CASE HISTORY
DOHA RED LINE NORTH
-
CONTROL IN EXECUTION OF SYSTEM PERFORMANCE OF
CONNECTION AND GASKET
Emissione Data Approvazione Progetto Rev.
S. LUPI 27/10/2014 G. BOMBEN DOHA RED LINE NORTH 1
CASE HISTORY
INTRODUCTION
Fama Spa is an Italian company operating since 1988 in design, certification,
manufacture of products for precast lining of tunnels.
Fama Spa is specialized in the development of sealing systems and a wide
range of accessories for the connection, lifting and anchoring systems for
the construction of tunnels with TBM.
For the excavation of the Red Line North di DOHA, FAMA SpA provided
gaskets and connection systems.
To complete a strategic path that began with the design and continued with
the certification through laboratory tests, with a campaign of
measurements, it was possible to document the performance of these
products in exercise.
CASE HISTORY
DOHA METRO RED LINE NORTH
DESIGN OF THE LINING
- UNIVERSAL RING 6+1
- KEY 1/3 OTHER SEGMENT
- EX. DIAMETER 6.770 mm
- IN. DIAMETER 6.170 mm
- THICKNESS OF CONCRETE 300 mm
- LENGTH OF CONCRETE 1.500 mm
- ANCHORED GASKET 26 x 17 mm
WITH HIDROPHYLIC STRIP
- 19 CONNECTORS FOR RING
(3 FOR EACH SEGMENT , 1 FOR THE KEY)
- GUIDE BAR AND BOLT ON THE RADIAL
JOINT
CASE HISTORY
EPDM SEALING GASKET
- UG027A
- ANCHORED GASKET 26 x 17 mm WITH
HIDROPHYLIC STRIP
- PRESSURE REQUIRED TO CONTRACT
 10 bar
 GAP 5 mm
 OFFSET 10 mm
CASE HISTORY
CONNECTION SYSTEM
- SMARTBLOCK 90-160/300-60
- PULL OUT 90 KN
- SHEAR STRENGTH 160 KN
- LENGTH 300 mm
- DIAMETER OF CENTERING 60 mm
CASE HISTORY
1. We want to calculate the current state of misalignment and separation of the joints between the
segments in the gallery;
2. The relief is performed with the use of two measurement gauges: one for the depth, with which
recalculate the offsets and one for the width of the slots for the recalculation of the gap;
3. The joints are first classified according to the orientation angle to the progress of the excavation;
4. Usually the relief is performed on a continuous succession of five joints, reached by the operator
that runs through the tunnel by foot. In case of severe anomalies the relief can be conducted on the
entire ring with the aid of suitable lifting equipment. The measuring block 5 of joints may, at the
operator's discretion, be repeated several times;
5. The sequence of measurements, if necessary, can be performed on the right side and on the left side
of the tunnel with reference to the direction of advance of the excavation;
6. May be conducted in the presence of detections punctual infiltration of water, in order to evaluate if
this is generated by an excessive misalignment, or spreading of the coupling or, finally, from other
causes;
7. If necessary measurements can be performed on the blocks, facing the opposite of progress to
compare with those initial misalignment stabilized along the tunnel.
PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN
THE JOINTS IN CONCRETE INTO THE TUNNEL
CASE HISTORY
PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN THE
JOINTS IN CONCRETE INTO THE TUNNEL
The measurements of gap and offset are performed at approximately 20
mm from the T joint, where the deviations from nominal are maximums.
MEASUREMENTS
OF GAP
MEASUREMENTS
OF GAP
CASE HISTORY
PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN
THE JOINTS IN CONCRETE
In the diagrams below are identified types of angles between segments of a
same ring adjacent each other refer to the direction of excavation.
CASE HISTORY
PRESENTATION OF RESULTS
MEASURES OF GAP IN THE CIRCUMFERENTIAL JOINTS
CASE HISTORY
PRESENTATION OF RESULTS
MEASURES OF GAP IN THE LONGITUDINAL JOINTS
CASE HISTORY
PRESENTATION OF RESULTS
MEASURES OF OFFSET IN THE CIRCUMFERENTIAL JOINTS
CASE HISTORY
PRESENTATION OF RESULTS
MEASURES OF OFFSET IN THE LONGITUDINAL JOINTS
CASE HISTORY
PRESENTATION OF RESULTS
PICTURES OF THE TUNNEL
CASE HISTORY
ANALYSIS OF THE RESULTS
ASSESSMENT OF THE EFFICIENCY OF THE CONNECTION SYSTEM
There have been 294 measurements of gap and offset.
The average weigth gain of the gap is 0.4 mm, the offset of 1.4 mm.
The requirements of the specifications of the Doha Metro Red Line North provide
a mounting tolerance of 5 mm on the opening of the joint (gap) and 10 mm on
the misalignment of the joint (offset). The connection system SmartBlock
allowed a mounting error is much lower than expected.
The connection system SmartBlock has minimized the effect of the divergence of
the longitudinal and circumferential joints generated by the thrust of the gasket.
The performance of the pull-out and shear of the SmartBlock are suited to the
conditions of employment, ensuring the correct dimensioning of the system.
CASE HISTORY
ANALYSIS OF THE RESULTS
ASSESSMENT OF THE EFFICIENCY OF THE SEALING GASKET
The gallery of the DOHA METRO RED LINE NORTH is dry.
The gasket sealing UG027A has been tested at the University Tor Vergata for
the hydraulic performance requirements in the specifications of the project
Doha Metro Red Line North.
The gasket UG022A requires a load of 45 KN/m for its complete compression
facilitating, in fact, the permanence of the closed joint.
The geometry of UG022A well balanced between width and height and
angles conformed to the geometry of the concrete allow, during assembly of
the ring, to remain in its seat.

