CHANGE CONTROL
07/15/13 1
Table of content
1. Definitions ( Change and Change Control) 3
2. Tasks of Change Control 4
3. Principles of Change Control 5
4. Regulatory requirements 6
5. Elements of Change Control 7
6. Steps of Change Control 8
7. Classification of Change Control with example 9-10
8. Motives for Change Control 11
9. Documentation 12-13
10. Challenges of Change Control 14-16
11. Examples of Changes 17-18
07/15/13 2
CHANGE CONTROL
• Change refers to any modification in equipment, manufacturing
materials, facilities, utilities, design, formulations, processes,
packaging/labeling, computer systems, and all associated
documentation (SOPs, quality manual, etc.).
• According to WHO
“Change control is a formal system by which qualified representatives of
appropriate disciplines review proposed or actual changes that might
effect a validated status. The intent is to determine the need for the action
that would ensure that the system is maintained in a validated state”.
OR
• Change Control within a QMS is a formal process used to ensure
that a change to a system is introduced in a controlled and
coordinated manner.
07/15/13 3
TASKS OF CHANGE
CONTROL
• Change control minimizes the risk that changes can have on
the quality or process characteristics
• Each change to previously approved requirements requires a
review and authorization to keep the system in its original
state of “proven suitability”
• Formal change control guarantees that all changes are
evaluated for their effect on product quality or validation
status
• Change control programs have become recognized as essential
element of the pharmaceutical quality assurance system
07/15/13 4
PRINCIPLES OF CHANGE
CONTROL
• As the change control is considered an essential element of the
pharmaceutical quality assurance system, it is logical the
person responsible is quality assurance (QA representative,
QA head)
• Change control is not department-specific, rather the task of
the whole company
• The change control monitors all types of changes which can
influence the process or product quality and states the
measures necessary for implementing the change or decides
that a change should not be implemented
07/15/13 5
REGULATORY
REQUIREMENTS
• Any changes in the production and processes must be controlled-meaning
recorded, reviewed and approved by the QC unit.
• Manufacturers certified to ISO 9000:2000 and ISO 13485 standards are
required to ensure that any changes affecting QMS ( including product
requirements, deign and development changes) should be controlled.
• All changes should be made according to approved (approval implies
successful testing or thorough review/investigation) written company
policies and procedures.
• Change control procedures have to be written as a way of standardizing
instructions.
• In FDA and ISO environments, strict adherence to approved policies and
procedures is a key factor in keeping manufacturing operations in a state of
control and it is what makes change control crucial.
07/15/13 6
ELEMENTS OF CHANGE
CONTROL
• INITIATOR
Change is typically introduced by a initiator or originator. Initiating a changes
involves filling out a change request form which them moves through a process or
system of review and approval.
• CHANGE CONTROL COMMITTEE
May be a single entity for the whole company or may be one for the company’s
manufacturing site. It usually includes representatives from different departments
involved in production such as quality, manufacturing, regulatory affairs and
engineering. Depending on the change, committee may include legal, sales and
marketing departments.
• CHANGE ADMINISTRATOR
In pharmaceutical companies, cGMP requires that all changes must be reviewed
and approved by quality unit. In such companies, there must be a “Change
Administrator”, a role usually assumed by quality unit.
07/15/13 7
STEPS OF CHANGE
CONTROL
• Record / Classify ( Initiator initiates a change by filling a change request form. The
change control team then records and categorize it).
• Assess (Assessors then make their risk analysis typically by answering a set of
questions concerning risk, both to the business and to the process, and follow this
by making a judgment on who should carry out the change, then it is sent for
planning ).
• Plan ( Planning team plans the change in detail as well as construct a regression
plan in case if the change is backed out).
• Build / Test ( team then make solutions, which will then be tested. They will then
seek approval and request a time and date to carry out the implementation phase) .
• Implement ( In this phase, finalized solutions or changes are implemented).
• Evaluation ( after change has been implemented, it should be evaluated)
• Close / Gain Acceptance ( when change is implemented correctly then it will be
closed).
07/15/13 8
CLASSIFICATION OF
CHANGES
• A classification procedure nay help in determining the level of
testing, validation and documentation needed to justify the
changes of validated process.
• Changes may be classified as Major or Minor, depending on
the nature and extent of changes or the effect these changes
