SlideShare uma empresa Scribd logo
1 de 42
Manufacturing Planning and Self Inspection in
Pharmaceutical Industry
PRESENTED BY:
Ms. Sahoo Sumita Gopal
Quality Assurance Techniques
semester II
GUIDED BY:
Prof. Arun Maruti Kashid
Asst. Professor, Pharmaceutical Chemistry
Sinhgad Technical Education Society,
SINHGAD INSTITUTE OF PHARMACY, NARHE,PUNE.
1
CONTENT
o Introduction to Manufacturing
o Factors that Make Changes in Manufacturing Sectors
o Importance in Manufacturing Planning
o Elements of Manufacturing Planning
o Initial Planning for Manufacturing
o Importance of Aspect of Manufacturing Planning for Quality
o Introduction to Self Inspection
o Criteria for Self- Inspection
2
MANUFACTURING PLANNING
3
What is manufacturing planning ???
 A Manufacturing Planning is a methodology
designed to manage efficiently the
Flow of material,
Utilization of people and equipment,
and to respond to customer requirements.
 By utilizing the capacity of suppliers, internal
facilities, and in some cases that of customers to
meet customer demand.
4
What Make the Change in Manufacturing Sectors ??
 Customer demand for higher quality
 Agile competition
 Impact of technology
5
Manufacturing is no longer simply about making
physical products.
Changes in consumer demand, the nature of
products, the economics of production, and the
economics of the supply chain have led to a
fundamental shift in the way companies do
business.
Customers demand turn “dumb” products into
“smart” ones, while products increasingly become
platforms and even move into the realm of
services.
Customer Demand for Higher Quality
6
Agile Competition
 Agile organization is able to respond to
constantly changing customer demand by:
 changing from one product to another quickly.
 Manufacturing goods to customers orders in
small lot size.
 Customizing goods for individual customers.
 Using expertise people and facilities.
7
 Technology is improving quality by
providing a wider variety of more
consistent output.
 Technology makes job complex but
enable to obtain high quality .
Impact of Technology8
Utilize the Resources Effectively
Makes flow of Production Steady
Estimate Production Resource
Maintain Necessary Stock Levels
Co-ordinate Departmental Activities
Minimize the Wastage of Resource
Improves Labor Efficiency
Facilitates Quality Improvement
Reduce Production Cost
Importance of Manufacturing planning
9
Element of Manufacturing Planning
1. Planning
2. Routing
3. Scheduling
4. Dispatching
10
11 Resource
Planning
Sales an operations
Planning
Demand
management
Master production
scheduling
Detailed
capacity
planning
Detailed material
planning
Material and
capacity plans
Shop-floor
systems
Supplier
systems
EnterpriseResourcePlanning(ERP)System
Front End
Engine
Back end
Manufacturing Planning and Control System
 Planning start with review of product design and then process design.
 While planning for manufacturing first the planning of product
designing is done followed by its review in development process.
 There is clear advantage to having a new product design reviewed by
operations personnel before the design is finalized for the market
place .
INITIAL PLANNING FOR QUALITY12
Process
characteristic
Product
characteristic
Design for
manufacturability
Process robustness
Availability of
capable
manufacturing
process
Availability of
capable
measurement
process
Identification of
special need of
product
Material control
Special skill
required of
operational
personnel
Evaluation of Product Design Include the Following:
13
Identification of
key product and
process
characteristic
Relative
importance of
product
characteristic
Analysis of the
process flow
diagram
Correlation of
process variables
with product
result
Error-proofing
the process
Plan for neat and
clean workplace
Validate the
measurement
system
Reviewing the Process Designing Include Following:
14
 Key product characteristic are the features that the product has to meet
customer's needs.
 Key process characteristic are those that will create the key product
characteristic.
 Product and Process characteristic can be identify by:
Inputs from Market Research
Quality Function Development
Design Review
Failure Mode and Effect Analysis
1. Identification of Key Product and Process Characteristic
15
2. Relative Importance of Product Characteristic
The relative importance of product characteristic can be establish by two technique:
1. The Identification of Critical Items
2. The Classification of Characteristics
16
Identification Of Critical Items
 Critical items are the product characteristics that requires high levels of
attentions to ensure that all requirement are met.
 The company identifies Quality sensitives parts by using criteria such as part
complexity and high failure rate parts.
 For such parts special planning include:
1. Supplier involvement before and during the process
2. Process capabilities studies
3. Reliability identification
17
The Classification of Characteristic
 In this system the relative importance of characteristic is determine and
indicates on drawing and documents.
 The classification can be:
- Functional
- Non-functional
 The classification of characteristic used the criteria such as:
- Reflect safety
- Operating failure
- Performance
- Service
- Manufacturing
18
3. Analysis of the Process Flow Diagram
 A process design can be reviewed by laying out the overall process in a
flow diagram .
 By using such flow diagram it becomes possible to divide the flow into
logical sections called workstations.
 For each work station they prepare a formal documents such as:
 Operation to be Performed
 Sequence of Operation
 Facilities of Operation and Instruments to be Employed
 Process Condition to be Maintained
19
Process flow diagram of tablet manufacturing
20
4. Correlation of Process Variables with Product Result
 A critical aspect of planning during manufacturing is to discover the
relationship between process features or variables & product features
