KDC#16 Site Visitor HSE Orientation
Development Drilling Group (I) , Team : V
2
KDC # 16
Comply Wtih All KDC HSE Rules 3
OUR Policy Gives the right to every
individual to STOP WORK.
KDC HSE POLICY
We are committed to conduct our activities:
• In a manner that does not expose employees,
business partners, subcontractors and
communities to injury or harm, ill-health
• In an environmentally responsible manner with
due regards to the natural areas
• In accordance to applicable local laws &
regulations, industry codes, and client’s
requirements.
Welcome to RIG 16
Rig Personnel:
POSITION NAMES CONTACT NUMBER
Rig Superintendent Hamad Al Rish 99244068
Company Man • Bader
• Abdul Rahuman
96923174
SENIOR TOOL PUSHER • Hamed Moneer
• Gamal El Said
97895053
NIGHT TOOL PUSHERS • Balchandra Pandey
• Ali Mohammed
97895053
Medics • Jaidevan V.
• Basil John
• Jibu Varghese
97895053
HSE Field Advisors • Julius Tharakan
• Rajesh Kumar Rath
99319867
3
LTI Fee Days
5
As of 5th Jan 2023 we have
completed 1754 Days of
LTI Free Days
Environment Information: Abdali, North Kuwait
6
Weather Forecast Information:
Cold and Partly cloudy with light
to moderate freshening at times
northwesterly wind with speed of
10 - 40 km/h with a chance for
scattered light rain.
7
Cairn India – 2011
SMOKING
Smoking permitted only in the designated Smoking area.
Camera
Photography is prohibited. Permission to be obtained
from Rig Manager
MOBILE
Mobiles are prohibited in Hazardous Zones
Lighters /Match Box
Deposit at Office / mess halls.
Speed Limit
10 Km / Hr.
Site Specific Rules
8
Field Location - SABRIYA
Field
Location -
RAUDHATAI
N
WELL # RA-801 spudded on: 27-09-19
9
Rig Organization
KOC Company Man
Badar
Abdul Rahuman
KDC Rig Manager
Hamed Moneer /Gamal El
Said
Medics
1.Jai Devan
2. Jibu Varghese
3. Basil John
HSE Advisor
1.Rajesh Kumar
Rath
2. Julius Tharakan
Night Pusher
1.Balchandra
Pandey
2. Ali Mohammed
Drillers
Muhammed Kutty
Robert A.
Domingo A.
Tamer Bedir
Senior Electrician
Arun/ Pradeep
Senior Mechanic
Istiaq/Asif
DS
Hamad Al Rish
HSE Coordinator
Miguel H.
Emergency Response
 Two Muster Point Stations
 Rig entrance
 Opposite side of Rig entrance
 When you hear the alarm:
 Check the windsock direction
 Proceed to upwind Muster Point
 Line up accordingly
 Medic will conduct the head count
 In case of missing Personnel, the Search and
Rescue Team will be activated
 Wind socks are located at Both Muster Points, Dog
house and Mud Tanks.
10
Fire Alarm
Siren + Red Flashing Light
H2S Alarm
Warning tone+ Amber Light
Kick – Blow Out Alarm
Continuous sound blast from the rig air horn
All-Clear Signal
Different Types of Alarms
11
Emergency Response
GREEN-SAFE TO ENTER
YELLOW-WITH CAUTION
RED-DO NOT ENTER
RIG ENTRY H2S SIGN
Rig Layout
Please update with rig specific route map 13
Emergency Rig Layout of KDC-16
14
Emergency Response
15
 Be aware of snakes and
scorpions, especially in dark.
 Check your room thoroughly
before going to bed.
 Check boots and clothes in the
morning before putting on.
 Do not touch any unidentified
things with bare hands.
COMMON HAZARD – IN & AROUND
16
Specific Hazards and Risks
What are the more
common risks on a Drilling
site ?
17
TOXIC GAS KICK
HP LINES
CONFINED SPACE LIFTING ACTIVITIES SLIP / TRIP
BIOLOGICAL MANAUAL HANDLING WORK AT HEIGHT
MOVING EQUIPMENTS
Specific Hazards and Risks
FIRE
General HSE Rules
 Use of PPE is mandatory in working areas.
 Facial hair that might inhibit the seal of a respirator is not
permitted.
 The following items are prohibited on location
 Waste Segregation: Use appropriate trash bins
 Report any spillage or leakage
 Report to the Medic if under specific medication or allergy
USE of Web sling is banned
at Rig Site
19
This applicable to KDC & its Workplace
Third Party Sub-contractor
HSE Communication & HAZARD Reporting
 Empowerment to STOP the job
 STAR Cards shall be used to report all
safe/unsafe conditions and acts.
 Report any Hazards or Incidents to the
Company man and Rig Manager
immediately.
Safety Meetings
 Weekly Safety meeting
 Pre-Tour Meeting conducted
everyday
For STAR Cards
• Obey all posted signs such as No Smoking, Use Hearing
Protection and Authorized Personnel Only.
• Smoking is allowed in Designated Smoking Areas. Please do use
the provided ashtrays and avoid the ground or trash buckets.
• Help keep our site clean and do not create a fire hazard.
Information Signs and Smoking Areas
21
Comply Wtih All KDC HSE Rules
Please Help Us Preserve the Environment and Our Job Site!
1. Always use the provided waste containers and trash barrels.
2. Segregate waste and dispose of it using the correct container.
3. Never throw “hot” items or cigarettes into trash containers.
4. Do not throw drinking bottles and trash onto the ground.
Housekeeping and the Environment
22
Comply With All KDC HSE Rules
CONCLUSION
 Log in onto visitor’s log book.
 Make sure to sign out before leaving the location.
 Wear your full PPE at all the times in working areas.
 Do not put yourself in the “Line of Fire”.
Respect the sign posted.
 Report all Hazardous situations and unsafe acts to supervisors.
 Secure your laptop properly.
 STOP THE JOB, if you feel it is unsafe to proceed.
Please Remember To
1. Gather up all of your belongings and personal gear.
2. Inform the Rig Manager and/or Medic that you are leaving, including
the date and time of your departure.
3. Unless you are using your own vehicle, wait in living quarters or your
temporary office until your transport and driver is ready. You will be
called when it is time to board.
4. Ensure you sign out of the Visitors Log and remove your
identification from the T Card Board.
Leaving the Facility
1 April 15 24
Comply Wtih All KDC HSE Rules
KDC-16 RIG Induction PPT-Updated-01-2023.pptx
KDC-16 RIG Induction PPT-Updated-01-2023.pptx

