Establishment of K.A.CARE


                     Royal Order A/35
                            April 17, 2010




                                             1
Royal Vision




               2
K.A.CARE Mandate


       The City shall aim at contributing
      to the sustainable development in
      the Kingdom through utilization of
       science, research, and industries
        related to atomic and renewable
       energy for peaceful purposes in a
          way that leads to raising the
       standards of living and quality of
               life in the Kingdom
                                            3
Towards energy sustainability


                                                      The Kingdom of
       The Kingdom of Energy
                                                      Sustainable Energy




                         Towards
                          greater
                       sustainability




             A new energy mix to meet local needs as well as maintain
                  leadership role in the global energy landscape
                                                                           4
A decision that was not taken lightly




      Saudi Arabia has the world’s largest oil
       reserves

      Saudi Arabia has the 5th largest proven
       gas reserves

         Saudi Arabia has the world’s largest swing
          capacity for oil production

             Why is Saudi Arabia is promoting the introduction of
                            alternative energies?
                                                                    5
Energy growth drivers




                Population growth at an annual rate
                of 3.2% (2004 – 2010)
                Robust economic growth (4.3%
                2008, 0.1% 2009, 3.8% 2010)
                Industrial production growth of
                3.1% in 2009


                                                      6
Projected growth in electricity peak demand


   Electricity peak demand
   GW

                               120



                70

    45




 2010          2020          2030



              At current pace, energy peak demand is expected to
                            exceed 120 GW by 2030
                                                                   7
Growth in oil demand between 2007 and 2010




        30

        25

        20

        15

        10

         5

         0

        -5

        -10
              Saudi Arabia   Asia   North America   Europe   Middle East   Latin America




                                                                                           8
Government allocation for water-related spending




              50                                                                                                   9
              45                                                                                                   8.5
              40
                                                                                                                   8
              35
              30                                                                                                   7.5
   (SR, bn)




              25                                                                                                   7
              20                                                                                                         (%)
                                                                                                                   6.5
              15
                                                                                                                   6
              10
              5                                                                                                    5.5

              0                                                                                                    5
                   2004        2005           2006           2007            2008            2009           2010

                          Water, electricity and infrastructure allocation          Ratio to total state budget




                                                                                                                               9
SEC planned retiring capacity



             140,000


             120,000


             100,000
                                    The Gap By
              80,000                   2030
        MW




              60,000


              40,000


              20,000            Today’s Fuel Mix
                                Extended to 2030
                  0




                                                 10
Forecast of energy demand growth




             3.4*                                                            8.3*
             MBOE                                                           MBOE

             2010
                                                                             2028

                   At current pace, domestic consumption of fossil fuels is
                               expected to nearly triple by 2030

   * Total local consumption (transportation, industry, electricity, etc)           11
Forecasted growth of alternative energy capacity worldwide




                                             1,545       4.7

                                                        Growth
                                   1,105                 rate


                          533



                          2007      2020     2030

             % Capacity   12%       17%      19%

                       % of Installed Capacity

                                                                 12
K.A.CARE vision



             The vision of K.A.CARE is to be:

      the driving force for making atomic and
       renewable energy an integral part of a
        national sustainable energy mix, by
      creating and leveraging the competitive
      advantages of relevant technologies for
       the social and economic development
          of the Kingdom of Saudi Arabia

                                                13
Gradual introduction of renewable and atomic energy


              Nuclear
              Renewables
              Fossil
    TWh




              Alternative energy will gradually replace fossil based generation

                                                                                  14
Sustainable energy outlook for Saudi Arabia

                                                     Wind/Other Ren


                                                     Solar PV


                                                     Solar CST
  Needed Capacity (MW)




                                                     Nuclear


                                                     New Required Fossil


                                                     New Committed


                                                     Existing Diesel


                                                     Existing HFO


                                                     Existing Crude


                                                     Existing Gas

                         2010   2020   2030   2050

                                                                       15
The mandate and responsibilities of K.A.CARE



                                     Policies &
                                                  Execution
                                     Strategies


                                                              Investment
                        Regulatory                            & Business




             R&D &                                                         Investment
           Technology                                                       Relations




      Human
      Capacity
                          K.A.CARE’s Mandate                                       Facilities




                                                                                                16
R&D&T



       National legal
        Framework
                                                  Pillars of sustainable development




        Value Chain



     National Economic
        Framework
                         Sustainable Energy Mix