or results by data analysis.
 This enables the planner to create process control features, include:
Limits and Regulating Mechanism on Variables
To Keep Process in Steady State
To Achieve Specified Product Result
21
5. Error –Proofing the Process
Element of prevention is the concept of designing the process to be error
free through “error proofing’’.
Type Objectives Example
Elimination Eliminating the possibility of
error
Redesigning the process or
product so that the task is no
longer
Replacement Substituting a more reliable
process for workers
Using robotics
Facilitation Making the work easier to
perform
Color coding parts
Detection Detecting the error before
further processing
Developing the software
Mitigation Minimizing the effect of the
error
Using fuses for over loaded
circuits
22
6. Plan for Neat and Clean Workplace
 The good workplace always provide the prevention of defects, prevention of
accidents, and elimination of time wasted in searching for tools,
documentation, and other ingredient of manufacturing.
 The frame work to create a neat and clean workplace is called as 5S.
The 5S stand for:
1. Sort
2. Set in Orders
3. Shine
4. Standardization
5. Sustain
23
5S CONCEPT FOR NEAT AND CLEAN WORK PLACE24
7. Validate the Measurement System
In order to minimize the error and demand to obtain low defect levels, it is
important to understand the capability of the manufacturing process and
measurement process.
The planning and control of the measurement process is the part of six
sigma approach.
The variation in the measurement process can result in wrong predicting of
quality, hence to evaluate measurement capabilities and to determine
whether measuring equipment is accurately measuring process output
becomes important.
25
Observed Process
Variation
Actual Process
Variation
Long Term
Process Variation
Short-term
Process Variation
Measurement Variation
Variation due to
Operation
Reproducibility
Variation due to
Gauge
Accuracy
Stability
Linearity
Repeatability
Possible Source of Variation
26
Important Aspects of Manufacturing Planning for Quality
Lean Manufacturing Six Sigma Approach
27
SELF-INSPECTION
28
Self-Inspection
Self inspection consist of,
 Periodic detailed examination of condition
 Working procedure by a team from
production site,
with a aim of verifying that good
pharmaceutical manufacturing practise are
being applied and,
propose any necessary corrective measures
to responsible management.
29
OBJECTIVES OF SELF INSPECTION
 Production workers are made to fell more responsible for the quality of their work
 Feedback on performance is immediate, thereby facilitating process adjustments.
 The cost of a separate inspection department can be reduced.
 Elimination of a specific station for inspecting all products reduces the total
manufacturing cycle time.
30
SelfInspection
Informal Daily
Immediate
Correction
Formal Quarterly Improve System
QC Internals Half Yearly
Confirm
Compliance
TYPES OF SELF-INSPECTION
31
PURPOSE OF SELF-INSPECTION
 To evaluate whether a company’s operations remain compliant with GMP.
 Assists in ensuring quality improvement.
The programme should
 Cover all aspects of production and quality control
 Being designed to detect shortcomings in the implementation of GMP
 Recommend corrective actions
 Set a timetable for corrective action to be completed
32
 Performed routinely also on special occasions such as :
 Recalls
 Repeated rejections
 When a GMP inspection is announced by the national drug
regulatory authority
 Procedure should be documented for Effective follow-up programme.
33
 Self-inspection team should consist of personnel who:
 Can evaluate the situation objectively
 Have no conflict of interest, have no revenge in mind
 Should have experience as observers of a self-inspection team before becoming a
team member
 Can be lead self-inspector with experience as team member
34
CRITERIA FOR SELF-INSPECTION
 Written instructions must provide minimum and uniform standard
Covering all aspects of GMP:
 Personnel
 Premises including personnel facilities
 Maintenance of buildings and equipment
 Storage of starting materials and finished products
 Equipment
 Production and in-process controls
 Quality control
35
 Documentation
 Sanitation and hygiene
 Validation and revalidation programmes
 Calibration of instruments or measurement systems
 Recall procedures
 Complaints management
 Labels control
 Results of previous self-inspections and any corrective steps taken
36
THE SELF INSPECTION TEAM
 The team appointed by management, with:
 Authority and member from different areas of experience
 Sufficient experience
 May be from inside or outside the company
 Experts in their own field
 Familiar with GMP
Team members can be selected from:
 Quality assurance /Quality control
 Production & Engineering
 Planning & inventory control
37
CARRYING OUT A SELF-INSPECTION
 Frequency should be at least once a year.
 May depend on company requirements
 Size of the company and activities
 Report prepared at completion of inspection, including:
 Results
 Evaluation
 Conclusions
 Recommended corrective measures
38
 Follow-up action
 Effective follow-up programme
 Company management to evaluate both the report and corrective actions
39
REFERENCES
1. Gryna F. M., Chua R. C., Defeo J. A., Juran’s quality planning and analysis for
enterprise quality, 5th edition, Tata McGraw-hill, 396:423.
2. Juran J. M., Early J. F., Coletti O. J., Quality planning process, 2nd edition,
McGraw-Hill, 125:240.
3. Sharma D., Sharma J., Production Planning and Control, International Journal of
Scientific Research Engineering &Technology (IJSRET),Volume 3, 2014, 319:321.
4. Schroeder R.G., Linderman K., Liedtke C., Choo A.S., Six sigma:Definition and
Underlying Theory, Journal of Operational Management, 2008, 536:554.
40
http://WHO_TRS_823-Annex2.pdf5.
41
Accessed on -11/02/2016
6. http://www.pharmaguideline.com/2013/04/self-inspection-and-quality-audits.html
Accessed on-13/02/2016
REFERENCES
42