Mais conteúdo relacionado

Mais procurados

Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and typesElsayed Amer
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellheadElsayed Amer
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valvesAkhilesh Maurya
 
Offshore platform slot recovery process
Offshore platform slot recovery processOffshore platform slot recovery process
Offshore platform slot recovery processKamel Elsayed
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )guest521158
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wlegElsayed Amer
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selectionElsayed Amer
 
Safety drilling slide show
Safety drilling slide showSafety drilling slide show
Safety drilling slide showCLIFFHORN65
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequanceElsayed Amer
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guideElsayed Amer
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templatesDwarika Bhushan Sharma
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 

Mais procurados (20)

Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and types
 
Rig components
Rig componentsRig components
Rig components
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Ssd spm
Ssd   spmSsd   spm
Ssd spm
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valves
 
Offshore platform slot recovery process
Offshore platform slot recovery processOffshore platform slot recovery process
Offshore platform slot recovery process
 
BOP
BOPBOP
BOP
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
 
Tubing string
Tubing stringTubing string
Tubing string
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selection
 
Safety drilling slide show
Safety drilling slide showSafety drilling slide show
Safety drilling slide show
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guide
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Wellhead
WellheadWellhead
Wellhead
 
02 wireline
02 wireline02 wireline
02 wireline
 

Semelhante a KDC-16 RIG Induction PPT-Updated-01-2023.pptx

SITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAININGSITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAININGsatheesh843134
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfIbukunOwolabi4
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdfHSEXINYIPROJECT
 
Th en-sds16-lubodrive ec
Th en-sds16-lubodrive ecTh en-sds16-lubodrive ec
Th en-sds16-lubodrive ecvilapthi
 
NGI-Safety Induction-English
NGI-Safety Induction-EnglishNGI-Safety Induction-English
NGI-Safety Induction-Englishlifecombo
 
Cleanworks induction updated 2012
Cleanworks induction updated 2012Cleanworks induction updated 2012
Cleanworks induction updated 2012Psyche Penuliar
 
Basic Safety Induction .pptx
Basic Safety Induction .pptxBasic Safety Induction .pptx
Basic Safety Induction .pptxssuser1f86f6
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
Curtislubeplus fsc-8000_
Curtislubeplus  fsc-8000_Curtislubeplus  fsc-8000_
Curtislubeplus fsc-8000_cesar16405893
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxAamirAbbas75
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment InductionDotjo Dev
 
