PresentationTK Q4-20 Earnings Presentation
TK Q4-20 Earnings PresentationTeekay Corporation
 
TGP Q4-20 Earnings Presentation
TGP Q4-20 Earnings PresentationTGP Q4-20 Earnings Presentation
TGP Q4-20 Earnings PresentationTeekay Corporation
 
TGP Q3 2020 Earnings Presentation
TGP Q3  2020 Earnings PresentationTGP Q3  2020 Earnings Presentation
TGP Q3 2020 Earnings PresentationTeekay Corporation
 
TNK Q3 2020 Earnings Presentation
TNK Q3 2020 Earnings PresentationTNK Q3 2020 Earnings Presentation
TNK Q3 2020 Earnings PresentationTeekay Corporation
 

Mais de Teekay Corporation (20)

Teekay Corporation Q4-23 and Annual 2023 ER Document
Teekay Corporation  Q4-23 and Annual 2023 ER DocumentTeekay Corporation  Q4-23 and Annual 2023 ER Document
Teekay Corporation Q4-23 and Annual 2023 ER Document
 
Teekay Corporation Q3-23 ER Document
Teekay Corporation Q3-23 ER DocumentTeekay Corporation Q3-23 ER Document
Teekay Corporation Q3-23 ER Document
 
Teekay Corporation Q2-23 ER Document
Teekay Corporation Q2-23 ER DocumentTeekay Corporation Q2-23 ER Document
Teekay Corporation Q2-23 ER Document
 
Teekay Corporation Q1-23 ER Document.pdf
Teekay Corporation Q1-23 ER Document.pdfTeekay Corporation Q1-23 ER Document.pdf
Teekay Corporation Q1-23 ER Document.pdf
 
Teekay Corporation Q4-22 Earning Release Document
Teekay Corporation Q4-22 Earning Release DocumentTeekay Corporation Q4-22 Earning Release Document
Teekay Corporation Q4-22 Earning Release Document
 
TK Q3-22 ER Document
TK Q3-22 ER DocumentTK Q3-22 ER Document
TK Q3-22 ER Document
 
TK Q2-22 ER Document
TK Q2-22 ER DocumentTK Q2-22 ER Document
TK Q2-22 ER Document
 
TNK Q3 2021 Earnings Presentation
TNK Q3 2021 Earnings PresentationTNK Q3 2021 Earnings Presentation
TNK Q3 2021 Earnings Presentation
 
TK Q3 2021 Earnings Presentation
TK Q3 2021 Earnings PresentationTK Q3 2021 Earnings Presentation
TK Q3 2021 Earnings Presentation
 
TGP Q2-21 Earnings Presentation
TGP Q2-21 Earnings PresentationTGP Q2-21 Earnings Presentation
TGP Q2-21 Earnings Presentation
 
TNK Q2-21 Earnings Presentation
TNK Q2-21 Earnings PresentationTNK Q2-21 Earnings Presentation
TNK Q2-21 Earnings Presentation
 
TK Q2-21 Earnings Presentation
TK Q2-21 Earnings PresentationTK Q2-21 Earnings Presentation
TK Q2-21 Earnings Presentation
 
TK Q1-21 Earnings Presentation
TK Q1-21 Earnings PresentationTK Q1-21 Earnings Presentation
TK Q1-21 Earnings Presentation
 
TGP Q1-21 Earnings Presentation
TGP Q1-21 Earnings PresentationTGP Q1-21 Earnings Presentation
TGP Q1-21 Earnings Presentation
 
TNK Q1-21 Earnings Presentation
TNK Q1-21 Earnings PresentationTNK Q1-21 Earnings Presentation
TNK Q1-21 Earnings Presentation
 
TNK Q4-20 Earnings Presentation
TNK Q4-20 Earnings PresentationTNK Q4-20 Earnings Presentation
TNK Q4-20 Earnings Presentation
 
TK Q4-20 Earnings Presentation
TK Q4-20 Earnings PresentationTK Q4-20 Earnings Presentation
TK Q4-20 Earnings Presentation
 
TGP Q4-20 Earnings Presentation
TGP Q4-20 Earnings PresentationTGP Q4-20 Earnings Presentation
TGP Q4-20 Earnings Presentation
 