Mais conteúdo relacionado

Mais procurados

Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentPRANJAY PATIL
 
Documentation in pharmaceutical industry
Documentation  in pharmaceutical industryDocumentation  in pharmaceutical industry
Documentation in pharmaceutical industryPRANJAY PATIL
 
Manufacturing operation and control
Manufacturing operation and controlManufacturing operation and control
Manufacturing operation and controlMalay Pandya
 
Six system inspection model.
Six system inspection model.Six system inspection model.
Six system inspection model.VikramMadane1
 
cGMP regulations & QA function.pptx
cGMP regulations &  QA function.pptxcGMP regulations &  QA function.pptx
cGMP regulations & QA function.pptxDhruvi50
 
Quality metrics
Quality metricsQuality metrics
Quality metricsDhruvi50
 
statistical process control
 statistical process control statistical process control
statistical process controlAnkitaGorhe
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationShihabPatel
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentArpitSuralkar
 
Auditing in Solid Oral Dosage Form Production Department
Auditing in Solid Oral Dosage Form Production DepartmentAuditing in Solid Oral Dosage Form Production Department
Auditing in Solid Oral Dosage Form Production DepartmentSANJAY KUMAR PUROHIT
 
CHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfCHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfDr. Dinesh Mehta
 
USFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachUSFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachRx Ayush Sharma
 
Pat process analytical technique
Pat  process analytical techniquePat  process analytical technique
Pat process analytical techniqueSalmanLatif14
 
Self inspection
Self inspectionSelf inspection
Self inspectionBangaluru
 
Quality by Design and Process Analytical Technology
Quality by Design and Process Analytical TechnologyQuality by Design and Process Analytical Technology
Quality by Design and Process Analytical TechnologyMANIKANDAN V
 
Six System Inspection Model.pptx
Six System Inspection Model.pptxSix System Inspection Model.pptx
Six System Inspection Model.pptxVIJAYAVICHARE
 
Nonsterile Manufacturing process Technology
Nonsterile Manufacturing process TechnologyNonsterile Manufacturing process Technology
Nonsterile Manufacturing process TechnologyDnyaneshwarKhodse
 

Mais procurados (20)

Ich q10
Ich q10Ich q10
Ich q10
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Documentation in pharmaceutical industry
Documentation  in pharmaceutical industryDocumentation  in pharmaceutical industry
Documentation in pharmaceutical industry
 
Manufacturing operation and control
Manufacturing operation and controlManufacturing operation and control
Manufacturing operation and control
 
Six system inspection model.
Six system inspection model.Six system inspection model.
Six system inspection model.
 
cGMP regulations & QA function.pptx
cGMP regulations &  QA function.pptxcGMP regulations &  QA function.pptx
cGMP regulations & QA function.pptx
 
Quality metrics
Quality metricsQuality metrics
Quality metrics
 
statistical process control
 statistical process control statistical process control
statistical process control
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Auditing in Solid Oral Dosage Form Production Department
Auditing in Solid Oral Dosage Form Production DepartmentAuditing in Solid Oral Dosage Form Production Department
Auditing in Solid Oral Dosage Form Production Department
 
CHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfCHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdf
 
Deviation QA
Deviation QADeviation QA
Deviation QA
 
USFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachUSFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approach
 
Pat process analytical technique
Pat  process analytical techniquePat  process analytical technique
Pat process analytical technique
 
Vendor Audites
Vendor AuditesVendor Audites
Vendor Audites
 
Self inspection
Self inspectionSelf inspection
Self inspection
 
Quality by Design and Process Analytical Technology
Quality by Design and Process Analytical TechnologyQuality by Design and Process Analytical Technology
Quality by Design and Process Analytical Technology
 
Six System Inspection Model.pptx
Six System Inspection Model.pptxSix System Inspection Model.pptx
Six System Inspection Model.pptx
 
Nonsterile Manufacturing process Technology
Nonsterile Manufacturing process TechnologyNonsterile Manufacturing process Technology
Nonsterile Manufacturing process Technology
 

