โ€ข India is the second largest telecom market in the world followed by China. The telecom subscriber
base in the country is dominated by the wireless segment which accounts for about 97% of the total
subscriber base.
โ€ข The wireless subscriber base in India stood at 1,033.6 million at the end of 2015-2016 financial
year.
โ€ข Approximate consumption of mobile tower is 3-5 kilowatts depending on the numbers of operator
using the tower.
โ€ข According to TRAI an average fuel consumption of 8,760 liters diesel every year per tower
assuming 8 hours of operation by diesel.
โ€ข Total Co2 Emission by using of Diesel is 10 metric tone.
โ€ข By using of Renewable Energy Like Solar Energy can reduce the Co2 foot print And consumption of
Diesel.
โ€ข Now TRAI(Telecom regulatory Authority of India)And DOT(Department of telecommunication)
jointly Working to reduce the carbon Emission by 25% by 2020.
Why Solar Power ?
โ€ข Clean and efficient:
traditional electricity is powered by coal & fuel which release harmful emission causes green house
effect. From supply to distribution there are 21% transmission loss.
โ€ข No maintenance:
Solar panels have no moving parts and not damaged easily.
โ€ข Environmental Benefits:
By going solar you are helping society towards a greener and sustainable future.
โ€ข Noise Minimization :
Photovoltaic (PV) panels operate without any noise, a property of key value in hospitals because
they do not incorporate any moving mechanical parts
Comparison of Energy Source
SPV WIND TURBINE BIOMASS FUEL CELL
ENERGY SOURCE PV energy generating
systems coverts sun
energy into electric
energy
The kinetic energy of
wind converted
mechanical energy into
electrical energy
Waste composed or
recently dead
organisms are used to
produce alternative
fuels for producing
energy.
Chemical energy
hydrogen
converted to
electricity ,water
vapor and heat.
EFFIENCY 6.2-19.7% 20% 20% 20%
Co2 FOOT PRINT Zero at point of use Zero at point of use Minimal Zero at point of
use
MAINTAINANCE Minimal Minimal Biomass fuel cost and
plant maintenance.
Hydrogen fuel cost
and system
maintenance.
ENERGY MANAGEMENT AND CHALLENGES
โ€ข Energy is a dominant cost component for telecom companies.
โ€ข The energy consumption is mainly for operating the Base Transceiver Station(BTS) or simply
mobile towers.
โ€ข Majority of the mobile towers are in the rural sector, where continuous supply of grid connected
electricity is not available.
โ€ข Moving further 25 % of these towers are located in areas with no grid connectivity.
โ€ข Electricity availability in a day ranges from about 7 to 21 hrs. across the major telecom circles in
India.
โ€ข In order to curb this menace the telecom companies keep a backup power source.
โ€ข The back up power source will be a 15-25kva 40kva diesel generator.
โ€ข Energy expenses constitute one third of total OPEX costs for telecom towers.
โ€ข Each tower consumes an average of 4000 liters of diesel every year. A telecom operator should have
to spend Rs 3 billion every month for running this generators. By using the diesel generator the
telecom sector is responsible for over 10 metric tones of CO2 emissions annually.
BENIFITS
โ€ข Dependency upon Diesel will Reduce .
โ€ข It Will helps the Environment to Reduce the green house gas.
โ€ข Low Cost than the other sources like Biomass, Wind turbine.
โ€ข Power interruption chance is very Low.
โ€ข Solar energy easily available and having low maintenance.
โ€ข it can be installed in the unused space.it not required any extra Space for installation.
WHAT ARE THE COMPANIES DOING ?
โ€ข The major players are BSNL, Airtel, Reliance, Vodafone, Idea.
โ€ข Bharti Airtel has no clear cut policies regarding the emission of GHG(Green House Gas).
โ€ข But it is saying that Bharti Infratel has committed to solarizing 2000 mobile towers.
โ€ข Reliance has no plans for cutting their emission.
โ€ข The Vodafone group has set a reduction target for Carbon emissions of 50 % by 2020.
โ€ข BSNL calls for increasing the number of towers working under solar energy. But they donโ€™t have
other plans.
โ€ข Idea Cellular wants to develop solar-DG hybrid solutions and Hydrogen fuel cell solutions but
nothing comes into practice yet.
CASE STUDY
โ€ข This case assumes an outdoor site with 3 kW load and with 8 hours of grid power outage per day on
average
โ€ข Case scenario
โ€ข The site requires 8 hours or 24 kWh/day equivalent of back-up power .
โ€ข To meet the site off grid energy requirement of 24kWhr/day, the solar photovoltaic solution should be
capable of providing 33kWhr/day.
Site Type Outdoor
Site Load kW 3
Grid Power
Availability
hrs/day 16
Output Power
Requirement
kWhr/day 24
Battery Output
Voltage
volt 48
CASE STUDY
โ€ข Assuming average of 4 hours of sunshine per day, an 8kW solar photovoltaic system will need to be
installed. It is assumed that, the 8 hours of outage can occur during sunshine availability hours or
during non-availability hours.
โ€ข Considering average standard sunshine of 4 hours and 30% depth of battery discharge per day, a
battery capacity of 1720 Ah @ 48 volts will be required . As per energy requirement of this site the
installation area required is 900sq.ft.
SPV solution
Avg. Sunshine availability hrs/per day 4
1 Kwp SPV Panel
generates
KWh/day 4
Efficiency Loss Charge
controller efficiency % 90
Loss due to Dust % 95
Battery Effiency % 85
CASE STUDY
โ€ข At the current price of INR 125/Wp panel, this installation will cost INR 10,00,000.
โ€ข It is to be noted here that the system life of a solar photovoltaic system is estimated to be 20 years
and that of the battery is 3 years.
Govt. Initiatives
โ€ข Some initiatives have been taken by govt. organizations to encourage the use of renewable energy
resources.
โ€ข As part of the NAPCC the Jawaharlal Nehru National Solar Mission(JNNSM) provides support for
installing photovoltaic cells.
โ€ข In order to decrease the risk of developers the NVVN would share the costs of the project.
โ€ข The government also provide help to developers harnessing power through other sources like wind
energy.
โ€ข In India the government set a target to run 75% of tower in rural area and 33% in the urban area
under solar Energy.
Solar Energy in Telecom Sector

