STEP BY STEP USE ACONEX
WORK FLOW FOR FSP-KL
PROJECT
Prepare By: Jack Tan
Company: Turner International Malaysia
WHEN YOU RECEIVE WORK FLOW
TRANSMITTAL FROM MAIN CONTRACTOR:-
Step 1: Clicks
Action
Step 2: select
review
documents
DOWNLOAD DOCUMENTS AND REVIEW
Step 3: download and review
documents
Step 4: Select the review outcome,
“A” Approved: CRCC to issue approved submittal back to the NSC/DSC, and the works may proceed
“B” Approved as Noted: CRCC to issue approved submittal back to the NSC/DSC in full, and to ensure
that any comments are addressed prior to works proceeding.
“C” Revise and Resubmit or “D” Rejected: CRCC to issue submittal with all comments to the sub-
contractor; follow up with the NSC for re-submission; check the resubmission against the consultants
comments to ensure that all items have been addressed; after reviewing and ensuring that all
comments have been addressed, resubmit to the consultant using the workflow process until “A” or
“B” status is achieved.
CONSULTANTS INPUT COMMENTS (IF ANY)
Comments on each drawing/document
can be entered here, or they can be
manually written on the drawing and
then uploaded to Supersede the
previous file (see next slide)
STEP 5: REPLACEMENT FILE (WITH CONSULTANTS
COMMENTS AND SIGNATURE
If comments have been manually written on
the drawing/document, use the "paper clip"
icon to upload the commented version (either
from your computer, or from your files within
Aconex). This function will Supersede the
previous version so you must be sure that there
has been no change to the Document
Number/File name.
REVIEW AND COMMENTS ON HARD COPY
sample
sample
Step 6: Submit
selected
documents
ACONEX
HOW TO CREATE SUB-
WORKFLOW TO
CONSULTANTS
 Design Consultant Receives, Reviews Submission – once the workflow is initiated, the Design Consultant has a
specified time to respond to CRCC, The Consultant shall review the submittal, and initiate sub-workflows to
secondary design consultants (if required) who’s input is needed for a full response.
 Sub-workflow Initiated – If the Primary Consultant requires input or coordination from other Secondary
consultants, they shall initiate a sub-workflow to each secondary consultant from whom input is needed
 Secondary Consultants Review – Secondary Consultants typically have 7-10 days to respond to a sub-
workflow, however this may be longer or shorter depending on the requirements of the Primary Consultant in
order to not surpass the overall duration for review of the main workflow
 Secondary Consultants Reply – Secondary Consultants reply to the sub-workflow
 Secondary Design Consultants (any design consultant cc-ed on a workflow or who has been issued a Sub-
workflow from the Primary Design Consultant) are responsible for:
 Receiving and reviewing sub-workflows from the Primary Consultant, and issuing comments as related to their
discipline
 Reviewing workflows on which they were copied to ensure there is no conflict with their own design/works
 If a conflict arises, notify the Primary Consultant immediately and work to coordinate with them on a
response.
 Returning comments to the Primary Consultant in time to allow response back to CRCC within the 21 day
contractual requirement.
 Answering any questions from CRCC, or the NSC/DSC about comments made in the submittal response.
 Must ensure that CRCC is copied on any correspondence between them and the NSC/DSC
FLOW CHART OF SUB-WORK FLOW
Primary Consultant
initiative Sub-Workflow
to secondary
consultants
Secondary consultants
review and comments
send back to primary
consultants
Primary consultants
receive additional
information, workflow
back to main
contractor
SELECT “ITEM/ISSUE“ FOR START SUB-
WORK FLOW TO OTHER CONSULTANTS
Select item
need to sub
workflow
CLICKS “START SUBWORKFLOW”
Click here for
start work flow
STEP BY STEP FOR SUB-WORKFLOW
STEP 1, SELECT ITEM “2” AND STEP 2: SELECT
TEMPLATE NAME “SW 1” FOR RFI, SELECT “SW 2”
FOR OTHER SUBMITTALS.
Step 1:
item 2
Step 2: Select
the template
SW1, 2,and 3
CLICK “NEXT” FOR THE NEXT STEP
STEP 3: CLICKS
NEXT
STEP 4: INPUT AND SELECT THE INFORMATION IN
YELLOW BOX
Fill in the Attributes and the Reason for
Issue from the drop down menus
SELECT PERSON, WHICH IS ONLY
REVIEW IN FINAL RESULTS. (IF ANY)
SELECT THE PARTICIPANTS NAME
Step 5:
Clicks here
Step 6: Input
the participants
name (based
on Aconex
protocol)
Step 7:
Clicks here
NOTE: people entered in the
"Participants" section can take action on
the subworkflow; people entered in the
"Cc" section can only view but can not
respond to the subworkflow
CLICK “SUBMIT” SUBMIT TO SECONDARY
CONSULTANTS
Step 8:
Submit
Thank you