Destaque

Self-inspection SOP
Self-inspection SOPSelf-inspection SOP
Self-inspection SOPnorwinu
 
Self Inspection Checklist
Self Inspection ChecklistSelf Inspection Checklist
Self Inspection ChecklistKris Schade
 
Factors Affecting Industrial Location
Factors Affecting Industrial LocationFactors Affecting Industrial Location
Factors Affecting Industrial LocationAaditya Nagpal
 
Usa safe work procedures self inspection for ppe
Usa safe work procedures self inspection for ppeUsa safe work procedures self inspection for ppe
Usa safe work procedures self inspection for ppeTerry Penney
 
Self Inspection and Introspection
Self Inspection and IntrospectionSelf Inspection and Introspection
Self Inspection and IntrospectionAMAR MISHRA
 
process validation
process validationprocess validation
process validationSumita Sahoo
 
child labor in Tamil Nadu
child labor in Tamil Naduchild labor in Tamil Nadu
child labor in Tamil Nadusujima
 
Recurring inspection in QM
Recurring inspection in QMRecurring inspection in QM
Recurring inspection in QMAnkit Sharma
 
A Study of Tamilnadu's Economy and its contribution to India's GDP
A Study of Tamilnadu's Economy and its contribution to India's GDPA Study of Tamilnadu's Economy and its contribution to India's GDP
A Study of Tamilnadu's Economy and its contribution to India's GDPUttam Satapathy
 
Integration of Urban Design and Industrial Estate Planning, a Case Study: Med...
Integration of Urban Design and Industrial Estate Planning, a Case Study: Med...Integration of Urban Design and Industrial Estate Planning, a Case Study: Med...
Integration of Urban Design and Industrial Estate Planning, a Case Study: Med...drboon
 
An Industrial Case Study of Automatically Identifying Performance Regression-...
An Industrial Case Study of Automatically Identifying Performance Regression-...An Industrial Case Study of Automatically Identifying Performance Regression-...
An Industrial Case Study of Automatically Identifying Performance Regression-...SAIL_QU
 
Regional 6
Regional 6Regional 6
Regional 6Jack Ong
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Priyanka Singh
 
Inspection Report during Plant Outage @ NA Plant
Inspection Report during Plant Outage @ NA PlantInspection Report during Plant Outage @ NA Plant
Inspection Report during Plant Outage @ NA PlantAnas Asad
 
On the complexity of production planning and scheduling in the pharmaceutica...
On the complexity of production planning and scheduling  in the pharmaceutica...On the complexity of production planning and scheduling  in the pharmaceutica...
On the complexity of production planning and scheduling in the pharmaceutica...Samuel Moniz
 
AAPS Advanced Controls Uploaded 2
AAPS Advanced Controls Uploaded 2AAPS Advanced Controls Uploaded 2
AAPS Advanced Controls Uploaded 2Paul Brodbeck
 

Destaque (20)

Self-inspection SOP
Self-inspection SOPSelf-inspection SOP
Self-inspection SOP
 
Pharmaceutical manufacturing plant
Pharmaceutical manufacturing plantPharmaceutical manufacturing plant
Pharmaceutical manufacturing plant
 
Location of Industries
Location of IndustriesLocation of Industries
Location of Industries
 
Self Inspection Checklist
Self Inspection ChecklistSelf Inspection Checklist
Self Inspection Checklist
 
Factors Affecting Industrial Location
Factors Affecting Industrial LocationFactors Affecting Industrial Location
Factors Affecting Industrial Location
 
Usa safe work procedures self inspection for ppe
Usa safe work procedures self inspection for ppeUsa safe work procedures self inspection for ppe
Usa safe work procedures self inspection for ppe
 
Self Inspection and Introspection
Self Inspection and IntrospectionSelf Inspection and Introspection
Self Inspection and Introspection
 
process validation
process validationprocess validation
process validation
 
child labor in Tamil Nadu
child labor in Tamil Naduchild labor in Tamil Nadu
child labor in Tamil Nadu
 
Recurring inspection in QM
Recurring inspection in QMRecurring inspection in QM
Recurring inspection in QM
 
A Study of Tamilnadu's Economy and its contribution to India's GDP
A Study of Tamilnadu's Economy and its contribution to India's GDPA Study of Tamilnadu's Economy and its contribution to India's GDP
A Study of Tamilnadu's Economy and its contribution to India's GDP
 
Sumita
SumitaSumita
Sumita
 
Integration of Urban Design and Industrial Estate Planning, a Case Study: Med...
Integration of Urban Design and Industrial Estate Planning, a Case Study: Med...Integration of Urban Design and Industrial Estate Planning, a Case Study: Med...
Integration of Urban Design and Industrial Estate Planning, a Case Study: Med...
 
An Industrial Case Study of Automatically Identifying Performance Regression-...
An Industrial Case Study of Automatically Identifying Performance Regression-...An Industrial Case Study of Automatically Identifying Performance Regression-...
An Industrial Case Study of Automatically Identifying Performance Regression-...
 