impart on process.
• They can also be categorized as specification changes, raw
material changes, equipment changes.
07/15/13 9
EXAMPLES OF CHANGES
Major change Minor change
Not requiring
control
Significance change
Influences product
quality of process
reliability
Influencing a unit
requiring control
No relevance to GMP or
authorization
Possible measures
(selection)
• Official licence
• Approval
• Revalidation
• Amendment
• Review
• Documentation
No relevance to GMP or
authorization
Examples
• Changes of
manufacturers:
other synthesis
route of a starting
material (other
impurities)
• Removal of
processes to other
site
• Change in the
product
composition
• Change to the
process parameters.
• Replacement of
apparatus part of the
same design
• Change of cleaning
agent for floors
• Change of laundry
for work clothes
(non-sterile or
antibiotics area)
• Change to working
times
• Installation of air
conditioner in
administrative area
• Change in purchase
procedure
07/15/13 10
MOTIVES FOR CHANGE
CONTROL
• Experiences from developmental and transfer phases.
• Results of process monitoring and statistical process control.
• Finding from quality control and stability results.
• Continuous improvement processes and processes
optimization.
• Strategic consideration ( changing suppliers, product transfer)
• CAPA processes
• Customer requests
• Regulations ( legal changes and official requirements)
07/15/13 11
DOCUMENTATION
07/15/13 12
DOCUMENTATION
• Change control requires a written procedure to establish at least the following steps:
– What type of changes does change control take into account?
– What are the requirements for urgent changes?
– For which areas does this operating procedure apply?
– Who can suggest changes?
– How are changes requested (forms, method of communication)?
– How are changes graded and who is responsible for the rating?
– How are the measures for carrying out the change established?
– Who is responsible for the implementation and monitoring of all measures?
– Who is included in the change control team?
– What are the duties of the change control team?
– How is the change documented (format, content, storage)?
– Who is responsible to authorize changes?
• All quality-relevant changes should be documented
• All actions to be taken, including the need for and extent of qualification or validation, should be
described
• The records can be archived in paper form or electronically
• When storing documents, raw data and other relevant documents for change should be kept accessible
• The documentation for the change procedure should show that the change was evaluated (risk analysis)
07/15/13 13
What makes change control so
challenging?
07/15/13 14
CHALLENGES IN CHANGE
CONTROL
There are many factors, but the following are the most common issues:
• Poor Communication - Lack of communication between departments, failure to
follow up or escalate change requests and delayed or inappropriate notification of
changes made by suppliers etc.
• Poor Turnaround - Timeliness can make or break a product's chances of
succeeding in the market. Companies that rely on a manual system to generate
data and to route and track submissions and change orders are likely to have poor
turnaround for change implementation because the system requires more time
and effort. The problem becomes worse when there is an unexpected change—a
deviation—and supporting data is not generated in a timely manner. Delays may
also result because of failure to recognize the urgency of a change and the
absence of a contingency plan for certain types of changes.
07/15/13 15
• Ineffective Documentation - A manual system makes it more difficult to update
documentation, including revision history, and to find/retrieve necessary data to
support a change. The proposed change may be delayed when an outdated record
does not show revision history, or testing may be duplicated because
documentation has not been updated with results of a previous testing.
• Training not integrated with Change - Adequate training of personnel is a
prerequisite in both FDA and ISO environments. When training control is not
connected to the rest of the quality process, such as in manual systems, keeping
training current with procedures that have changed can be difficult. Training tasks
can easily fall through the cracks if employees are not vigilant in seeking them.
07/15/13 16
EXAMPLES OF CHANGES
07/15/13 17
Examples of changes
 Changes to the cleaning procedure
- use of a new cleaning agent
- change in concentration / volumes of cleaning agent
- change in volumes of rinsing water
- change of cleaning process parameters
 Changes to the production equipment
- changes to the CIP equipment
- changes to / replacement of equipment parts (difficult to give detailed examples
as these changes are too diverse)
- change of process parameters
 Changes to the product
- changes to composition (reformulation with different excipients)
- changes to the manufacturing process (i.e. transfer of a product)
 Changes to HVAC system / unidirectional flow
 Changes in lay-out (i.e. implementation of a pass-box07/15/13 18