More Related Content

What's hot

Construction Claims Explained
Construction Claims ExplainedConstruction Claims Explained
Construction Claims Explainedclaimsconsultancy
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
Claims & disputes management
Claims & disputes managementClaims & disputes management
Claims & disputes managementMohammed Tanbouz
 
Agile Implementation
Agile ImplementationAgile Implementation
Agile ImplementationOlga Sa
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentationJeff B
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...Edureka!
 
Civil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesCivil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesSlideTeam
 
EOT Related Cost Compensation Determination
EOT Related Cost Compensation DeterminationEOT Related Cost Compensation Determination
EOT Related Cost Compensation DeterminationVimal Daluwatta
 
Contractor Prequalification Presentation
Contractor Prequalification PresentationContractor Prequalification Presentation
Contractor Prequalification Presentationcimone
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 Pang Khai Shuen
 
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Fakhar-un -Nisa
 

What's hot (20)

Construction Claims Explained
Construction Claims ExplainedConstruction Claims Explained
Construction Claims Explained
 
Introduction to construction contracts fundamentals
Introduction to construction contracts fundamentalsIntroduction to construction contracts fundamentals
Introduction to construction contracts fundamentals
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Claims & disputes management
Claims & disputes managementClaims & disputes management
Claims & disputes management
 
Agile Implementation
Agile ImplementationAgile Implementation
Agile Implementation
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 
METHOD STATEMENT
METHOD STATEMENTMETHOD STATEMENT
METHOD STATEMENT
 
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
 
Hse plan
Hse planHse plan
Hse plan
 
Scope of work
Scope of workScope of work
Scope of work
 
Civil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesCivil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation Slides
 
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation SlidesExtension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
 
COBie
COBieCOBie
COBie
 
EOT Related Cost Compensation Determination
EOT Related Cost Compensation DeterminationEOT Related Cost Compensation Determination
EOT Related Cost Compensation Determination
 
Contractor Prequalification Presentation
Contractor Prequalification PresentationContractor Prequalification Presentation
Contractor Prequalification Presentation
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)
 

Viewers also liked

Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Aconex
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Aconex
 
FY16 Results Presentation
FY16 Results PresentationFY16 Results Presentation
FY16 Results PresentationPranav Rao
 
Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015Aconex
 
Product Managers are from Pluto and UXers are from Uranus
Product Managers are from Pluto and UXers are from UranusProduct Managers are from Pluto and UXers are from Uranus
Product Managers are from Pluto and UXers are from UranusProduct Anonymous
 
ASG CloudFactory
ASG CloudFactoryASG CloudFactory
ASG CloudFactoryDavidZou
 
Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015
Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015
Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015Aconex
 
Achieve competitive advantage through innovative process management
Achieve competitive advantage through innovative process managementAchieve competitive advantage through innovative process management
Achieve competitive advantage through innovative process managementAconex
 
How to improve RFI management across your projects
How to improve RFI management across your projectsHow to improve RFI management across your projects
How to improve RFI management across your projectsAconex
 
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...Aconex
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsLinkedIn
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with DataSeth Familian
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017Drift
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheLeslie Samuel
 

Viewers also liked (19)

Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...
 
Aconex Certified
Aconex CertifiedAconex Certified
Aconex Certified
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
 
Steven Lee 李家倫 黑帶大師
Steven Lee 李家倫 黑帶大師Steven Lee 李家倫 黑帶大師
Steven Lee 李家倫 黑帶大師
 
FY16 Results Presentation
FY16 Results PresentationFY16 Results Presentation
FY16 Results Presentation
 
Technology ap cons. ppt
Technology ap cons. pptTechnology ap cons. ppt
Technology ap cons. ppt
 
Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015
 
Product Managers are from Pluto and UXers are from Uranus
Product Managers are from Pluto and UXers are from UranusProduct Managers are from Pluto and UXers are from Uranus
Product Managers are from Pluto and UXers are from Uranus
 
ASG CloudFactory
ASG CloudFactoryASG CloudFactory
ASG CloudFactory
 
Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015
Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015
Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015
 
Achieve competitive advantage through innovative process management
Achieve competitive advantage through innovative process managementAchieve competitive advantage through innovative process management
Achieve competitive advantage through innovative process management
 