Regional 6
Regional 6Regional 6
Regional 6
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)
 
Inspection Report during Plant Outage @ NA Plant
Inspection Report during Plant Outage @ NA PlantInspection Report during Plant Outage @ NA Plant
Inspection Report during Plant Outage @ NA Plant
 
Auditoria farmaceutica
Auditoria farmaceuticaAuditoria farmaceutica
Auditoria farmaceutica
 
On the complexity of production planning and scheduling in the pharmaceutica...
On the complexity of production planning and scheduling  in the pharmaceutica...On the complexity of production planning and scheduling  in the pharmaceutica...
On the complexity of production planning and scheduling in the pharmaceutica...
 
AAPS Advanced Controls Uploaded 2
AAPS Advanced Controls Uploaded 2AAPS Advanced Controls Uploaded 2
AAPS Advanced Controls Uploaded 2
 

Semelhante a Manufacturing planning and self inspection in pharmaceutical industries

Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlNishant Agrawal
 
7 Steps to Set up Statistical Process Control.pdf
7 Steps to Set up Statistical Process Control.pdf7 Steps to Set up Statistical Process Control.pdf
7 Steps to Set up Statistical Process Control.pdfMr. Business Magazine
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master planBharatlal Sain
 
Production Planning and Control .pptx
Production Planning and Control .pptxProduction Planning and Control .pptx
Production Planning and Control .pptxAnand Gaikwad
 
E11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webE11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webDir Jan
 
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Er. Bade Bhausaheb
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.pptSrinuKN
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control ReportEzevillo Zim
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notesismatullahzazai
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlShubhamChikhale8
 
9.process improvement chapter 9
9.process improvement chapter 99.process improvement chapter 9
9.process improvement chapter 9Warui Maina
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxTanmayPanigrahy
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical
 

Semelhante a Manufacturing planning and self inspection in pharmaceutical industries (20)

Product Operation Planning & Control
Product Operation Planning & ControlProduct Operation Planning & Control
Product Operation Planning & Control
 
PPC
PPCPPC
PPC
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
7 Steps to Set up Statistical Process Control.pdf
7 Steps to Set up Statistical Process Control.pdf7 Steps to Set up Statistical Process Control.pdf
7 Steps to Set up Statistical Process Control.pdf
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
 
Production Planning and Control .pptx
Production Planning and Control .pptxProduction Planning and Control .pptx
Production Planning and Control .pptx
 
E11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webE11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-web
 
Engineering
EngineeringEngineering
Engineering
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
 
Validation
ValidationValidation
Validation
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.ppt
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control Report
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notes
 
Manufacturing
ManufacturingManufacturing
Manufacturing
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Prospective Validation NSR.pdf
Prospective Validation NSR.pdfProspective Validation NSR.pdf
Prospective Validation NSR.pdf
 
9.process improvement chapter 9
9.process improvement chapter 99.process improvement chapter 9
9.process improvement chapter 9
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptx
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 

Último

Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...ggsonu500
 
Russian Escorts Delhi | 9711199171 | all area service available
Russian Escorts Delhi | 9711199171 | all area service availableRussian Escorts Delhi | 9711199171 | all area service available
Russian Escorts Delhi | 9711199171 | all area service availablesandeepkumar69420
 
2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology InsightsHealth Catalyst
 
Biology class 12 assignment neet level practise chapter wise
Biology class 12 assignment neet level practise chapter wiseBiology class 12 assignment neet level practise chapter wise
Biology class 12 assignment neet level practise chapter wiseNAGKINGRAPELLY
 
Low Rate Call Girls In Bommanahalli Just Call 7001305949
Low Rate Call Girls In Bommanahalli Just Call 7001305949Low Rate Call Girls In Bommanahalli Just Call 7001305949
Low Rate Call Girls In Bommanahalli Just Call 7001305949ps5894268
 
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...scanFOAM
 
Gurgaon Sushant Lok Phase 2 Call Girls Service ( 9873940964 ) unlimited hard...
Gurgaon Sushant Lok Phase 2 Call Girls Service ( 9873940964 )  unlimited hard...Gurgaon Sushant Lok Phase 2 Call Girls Service ( 9873940964 )  unlimited hard...
Gurgaon Sushant Lok Phase 2 Call Girls Service ( 9873940964 ) unlimited hard...ggsonu500
 
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...satishsharma69855
 
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbersHi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbersnarwatsonia7
 
Gurgaon DLF Phase 5 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Fe...
Gurgaon DLF Phase 5 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Fe...Gurgaon DLF Phase 5 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Fe...
Gurgaon DLF Phase 5 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Fe...ggsonu500
 
Russian Call Girls Ajmeri Gate | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Ajmeri Gate | 9711199171 | High Profile -New Model -Availa...Russian Call Girls Ajmeri Gate | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Ajmeri Gate | 9711199171 | High Profile -New Model -Availa...sandeepkumar69420
 
