  1. 1. Engr. Sultan Said Faqir Electrical & Instrument Engineering & Construction, QA/QC, Pre, comm & Commissioning Project Name: MA’ADEN WA’ADAL-SHAMAL phosphate Project Turaif [KSA] Hanwha E & C/ FLUOR (KSA) Email: safullahpak1@gmail.com Mobile: 00966-502235627/0581720925 . To whom it may concern I am applying for the capacity of Electrical & Instrument Engineer I have been seeking just such an opportunity as this, and I believe my Education & Experience would be a good match for your requirements. I have done Bachelor’s Degree in Electrical Engineering from University of Engineering & Technology Peshawar Pakistan in 1997. I have acquainted myself with a range of skills that would allow me to blend you’re your organization’s Culture and propel the team to new height of success. Your company’s reputation, stability and integrity have encouraged me to pursue my career path with your organization. I am very interested to work in the field of engineering and technological administration. I have completed a wide range of subjects that essential as a firm base of knowledge and skills relevant to the requirements of the management position. I believe that I can deliver all the tasks and responsibilities entitled to me. I welcome the opportunity to me at your convenience to discuss your current and future needs and how I might serve them. I appreciate your time reviewing my application, and it will be a pleasure for me to attend an interview with you. You may reach me through my mobile or by the email address. Thank you for your kind attention and consideration. Together with this letter, I enclosed my resume for your perusal. Kind Regards Engr. Sultan Said Bin Said Fiqer Enclosures: 1. Resume E & I /Project Engineer
  2. 2. Eng. Sultan Said Fiqer Electrical & Instrumentation Engineer with 15 years’ Field Experience in Constructions, QA/QC/ Pre, comm & Commissioning Mobile No: 00966-50-2235627/0581720925 Email: safullahpak1@gmail.com Objectives: To become a part of a dynamic group where I could further explore the skills and capabilities, which I engaged in the whole academic career, and to serve in a challenging work environment and to gain equally vas t opportunities of career development based upon achievements and results. Academic information: Bachelor degree in Electrical Engineering from University of Engineering & Technology Peshawar, PAK Registered Engineer of Pakistan Engineering Council, Islamabad Pakistan Professional Experiences: Engineering, constructions, QA/QC, Pre, Commissioning & Commissioning of the industrial & high rice building projects management, planning time scheduling of the projects , Involve in technical evaluation with project construction engineering , fabrication, installation, designing work planning, Inspections, testing as per International Electrotechnical Commission and Aramco Standard ( SAIP/SAMSS/STIPs/SAICs/SATRs/IEC/IEEE/ISO/EN/ANSI/BSI/ISO9000/ISO9001/IESO) standards & also calibration n of the instruments and heavy equipment installations alignment, calculation of construction , Inspections test Plans, Test packing & Work packing / documentation of mechanical completion Pre-commissioning calibration of instrumentation and electrical equipment with system for offshore platforms, chemical, refinery power generation industrial and petrochemical, Electronic railway track system, application duties coated project estimated material included but we are not limited to engineering Inspection safety, DCS control system, PLC, PMCS, SIS/ESD/F&A /P,S,control system, MCC with DCS interface electrical control HT/HV/MV/LV, Cables & 132KV,GIS/33Kv/11Kv/415KV Step-up & Step down/power/distribution & current transformation. Switch gear testing & commissioning distribution (LOTO)rotation of equipment, piping, vessel, boiler, cool conveyers, HVAC, chillier safety interlock/shutdown systems, fire alarm, public address and security y systems, lighting and small power load calculation for high rise building, Building Management System (BMS), Telephone Date, CATV, CCTV System for high rise building, lightning protection and earthling Installation, provide ability to effectively manage multiple activities under tight times strains, in addition to salve problem resolution associated challenging and trouble project
  3. 3. Handling Projects: 1.)Project Name: MA’ADEN [PAP] Phosphate Acid Project Turaif ( KSA) Employer : Hanwha E & C/ FLUOR KSA Period : April 16- 2015 to 30 April 16 Designation : QA/QC Engineer Responsibilities: Preparation Project Inspections test Plans, Test packing documentation mechanical completion of Electrical & Instrument Sub-Systems of the project turnover to client with QVD, documentation mechanical completion CCW/MCW, pre commissioning team and Commissioning. Collate Inspection Results, coordinate field inspection activities of HANWAH / E & C and Third Party Inspection agencies. Which require to be addressed separately and need to be controlled through specific procedures? Prepare accordingly documents relevant to data control, inspection reporting procedure, technical queries and procedures Provide technical inputs for vendor queries, conformance reports