More Related Content

What's hot

BMR (Batch Manufacturing Record)
BMR (Batch Manufacturing Record)BMR (Batch Manufacturing Record)
BMR (Batch Manufacturing Record)
Ram Mohan S R
 
Bulk active post approval changes
Bulk active post approval changesBulk active post approval changes
Bulk active post approval changes
bdvfgbdhg
 

What's hot (20)

Documentation of technology Transfer .pptx
Documentation of technology Transfer .pptxDocumentation of technology Transfer .pptx
Documentation of technology Transfer .pptx
 
Process validation and its types
Process validation and its typesProcess validation and its types
Process validation and its types
 
cGMP.
cGMP.cGMP.
cGMP.
 
Pharmaceutical documentation
Pharmaceutical documentationPharmaceutical documentation
Pharmaceutical documentation
 
CDER
CDERCDER
CDER
 
Vendor qualification
Vendor qualification Vendor qualification
Vendor qualification
 
Pharmaceutical validation & it's types
 Pharmaceutical validation & it's types Pharmaceutical validation & it's types
Pharmaceutical validation & it's types
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
 
Out of specification shravan
Out of specification shravanOut of specification shravan
Out of specification shravan
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Pharmaceutical inspection convention
Pharmaceutical inspection conventionPharmaceutical inspection convention
Pharmaceutical inspection convention
 
Quality Risk Management
Quality Risk ManagementQuality Risk Management
Quality Risk Management
 
Quality audit plan
Quality audit planQuality audit plan
Quality audit plan
 
Technology transfer plan & exhibit
Technology transfer plan & exhibit Technology transfer plan & exhibit
Technology transfer plan & exhibit
 
Process validation
Process validationProcess validation
Process validation
 
BMR (Batch Manufacturing Record)
BMR (Batch Manufacturing Record)BMR (Batch Manufacturing Record)
BMR (Batch Manufacturing Record)
 
Bulk active post approval changes
Bulk active post approval changesBulk active post approval changes
Bulk active post approval changes
 
Manufacturing operation and control
Manufacturing operation and controlManufacturing operation and control
Manufacturing operation and control
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management System
 
Ipqc
Ipqc Ipqc
Ipqc
 

Similar to Change control

ISO 13485.2016 Training (Sample)
ISO 13485.2016 Training (Sample)ISO 13485.2016 Training (Sample)
ISO 13485.2016 Training (Sample)
Karen Boyd, ASQ CQA
 

Similar to Change control (20)

Change Control.pptx
Change Control.pptxChange Control.pptx
Change Control.pptx
 
Regulatory aspect of pharmaceutical change control system
Regulatory aspect of pharmaceutical  change control systemRegulatory aspect of pharmaceutical  change control system
Regulatory aspect of pharmaceutical change control system
 
Change management and control lessons from a consent decree
Change management and control lessons from a consent decreeChange management and control lessons from a consent decree
Change management and control lessons from a consent decree
 
Change management system
Change management systemChange management system
Change management system
 
GMP Training: Handling of deviation
GMP Training: Handling of deviationGMP Training: Handling of deviation
GMP Training: Handling of deviation
 
Gmp change control by amsavel
Gmp  change control  by amsavelGmp  change control  by amsavel
Gmp change control by amsavel
 
Specific Detailed Changes to the New ISO 13485:2016
Specific Detailed Changes to the New ISO 13485:2016Specific Detailed Changes to the New ISO 13485:2016
Specific Detailed Changes to the New ISO 13485:2016
 
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
 
Presentation on-change-control
Presentation on-change-controlPresentation on-change-control
Presentation on-change-control
 
calulation of yields, production record review,change control
calulation of yields, production record review,change control calulation of yields, production record review,change control
calulation of yields, production record review,change control
 
CCF PPT By Amit Gupta.pptx
CCF PPT By Amit Gupta.pptxCCF PPT By Amit Gupta.pptx
CCF PPT By Amit Gupta.pptx
 
Technology Transfer
Technology Transfer Technology Transfer
Technology Transfer
 
change control
change controlchange control
change control
 
Change control request
Change control requestChange control request
Change control request
 
ISO 13485.2016 Training (Sample)
ISO 13485.2016 Training (Sample)ISO 13485.2016 Training (Sample)
ISO 13485.2016 Training (Sample)
 