       National HR
17
New implementation paradigm


 1.    Long Term Commitment from all Partners
          Technology
           Education / Training

 2. Contribution to GDP Creation:

           Job creation
           Value chain development
           Economic development spillovers
           Electricity generation
                                                18
Partnership with U.S. companies



   • Expected major role for U.S. FDI in the Saudi
     alternative energy sector:
       • FDI in Saudi Arabia exceeds $200 billion
       • U.S. has the lion share of this stock at 18%

   • Expected outcome of partnership:
       • Comprehensive value chain integration with
         electricity generation
       • Localization of niche products and services
       • Seamless integration with international product
         chains and global energy services

                                                           19
Reaping the fruits of sustainable development




                                                Sustainable and efficient
                                                energy future for KSA
                              Sustainable
                              alternative
    “… use of alternative     energy mix
    sustainable and
    reliable resources ...
    reduces dependency
    on hydrocarbon
    resources … and keep      Balanced
    them as a source for      execution
    income for a longer       plans
    period of time...”



                                                                            20
Bases for constructing recommended energy mix


  • Peak demand reduction from energy efficiency and
    conservation.
  • Liquid fuel (crude oil, diesel, and HFO) that will be
    saved by the proposed energy mix.
  • Generation related matters, such as:
     • load factors and load management
     • generation technologies and their practical
       limitations
  • Human capacity building potential.
  • International product chains and the Saudi role, in
    the alternative energy sector.
  • Local value chain
                                                        21
1
      15
      29
      43
      57




           60%
      71
      85
      99
     113
     127
     141
     155
     169
                        Seasonal peak variation in Saudi Arabia




     183
     197
     211
     225
     239
     253
     267
     281
     295
     309
                 100%




     323
     337
     351
22




     365
Typical daily demand profile variation for Saudi Arabia




            Demand profile




                                        GW
            for a summer day
            in August




                                        GW
            Demand profile
            for a winter day
            in January




                                                                                11:00
                                                                                        13:00
                                                                                                15:00
                                                                                                        17:00
                                                                                                                19:00
                                                                                                                        21:00
                                                                                                                                23:00
                                             1:00
                                                    3:00
                                                           5:00
                                                                  7:00
                                                                         9:00
                                                                                                                                        23
GW
      1
      15
      29
      43
      57
      71
      85
      99
     113
     127
     141
     155
     169
     183
     197
                              Annual day-night load variation for Saudi Arabia




     211
     225
     239
     253
           Night




     267
     281
     295
     309
                        Day




     323
     337
     351
24




     365
Electricity load profile breakdown in Saudi Arabia


                         3     Daily summer peak load


                                                                              Additional summer load = 20%
                                                                      2
                                                                                   of annual peak load




                    1        Average annual load = 65% of annual peak load
 1
     15
          29
               43
                    57
                         71
                              85
                                   99
                                        113
                                              127
                                                    141
                                                          155
                                                                169
                                                                      183
                                                                            197
                                                                                  211
                                                                                        225
                                                                                              239
                                                                                                    253
                                                                                                          267
                                                                                                                281
                                                                                                                      295
                                                                                                                            309
                                                                                                                                  323
                                                                                                                                        337
                                                                                                                                              351
                                                                                                                                                    365
                                                                                                                                                     25
Suitable technology choices for Saudi load profile


                                   3     Fossil – solar


                                                                  2                Solar - Fossil




                                               Nuclear – geothermal (closed cycle) – Waste-to-
                                   1
                                                energy – Concentrated solar (storage) – Fossil
 1
     15
          29
               43
                    57
                         71
                              85
                                   99
                                        113
                                              127
                                                    141
                                                          155
                                                                169
                                                                      183
                                                                            197
                                                                                  211
                                                                                        225
                                                                                              239
                                                                                                    253
                                                                                                          267
                                                                                                                281
                                                                                                                      295
                                                                                                                            309
                                                                                                                                  323
                                                                                                                                        337
                                                                                                                                              351
                                                                                                                                                    365
                                                                                                                                                    26
Criteria used to narrow down choices of energy mix




      Plausible energy mix criteria:
         • Sustainability
         • Economic viability
         • Technical feasibility
         • Enabling of further development

      Optimum energy mix criteria:
        • Must deliver the required capacity both
           cost-effectively and in a timely fashion