and non-conformance reports. Review vendor queries, CR (Conformance Reports), NCR, (Non Conformance Reports) for possible resolutions and analyses fitness to purpose. Provide necessary recommendations that need to be forwarded to the client support the commissioning team (LOTO) and supported documentation monitor the site work plan and attend t h e weekly meeting And Reported to client etc. 2.)Project Name ; Uthim ArAr / Uthim Hail Shopping Mall KSA Saudi Arabia Employer : Seenat Construction Est / KSA Period : Jan 2015 to 15 April 2015 Designation : Electro Mechanical Engineer Responsibilities: Costing and Tendering the Project directs activities concerned with High Rice Building Project’s systems installation, (BMS, HAVC, CCTV, CATV, FA, and PA) operation, directs activities of engineers engaged in preparing designs plans to construction. lightning protection and earthling Installation Provides engineering & technical direction for planning and projects Shop Drawing Reviews plan specifications prior to instituting project to Coordinates with material procurement specifications to prepare project proposals for negotiating production contracts discussions with contactor as pre project time Scheduling Supervises coordinates activities of workers engaged in assembly, inspecting, and testing of electrical equipment like 33Kva,11Kav Transformers, Bas bar riser, Chillers, LV,MV Switch Gear &415KVA Power Distribution Board, Motors, generators, voltage regulators, capacitors, and switches, applying knowledge of assembly techniques, machine setup, and testing Commissioning procedures. Interprets blueprints, specific at... 3.Project Name; Vale Malaysia Minerals SDN BHD[VMM] Phase1, Malaysia Employer : Arcadias & Towell Sdn. Bhd. (VMMP), (Brazil) Period : Jul 2013 to Nov 2014 Designation : E &I /QA/QC Engineer
  4. 4. Responsibilities: Plan, coordinate and direct quality program designed to ensure consistency With established standards’ ITP Establish proposed quality and inspectors over testing activities. Primary Duties QA/QC Engineer has all the responsibility calibration of instrumentation and electrical equipment with system of QC Inspector in addition to this he shall, Review contract documents to ensure identification of quality requirements. Participate in internal & external audits and assessments. Supervise Other Contractors QC personnel. Implement Project inspection and test Plans, collate Inspection Results, coordinate field inspection activities of Vale and Third Party Inspection agencies. Which require to be addressed separately and need to be controlled through specification procedures? Prepare accordingly documents relevant to data control, inspection reporting procedure, technical queries and procedures Provide technical inputs for vendor queries, conformance reports and non-conformance reports. Review vendor queries, CR (Conformance Reports), NCR (Non Conformance Reports) for possible Resolutions and analyses fitness to purpose. Provide necessary recommendations that need to be forwarded to the client support the commissioning team and supported documentation monitor the site work plan and attend the weekly meeting and Reported to client etc. 4.)Project Name; Safran Hambd Sendayen TAC Valley Seramban Malaysia Employer : ALTOTEGAS ELECTRICAL & INSTRUMENT, (Malaysia) Period : August 2012 to Jun 2013 Designation : Construction Manager Responsibilities: Constructions & Manage the project construction and technical Engineering pending issues designing shop drawing Electrical and instruments work, procurement and work plan for construction completed documentation mechanical compaction of the project hand overrunning to client leading QA/QC, pre commissioning team and Commissioning. 5.) Project Name; alliance LNG Re-gasification Offshore Berth & Subsea Pipeline Employer : RANHILL WORLEY PERSON, (Australia) Period : November 2011 to July2012 Designation : E&I Project Engineer Responsibilities: Construction & Engineering for construction of the project onshore & offshore and scheduling ship loading and Consisted completed installation of electrical and instrument equipment’s included Designing issues shop drawing, red line and mark up drawing as for site construction requirement, up dated documentation, included instrument calibration handling QA/QC Electrical & Instrumentation Mechanical & Completion, pre commissioning& Commissioning also. Handover to Operation 6.) Project Name; Laynas Advance Material Industrial Area GEB Malaysia Employer : ROTARY (MAC) MALAYSIA SDN BHD, Singapore Period : January 2011 to November 2011 Designation : QA/ QC manager