How to improve RFI management across your projects
How to improve RFI management across your projectsHow to improve RFI management across your projects
How to improve RFI management across your projects
 
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
 
Iso 9001 2015 Understanding
Iso 9001 2015 Understanding Iso 9001 2015 Understanding
Iso 9001 2015 Understanding
 
CV - DOC CONT
CV - DOC CONTCV - DOC CONT
CV - DOC CONT
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving Cars
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Similar to ACONEX-workflow System

Change management plan_template
Change management plan_templateChange management plan_template
Change management plan_templaterac2
 
Manual testing good notes
Manual testing good notesManual testing good notes
Manual testing good notesdkns0906
 
Responses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptxResponses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptxPANKITPATEL12
 
Project closure template v3.0
Project closure template v3.0Project closure template v3.0
Project closure template v3.0Aditya Pandey
 
nc_tracking.ppt
nc_tracking.pptnc_tracking.ppt
nc_tracking.pptChemistAnn
 
Designing A Waterfall Approach For Software Development Essay
Designing A Waterfall Approach For Software Development EssayDesigning A Waterfall Approach For Software Development Essay
Designing A Waterfall Approach For Software Development EssayAlison Reed
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approachJames (JD) Dimas
 
]project-open[ Workflow Developer Tutorial Part 2
]project-open[ Workflow Developer Tutorial Part 2]project-open[ Workflow Developer Tutorial Part 2
]project-open[ Workflow Developer Tutorial Part 2Klaus Hofeditz
 
Spm project planning
Spm project planning Spm project planning
Spm project planning Kanchana Devi
 
Asbo Vendor Performance Eval Chicago 092509
Asbo Vendor Performance Eval   Chicago   092509Asbo Vendor Performance Eval   Chicago   092509
Asbo Vendor Performance Eval Chicago 092509Richard Gay, CPPO, RSBO
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides SlideTeam
 

Similar to ACONEX-workflow System (20)

Change management plan_template
Change management plan_templateChange management plan_template
Change management plan_template
 
Stlc 12 Steps Ppt
Stlc 12 Steps PptStlc 12 Steps Ppt
Stlc 12 Steps Ppt
 
Manual testing good notes
Manual testing good notesManual testing good notes
Manual testing good notes
 
Responses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptxResponses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptx
 
Project closure template v3.0
Project closure template v3.0Project closure template v3.0
Project closure template v3.0
 
nc_tracking.ppt
nc_tracking.pptnc_tracking.ppt
nc_tracking.ppt
 
Designing A Waterfall Approach For Software Development Essay
Designing A Waterfall Approach For Software Development EssayDesigning A Waterfall Approach For Software Development Essay
Designing A Waterfall Approach For Software Development Essay
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
 
Wideband Delphi Estimation
Wideband Delphi EstimationWideband Delphi Estimation
Wideband Delphi Estimation
 
UAD/UCDP Seminar
UAD/UCDP SeminarUAD/UCDP Seminar
UAD/UCDP Seminar
 
]project-open[ Workflow Developer Tutorial Part 2
]project-open[ Workflow Developer Tutorial Part 2]project-open[ Workflow Developer Tutorial Part 2
]project-open[ Workflow Developer Tutorial Part 2
 
Spm project planning
Spm project planning Spm project planning
Spm project planning
 
SDLC Models.pdf
SDLC Models.pdfSDLC Models.pdf
SDLC Models.pdf
 
Asbo Vendor Performance Eval Chicago 092509
Asbo Vendor Performance Eval   Chicago   092509Asbo Vendor Performance Eval   Chicago   092509
Asbo Vendor Performance Eval Chicago 092509
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides
 
Manual Testing
Manual TestingManual Testing
Manual Testing
 
EA credit 3
EA credit 3EA credit 3
EA credit 3
 
Award Pre-Closeout, Closeout, Record Retention
Award Pre-Closeout, Closeout, Record RetentionAward Pre-Closeout, Closeout, Record Retention
Award Pre-Closeout, Closeout, Record Retention
 
3. ch 2-process model
3. ch 2-process model3. ch 2-process model
3. ch 2-process model
 