                                                      27
Illustrative example of a plausible energy mix


                                                  Wind /
                                                 Other Ren

                                                  Solar PV

                                                 Solar CST


                                                  Nuclear


                                                   New
                                                 Additional
                                                   Fossil


Present
 Fossil
  Mix




                                                              28
Comprehensive stakeholder engagement


    Saudi Arabia:
        •   Government agencies, regulator and utility
        •   Private sector
    International:
        •   Technology providers
        •   Project developers
        •   Utilities

    Activities:
      • Workshops, visits and meetings (hundreds)
      • Case studies (hundreds)
                                                         29
Cost benefit analysis of proposed alternative energy mix


       CAPEX plus OPEX




         Additional      Additional
          capital          Opex
           cost            Costs

                                                           30
Cost benefit analysis of proposed alternative energy mix


     CAPEX plus OPEX plus
     revenue from oil saved




         Additional     Additional      Value of
          capital         Opex             oil
           cost           Costs          saved

                                                           31
Cost benefit analysis of proposed alternative energy mix

   CAPEX plus OPEX plus
    revenue from oil saved
   plus investment in value
  chain and human capacity




                                                       Industry
         Additional     Additional      Value of         and
          capital         Opex             oil          human
           cost           Costs          saved          capital

                                                                  32
K.A.CARE commitment to developing alternative energy


 1. Transparency

 2. Safety and international best practices

 3. Non-proliferation and highest standards of Safeguards

 4. Localization of the nuclear and renewable value chain
    in Saudi Arabia

 5. Transparent Incentives, Off Taking, and Funding
    Mechanism


                                                            33
Components of K.A.CARE City

  The KA-CARE city will include the
  following
  ▪ National Sustainable Energy
      Laboratory
  ▪   Industrial clusters
  ▪   Alternative energy farm
  ▪   Energy park
  ▪   Technical training institutions
  ▪   Technical incubators
  ▪   Commercial facilities
  ▪   Convention centers, exhibition
      halls and other public amenities
  ▪ KA-CARE headquarters and
      residential facilities
  ▪ Basic infrastructure

                                         34
K.A.CARE City site characteristics




                                     35
A global initiative




                      36
Virtual tour of the K.A.CARE City




                                    37
First phase development plan for K.A.CARE City



                                                  3-5 year R&D focused develop-
City infrastructure
                                                  ment program for 8,000 to 10,000
requirements for Phase 1
                                                  residents (including 800 scientists)
                           1.5 GW of renewables




                                                                                  38
Summary



  1. Saudi Arabia needs to add more than 80 GW of
     generation capacity by 2032. The additional
     capacity, anchored in energy conservation, would
     include nuclear, and renewable capacity. The
     investment required is in the hundreds of billion US
     dollars.
  2. Saudi Arabia has been a favorable destination of
     U.S. FDI and exports, and we would certainly
     encourage this trend to grow in the renewable and
     nuclear energy sectors, as well as in energy
     conservation, conventional energy and energy
     support services.
                                                            39
Thank you

More Related Content

What's hot

2012 Energy Summit: The Business of Sustainability
2012 Energy Summit: The Business of Sustainability2012 Energy Summit: The Business of Sustainability
2012 Energy Summit: The Business of SustainabilityCharlotte Chamber
 
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)finance49
 
E-Updates_Apr12—Indian & Global Economic Indicators
E-Updates_Apr12—Indian & Global Economic IndicatorsE-Updates_Apr12—Indian & Global Economic Indicators
E-Updates_Apr12—Indian & Global Economic IndicatorsEcofin Surge
 
Day 1 Requirements of the Arab EE Guideline & responsibilities for the mandat...
Day 1 Requirements of the Arab EE Guideline & responsibilities for the mandat...Day 1 Requirements of the Arab EE Guideline & responsibilities for the mandat...
Day 1 Requirements of the Arab EE Guideline & responsibilities for the mandat...RCREEE
 
Global market outlook_until_2013 (1)
Global market outlook_until_2013 (1)Global market outlook_until_2013 (1)
Global market outlook_until_2013 (1)guest1c66d59
 
General Motors- Events & Presentations 2008 Jp Morgan Auto Conference Gm Acti...
General Motors- Events & Presentations 2008 Jp Morgan Auto Conference Gm Acti...General Motors- Events & Presentations 2008 Jp Morgan Auto Conference Gm Acti...
General Motors- Events & Presentations 2008 Jp Morgan Auto Conference Gm Acti...Manya Mohan
 