  5. 5. Responsibilities: Involve in the project hand over documentation mechanical completion instruments calibrations procedure & test packing of Electrical & Instrument Sub-Systems as per Project specification and (ISO) standards, work pack for electrical and instruments pre loading system of the project including pre commissioning and commissioning also relay calibration 33kv/11kv/415transformer man substation, distribution MCC and motor control system. Electrical Intelligent network with PLC system, including project management manpower management cost management & over all enounce of quality work man ship delivered to client. 7.) Project Name;G+45 F, Al Majaz Hotel Continental Consultant & Engr.UAE Employer : CONTINENTAL CONSULTANT, LLC, United Arab Emirates Period : July 2007 to Dec 2010 Designation : Electro Mechanical Engineer Responsibilities: Engineering & Construction of high rice building & (MEP/BMS) Project Electrical load Calculation, Shop Drawing and designing telephone, date, CATV, CCTV, HVAC, chillers including firefighting also public security system tendering the project with specification inspection and manage the contractor with project completion time & date scheduled commissioning etc. 8.) Project Name; Tanjugbin 3X700MV Coal Fired Power Plant Malaysia Employer : MCIE SDN BHD, Malaysia Period : July 2006 to March 2007 Designation : E &I /QA/QC Supervisor Responsibilities: QC Participate in internal & external audits and assessments. Supervise Other Contractors QC personnel. Implement Project inspection and test Plans, collate Inspection Results, coordinate field inspection activities of Sumitomo and Third Party Inspection agencies. Identify specific requirements in the contract, which require to be addressed separately and need to be controlled through specific procedures. Prepare accordingly documents relevant to data control, inspection reporting procedure, technical queries and procedures for concessionary reports. Coordinate all inspection requirements. Set up a system for tracking inspection notifications and execution of inspection until a release note is issued. Control the number of inspection. Its compliance to approved data sheets drawings, witness testing as approved by ITP. Produce necessary inspection report and release Notes. Integrate with and work alongside the quality team and perform all related tasks as and when requested by the supervisor. Provide technical inputs for vendor queries, conformance reports and non- conformance reports. Review vendor queries, CR (Conformance Reports), NCR (Non Conformance Reports) for possible resolutions and analyses fitness to purpose. Provide necessary recommendations that need to be forwarded to the client.3.3 KV Rotary hammier in tow (2) tripper car units and other ancillary equipment requirements of the project system with. DCS and PLC system including operation and maintenance i n c l u d i n g 3.3 KV/11KV/415V main and satellite substation distribution system electrical intelligent network with PLC & DCS system.
  6. 6. 9.) Project Name;TanjungBin 3X700 MV Coal Fired Power Plant MALAYSIA Employer : ISHIPOWER /CONCORD ENINEERING SDN BHD, Japan Period : Dec 2004 to Jun 2006 Designation : Electrical /QA/QC Supervisor Responsibilities: Coordinate inspection activities with in discipline in accordance with the relevant Inspection and Test Plan. To Read and understand the ITP requirements for quality on the Project identified with the Project Specifications and Procedures and Ensure that inspection activities and acceptance criteria are clearly understood to subcontractor and the discipline inspectors. Liaise with the Discipline Supervisors and the Company with regard to inspection requirements and acceptance criteria. Discuss and resolve, if possible, problems relating to quality with the company representative, always reporting back to the Project Quality Manager. Verify and approve quality control records within discipline ensuring that records are generated accurately and expeditiously by the subcontractor in accordance with the relevant ITP. Record and control all non-conformances raised within discipline and monitor the implementation of any corrective action. Report any non-conformances found during inspection coordination with the QC Inspectors Project Quality Manager. 10.) Project Name; Manjung 3X700MV Coal Fired Power Plant Mnj. Malaysia Employer : ALSTOM CONSORTIUM / KENTZ PERMBA, (France Period : Dec 2001 to Nov 2003 Designation : Electrical Engineer. Responsibilities: Overall site construction engineering and supervision of boiler bunker and cool conveyor Equipment installation of coal conveyor to boiler bunkers including fly ash and bottom ash conveyor to ash pond equipment inclusive in system commissioning are magnetic separator tramp detectors, coal analyzers. 3.3. KW rotary hammer coal crushers, chute actuator, screw conveyor12 dust extraction units 2 tripper car units and other ancillary equipment’s. Scope of work included but not Limited to project management, manpower/m hour management, cost management and overall enounce of quality. Workmanship delivered d to client 11.) Project Name Optimal Olefain Project Union,C /Petronas Malaysia Employer : SAMSUNG ENGINEERING (M) SDN BHD,( Korea ) Period : November 2000 to Nov 2001 Designation : Instrument Engineer Responsibilities: Construction installation and process instrumentation with DCS, PMCS, SIS system Mechanical completion, Pre-commissioning & commissioning including process operations and support facilities, security system electrical heart trace controls simulation Distribution, ambient and process analyzers, security system, electrical heart trace also Procurements, cost estimation.
