SlideShare uma empresa Scribd logo
1 de 14
Baixar para ler offline
L3 Communications Reverse Engineering Presented by Anish Tailor  and Jacob Wilson
Constraints Certain rules we must abide by 1. Alter the original testing rack, but without changing size and overall design.  2. The timer inputs must not be altered. 3. The structure must support itself. 4. Materials that have a low melting or freezing point cannot be used.
Problem and Design Statement  To Develop a new testing racks to hold timers. This rack must go through any environment the timers would go through. L3 Avionics would put this rack into a testing chamber to see if the structure and timers and withstand the environmental forces. Target Consumer and Client Co. would be L3 Communications.  Design Statement: To design, model and build a testing rack which holds timers through contrasting temperatures and physical movements.
Problems found Main Problems
Solutions
Chosen Idea   The proposed structure would contain a handle on the top and everything will acquire a new material scheme of Titanium.  The steel base of the structure would be removed.  There will be a plastic sheet covering the wiring in the back of the structure that can slide in and out of place for easy access.   The thickness of the Railings will be reduced. The Titanium is known for its excellent resistance to corrosion.
Final prototype of Chosen Idea
New Back
Assembly Chart
Materials used in proposal  Nonferrous Metals Ferrous Metals Plastics
WorksCited http://www.lenntech.com/periodic/elements/ti.htm http://www.roymech.co.uk/Useful_Tables/Matter/Titanium.html

Mais conteúdo relacionado

Destaque

Destaque (6)

11 goodways
11 goodways11 goodways
11 goodways
 
Pringles presentation
Pringles presentationPringles presentation
Pringles presentation
 
Probabilitas sampling
Probabilitas samplingProbabilitas sampling
Probabilitas sampling
 
Mcs final cisco case study
Mcs final cisco case studyMcs final cisco case study
Mcs final cisco case study
 
Cadbury
CadburyCadbury
Cadbury
 
Bmw x1 marketing plan
Bmw x1  marketing planBmw x1  marketing plan
Bmw x1 marketing plan
 

Mais de steelerboy9553

All parts for oil tanker
All parts for oil tankerAll parts for oil tanker
All parts for oil tankersteelerboy9553
 
All parts for oil tanker
All parts for oil tankerAll parts for oil tanker
All parts for oil tankersteelerboy9553
 
Title block for all pieces
Title block for all piecesTitle block for all pieces
Title block for all piecessteelerboy9553
 
Title block for all pieces
Title block for all piecesTitle block for all pieces
Title block for all piecessteelerboy9553
 
Viking title block for train parts
Viking title block for train partsViking title block for train parts
Viking title block for train partssteelerboy9553
 
Viking title block for train parts
Viking title block for train partsViking title block for train parts
Viking title block for train partssteelerboy9553
 
Viking title block for bracket
Viking title block for bracketViking title block for bracket
Viking title block for bracketsteelerboy9553
 
Viking title block for sectioned bracket and base
Viking title block for sectioned bracket and baseViking title block for sectioned bracket and base
Viking title block for sectioned bracket and basesteelerboy9553
 
Pringles presentation for blake and jacob
Pringles presentation for blake and jacobPringles presentation for blake and jacob
Pringles presentation for blake and jacobsteelerboy9553
 
Viking title block for cube 2 title block
Viking title block for cube 2 title blockViking title block for cube 2 title block
Viking title block for cube 2 title blocksteelerboy9553
 
Viking title block for cube 1 title block
Viking title block for cube 1 title blockViking title block for cube 1 title block
Viking title block for cube 1 title blocksteelerboy9553
 
The evolution of the rocket 2 real one
The evolution of the rocket 2 real one The evolution of the rocket 2 real one
The evolution of the rocket 2 real one steelerboy9553
 

Mais de steelerboy9553 (15)

All parts for oil tanker
All parts for oil tankerAll parts for oil tanker
All parts for oil tanker
 
All parts for oil tanker
All parts for oil tankerAll parts for oil tanker
All parts for oil tanker
 
Title block for all pieces
Title block for all piecesTitle block for all pieces
Title block for all pieces
 
Title block for all pieces
Title block for all piecesTitle block for all pieces
Title block for all pieces
 
Viking title block for train parts
Viking title block for train partsViking title block for train parts
Viking title block for train parts
 
Viking title block for train parts
Viking title block for train partsViking title block for train parts
Viking title block for train parts
 
Viking title block for bracket
Viking title block for bracketViking title block for bracket
Viking title block for bracket
 
Viking title block for sectioned bracket and base
Viking title block for sectioned bracket and baseViking title block for sectioned bracket and base
Viking title block for sectioned bracket and base
 
Eco shelter
Eco shelterEco shelter
Eco shelter
 
Pltw template mod
Pltw template modPltw template mod
Pltw template mod
 
Pringles presentation for blake and jacob
Pringles presentation for blake and jacobPringles presentation for blake and jacob
Pringles presentation for blake and jacob
 
Viking title block for cube 2 title block
Viking title block for cube 2 title blockViking title block for cube 2 title block
Viking title block for cube 2 title block
 
Viking title block for cube 1 title block
Viking title block for cube 1 title blockViking title block for cube 1 title block
Viking title block for cube 1 title block
 
Next gen cup
Next gen cupNext gen cup
Next gen cup
 
The evolution of the rocket 2 real one
The evolution of the rocket 2 real one The evolution of the rocket 2 real one
The evolution of the rocket 2 real one
 

L3 communications reverse engineering anish and jacobo

  • 1. L3 Communications Reverse Engineering Presented by Anish Tailor and Jacob Wilson
  • 2. Constraints Certain rules we must abide by 1. Alter the original testing rack, but without changing size and overall design. 2. The timer inputs must not be altered. 3. The structure must support itself. 4. Materials that have a low melting or freezing point cannot be used.
  • 3. Problem and Design Statement To Develop a new testing racks to hold timers. This rack must go through any environment the timers would go through. L3 Avionics would put this rack into a testing chamber to see if the structure and timers and withstand the environmental forces. Target Consumer and Client Co. would be L3 Communications. Design Statement: To design, model and build a testing rack which holds timers through contrasting temperatures and physical movements.
  • 6.
  • 7.
  • 8. Chosen Idea The proposed structure would contain a handle on the top and everything will acquire a new material scheme of Titanium. The steel base of the structure would be removed. There will be a plastic sheet covering the wiring in the back of the structure that can slide in and out of place for easy access. The thickness of the Railings will be reduced. The Titanium is known for its excellent resistance to corrosion.
  • 9. Final prototype of Chosen Idea
  • 12.
  • 13. Materials used in proposal Nonferrous Metals Ferrous Metals Plastics