Jakubowska Teresa - BIOGAS IN POMERANIA - development strategy woju pazdzi...
Jakubowska Teresa - BIOGAS IN POMERANIA - development strategy woju pazdzi...Jakubowska Teresa - BIOGAS IN POMERANIA - development strategy woju pazdzi...
Jakubowska Teresa - BIOGAS IN POMERANIA - development strategy woju pazdzi...Pomcert
 
The Baltic Outlook: Update, July 2009
The Baltic Outlook: Update, July 2009The Baltic Outlook: Update, July 2009
The Baltic Outlook: Update, July 2009Swedbank
 
Fev @ Take A Breath 2012
Fev @ Take A Breath 2012Fev @ Take A Breath 2012
Fev @ Take A Breath 2012Loccioni Group
 
terex BofA050808
terex BofA050808terex BofA050808
terex BofA050808finance42
 
Utilization of wind energy in indonesia
Utilization of wind energy in indonesiaUtilization of wind energy in indonesia
Utilization of wind energy in indonesiaDickdick Maulana
 
Linked In Logica Utilities Outlook 040210
Linked In Logica Utilities Outlook 040210Linked In Logica Utilities Outlook 040210
Linked In Logica Utilities Outlook 040210shahzad6708
 
terex Merrill050808
terex Merrill050808terex Merrill050808
terex Merrill050808finance42
 

What's hot (18)

2011 Wind Technologies Market Report
2011 Wind Technologies Market Report2011 Wind Technologies Market Report
2011 Wind Technologies Market Report
 
2012 Energy Summit: The Business of Sustainability
2012 Energy Summit: The Business of Sustainability2012 Energy Summit: The Business of Sustainability
2012 Energy Summit: The Business of Sustainability
 
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)el paso  11_20_Hopper_BofACreditConferenceFINALv2(Web)
el paso 11_20_Hopper_BofACreditConferenceFINALv2(Web)
 
E-Updates_Apr12—Indian & Global Economic Indicators
E-Updates_Apr12—Indian & Global Economic IndicatorsE-Updates_Apr12—Indian & Global Economic Indicators
E-Updates_Apr12—Indian & Global Economic Indicators
 
Day 1 Requirements of the Arab EE Guideline & responsibilities for the mandat...
Day 1 Requirements of the Arab EE Guideline & responsibilities for the mandat...Day 1 Requirements of the Arab EE Guideline & responsibilities for the mandat...
Day 1 Requirements of the Arab EE Guideline & responsibilities for the mandat...
 
Alterra presentation DEC
Alterra presentation   DECAlterra presentation   DEC
Alterra presentation DEC
 
Mr Francois Nguyen
Mr Francois NguyenMr Francois Nguyen
Mr Francois Nguyen
 
Weekly Fundamental Review Company Report( 21st 27th Feb 2010)
Weekly Fundamental Review  Company Report( 21st 27th Feb 2010)Weekly Fundamental Review  Company Report( 21st 27th Feb 2010)
Weekly Fundamental Review Company Report( 21st 27th Feb 2010)
 
Global market outlook_until_2013 (1)
Global market outlook_until_2013 (1)Global market outlook_until_2013 (1)
Global market outlook_until_2013 (1)
 
General Motors- Events & Presentations 2008 Jp Morgan Auto Conference Gm Acti...
General Motors- Events & Presentations 2008 Jp Morgan Auto Conference Gm Acti...General Motors- Events & Presentations 2008 Jp Morgan Auto Conference Gm Acti...
General Motors- Events & Presentations 2008 Jp Morgan Auto Conference Gm Acti...
 
Jakubowska Teresa - BIOGAS IN POMERANIA - development strategy woju pazdzi...
Jakubowska Teresa - BIOGAS IN POMERANIA - development strategy woju pazdzi...Jakubowska Teresa - BIOGAS IN POMERANIA - development strategy woju pazdzi...
Jakubowska Teresa - BIOGAS IN POMERANIA - development strategy woju pazdzi...
 