Safety interview question
Safety interview questionSafety interview question
Safety interview questionNoorul Mustafa
 
HTHA Report IOCL_publish
HTHA Report IOCL_publishHTHA Report IOCL_publish
HTHA Report IOCL_publishArijit Karmakar
 
Safetyinterviewquestionanswer 160830071330
Safetyinterviewquestionanswer 160830071330Safetyinterviewquestionanswer 160830071330
Safetyinterviewquestionanswer 160830071330nizamtharangini
 
Safety interview question & answer
Safety interview question & answerSafety interview question & answer
Safety interview question & answerSalim Solanki
 

Semelhante a KDC-16 RIG Induction PPT-Updated-01-2023.pptx (20)

SITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAININGSITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAINING
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
SIC.pptx
SIC.pptxSIC.pptx
SIC.pptx
 
Th en-sds16-lubodrive ec
Th en-sds16-lubodrive ecTh en-sds16-lubodrive ec
Th en-sds16-lubodrive ec
 
NGI-Safety Induction-English
NGI-Safety Induction-EnglishNGI-Safety Induction-English
NGI-Safety Induction-English
 
Cleanworks induction updated 2012
Cleanworks induction updated 2012Cleanworks induction updated 2012
Cleanworks induction updated 2012
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 
Basic Safety Induction .pptx
Basic Safety Induction .pptxBasic Safety Induction .pptx
Basic Safety Induction .pptx
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
 
Safety.pptx
Safety.pptxSafety.pptx
Safety.pptx
 
Curtislubeplus fsc-8000_
Curtislubeplus  fsc-8000_Curtislubeplus  fsc-8000_
Curtislubeplus fsc-8000_
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment Induction
 
Safety interview question
Safety interview questionSafety interview question
Safety interview question
 
HTHA Report IOCL_publish
HTHA Report IOCL_publishHTHA Report IOCL_publish
HTHA Report IOCL_publish
 
Safetyinterviewquestionanswer 160830071330
Safetyinterviewquestionanswer 160830071330Safetyinterviewquestionanswer 160830071330
Safetyinterviewquestionanswer 160830071330
 
Safety interview question & answer
Safety interview question & answerSafety interview question & answer
Safety interview question & answer
 

Último

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 

Último (20)