More Related Content

Viewers also liked (7)

Road map of pp
Road map of ppRoad map of pp
Road map of pp
 
Case history doha linea red line north en
Case history   doha linea red line north enCase history   doha linea red line north en
Case history doha linea red line north en
 
Guarnizione ancorata ug027 a def_fr
Guarnizione ancorata ug027 a def_frGuarnizione ancorata ug027 a def_fr
Guarnizione ancorata ug027 a def_fr
 
Fama presentazione aziendale slim en
Fama presentazione aziendale slim enFama presentazione aziendale slim en
Fama presentazione aziendale slim en
 
Fama presentazione aziendale slim en
Fama presentazione aziendale slim enFama presentazione aziendale slim en
Fama presentazione aziendale slim en
 
Fama presentazione aziendale slim
Fama presentazione aziendale slim Fama presentazione aziendale slim
Fama presentazione aziendale slim
 
Anchored rubber gasket UG027A presentation
Anchored rubber gasket UG027A presentationAnchored rubber gasket UG027A presentation
Anchored rubber gasket UG027A presentation
 

Similar to Case history doha linea red line north en

Pipeline Construct.pptx
Pipeline Construct.pptxPipeline Construct.pptx
Pipeline Construct.pptx
ssuserfc98db
 
SPC HDPE BROCHURE NEW
SPC HDPE BROCHURE NEWSPC HDPE BROCHURE NEW
SPC HDPE BROCHURE NEW
Lia Collatz
 
804 query-short-spools-support
804 query-short-spools-support804 query-short-spools-support
804 query-short-spools-support
Alaa Altaie
 

Similar to Case history doha linea red line north en (20)

Case history doha linea red line north en
Case history   doha linea red line north enCase history   doha linea red line north en
Case history doha linea red line north en
 
A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...
 
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...
Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Mach...
 
Pipeline Construct.pptx
Pipeline Construct.pptxPipeline Construct.pptx
Pipeline Construct.pptx
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
ADITYA IS-4984.pptx
ADITYA IS-4984.pptxADITYA IS-4984.pptx
ADITYA IS-4984.pptx
 
11.01.04 Trench Drains
11.01.04    Trench  Drains11.01.04    Trench  Drains
11.01.04 Trench Drains
 
SPC HDPE BROCHURE NEW
SPC HDPE BROCHURE NEWSPC HDPE BROCHURE NEW
SPC HDPE BROCHURE NEW
 
Mill & Kiln Gear Asset Management
Mill & Kiln Gear Asset ManagementMill & Kiln Gear Asset Management
Mill & Kiln Gear Asset Management
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
Analysis of 8 path meter diagnostics
Analysis of 8 path meter diagnosticsAnalysis of 8 path meter diagnostics
Analysis of 8 path meter diagnostics
 
A Complete Guide on Directional Boring
A Complete Guide on Directional BoringA Complete Guide on Directional Boring
A Complete Guide on Directional Boring
 
Hydraulic catalogue
Hydraulic catalogueHydraulic catalogue
Hydraulic catalogue
 
Ptc magmeter manual
Ptc magmeter manualPtc magmeter manual
Ptc magmeter manual
 
Effect of height of triangular siil on the performance of stilling basin model
Effect of height of triangular siil on the performance of stilling basin modelEffect of height of triangular siil on the performance of stilling basin model
Effect of height of triangular siil on the performance of stilling basin model
 