More Related Content

What's hot

Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorVijay Menghani
ย 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismSpark Network
ย 
Smart Grid Technology
Smart Grid TechnologySmart Grid Technology
Smart Grid TechnologyAditya Jalan
ย 
Economic operation of power system
Economic operation of power systemEconomic operation of power system
Economic operation of power systemBalaram Das
ย 
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM International
ย 
Electricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignElectricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignLeonardo ENERGY
ย 
solar-power-plant-ppt
 solar-power-plant-ppt solar-power-plant-ppt
solar-power-plant-pptArvind Nangare
ย 
Smart grid and hydo electric power power plant
Smart grid and hydo electric power power plantSmart grid and hydo electric power power plant
Smart grid and hydo electric power power plantjunaid bashir
ย 
5 g core network and the cloud - A standards perspective
5 g core network and the cloud - A standards perspective5 g core network and the cloud - A standards perspective
5 g core network and the cloud - A standards perspectiveSridhar Bhaskaran
ย 
Introduction of wide area mesurement syatem
Introduction of wide area mesurement syatemIntroduction of wide area mesurement syatem
Introduction of wide area mesurement syatemPanditNitesh
ย 
Phasor measurement unit and it's application ppt
Phasor measurement unit and it's application pptPhasor measurement unit and it's application ppt
Phasor measurement unit and it's application pptKhurshid Parwez
ย 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
ย 
Unit 5 Economic Load Dispatch and Unit Commitment
Unit 5 Economic Load Dispatch and Unit CommitmentUnit 5 Economic Load Dispatch and Unit Commitment
Unit 5 Economic Load Dispatch and Unit CommitmentSANTOSH GADEKAR
ย 
Ericsson Lean Carrier
Ericsson Lean CarrierEricsson Lean Carrier
Ericsson Lean CarrierEricsson
ย 
Battery energy storage systems (BESS) โ€“ an overview of the basics
Battery energy storage systems (BESS) โ€“ an overview of the basicsBattery energy storage systems (BESS) โ€“ an overview of the basics
Battery energy storage systems (BESS) โ€“ an overview of the basicsBushveld Energy
ย 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSSMohitkalal4
ย 