Renewable Energy: An IEA Perspective
Renewable Energy: An IEA PerspectiveRenewable Energy: An IEA Perspective
Renewable Energy: An IEA Perspective
 
The Baltic Outlook: Update, July 2009
The Baltic Outlook: Update, July 2009The Baltic Outlook: Update, July 2009
The Baltic Outlook: Update, July 2009
 
Fev @ Take A Breath 2012
Fev @ Take A Breath 2012Fev @ Take A Breath 2012
Fev @ Take A Breath 2012
 
terex BofA050808
terex BofA050808terex BofA050808
terex BofA050808
 
Utilization of wind energy in indonesia
Utilization of wind energy in indonesiaUtilization of wind energy in indonesia
Utilization of wind energy in indonesia
 
Linked In Logica Utilities Outlook 040210
Linked In Logica Utilities Outlook 040210Linked In Logica Utilities Outlook 040210
Linked In Logica Utilities Outlook 040210
 
terex Merrill050808
terex Merrill050808terex Merrill050808
terex Merrill050808
 

Similar to Nuclear and Renewable Energy: Building Resources for the Future

Malaysia - Renewable Energy: Sexy or Dull?
Malaysia - Renewable Energy: Sexy or Dull?Malaysia - Renewable Energy: Sexy or Dull?
Malaysia - Renewable Energy: Sexy or Dull?Volker Friedrich
 
Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Ines Kkumar
 
Chevron at Barclays Capital 2009 CEO Energy/Power Conference
Chevron at Barclays Capital 2009 CEO Energy/Power ConferenceChevron at Barclays Capital 2009 CEO Energy/Power Conference
Chevron at Barclays Capital 2009 CEO Energy/Power Conferenceinvestorrelation
 
India Biomass Power Sector
India Biomass Power SectorIndia Biomass Power Sector
India Biomass Power Sectorguest067b99
 
CCXG Forum, September 2022, Tanguy de Bienassis
CCXG Forum, September 2022, Tanguy de BienassisCCXG Forum, September 2022, Tanguy de Bienassis
CCXG Forum, September 2022, Tanguy de BienassisOECD Environment
 
Development Bank of Jamaica Presentation by Alexander Ochs
Development Bank of Jamaica Presentation by Alexander OchsDevelopment Bank of Jamaica Presentation by Alexander Ochs
Development Bank of Jamaica Presentation by Alexander OchsWorldwatchEn
 
Webcast Business Plan 2011-2015 Presentation
Webcast Business Plan 2011-2015 Presentation Webcast Business Plan 2011-2015 Presentation
Webcast Business Plan 2011-2015 Presentation Petrobras
 
Ceew ceew cef market handbook q1 2020-21 10 sep20
Ceew   ceew cef market handbook q1 2020-21 10 sep20Ceew   ceew cef market handbook q1 2020-21 10 sep20
Ceew ceew cef market handbook q1 2020-21 10 sep20Mayank Munjal
 
AREVA, business & strategy overview - January 2009 - Appendix 7
AREVA, business & strategy overview - January 2009 - Appendix 7AREVA, business & strategy overview - January 2009 - Appendix 7
AREVA, business & strategy overview - January 2009 - Appendix 7AREVA
 
China energy roadmap slides
China energy roadmap slidesChina energy roadmap slides
China energy roadmap slidesRoger Atkins
 
Benchmark InfraBees Fund
Benchmark InfraBees FundBenchmark InfraBees Fund
Benchmark InfraBees Fundgranny2010
 
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Rick Borry
 
Ofgem Presentation at Economist Energy Summit
Ofgem Presentation at Economist Energy SummitOfgem Presentation at Economist Energy Summit
Ofgem Presentation at Economist Energy Summitcarbonbrief
 
GE- Goldman Sachs Fourth Annual Alternative Energy Conference
GE- Goldman Sachs Fourth Annual Alternative Energy Conference GE- Goldman Sachs Fourth Annual Alternative Energy Conference
GE- Goldman Sachs Fourth Annual Alternative Energy Conference Manya Mohan
 

Similar to Nuclear and Renewable Energy: Building Resources for the Future (20)

Energy Issues in the New Congress
Energy Issues in the New CongressEnergy Issues in the New Congress
Energy Issues in the New Congress
 
Malaysia - Renewable Energy: Sexy or Dull?
Malaysia - Renewable Energy: Sexy or Dull?Malaysia - Renewable Energy: Sexy or Dull?
Malaysia - Renewable Energy: Sexy or Dull?
 
Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10
 
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
 
Chevron at Barclays Capital 2009 CEO Energy/Power Conference
Chevron at Barclays Capital 2009 CEO Energy/Power ConferenceChevron at Barclays Capital 2009 CEO Energy/Power Conference
Chevron at Barclays Capital 2009 CEO Energy/Power Conference
 
EDP Energias do Brasil Presentation
EDP Energias do Brasil PresentationEDP Energias do Brasil Presentation
EDP Energias do Brasil Presentation
 
Expanding the Commercial Partnership
Expanding the Commercial PartnershipExpanding the Commercial Partnership
Expanding the Commercial Partnership
 
Khateeb
KhateebKhateeb
Khateeb
 
Barrack
BarrackBarrack
Barrack
 
India Biomass Power Sector
India Biomass Power SectorIndia Biomass Power Sector
India Biomass Power Sector
 
CCXG Forum, September 2022, Tanguy de Bienassis
CCXG Forum, September 2022, Tanguy de BienassisCCXG Forum, September 2022, Tanguy de Bienassis
CCXG Forum, September 2022, Tanguy de Bienassis
 
Development Bank of Jamaica Presentation by Alexander Ochs
Development Bank of Jamaica Presentation by Alexander OchsDevelopment Bank of Jamaica Presentation by Alexander Ochs
Development Bank of Jamaica Presentation by Alexander Ochs
 
Webcast Business Plan 2011-2015 Presentation
Webcast Business Plan 2011-2015 Presentation Webcast Business Plan 2011-2015 Presentation
Webcast Business Plan 2011-2015 Presentation
 
Ceew ceew cef market handbook q1 2020-21 10 sep20
Ceew   ceew cef market handbook q1 2020-21 10 sep20Ceew   ceew cef market handbook q1 2020-21 10 sep20
Ceew ceew cef market handbook q1 2020-21 10 sep20
 
AREVA, business & strategy overview - January 2009 - Appendix 7
AREVA, business & strategy overview - January 2009 - Appendix 7AREVA, business & strategy overview - January 2009 - Appendix 7
AREVA, business & strategy overview - January 2009 - Appendix 7
 
China energy roadmap slides
China energy roadmap slidesChina energy roadmap slides
China energy roadmap slides
 
Benchmark InfraBees Fund
Benchmark InfraBees FundBenchmark InfraBees Fund
Benchmark InfraBees Fund
 
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
 
Ofgem Presentation at Economist Energy Summit
Ofgem Presentation at Economist Energy SummitOfgem Presentation at Economist Energy Summit
Ofgem Presentation at Economist Energy Summit
 
GE- Goldman Sachs Fourth Annual Alternative Energy Conference
GE- Goldman Sachs Fourth Annual Alternative Energy Conference GE- Goldman Sachs Fourth Annual Alternative Energy Conference
GE- Goldman Sachs Fourth Annual Alternative Energy Conference
 

More from sustg

Business Forum: Nuclear & Renewable Energy - Suciu
Business Forum: Nuclear & Renewable Energy - SuciuBusiness Forum: Nuclear & Renewable Energy - Suciu
Business Forum: Nuclear & Renewable Energy - Suciusustg
 
Business Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - BrownBusiness Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - Brownsustg
 
Business Forum: Nuclear & Renewable Energy - Bernhard
Business Forum: Nuclear & Renewable Energy - BernhardBusiness Forum: Nuclear & Renewable Energy - Bernhard
Business Forum: Nuclear & Renewable Energy - Bernhardsustg
 
Wisnoski
WisnoskiWisnoski
Wisnoskisustg
 
Rabiah
RabiahRabiah
Rabiahsustg
 
Osilan
OsilanOsilan
Osilansustg
 

More from sustg (6)

Business Forum: Nuclear & Renewable Energy - Suciu
Business Forum: Nuclear & Renewable Energy - SuciuBusiness Forum: Nuclear & Renewable Energy - Suciu
Business Forum: Nuclear & Renewable Energy - Suciu
 
Business Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - BrownBusiness Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - Brown
 
Business Forum: Nuclear & Renewable Energy - Bernhard
Business Forum: Nuclear & Renewable Energy - BernhardBusiness Forum: Nuclear & Renewable Energy - Bernhard
Business Forum: Nuclear & Renewable Energy - Bernhard
 
Wisnoski
WisnoskiWisnoski
Wisnoski
 
Rabiah
RabiahRabiah
Rabiah
 
Osilan
OsilanOsilan
Osilan
 

Recently uploaded

Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 

Recently uploaded (20)

Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 

Nuclear and Renewable Energy: Building Resources for the Future

  • 1. Nuclear and Renewable Energy Building Resources for the Future Dr. Hashim Yamani President King Abdullah City for Atomic and Renewable Energy (K.A.CARE)
  • 2. Establishment of K.A.CARE Royal Order A/35 April 17, 2010 1
  • 4. K.A.CARE Mandate The City shall aim at contributing to the sustainable development in the Kingdom through utilization of science, research, and industries related to atomic and renewable energy for peaceful purposes in a way that leads to raising the standards of living and quality of life in the Kingdom 3
  • 5. Towards energy sustainability The Kingdom of The Kingdom of Energy Sustainable Energy Towards greater sustainability A new energy mix to meet local needs as well as maintain leadership role in the global energy landscape 4
  • 6. A decision that was not taken lightly  Saudi Arabia has the world’s largest oil reserves  Saudi Arabia has the 5th largest proven gas reserves  Saudi Arabia has the world’s largest swing capacity for oil production Why is Saudi Arabia is promoting the introduction of alternative energies? 5
  • 7. Energy growth drivers Population growth at an annual rate of 3.2% (2004 – 2010) Robust economic growth (4.3% 2008, 0.1% 2009, 3.8% 2010) Industrial production growth of 3.1% in 2009 6
  • 8. Projected growth in electricity peak demand Electricity peak demand GW 120 70 45 2010 2020 2030 At current pace, energy peak demand is expected to exceed 120 GW by 2030 7
  • 9. Growth in oil demand between 2007 and 2010 30 25 20 15 10 5 0 -5 -10 Saudi Arabia Asia North America Europe Middle East Latin America 8
  • 10. Government allocation for water-related spending 50 9 45 8.5 40 8 35 30 7.5 (SR, bn) 25 7 20 (%) 6.5 15 6 10 5 5.5 0 5 2004 2005 2006 2007 2008 2009 2010 Water, electricity and infrastructure allocation Ratio to total state budget 9
  • 11. SEC planned retiring capacity 140,000 120,000 100,000 The Gap By 80,000 2030 MW 60,000 40,000 20,000 Today’s Fuel Mix Extended to 2030 0 10
  • 12. Forecast of energy demand growth 3.4* 8.3* MBOE MBOE 2010 2028 At current pace, domestic consumption of fossil fuels is expected to nearly triple by 2030 * Total local consumption (transportation, industry, electricity, etc) 11
  • 13. Forecasted growth of alternative energy capacity worldwide 1,545 4.7 Growth 1,105 rate 533 2007 2020 2030 % Capacity 12% 17% 19% % of Installed Capacity 12
  • 14. K.A.CARE vision The vision of K.A.CARE is to be: the driving force for making atomic and renewable energy an integral part of a national sustainable energy mix, by creating and leveraging the competitive advantages of relevant technologies for the social and economic development of the Kingdom of Saudi Arabia 13
  • 15. Gradual introduction of renewable and atomic energy Nuclear Renewables Fossil TWh Alternative energy will gradually replace fossil based generation 14
  • 16. Sustainable energy outlook for Saudi Arabia Wind/Other Ren Solar PV Solar CST Needed Capacity (MW) Nuclear New Required Fossil New Committed Existing Diesel Existing HFO Existing Crude Existing Gas 2010 2020 2030 2050 15
  • 17. The mandate and responsibilities of K.A.CARE Policies & Execution Strategies Investment Regulatory & Business R&D & Investment Technology Relations Human Capacity K.A.CARE’s Mandate Facilities 16
  • 18. R&D&T National legal Framework Pillars of sustainable development Value Chain National Economic Framework Sustainable Energy Mix National HR 17
  • 19. New implementation paradigm 1. Long Term Commitment from all Partners  Technology  Education / Training 2. Contribution to GDP Creation:  Job creation  Value chain development  Economic development spillovers  Electricity generation 18
  • 20. Partnership with U.S. companies • Expected major role for U.S. FDI in the Saudi alternative energy sector: • FDI in Saudi Arabia exceeds $200 billion • U.S. has the lion share of this stock at 18% • Expected outcome of partnership: • Comprehensive value chain integration with electricity generation • Localization of niche products and services • Seamless integration with international product chains and global energy services 19
  • 21. Reaping the fruits of sustainable development Sustainable and efficient energy future for KSA Sustainable alternative “… use of alternative energy mix sustainable and reliable resources ... reduces dependency on hydrocarbon resources … and keep Balanced them as a source for execution income for a longer plans period of time...” 20