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near MeBook Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Menarwatsonia7
 
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts ServiceCall Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Servicenarwatsonia7
 
Call Girls Dwarka 9999965857 Cheap & Best with original Photos
Call Girls Dwarka 9999965857 Cheap & Best with original PhotosCall Girls Dwarka 9999965857 Cheap & Best with original Photos
Call Girls Dwarka 9999965857 Cheap & Best with original Photosparshadkalavatidevi7
 
Rohini Sector 6 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few Cl...
Rohini Sector 6 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few Cl...Rohini Sector 6 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few Cl...
Rohini Sector 6 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few Cl...ddev2574
 
MVP Health Care City of Schenectady Presentation
MVP Health Care City of Schenectady PresentationMVP Health Care City of Schenectady Presentation
MVP Health Care City of Schenectady PresentationMVP Health Care
 
Rohini Sector 30 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
Rohini Sector 30 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...Rohini Sector 30 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
Rohini Sector 30 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...ddev2574
 
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of Hospital A...
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of  Hospital A...Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of  Hospital A...
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of Hospital A...Era University , Lucknow
 

Último (20)

Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
 
Russian Escorts Delhi | 9711199171 | all area service available
Russian Escorts Delhi | 9711199171 | all area service availableRussian Escorts Delhi | 9711199171 | all area service available
Russian Escorts Delhi | 9711199171 | all area service available
 
2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights
 
Biology class 12 assignment neet level practise chapter wise
Biology class 12 assignment neet level practise chapter wiseBiology class 12 assignment neet level practise chapter wise
Biology class 12 assignment neet level practise chapter wise
 
Low Rate Call Girls In Bommanahalli Just Call 7001305949
Low Rate Call Girls In Bommanahalli Just Call 7001305949Low Rate Call Girls In Bommanahalli Just Call 7001305949
Low Rate Call Girls In Bommanahalli Just Call 7001305949
 
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
 
Gurgaon Sushant Lok Phase 2 Call Girls Service ( 9873940964 ) unlimited hard...
Gurgaon Sushant Lok Phase 2 Call Girls Service ( 9873940964 )  unlimited hard...Gurgaon Sushant Lok Phase 2 Call Girls Service ( 9873940964 )  unlimited hard...
Gurgaon Sushant Lok Phase 2 Call Girls Service ( 9873940964 ) unlimited hard...
 
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
 
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbersHi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
 
Gurgaon DLF Phase 5 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Fe...
Gurgaon DLF Phase 5 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Fe...Gurgaon DLF Phase 5 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Fe...
Gurgaon DLF Phase 5 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Fe...
 
Russian Call Girls Ajmeri Gate | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Ajmeri Gate | 9711199171 | High Profile -New Model -Availa...Russian Call Girls Ajmeri Gate | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Ajmeri Gate | 9711199171 | High Profile -New Model -Availa...
 
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near MeBook Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
 
Russian Call Girls Jor Bagh 9711199171 discount on your booking
Russian Call Girls Jor Bagh 9711199171 discount on your bookingRussian Call Girls Jor Bagh 9711199171 discount on your booking
Russian Call Girls Jor Bagh 9711199171 discount on your booking
 
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts ServiceCall Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
 
Call Girls Dwarka 9999965857 Cheap & Best with original Photos
Call Girls Dwarka 9999965857 Cheap & Best with original PhotosCall Girls Dwarka 9999965857 Cheap & Best with original Photos
Call Girls Dwarka 9999965857 Cheap & Best with original Photos
 
Rohini Sector 6 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few Cl...
Rohini Sector 6 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few Cl...Rohini Sector 6 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few Cl...
Rohini Sector 6 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few Cl...
 
MVP Health Care City of Schenectady Presentation
MVP Health Care City of Schenectady PresentationMVP Health Care City of Schenectady Presentation
MVP Health Care City of Schenectady Presentation
 
Russian Call Girls South Delhi 9711199171 discount on your booking
Russian Call Girls South Delhi 9711199171 discount on your bookingRussian Call Girls South Delhi 9711199171 discount on your booking
Russian Call Girls South Delhi 9711199171 discount on your booking
 
Rohini Sector 30 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
Rohini Sector 30 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...Rohini Sector 30 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
Rohini Sector 30 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
 
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of Hospital A...
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of  Hospital A...Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of  Hospital A...
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of Hospital A...
 