TGP Q3 2020 Earnings Presentation
TGP Q3  2020 Earnings PresentationTGP Q3  2020 Earnings Presentation
TGP Q3 2020 Earnings Presentation
 
TNK Q3 2020 Earnings Presentation
TNK Q3 2020 Earnings PresentationTNK Q3 2020 Earnings Presentation
TNK Q3 2020 Earnings Presentation
 

Último

Terna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna SpA
 
Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024nicola_mining
 
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd
 
Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop AG
 
Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop AG
 
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFWWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFMichael Claudio
 
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper PotentialAdvancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper Potentialnicola_mining
 

Último (7)

Terna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 Presentation
 
Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
 
Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023
 
Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24
 
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFWWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
 
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper PotentialAdvancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
 

Falcon Spirit FSO

  • 1. www.teekay.com Falcon Spirit CONVERSION OF A 1986 SHUTTLE TANKER TO A FLOATING STORAGE AND OFFLOADING UNIT Client: Occidental Petroleum Location: Al Rayyan Field, offshore Qartar The Project Occidental Petroleum was looking for an FSO vessel for deployment on the Al Rayyan Field offshore Qatar. Teekay was awarded the contract in April 2009 and delivery of the Falcon Spirit took place 8 months later, in December 2009. This fast track project included procurement of the FSO equipment and a conversion of the former shuttle tanker Sarita. Al Rayyan is a large oil field located offshore Qatar. The field is developed by a production jack-up rig and the Falcon Spirit for storage. The FSO is moored to an SBM buoy using the standard Bow Loading Equipment that has formerly been used for 23 years on the vessel as a shuttle tanker. Conventional tankers moor to the stern of the Falcon Spirit for cargo transfer once every two months. The Vessel The vessel is a 125 000 dwt double hull Crude Oil Tanker built by Daewoo Shipbuilding and Heavy Machinery, Korea in 1986.
  • 2. Falcon SpiritVessel History 2009 – present FSO at the Al Rayyan Field, Qatar 2006 – 2009 Shuttle tanker operating in South Africa 1986 – 2006 Shuttle tanker SARITA operating in the North Sea FS0 Upgrade Work • Extensive fatigue bracket installation scope for life extension • Grit and hydro blasting and painting of cargo and ballast tanks • Modification of main engines to run on low load • Installation of new ventilation and air conditioning system • Installation of new water maker (reverse osmosis) • Lifting of helicopter deck and general upgrade • Installation of new offshore crane • Installation of new Gas detection and emergency shut own system with automatic ventilation dampers • Upgrade and overhaul of Bow Loading System • Installation of a stern discharge system, and chain stopper • Modification of the cargo vent system • Installation of new free fall life boat including davit • In water survey arrangement • Full class survey and class renewal Equipment Manufactures and Major Subcontractors • FSO Engineering and Design: Icepronav, Romania • New AC plant: Aeron, Norway • Offshore Crane: Italgru, Italy • FSU Upgrade yard: Drydocks World Dubai • ESD system: Bjørge, Norway Principal Dimensions • Length, overall:..................... 260.0 m • Breath, moulded: .................. 46.00 m • Deapth, moulded:................. 21.80 m • Draft, designed:.................... 14.80 m • Deadweight, scantling:............. 124,472 tons Capacities • 6 x 2 Cargo Tanks and 2 Slop Tanks • Double Hull for Segregated Water Ballast • Cargo Tanks incl. slop tanks: 165,83 m3 • Ballast Tanks incl. peak tanks: 54,961 m3 • Accommodation: 32 persons • Main Engine: 2 x MAN 6L6OMCE • Propellers: 2 controllable pitch propellers Class Notation Registration and Requirements • DNV,+ 1A1 Ship-shaped Oil Storage Unit Tanker for Oil, ESP HELDK, E0 • Bahamas Registration Specific Client Requirements: • All tank ventilation under special procedures due to H2S • Special tank ventilation system installed • In line sampling for export oil • New life boat: Norsafe, Norway • Chain stopper: Harbour and Marine, Australia • Special air breathing system Teekay Shipping Norway AS Verven 4 N-4014 Stavanger Norway Tel: +47 51 44 27 00