  7. 7. 12.)Project Name;Centralized Utility Facility Petronas Project Malaysia Employer :FOSTER WHEELER INTERNATIONAL (M) SDN BHD, (England) Period :June 1999 to Nov 2000 Designation : Electrical Supervisor Responsibilities: Main scope of work installation of electrical & instruments equipment’s for complete plant system including 6G, 45 MW cogon units, denier water, oxygen and nitrogen manufacturing as well as safety and alarm system. In addition, was responsible for organization and completion of loop check dossier and P&ID to ensure start up and commissioning procedures for mechanical equipment and gas turbines were adhered to additional responsibilities included the coordination and management of labor and procurement of materials required to clear punch list items in order to support commissioning activities and schedules. 13.)Project Name; PETRONAS KR2 Aromatics Project Kertih TRG Malaysia Employer : TOYO ENGINEERING (M) SDN BHD, japan Period : June 1998 to June 1999 Designation : Electrical& Instrument supervisor. Responsibilities: Responsible for coordination and monitoring of installation, QA /QC testing and commissioning associate d with all mechanical & electrical requirements of the project system included 33 KV/11KV/3.3 KV/415 V main and satellite substation distribution system, Electrical intelligent network DC, PMCS, SIS system, fire monitoring and protection equipment. 14.) Project Name; BASF PETRONAS Chemical Project Pahang Malaysia Employer : CARLOGAVAZIE (M) SDN BHD, Italy Period : May1997 to May 1998 Designation : Instrument technician. Responsibilities: Responsible for the complete installation of DCS control system, non-endive and intrinsic instrument System, MCC, s motor and motor control system,6 compressor stations and all inter connecting instrument s piping for feed treatment. Flare Water system, steam and condensate, nitrogen and instrument air, star t-up of electrical system and mechanical commissioning engineer prior to system hand over in addition to material organization, material specification and procurement, development of database to track installations on. Supervisor of filed supervisors and monitoring of all bench alignments for filed installations. 15.)Project Name; PETRONAS Gas BHD GPP 5&6 Project Trg Malaysia Employer : DAELIM ENGINEERING (M) SDN BHD, Korea Period : August 1996 to May 1997. Designation : Electrical Technician.
  8. 8. Responsibilities: Consisted of the complete installation of a Foxboro1/A 12 node, 30 tower DCS system with operations, and maintenance works stations. Designed and installed cable tray for Electrical cabling. Complete install actions of all power control and DCS cabling &associated instrumentation piping and update documentation to reflect deviations and changes, Complete electrical installation for the tank farm project including 6 spherical tanks, 5 horizontal tanks,3 enclosed, and I floating lid tang, as well as 8 truck loading stations. Also included were 10 BLH weighing system ambient air analyzer systems. DCS control system with MCC interface and regular and emergency area lighting. 16.)Project Name; PETRONAS Refinery PSR2 Project Malacca Malaysia Employer : CHYODA ENGINEERING SDN BHD, Japan Period : January 1996 to August 1996. Designation : Electrical& Instruments technician. Responsibilities to for the installation, control system, shutdown system, 11 process and ambient air analyzers, fire alarm and PA system Developed and monitored index data to prioritize and track installation activities to support commissioning activities. Interfaced and coordinated with subcontractors in order assist in organization of filed Instruments Installation supervision. Professional Certification: Certified Professional Engineer Oil & Gas Safety Passport (NIOSH). Combined Sea Survival, First Aid, Bosiet Training Training OGSP + CIDB. Luck out take out (LOTO) Microsoft Excel, Word, Power Point. Auto cad
  9. 9. Personal Information: Name : Sultan Bin Said Faqir Date & place of Birth : Peshawar (Pakistan) 01/04/1977 Nationality : Pakistani Language : English, Arabic, Hindi, Malay, Pashto Current Country : Saudi Arabia Visa Status : Resident Visa (Transferable) Driving License : Saudi Arab (KSA) Notice Period : Immediate Joining Relocation : Willing to Relocate Expected Salary : Negotiable Total Experience : 15+ Years References: 1. Loong Mun Lok (Project Manage) (longmunlok@cepl.com.sg)Tel: 0060-012-7641255 Concord Electrical SDN BHD (Malaysia) 2/ MR Chew See Seng( Project Director) ( chewaltotegas@gmail.com)Tel: 006-012-6087257 Altotegas SDN BHD. (Malaysia) 3/ MR Satish Kumar (Construction Manager) (sathish@tecnip.com ) Tel: 006-019-9532077 Technip Engineering SDN BHD. (Malaysia) 4/ Muhammad Amir Engineering. Manager) (Amir@contientalgmail.com)Tel: 00971-507919826 Continental Consultant & Engineering (UAE) 5/ Muhammed Alrefaie .CEO. (mrecontractong@gmail.com) Tel: 00966-59-3025664 Seenat Construction & Engineering (KSA