What's hot (20)

Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
ย 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
ย 
Smart Grid
Smart GridSmart Grid
Smart Grid
ย 
Smart Grid Technology
Smart Grid TechnologySmart Grid Technology
Smart Grid Technology
ย 
Economic operation of power system
Economic operation of power systemEconomic operation of power system
Economic operation of power system
ย 
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network Architecture
ย 
Electricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignElectricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market Design
ย 
Smart grid
Smart gridSmart grid
Smart grid
ย 
solar-power-plant-ppt
 solar-power-plant-ppt solar-power-plant-ppt
solar-power-plant-ppt
ย 
Smart grid and hydo electric power power plant
Smart grid and hydo electric power power plantSmart grid and hydo electric power power plant
Smart grid and hydo electric power power plant
ย 
5 g core network and the cloud - A standards perspective
5 g core network and the cloud - A standards perspective5 g core network and the cloud - A standards perspective
5 g core network and the cloud - A standards perspective
ย 
Introduction of wide area mesurement syatem
Introduction of wide area mesurement syatemIntroduction of wide area mesurement syatem
Introduction of wide area mesurement syatem
ย 
Phasor measurement unit and it's application ppt
Phasor measurement unit and it's application pptPhasor measurement unit and it's application ppt
Phasor measurement unit and it's application ppt
ย 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
ย 
Energy storage in smart micro-grid
Energy storage in smart micro-gridEnergy storage in smart micro-grid
Energy storage in smart micro-grid
ย 
E cpri protocol stack
E cpri protocol stackE cpri protocol stack
E cpri protocol stack
ย 
Unit 5 Economic Load Dispatch and Unit Commitment
Unit 5 Economic Load Dispatch and Unit CommitmentUnit 5 Economic Load Dispatch and Unit Commitment
Unit 5 Economic Load Dispatch and Unit Commitment
ย 
Ericsson Lean Carrier
Ericsson Lean CarrierEricsson Lean Carrier
Ericsson Lean Carrier
ย 
Battery energy storage systems (BESS) โ€“ an overview of the basics
Battery energy storage systems (BESS) โ€“ an overview of the basicsBattery energy storage systems (BESS) โ€“ an overview of the basics
Battery energy storage systems (BESS) โ€“ an overview of the basics
ย 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
ย 