ACONEX-workflow System

  • 1. STEP BY STEP USE ACONEX WORK FLOW FOR FSP-KL PROJECT Prepare By: Jack Tan Company: Turner International Malaysia
  • 2. WHEN YOU RECEIVE WORK FLOW TRANSMITTAL FROM MAIN CONTRACTOR:-
  • 3. Step 1: Clicks Action Step 2: select review documents
  • 4. DOWNLOAD DOCUMENTS AND REVIEW Step 3: download and review documents
  • 5. Step 4: Select the review outcome, “A” Approved: CRCC to issue approved submittal back to the NSC/DSC, and the works may proceed “B” Approved as Noted: CRCC to issue approved submittal back to the NSC/DSC in full, and to ensure that any comments are addressed prior to works proceeding. “C” Revise and Resubmit or “D” Rejected: CRCC to issue submittal with all comments to the sub- contractor; follow up with the NSC for re-submission; check the resubmission against the consultants comments to ensure that all items have been addressed; after reviewing and ensuring that all comments have been addressed, resubmit to the consultant using the workflow process until “A” or “B” status is achieved.
  • 6. CONSULTANTS INPUT COMMENTS (IF ANY) Comments on each drawing/document can be entered here, or they can be manually written on the drawing and then uploaded to Supersede the previous file (see next slide)
  • 7. STEP 5: REPLACEMENT FILE (WITH CONSULTANTS COMMENTS AND SIGNATURE If comments have been manually written on the drawing/document, use the "paper clip" icon to upload the commented version (either from your computer, or from your files within Aconex). This function will Supersede the previous version so you must be sure that there has been no change to the Document Number/File name.
  • 8. REVIEW AND COMMENTS ON HARD COPY sample sample
  • 10. ACONEX HOW TO CREATE SUB- WORKFLOW TO CONSULTANTS
  • 11.  Design Consultant Receives, Reviews Submission – once the workflow is initiated, the Design Consultant has a specified time to respond to CRCC, The Consultant shall review the submittal, and initiate sub-workflows to secondary design consultants (if required) who’s input is needed for a full response.  Sub-workflow Initiated – If the Primary Consultant requires input or coordination from other Secondary consultants, they shall initiate a sub-workflow to each secondary consultant from whom input is needed  Secondary Consultants Review – Secondary Consultants typically have 7-10 days to respond to a sub- workflow, however this may be longer or shorter depending on the requirements of the Primary Consultant in order to not surpass the overall duration for review of the main workflow  Secondary Consultants Reply – Secondary Consultants reply to the sub-workflow  Secondary Design Consultants (any design consultant cc-ed on a workflow or who has been issued a Sub- workflow from the Primary Design Consultant) are responsible for:  Receiving and reviewing sub-workflows from the Primary Consultant, and issuing comments as related to their discipline  Reviewing workflows on which they were copied to ensure there is no conflict with their own design/works  If a conflict arises, notify the Primary Consultant immediately and work to coordinate with them on a response.  Returning comments to the Primary Consultant in time to allow response back to CRCC within the 21 day contractual requirement.  Answering any questions from CRCC, or the NSC/DSC about comments made in the submittal response.  Must ensure that CRCC is copied on any correspondence between them and the NSC/DSC
  • 12. FLOW CHART OF SUB-WORK FLOW Primary Consultant initiative Sub-Workflow to secondary consultants Secondary consultants review and comments send back to primary consultants Primary consultants receive additional information, workflow back to main contractor
  • 13. SELECT “ITEM/ISSUE“ FOR START SUB- WORK FLOW TO OTHER CONSULTANTS Select item need to sub workflow
  • 14. CLICKS “START SUBWORKFLOW” Click here for start work flow
  • 15. STEP BY STEP FOR SUB-WORKFLOW
  • 16. STEP 1, SELECT ITEM “2” AND STEP 2: SELECT TEMPLATE NAME “SW 1” FOR RFI, SELECT “SW 2” FOR OTHER SUBMITTALS. Step 1: item 2 Step 2: Select the template SW1, 2,and 3
  • 17. CLICK “NEXT” FOR THE NEXT STEP STEP 3: CLICKS NEXT
  • 18. STEP 4: INPUT AND SELECT THE INFORMATION IN YELLOW BOX Fill in the Attributes and the Reason for Issue from the drop down menus
  • 19. SELECT PERSON, WHICH IS ONLY REVIEW IN FINAL RESULTS. (IF ANY)
  • 20. SELECT THE PARTICIPANTS NAME Step 5: Clicks here Step 6: Input the participants name (based on Aconex protocol) Step 7: Clicks here NOTE: people entered in the "Participants" section can take action on the subworkflow; people entered in the "Cc" section can only view but can not respond to the subworkflow
  • 21. CLICK “SUBMIT” SUBMIT TO SECONDARY CONSULTANTS Step 8: Submit