Change control
Change controlChange control
Change control
 
calulation of yields, production record review,change control
calulation of yields, production record review,change control calulation of yields, production record review,change control
calulation of yields, production record review,change control
 
Deviation control system
Deviation control systemDeviation control system
Deviation control system
 
Pqs220610.Ppt
Pqs220610.PptPqs220610.Ppt
Pqs220610.Ppt
 
Pqs220610.ppt
Pqs220610.pptPqs220610.ppt
Pqs220610.ppt
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 

Change control

  • 2. Table of content 1. Definitions ( Change and Change Control) 3 2. Tasks of Change Control 4 3. Principles of Change Control 5 4. Regulatory requirements 6 5. Elements of Change Control 7 6. Steps of Change Control 8 7. Classification of Change Control with example 9-10 8. Motives for Change Control 11 9. Documentation 12-13 10. Challenges of Change Control 14-16 11. Examples of Changes 17-18 07/15/13 2
  • 3. CHANGE CONTROL • Change refers to any modification in equipment, manufacturing materials, facilities, utilities, design, formulations, processes, packaging/labeling, computer systems, and all associated documentation (SOPs, quality manual, etc.). • According to WHO “Change control is a formal system by which qualified representatives of appropriate disciplines review proposed or actual changes that might effect a validated status. The intent is to determine the need for the action that would ensure that the system is maintained in a validated state”. OR • Change Control within a QMS is a formal process used to ensure that a change to a system is introduced in a controlled and coordinated manner. 07/15/13 3
  • 4. TASKS OF CHANGE CONTROL • Change control minimizes the risk that changes can have on the quality or process characteristics • Each change to previously approved requirements requires a review and authorization to keep the system in its original state of “proven suitability” • Formal change control guarantees that all changes are evaluated for their effect on product quality or validation status • Change control programs have become recognized as essential element of the pharmaceutical quality assurance system 07/15/13 4
  • 5. PRINCIPLES OF CHANGE CONTROL • As the change control is considered an essential element of the pharmaceutical quality assurance system, it is logical the person responsible is quality assurance (QA representative, QA head) • Change control is not department-specific, rather the task of the whole company • The change control monitors all types of changes which can influence the process or product quality and states the measures necessary for implementing the change or decides that a change should not be implemented 07/15/13 5
  • 6. REGULATORY REQUIREMENTS • Any changes in the production and processes must be controlled-meaning recorded, reviewed and approved by the QC unit. • Manufacturers certified to ISO 9000:2000 and ISO 13485 standards are required to ensure that any changes affecting QMS ( including product requirements, deign and development changes) should be controlled. • All changes should be made according to approved (approval implies successful testing or thorough review/investigation) written company policies and procedures. • Change control procedures have to be written as a way of standardizing instructions. • In FDA and ISO environments, strict adherence to approved policies and procedures is a key factor in keeping manufacturing operations in a state of control and it is what makes change control crucial. 07/15/13 6
  • 7. ELEMENTS OF CHANGE CONTROL • INITIATOR Change is typically introduced by a initiator or originator. Initiating a changes involves filling out a change request form which them moves through a process or system of review and approval. • CHANGE CONTROL COMMITTEE May be a single entity for the whole company or may be one for the company’s manufacturing site. It usually includes representatives from different departments involved in production such as quality, manufacturing, regulatory affairs and engineering. Depending on the change, committee may include legal, sales and marketing departments. • CHANGE ADMINISTRATOR In pharmaceutical companies, cGMP requires that all changes must be reviewed and approved by quality unit. In such companies, there must be a “Change Administrator”, a role usually assumed by quality unit. 07/15/13 7
  • 8. STEPS OF CHANGE CONTROL • Record / Classify ( Initiator initiates a change by filling a change request form. The change control team then records and categorize it). • Assess (Assessors then make their risk analysis typically by answering a set of questions concerning risk, both to the business and to the process, and follow this by making a judgment on who should carry out the change, then it is sent for planning ). • Plan ( Planning team plans the change in detail as well as construct a regression plan in case if the change is backed out). • Build / Test ( team then make solutions, which will then be tested. They will then seek approval and request a time and date to carry out the implementation phase) . • Implement ( In this phase, finalized solutions or changes are implemented). • Evaluation ( after change has been implemented, it should be evaluated) • Close / Gain Acceptance ( when change is implemented correctly then it will be closed). 07/15/13 8