young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 

KDC-16 RIG Induction PPT-Updated-01-2023.pptx

  • 1. 1 KDC#16 Site Visitor HSE Orientation Development Drilling Group (I) , Team : V
  • 3. Comply Wtih All KDC HSE Rules 3 OUR Policy Gives the right to every individual to STOP WORK. KDC HSE POLICY We are committed to conduct our activities: • In a manner that does not expose employees, business partners, subcontractors and communities to injury or harm, ill-health • In an environmentally responsible manner with due regards to the natural areas • In accordance to applicable local laws & regulations, industry codes, and client’s requirements.
  • 4. Welcome to RIG 16 Rig Personnel: POSITION NAMES CONTACT NUMBER Rig Superintendent Hamad Al Rish 99244068 Company Man • Bader • Abdul Rahuman 96923174 SENIOR TOOL PUSHER • Hamed Moneer • Gamal El Said 97895053 NIGHT TOOL PUSHERS • Balchandra Pandey • Ali Mohammed 97895053 Medics • Jaidevan V. • Basil John • Jibu Varghese 97895053 HSE Field Advisors • Julius Tharakan • Rajesh Kumar Rath 99319867 3
  • 5. LTI Fee Days 5 As of 5th Jan 2023 we have completed 1754 Days of LTI Free Days
  • 6. Environment Information: Abdali, North Kuwait 6 Weather Forecast Information: Cold and Partly cloudy with light to moderate freshening at times northwesterly wind with speed of 10 - 40 km/h with a chance for scattered light rain.
  • 7. 7 Cairn India – 2011 SMOKING Smoking permitted only in the designated Smoking area. Camera Photography is prohibited. Permission to be obtained from Rig Manager MOBILE Mobiles are prohibited in Hazardous Zones Lighters /Match Box Deposit at Office / mess halls. Speed Limit 10 Km / Hr. Site Specific Rules
  • 8. 8 Field Location - SABRIYA Field Location - RAUDHATAI N WELL # RA-801 spudded on: 27-09-19
  • 9. 9 Rig Organization KOC Company Man Badar Abdul Rahuman KDC Rig Manager Hamed Moneer /Gamal El Said Medics 1.Jai Devan 2. Jibu Varghese 3. Basil John HSE Advisor 1.Rajesh Kumar Rath 2. Julius Tharakan Night Pusher 1.Balchandra Pandey 2. Ali Mohammed Drillers Muhammed Kutty Robert A. Domingo A. Tamer Bedir Senior Electrician Arun/ Pradeep Senior Mechanic Istiaq/Asif DS Hamad Al Rish HSE Coordinator Miguel H.
  • 10. Emergency Response  Two Muster Point Stations  Rig entrance  Opposite side of Rig entrance  When you hear the alarm:  Check the windsock direction  Proceed to upwind Muster Point  Line up accordingly  Medic will conduct the head count  In case of missing Personnel, the Search and Rescue Team will be activated  Wind socks are located at Both Muster Points, Dog house and Mud Tanks. 10
  • 11. Fire Alarm Siren + Red Flashing Light H2S Alarm Warning tone+ Amber Light Kick – Blow Out Alarm Continuous sound blast from the rig air horn All-Clear Signal Different Types of Alarms 11 Emergency Response
  • 12. GREEN-SAFE TO ENTER YELLOW-WITH CAUTION RED-DO NOT ENTER RIG ENTRY H2S SIGN
  • 13. Rig Layout Please update with rig specific route map 13 Emergency Rig Layout of KDC-16
  • 15. 15  Be aware of snakes and scorpions, especially in dark.  Check your room thoroughly before going to bed.  Check boots and clothes in the morning before putting on.  Do not touch any unidentified things with bare hands. COMMON HAZARD – IN & AROUND
  • 16. 16 Specific Hazards and Risks What are the more common risks on a Drilling site ?
  • 17. 17 TOXIC GAS KICK HP LINES CONFINED SPACE LIFTING ACTIVITIES SLIP / TRIP BIOLOGICAL MANAUAL HANDLING WORK AT HEIGHT MOVING EQUIPMENTS Specific Hazards and Risks FIRE
  • 18. General HSE Rules  Use of PPE is mandatory in working areas.  Facial hair that might inhibit the seal of a respirator is not permitted.  The following items are prohibited on location  Waste Segregation: Use appropriate trash bins  Report any spillage or leakage  Report to the Medic if under specific medication or allergy
  • 19. USE of Web sling is banned at Rig Site 19 This applicable to KDC & its Workplace Third Party Sub-contractor
  • 20. HSE Communication & HAZARD Reporting  Empowerment to STOP the job  STAR Cards shall be used to report all safe/unsafe conditions and acts.  Report any Hazards or Incidents to the Company man and Rig Manager immediately. Safety Meetings  Weekly Safety meeting  Pre-Tour Meeting conducted everyday For STAR Cards
  • 21. • Obey all posted signs such as No Smoking, Use Hearing Protection and Authorized Personnel Only. • Smoking is allowed in Designated Smoking Areas. Please do use the provided ashtrays and avoid the ground or trash buckets. • Help keep our site clean and do not create a fire hazard. Information Signs and Smoking Areas 21 Comply Wtih All KDC HSE Rules
  • 22. Please Help Us Preserve the Environment and Our Job Site! 1. Always use the provided waste containers and trash barrels. 2. Segregate waste and dispose of it using the correct container. 3. Never throw “hot” items or cigarettes into trash containers. 4. Do not throw drinking bottles and trash onto the ground. Housekeeping and the Environment 22 Comply With All KDC HSE Rules
  • 23. CONCLUSION  Log in onto visitor’s log book.  Make sure to sign out before leaving the location.  Wear your full PPE at all the times in working areas.  Do not put yourself in the “Line of Fire”. Respect the sign posted.  Report all Hazardous situations and unsafe acts to supervisors.  Secure your laptop properly.  STOP THE JOB, if you feel it is unsafe to proceed.
  • 24. Please Remember To 1. Gather up all of your belongings and personal gear. 2. Inform the Rig Manager and/or Medic that you are leaving, including the date and time of your departure. 3. Unless you are using your own vehicle, wait in living quarters or your temporary office until your transport and driver is ready. You will be called when it is time to board. 4. Ensure you sign out of the Visitors Log and remove your identification from the T Card Board. Leaving the Facility 1 April 15 24 Comply Wtih All KDC HSE Rules