Fire Safety (Common Design Issues) .pptx
Fire Safety (Common Design Issues) .pptxFire Safety (Common Design Issues) .pptx
Fire Safety (Common Design Issues) .pptx
 
Flexible Ducts
Flexible DuctsFlexible Ducts
Flexible Ducts
 
Design and Fabrication of an In-Pipe Inspection Robot
Design and Fabrication of an In-Pipe Inspection RobotDesign and Fabrication of an In-Pipe Inspection Robot
Design and Fabrication of an In-Pipe Inspection Robot
 
Simulation of the Design of an Exhaust Silencer Stack by CFD
Simulation of the Design of an Exhaust Silencer Stack by CFDSimulation of the Design of an Exhaust Silencer Stack by CFD
Simulation of the Design of an Exhaust Silencer Stack by CFD
 
804 query-short-spools-support
804 query-short-spools-support804 query-short-spools-support
804 query-short-spools-support
 

More from stefanolupifamaspa

More from stefanolupifamaspa (11)

Case history doha linie red line north - ted. rev 1
Case history   doha linie red line north - ted. rev 1Case history   doha linie red line north - ted. rev 1
Case history doha linie red line north - ted. rev 1
 
Fr case history doha linea red line north - misura gap ed offset
Fr case history   doha linea red line north - misura gap ed offsetFr case history   doha linea red line north - misura gap ed offset
Fr case history doha linea red line north - misura gap ed offset
 
Case history doha linea red line north - misura gap ed offset rev 1
Case history   doha linea red line north - misura gap ed offset rev 1Case history   doha linea red line north - misura gap ed offset rev 1
Case history doha linea red line north - misura gap ed offset rev 1
 
Anchored rubber gasket UG027A english
Anchored rubber gasket UG027A englishAnchored rubber gasket UG027A english
Anchored rubber gasket UG027A english
 
Guarnizione ancorata UG027A francese
Guarnizione ancorata UG027A franceseGuarnizione ancorata UG027A francese
Guarnizione ancorata UG027A francese
 
Fama presentazione aziendale slim fr
Fama presentazione aziendale slim frFama presentazione aziendale slim fr
Fama presentazione aziendale slim fr
 
Verankerte Dichtung UG027A
Verankerte Dichtung UG027A Verankerte Dichtung UG027A
Verankerte Dichtung UG027A
 
Case history mailand linie m4 strecke expo
Case history   mailand linie m4 strecke expoCase history   mailand linie m4 strecke expo
Case history mailand linie m4 strecke expo
 
Fama presentazione aziendale slim ted
Fama presentazione aziendale slim tedFama presentazione aziendale slim ted
Fama presentazione aziendale slim ted
 
Case history milano linea m4 tratta expo rev.1
Case history   milano linea m4 tratta expo rev.1Case history   milano linea m4 tratta expo rev.1
Case history milano linea m4 tratta expo rev.1
 
Presentazione guarnizione ancorata UG027A
Presentazione guarnizione ancorata UG027APresentazione guarnizione ancorata UG027A
Presentazione guarnizione ancorata UG027A
 

Recently uploaded

Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
sexy call girls service in goa
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
Dr. Salem Baidas
 

Recently uploaded (20)

Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
Types of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentationTypes of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentation
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
 