  • 9. CLASSIFICATION OF CHANGES • A classification procedure nay help in determining the level of testing, validation and documentation needed to justify the changes of validated process. • Changes may be classified as Major or Minor, depending on the nature and extent of changes or the effect these changes impart on process. • They can also be categorized as specification changes, raw material changes, equipment changes. 07/15/13 9
  • 10. EXAMPLES OF CHANGES Major change Minor change Not requiring control Significance change Influences product quality of process reliability Influencing a unit requiring control No relevance to GMP or authorization Possible measures (selection) • Official licence • Approval • Revalidation • Amendment • Review • Documentation No relevance to GMP or authorization Examples • Changes of manufacturers: other synthesis route of a starting material (other impurities) • Removal of processes to other site • Change in the product composition • Change to the process parameters. • Replacement of apparatus part of the same design • Change of cleaning agent for floors • Change of laundry for work clothes (non-sterile or antibiotics area) • Change to working times • Installation of air conditioner in administrative area • Change in purchase procedure 07/15/13 10
  • 11. MOTIVES FOR CHANGE CONTROL • Experiences from developmental and transfer phases. • Results of process monitoring and statistical process control. • Finding from quality control and stability results. • Continuous improvement processes and processes optimization. • Strategic consideration ( changing suppliers, product transfer) • CAPA processes • Customer requests • Regulations ( legal changes and official requirements) 07/15/13 11
  • 13. DOCUMENTATION • Change control requires a written procedure to establish at least the following steps: – What type of changes does change control take into account? – What are the requirements for urgent changes? – For which areas does this operating procedure apply? – Who can suggest changes? – How are changes requested (forms, method of communication)? – How are changes graded and who is responsible for the rating? – How are the measures for carrying out the change established? – Who is responsible for the implementation and monitoring of all measures? – Who is included in the change control team? – What are the duties of the change control team? – How is the change documented (format, content, storage)? – Who is responsible to authorize changes? • All quality-relevant changes should be documented • All actions to be taken, including the need for and extent of qualification or validation, should be described • The records can be archived in paper form or electronically • When storing documents, raw data and other relevant documents for change should be kept accessible • The documentation for the change procedure should show that the change was evaluated (risk analysis) 07/15/13 13
  • 14. What makes change control so challenging? 07/15/13 14
  • 15. CHALLENGES IN CHANGE CONTROL There are many factors, but the following are the most common issues: • Poor Communication - Lack of communication between departments, failure to follow up or escalate change requests and delayed or inappropriate notification of changes made by suppliers etc. • Poor Turnaround - Timeliness can make or break a product's chances of succeeding in the market. Companies that rely on a manual system to generate data and to route and track submissions and change orders are likely to have poor turnaround for change implementation because the system requires more time and effort. The problem becomes worse when there is an unexpected change—a deviation—and supporting data is not generated in a timely manner. Delays may also result because of failure to recognize the urgency of a change and the absence of a contingency plan for certain types of changes. 07/15/13 15
  • 16. • Ineffective Documentation - A manual system makes it more difficult to update documentation, including revision history, and to find/retrieve necessary data to support a change. The proposed change may be delayed when an outdated record does not show revision history, or testing may be duplicated because documentation has not been updated with results of a previous testing. • Training not integrated with Change - Adequate training of personnel is a prerequisite in both FDA and ISO environments. When training control is not connected to the rest of the quality process, such as in manual systems, keeping training current with procedures that have changed can be difficult. Training tasks can easily fall through the cracks if employees are not vigilant in seeking them. 07/15/13 16
  • 18. Examples of changes  Changes to the cleaning procedure - use of a new cleaning agent - change in concentration / volumes of cleaning agent - change in volumes of rinsing water - change of cleaning process parameters  Changes to the production equipment - changes to the CIP equipment - changes to / replacement of equipment parts (difficult to give detailed examples as these changes are too diverse) - change of process parameters  Changes to the product - changes to composition (reformulation with different excipients) - changes to the manufacturing process (i.e. transfer of a product)  Changes to HVAC system / unidirectional flow  Changes in lay-out (i.e. implementation of a pass-box07/15/13 18