Manufacturing planning and self inspection in pharmaceutical industries

  • 1. Manufacturing Planning and Self Inspection in Pharmaceutical Industry PRESENTED BY: Ms. Sahoo Sumita Gopal Quality Assurance Techniques semester II GUIDED BY: Prof. Arun Maruti Kashid Asst. Professor, Pharmaceutical Chemistry Sinhgad Technical Education Society, SINHGAD INSTITUTE OF PHARMACY, NARHE,PUNE. 1
  • 2. CONTENT o Introduction to Manufacturing o Factors that Make Changes in Manufacturing Sectors o Importance in Manufacturing Planning o Elements of Manufacturing Planning o Initial Planning for Manufacturing o Importance of Aspect of Manufacturing Planning for Quality o Introduction to Self Inspection o Criteria for Self- Inspection 2
  • 4. What is manufacturing planning ???  A Manufacturing Planning is a methodology designed to manage efficiently the Flow of material, Utilization of people and equipment, and to respond to customer requirements.  By utilizing the capacity of suppliers, internal facilities, and in some cases that of customers to meet customer demand. 4
  • 5. What Make the Change in Manufacturing Sectors ??  Customer demand for higher quality  Agile competition  Impact of technology 5
  • 6. Manufacturing is no longer simply about making physical products. Changes in consumer demand, the nature of products, the economics of production, and the economics of the supply chain have led to a fundamental shift in the way companies do business. Customers demand turn “dumb” products into “smart” ones, while products increasingly become platforms and even move into the realm of services. Customer Demand for Higher Quality 6
  • 7. Agile Competition  Agile organization is able to respond to constantly changing customer demand by:  changing from one product to another quickly.  Manufacturing goods to customers orders in small lot size.  Customizing goods for individual customers.  Using expertise people and facilities. 7
  • 8.  Technology is improving quality by providing a wider variety of more consistent output.  Technology makes job complex but enable to obtain high quality . Impact of Technology8
  • 9. Utilize the Resources Effectively Makes flow of Production Steady Estimate Production Resource Maintain Necessary Stock Levels Co-ordinate Departmental Activities Minimize the Wastage of Resource Improves Labor Efficiency Facilitates Quality Improvement Reduce Production Cost Importance of Manufacturing planning 9
  • 10. Element of Manufacturing Planning 1. Planning 2. Routing 3. Scheduling 4. Dispatching 10
  • 11. 11 Resource Planning Sales an operations Planning Demand management Master production scheduling Detailed capacity planning Detailed material planning Material and capacity plans Shop-floor systems Supplier systems EnterpriseResourcePlanning(ERP)System Front End Engine Back end Manufacturing Planning and Control System
  • 12.  Planning start with review of product design and then process design.  While planning for manufacturing first the planning of product designing is done followed by its review in development process.  There is clear advantage to having a new product design reviewed by operations personnel before the design is finalized for the market place . INITIAL PLANNING FOR QUALITY12
  • 13. Process characteristic Product characteristic Design for manufacturability Process robustness Availability of capable manufacturing process Availability of capable measurement process Identification of special need of product Material control Special skill required of operational personnel Evaluation of Product Design Include the Following: 13
  • 14. Identification of key product and process characteristic Relative importance of product characteristic Analysis of the process flow diagram Correlation of process variables with product result Error-proofing the process Plan for neat and clean workplace Validate the measurement system Reviewing the Process Designing Include Following: 14
  • 15.  Key product characteristic are the features that the product has to meet customer's needs.  Key process characteristic are those that will create the key product characteristic.  Product and Process characteristic can be identify by: Inputs from Market Research Quality Function Development Design Review Failure Mode and Effect Analysis 1. Identification of Key Product and Process Characteristic 15
  • 16. 2. Relative Importance of Product Characteristic The relative importance of product characteristic can be establish by two technique: 1. The Identification of Critical Items 2. The Classification of Characteristics 16
  • 17. Identification Of Critical Items  Critical items are the product characteristics that requires high levels of attentions to ensure that all requirement are met.  The company identifies Quality sensitives parts by using criteria such as part complexity and high failure rate parts.  For such parts special planning include: 1. Supplier involvement before and during the process 2. Process capabilities studies 3. Reliability identification 17
  • 18. The Classification of Characteristic  In this system the relative importance of characteristic is determine and indicates on drawing and documents.  The classification can be: - Functional - Non-functional  The classification of characteristic used the criteria such as: - Reflect safety - Operating failure - Performance - Service - Manufacturing 18
  • 19. 3. Analysis of the Process Flow Diagram  A process design can be reviewed by laying out the overall process in a flow diagram .  By using such flow diagram it becomes possible to divide the flow into logical sections called workstations.  For each work station they prepare a formal documents such as:  Operation to be Performed  Sequence of Operation  Facilities of Operation and Instruments to be Employed  Process Condition to be Maintained 19
  • 20. Process flow diagram of tablet manufacturing 20