Case history doha linea red line north en

  • 1. CASE HISTORY DOHA RED LINE NORTH - CONTROL IN EXECUTION OF SYSTEM PERFORMANCE OF CONNECTION AND GASKET Emissione Data Approvazione Progetto Rev. S. LUPI 27/10/2014 G. BOMBEN DOHA RED LINE NORTH 1
  • 2. CASE HISTORY INTRODUCTION Fama Spa is an Italian company operating since 1988 in design, certification, manufacture of products for precast lining of tunnels. Fama Spa is specialized in the development of sealing systems and a wide range of accessories for the connection, lifting and anchoring systems for the construction of tunnels with TBM. For the excavation of the Red Line North di DOHA, FAMA SpA provided gaskets and connection systems. To complete a strategic path that began with the design and continued with the certification through laboratory tests, with a campaign of measurements, it was possible to document the performance of these products in exercise.
  • 3. CASE HISTORY DOHA METRO RED LINE NORTH DESIGN OF THE LINING - UNIVERSAL RING 6+1 - KEY 1/3 OTHER SEGMENT - EX. DIAMETER 6.770 mm - IN. DIAMETER 6.170 mm - THICKNESS OF CONCRETE 300 mm - LENGTH OF CONCRETE 1.500 mm - ANCHORED GASKET 26 x 17 mm WITH HIDROPHYLIC STRIP - 19 CONNECTORS FOR RING (3 FOR EACH SEGMENT , 1 FOR THE KEY) - GUIDE BAR AND BOLT ON THE RADIAL JOINT
  • 4. CASE HISTORY EPDM SEALING GASKET - UG027A - ANCHORED GASKET 26 x 17 mm WITH HIDROPHYLIC STRIP - PRESSURE REQUIRED TO CONTRACT  10 bar  GAP 5 mm  OFFSET 10 mm
  • 5. CASE HISTORY CONNECTION SYSTEM - SMARTBLOCK 90-160/300-60 - PULL OUT 90 KN - SHEAR STRENGTH 160 KN - LENGTH 300 mm - DIAMETER OF CENTERING 60 mm
  • 6. CASE HISTORY 1. We want to calculate the current state of misalignment and separation of the joints between the segments in the gallery; 2. The relief is performed with the use of two measurement gauges: one for the depth, with which recalculate the offsets and one for the width of the slots for the recalculation of the gap; 3. The joints are first classified according to the orientation angle to the progress of the excavation; 4. Usually the relief is performed on a continuous succession of five joints, reached by the operator that runs through the tunnel by foot. In case of severe anomalies the relief can be conducted on the entire ring with the aid of suitable lifting equipment. The measuring block 5 of joints may, at the operator's discretion, be repeated several times; 5. The sequence of measurements, if necessary, can be performed on the right side and on the left side of the tunnel with reference to the direction of advance of the excavation; 6. May be conducted in the presence of detections punctual infiltration of water, in order to evaluate if this is generated by an excessive misalignment, or spreading of the coupling or, finally, from other causes; 7. If necessary measurements can be performed on the blocks, facing the opposite of progress to compare with those initial misalignment stabilized along the tunnel. PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN THE JOINTS IN CONCRETE INTO THE TUNNEL
  • 7. CASE HISTORY PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN THE JOINTS IN CONCRETE INTO THE TUNNEL The measurements of gap and offset are performed at approximately 20 mm from the T joint, where the deviations from nominal are maximums. MEASUREMENTS OF GAP MEASUREMENTS OF GAP
  • 8. CASE HISTORY PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN THE JOINTS IN CONCRETE In the diagrams below are identified types of angles between segments of a same ring adjacent each other refer to the direction of excavation.
  • 9. CASE HISTORY PRESENTATION OF RESULTS MEASURES OF GAP IN THE CIRCUMFERENTIAL JOINTS
  • 10. CASE HISTORY PRESENTATION OF RESULTS MEASURES OF GAP IN THE LONGITUDINAL JOINTS
  • 11. CASE HISTORY PRESENTATION OF RESULTS MEASURES OF OFFSET IN THE CIRCUMFERENTIAL JOINTS
  • 12. CASE HISTORY PRESENTATION OF RESULTS MEASURES OF OFFSET IN THE LONGITUDINAL JOINTS
  • 13. CASE HISTORY PRESENTATION OF RESULTS PICTURES OF THE TUNNEL
  • 14. CASE HISTORY ANALYSIS OF THE RESULTS ASSESSMENT OF THE EFFICIENCY OF THE CONNECTION SYSTEM There have been 294 measurements of gap and offset. The average weigth gain of the gap is 0.4 mm, the offset of 1.4 mm. The requirements of the specifications of the Doha Metro Red Line North provide a mounting tolerance of 5 mm on the opening of the joint (gap) and 10 mm on the misalignment of the joint (offset). The connection system SmartBlock allowed a mounting error is much lower than expected. The connection system SmartBlock has minimized the effect of the divergence of the longitudinal and circumferential joints generated by the thrust of the gasket. The performance of the pull-out and shear of the SmartBlock are suited to the conditions of employment, ensuring the correct dimensioning of the system.
  • 15. CASE HISTORY ANALYSIS OF THE RESULTS ASSESSMENT OF THE EFFICIENCY OF THE SEALING GASKET The gallery of the DOHA METRO RED LINE NORTH is dry. The gasket sealing UG027A has been tested at the University Tor Vergata for the hydraulic performance requirements in the specifications of the project Doha Metro Red Line North. The gasket UG022A requires a load of 45 KN/m for its complete compression facilitating, in fact, the permanence of the closed joint. The geometry of UG022A well balanced between width and height and angles conformed to the geometry of the concrete allow, during assembly of the ring, to remain in its seat.