  • 22. Bases for constructing recommended energy mix • Peak demand reduction from energy efficiency and conservation. • Liquid fuel (crude oil, diesel, and HFO) that will be saved by the proposed energy mix. • Generation related matters, such as: • load factors and load management • generation technologies and their practical limitations • Human capacity building potential. • International product chains and the Saudi role, in the alternative energy sector. • Local value chain 21
  • 23. 1 15 29 43 57 60% 71 85 99 113 127 141 155 169 Seasonal peak variation in Saudi Arabia 183 197 211 225 239 253 267 281 295 309 100% 323 337 351 22 365
  • 24. Typical daily demand profile variation for Saudi Arabia Demand profile GW for a summer day in August GW Demand profile for a winter day in January 11:00 13:00 15:00 17:00 19:00 21:00 23:00 1:00 3:00 5:00 7:00 9:00 23
  • 25. GW 1 15 29 43 57 71 85 99 113 127 141 155 169 183 197 Annual day-night load variation for Saudi Arabia 211 225 239 253 Night 267 281 295 309 Day 323 337 351 24 365
  • 26. Electricity load profile breakdown in Saudi Arabia 3 Daily summer peak load Additional summer load = 20% 2 of annual peak load 1 Average annual load = 65% of annual peak load 1 15 29 43 57 71 85 99 113 127 141 155 169 183 197 211 225 239 253 267 281 295 309 323 337 351 365 25
  • 27. Suitable technology choices for Saudi load profile 3 Fossil – solar 2 Solar - Fossil Nuclear – geothermal (closed cycle) – Waste-to- 1 energy – Concentrated solar (storage) – Fossil 1 15 29 43 57 71 85 99 113 127 141 155 169 183 197 211 225 239 253 267 281 295 309 323 337 351 365 26
  • 28. Criteria used to narrow down choices of energy mix Plausible energy mix criteria: • Sustainability • Economic viability • Technical feasibility • Enabling of further development Optimum energy mix criteria: • Must deliver the required capacity both cost-effectively and in a timely fashion 27
  • 29. Illustrative example of a plausible energy mix Wind / Other Ren Solar PV Solar CST Nuclear New Additional Fossil Present Fossil Mix 28
  • 30. Comprehensive stakeholder engagement Saudi Arabia: • Government agencies, regulator and utility • Private sector International: • Technology providers • Project developers • Utilities Activities: • Workshops, visits and meetings (hundreds) • Case studies (hundreds) 29
  • 31. Cost benefit analysis of proposed alternative energy mix CAPEX plus OPEX Additional Additional capital Opex cost Costs 30
  • 32. Cost benefit analysis of proposed alternative energy mix CAPEX plus OPEX plus revenue from oil saved Additional Additional Value of capital Opex oil cost Costs saved 31
  • 33. Cost benefit analysis of proposed alternative energy mix CAPEX plus OPEX plus revenue from oil saved plus investment in value chain and human capacity Industry Additional Additional Value of and capital Opex oil human cost Costs saved capital 32
  • 34. K.A.CARE commitment to developing alternative energy 1. Transparency 2. Safety and international best practices 3. Non-proliferation and highest standards of Safeguards 4. Localization of the nuclear and renewable value chain in Saudi Arabia 5. Transparent Incentives, Off Taking, and Funding Mechanism 33
  • 35. Components of K.A.CARE City The KA-CARE city will include the following ▪ National Sustainable Energy Laboratory ▪ Industrial clusters ▪ Alternative energy farm ▪ Energy park ▪ Technical training institutions ▪ Technical incubators ▪ Commercial facilities ▪ Convention centers, exhibition halls and other public amenities ▪ KA-CARE headquarters and residential facilities ▪ Basic infrastructure 34
  • 36. K.A.CARE City site characteristics 35
  • 38. Virtual tour of the K.A.CARE City 37
  • 39. First phase development plan for K.A.CARE City 3-5 year R&D focused develop- City infrastructure ment program for 8,000 to 10,000 requirements for Phase 1 residents (including 800 scientists) 1.5 GW of renewables 38
  • 40. Summary 1. Saudi Arabia needs to add more than 80 GW of generation capacity by 2032. The additional capacity, anchored in energy conservation, would include nuclear, and renewable capacity. The investment required is in the hundreds of billion US dollars. 2. Saudi Arabia has been a favorable destination of U.S. FDI and exports, and we would certainly encourage this trend to grow in the renewable and nuclear energy sectors, as well as in energy conservation, conventional energy and energy support services. 39