  • 21. 4. Correlation of Process Variables with Product Result  A critical aspect of planning during manufacturing is to discover the relationship between process features or variables & product features or results by data analysis.  This enables the planner to create process control features, include: Limits and Regulating Mechanism on Variables To Keep Process in Steady State To Achieve Specified Product Result 21
  • 22. 5. Error –Proofing the Process Element of prevention is the concept of designing the process to be error free through “error proofing’’. Type Objectives Example Elimination Eliminating the possibility of error Redesigning the process or product so that the task is no longer Replacement Substituting a more reliable process for workers Using robotics Facilitation Making the work easier to perform Color coding parts Detection Detecting the error before further processing Developing the software Mitigation Minimizing the effect of the error Using fuses for over loaded circuits 22
  • 23. 6. Plan for Neat and Clean Workplace  The good workplace always provide the prevention of defects, prevention of accidents, and elimination of time wasted in searching for tools, documentation, and other ingredient of manufacturing.  The frame work to create a neat and clean workplace is called as 5S. The 5S stand for: 1. Sort 2. Set in Orders 3. Shine 4. Standardization 5. Sustain 23
  • 24. 5S CONCEPT FOR NEAT AND CLEAN WORK PLACE24
  • 25. 7. Validate the Measurement System In order to minimize the error and demand to obtain low defect levels, it is important to understand the capability of the manufacturing process and measurement process. The planning and control of the measurement process is the part of six sigma approach. The variation in the measurement process can result in wrong predicting of quality, hence to evaluate measurement capabilities and to determine whether measuring equipment is accurately measuring process output becomes important. 25
  • 26. Observed Process Variation Actual Process Variation Long Term Process Variation Short-term Process Variation Measurement Variation Variation due to Operation Reproducibility Variation due to Gauge Accuracy Stability Linearity Repeatability Possible Source of Variation 26
  • 27. Important Aspects of Manufacturing Planning for Quality Lean Manufacturing Six Sigma Approach 27
  • 29. Self-Inspection Self inspection consist of,  Periodic detailed examination of condition  Working procedure by a team from production site, with a aim of verifying that good pharmaceutical manufacturing practise are being applied and, propose any necessary corrective measures to responsible management. 29
  • 30. OBJECTIVES OF SELF INSPECTION  Production workers are made to fell more responsible for the quality of their work  Feedback on performance is immediate, thereby facilitating process adjustments.  The cost of a separate inspection department can be reduced.  Elimination of a specific station for inspecting all products reduces the total manufacturing cycle time. 30
  • 31. SelfInspection Informal Daily Immediate Correction Formal Quarterly Improve System QC Internals Half Yearly Confirm Compliance TYPES OF SELF-INSPECTION 31
  • 32. PURPOSE OF SELF-INSPECTION  To evaluate whether a company’s operations remain compliant with GMP.  Assists in ensuring quality improvement. The programme should  Cover all aspects of production and quality control  Being designed to detect shortcomings in the implementation of GMP  Recommend corrective actions  Set a timetable for corrective action to be completed 32
  • 33.  Performed routinely also on special occasions such as :  Recalls  Repeated rejections  When a GMP inspection is announced by the national drug regulatory authority  Procedure should be documented for Effective follow-up programme. 33
  • 34.  Self-inspection team should consist of personnel who:  Can evaluate the situation objectively  Have no conflict of interest, have no revenge in mind  Should have experience as observers of a self-inspection team before becoming a team member  Can be lead self-inspector with experience as team member 34
  • 35. CRITERIA FOR SELF-INSPECTION  Written instructions must provide minimum and uniform standard Covering all aspects of GMP:  Personnel  Premises including personnel facilities  Maintenance of buildings and equipment  Storage of starting materials and finished products  Equipment  Production and in-process controls  Quality control 35
  • 36.  Documentation  Sanitation and hygiene  Validation and revalidation programmes  Calibration of instruments or measurement systems  Recall procedures  Complaints management  Labels control  Results of previous self-inspections and any corrective steps taken 36
  • 37. THE SELF INSPECTION TEAM  The team appointed by management, with:  Authority and member from different areas of experience  Sufficient experience  May be from inside or outside the company  Experts in their own field  Familiar with GMP Team members can be selected from:  Quality assurance /Quality control  Production & Engineering  Planning & inventory control 37
  • 38. CARRYING OUT A SELF-INSPECTION  Frequency should be at least once a year.  May depend on company requirements  Size of the company and activities  Report prepared at completion of inspection, including:  Results  Evaluation  Conclusions  Recommended corrective measures 38
  • 39.  Follow-up action  Effective follow-up programme  Company management to evaluate both the report and corrective actions 39
  • 40. REFERENCES 1. Gryna F. M., Chua R. C., Defeo J. A., Juran’s quality planning and analysis for enterprise quality, 5th edition, Tata McGraw-hill, 396:423. 2. Juran J. M., Early J. F., Coletti O. J., Quality planning process, 2nd edition, McGraw-Hill, 125:240. 3. Sharma D., Sharma J., Production Planning and Control, International Journal of Scientific Research Engineering &Technology (IJSRET),Volume 3, 2014, 319:321. 4. Schroeder R.G., Linderman K., Liedtke C., Choo A.S., Six sigma:Definition and Underlying Theory, Journal of Operational Management, 2008, 536:554. 40
  • 41. http://WHO_TRS_823-Annex2.pdf5. 41 Accessed on -11/02/2016 6. http://www.pharmaguideline.com/2013/04/self-inspection-and-quality-audits.html Accessed on-13/02/2016 REFERENCES
  • 42. 42