O slideshow foi denunciado.
Utilizamos seu perfil e dados de atividades no LinkedIn para personalizar e exibir anúncios mais relevantes. Altere suas preferências de anúncios quando desejar.
Próximos SlideShares
What to Upload to SlideShare
Avançar

Compartilhar

Sap Suite On HANA Strategies & Roadmap

Sap Suite On HANA Strategies & Roadmap

  • Seja a primeira pessoa a gostar disto

Sap Suite On HANA Strategies & Roadmap

  1. 1. SAP Suite on HANA: Strategie & Roadmap Mr.Soumya De @PMP Certified February, 2021
  2. 2. What does it mean for you?
  3. 3. 3 SAP HANA Appliance – New Focus Network Storage Operating System Database Applications (SAP) Traditional approach: strong separation of concerns Project planning Work together for implementing SAP HANA Consider:  Appliance Shipment  User management  Wiring / set up process  New development process  Operations concept
  4. 4. 4 Think about… …The potential…Get familiar with the benefits you would get when porting your Suite to Suite on HANA – increase transaction/batch speed, boost operational reporting (HANA LIVE), ease the UI (improved selection screens) …Quick wins…Discover low hanging fruits and realize quick wins for your business. 1 3 2 …New innovations…Think about new/optimized processes that can leverage the HANA foundation.
  5. 5. How to get there?
  6. 6. 6 Suite on HANA Plan – Build – Run Plan  Prerequisites  Landscape Impact  SAP HANA Appliance  Installation  Update  Migration  Optimization  Monitoring  Operation Build Run
  7. 7. 7 Suite on HANA Plan – Build – Run Plan  Prerequisites  Landscape Impact  SAP HANA Appliance Build Run
  8. 8. 8 Prerequisites SAP Business Suite Powered by SAP HANA SAP ERP 6.0 SAP Enhancement Package 6 for SAP ERP 6.0, Version for SAP HANA SAP CRM 7.0 SAP Enhancement Package 2 for SAP CRM 7.0, Version for SAP HANA SAP SCM 7.0 SAP Enhancement Package 2 for SAP SCM 7.0, Version for SAP HANA Please note: not all scenarios / industries are already released for productive use with SAP HANA (note 1774566) Lot many to follow soon … Plan Build Run
  9. 9. 9 Prerequisites Dual-Stack / Unicode Dual-Stack Systems „[…] as of SAP Business Suite 7i2011, it will no longer be possible to upgrade an SAP dual-stack system to a higher release […].“ (note 1655335)  Suite on HANA is based on NetWeaver 7.40, not supporting dual-stack installations  Dual-stack systems have to be split before a SAP HANA migration – A dual-stack split tool is included in the SL toolset, available on SAP Service Marketplace  Java stack stays on current database, since Java is not yet supported to run on SAP HANA Unicode  SAP HANA runs natively on Unicode only  Unicode conversion can technically be done during the database migration, but preparatory steps are required Plan Build Run
  10. 10. 10 System considerations – what changes and what doesn’t? Hardware Impact - Migration of database server only + benefits AnyDB/ AnyOS AnyOS SAP HANA/ SUSE Linux (SLES) SAP HANA migration No Change  No change of frontends  Re-use of available application servers  Sizing of current application servers remains valid Change  Migration of database to SAP HANA appliance required  Co-deployment of application servers (e.g. central instances) on database hardware not possible with SAP HANA Frontends Application Servers No Functional Changes: IMG, Customization, Modifications, Connectivity, Security, Transports, Monitoring (DBACockpit & SolMa) stay all the same Application and Reporting Benefits: No dialog process in batch, acceleration/elimination of batch, Run operational reports in real-time inside Suite
  11. 11. 11 Landscape Options Plan – Build – Run “MCOD” Multiple components on one database  1 x Hardware  1 x SAP HANA DB  n x DB schema  n x Applications Productive usage allowed, e.g. SAP NW 7.3 BW together with Business Suite Accelerators. See note 1661202 “Classical” scenario Appliance approach for optimal performance  1 x Hardware  1 x SAP HANA DB  1 x DB schema  1 x Application (e.g. BW) AS ABAP SID: ABC Application XYZ SAP HANA Schema ABC <HDB> Schema XYZ Productive Systems SAP HANA <HDB> Schema ABC AS ABAP SID: ABC DYY QYY PYY Hardware options:  BW on HANA appliances available in different T-shirt sizes. Single node and scale-out solutions available.
  12. 12. 12 Appliance Scaling SAP HANA Scale-up (scale vertically) – Increase the size of the hardware (main memory, number of CPUs) Challenge:  availability of suitable hardware Scale-out (scale horizontally) – Several nodes (servers) are switched together for one database – Data are distributed over the main memories of these different nodes Challenge:  Cross-node communication is expensive – Avoid cross-node joins / views  Table distribution has to be customer / usage pattern specific  Dynamic re-distribution must be allowed Plan Build Run
  13. 13. 13 Suite on HANA Plan – Build – Run Plan  Installation  Update  Migration Build Run
  14. 14. 14 Migration Options Option 1: New installation  Clean installation, take chance to tidy up  Not suited for replacement of current production system  Data migration may be required Option 2: In-place migration  Avoids changes to the overall landscape – keep SID, host- name, application server, connectivity  Downtimes during upgrade and migration Option 3: Copy, upgrade + migrate  Ideal setup for PoCs and pilots: compare before & after, keep fallback  Short downtime of production system  BW-only: good option to run BW powered by SAP HANA parallel to original BW system productively
  15. 15. 16 Update and Migration Currently Available (SPS02): Two-Step Migration  One-step update to EhP for HANA  Afterwards Database migration  Also available as RDS. Planned: One-Step Migration via Database Migration Option for Software Update Manager (DMO for SUM)  Available for pilots with BW on HANA  Pilot planned for Suite on HANA in Q2 2013  Pilot with built-in downtime optimizations planned for Suite on HANA in Q3 2013.  GA planned in Q4 2013.  Also planned to be provided as RDS. DMO for SUM Update (EhP) SUM 1.0 SP6 Migration SWPM 1.0 SP1 Any DB AS ABAP 7.0x Kernel 7.x ERP 6.0x // CRM and SCM 7.0x Any DB AS ABAP 7.40 Kernel 7.40 ERP 6.16 // CRM and SCM 7.12 for HANA HANA 1.0 SPS5 AS ABAP 7.40 Kernel 7.40 ERP 6.16 // CRM and SCM 7.12 for HANA Any DB AS ABAP 7.0x Kernel 7.x ERP 6.0x // CRM and SCM 7.0x HANA 1.0 AS ABAP 7.40 Kernel 7.40 ERP 6.16 // CRM and SCM 7.12 for HANA Plan Build Run
  16. 16. 17 Suite on HANA Plan – Build – Run Plan  Optimization  Monitoring  Operation Build Run
  17. 17. 18 Code Optimization Maximal Flexibility – Minimal Disruption SAP HANA optimizations:  Additional views  Stored procedures (code pushdown to SAP HANA) To be activated via switch framework ‒ no change in business logic after migration to SAP HANA  All switches are reversible  Switches can be activated independently  Maximal flexibility in consumption of optimizations  Minimal disruption for customer business Custom Code (ABAP reports) • Regression tests for own code recommended after SAP HANA migration Display Business Function (SFW2) Plan Build Run
  18. 18. 19 Using Standard CTS for Suite on HANA How it works?  Develop ABAP in ABAP workbench; develop HANA in HANA Studio  Export HANA developments (views, stored procedures) into transport container (TLOGO object)  Assign transport container to a transport request in ABAP Transport Organizer  Use standard Change and Transport System (CTS) to transport and deploy changes Result  Use well-proven technology for transport of changes  Utilize full change control of SAP Solution Manager for SAP HANA ABAP Dev ABAP Test ABAP CTS Export SAP HANA Artifacts Import SAP HANA Artifacts SAP NetWeaver SAP HANA SAP GUI Application Logic SAP NetWeaver SAP HANA SAP GUI Application Logic Plan Build Run
  19. 19. 20 SAP HANA Administration and Monitoring SAP HANA Studio Administration & development tool for SAP HANA  Start / stop  Backup / recovery  Configuration  SAP HANA modeler  SAP HANA user management  Table management SAP Solution Manager  SAP HANA monitoring and alerting are integrated into SAP Solution Manager  Guided procedures for processing SAP alerts  End-to-end workload analysis for SAP HANA  SAP Solution Manager is used by SAP support for early problem analysis  SAP Solution Manager serves as backbone for CTS+ transport integration Plan Build Run
  20. 20. How can we support you?
  21. 21. . 23 From traditional to “powered by HANA” – Your path SoH Technical Planning/Upgrade Suite on HANA Migration Suite on HANA Post Optimization
  22. 22. . 24 Different SAP Services for different stages Rapid-deployment solutions provide an end-to-end solution for migrating an existing installation of the SAP Business Suite to the SAP HANA® database without disruption of existing content. SAP HANA Assessment Technical Planning/Upgrade SAP HANA Sizing/Installation/ Configuration Technical Upgrade Authorization Migration Functional Upgrade Unicode Conversion Database Migration RDS Prerequisite Post Optimizations SAP HANA Optimization Services (Suite on HANA) Service Software Enablement Content
  23. 23. . 25 From traditional to “powered by HANA” – Your path Technical Planning/Upgrade X on HANA Migration HANA Post Optimization Service Portfolio • HANA Technical Assessment for Suite on HANA • Upgrade Implementation for Suite on HANA • Predefined HANA Installation • HANA Data Replication Installation/Configuration Service Portfolio • Database migration for Suite on HANA Service Portfolio • Suite on HANA Optimization Service
  24. 24. . 26 A good starting point - Businesss Scenario Recommendation Report (BSR) http://www.suiteonhana.com
  25. 25. 27 HANA LAB to test Suite on HANA Hardware • Latest HANA HW technology in collaboration with HW vendors • 4tier landscape covering the most important HANA scenarios Software • HANA • SLT (Trigger based replication) • Data Services (ETL based replication) • BO BI 4.0 (incl. BO BI Mobile) • IDES System (ERP on RDMS for data provision) • BW on HANA und BW on RDMS • CRM on HANA (in preparation) • ERP on HANA (in preparation)
  26. 26. Summary
  27. 27. . 29 Migration to SAP HANA Benefits with SAP Services and Tools Keep risks under control Benefit from existing knowledge to speed up migration Flexible plan service to local customer situation Leverage existing RDS to boost the migration Holistic end-to-end view to all aspects of entire project Services expertise on supporting top companies 1 2 3 4 5 6 7 8 Careful planning and strong services partnership guarantees costs under control Services actively manages QA during entire project Comprehensive Expertise Cost controlled Quality optimized Risk mitigated Fast time-to-value Tailor fit Content How to get this?  Approach your Service Account Manager
  28. 28. . Thank You Contact Information: Name : Mr.Soumya De Mobile Number : +91-974 2582 226
  29. 29. Notes

Sap Suite On HANA Strategies & Roadmap

Vistos

Vistos totais

146

No Slideshare

0

De incorporações

0

Número de incorporações

72

Ações

Baixados

0

Compartilhados

0

Comentários

0

Curtir

0

×