Similar to Solar Energy in Telecom Sector

Photo
PhotoPhoto
Photodhaya1111
ย 
Renewable energy.pptx my presentation
Renewable energy.pptx my presentationRenewable energy.pptx my presentation
Renewable energy.pptx my presentationshaik maheboob sab
ย 
RECENT TRENDS IN MICRO GRIDS
     RECENT TRENDS IN MICRO GRIDS     RECENT TRENDS IN MICRO GRIDS
RECENT TRENDS IN MICRO GRIDSbetha divya
ย 
Power of sun and solar energy (india power)
Power of sun and solar energy (india power)Power of sun and solar energy (india power)
Power of sun and solar energy (india power)Mahesh Chandra Manav
ย 
Renewable energy for bts (2)
Renewable energy for bts (2)Renewable energy for bts (2)
Renewable energy for bts (2)nasir12345678900
ย 
Feasibility and Efficiency of Renewable Energy Habitat
 Feasibility and Efficiency of Renewable Energy Habitat  Feasibility and Efficiency of Renewable Energy Habitat
Feasibility and Efficiency of Renewable Energy Habitat Nilam Shah
ย 
Solar smart irrigation system
Solar smart irrigation systemSolar smart irrigation system
Solar smart irrigation systemNihal Shiroya
ย 
IRJET-A Standalone Solar System
IRJET-A Standalone Solar SystemIRJET-A Standalone Solar System
IRJET-A Standalone Solar SystemIRJET Journal
ย 
Photovoltaics
PhotovoltaicsPhotovoltaics
PhotovoltaicsNitish Kumar
ย 
A Presentation made on Solar Energy use at IESL
A Presentation made on Solar Energy use at IESL A Presentation made on Solar Energy use at IESL
A Presentation made on Solar Energy use at IESL Private Consultants
ย 
A new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationA new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationBiswajit Bhuyan
ย 
electricity generation from food waste - based bioenergy with IOT.pptx
electricity generation from food waste - based bioenergy with IOT.pptxelectricity generation from food waste - based bioenergy with IOT.pptx
electricity generation from food waste - based bioenergy with IOT.pptxAravindhKarthik1
ย 
Ppt on design of solar photovoltaic generation for residential building
Ppt on design of solar photovoltaic generation for residential buildingPpt on design of solar photovoltaic generation for residential building
Ppt on design of solar photovoltaic generation for residential buildingSiya Agarwal
ย 
IRJET- Planning and Designing of Zero Energy Residential Building
IRJET-  	  Planning and Designing of  Zero Energy Residential BuildingIRJET-  	  Planning and Designing of  Zero Energy Residential Building
IRJET- Planning and Designing of Zero Energy Residential BuildingIRJET Journal
ย 
Ub energy efficient concepts for smart city ibc
Ub energy efficient concepts for smart city ibcUb energy efficient concepts for smart city ibc
Ub energy efficient concepts for smart city ibcUsha Batra
ย 
Introduction and Present Status of Renewable Energies.ppt
Introduction and Present Status of Renewable Energies.pptIntroduction and Present Status of Renewable Energies.ppt
Introduction and Present Status of Renewable Energies.pptRajaDesingu2
ย 
Renewable Energy Integration Limits
Renewable Energy Integration LimitsRenewable Energy Integration Limits
Renewable Energy Integration LimitsAnand SR
ย 
Ebi may 2015 overview sg b1
Ebi may 2015 overview sg b1Ebi may 2015 overview sg b1
Ebi may 2015 overview sg b1frankjoh
ย 

Similar to Solar Energy in Telecom Sector (20)

Photo
PhotoPhoto
Photo
ย 
DreamGreen
DreamGreenDreamGreen
DreamGreen
ย 
Renewable energy.pptx my presentation
Renewable energy.pptx my presentationRenewable energy.pptx my presentation
Renewable energy.pptx my presentation
ย 
RECENT TRENDS IN MICRO GRIDS
     RECENT TRENDS IN MICRO GRIDS     RECENT TRENDS IN MICRO GRIDS
RECENT TRENDS IN MICRO GRIDS
ย 
Power of sun and solar energy (india power)
Power of sun and solar energy (india power)Power of sun and solar energy (india power)
Power of sun and solar energy (india power)
ย 
Ntpc business strategy
Ntpc business strategyNtpc business strategy
Ntpc business strategy
ย 
Renewable energy for bts (2)
Renewable energy for bts (2)Renewable energy for bts (2)
Renewable energy for bts (2)
ย 
Feasibility and Efficiency of Renewable Energy Habitat
 Feasibility and Efficiency of Renewable Energy Habitat  Feasibility and Efficiency of Renewable Energy Habitat
Feasibility and Efficiency of Renewable Energy Habitat
ย 
Solar smart irrigation system
Solar smart irrigation systemSolar smart irrigation system
Solar smart irrigation system
ย 
IRJET-A Standalone Solar System
IRJET-A Standalone Solar SystemIRJET-A Standalone Solar System
IRJET-A Standalone Solar System
ย 
Photovoltaics
PhotovoltaicsPhotovoltaics
Photovoltaics
ย 
A Presentation made on Solar Energy use at IESL
A Presentation made on Solar Energy use at IESL A Presentation made on Solar Energy use at IESL
A Presentation made on Solar Energy use at IESL
ย 
A new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationA new Clean technology for Electricity Generation
A new Clean technology for Electricity Generation
ย 
electricity generation from food waste - based bioenergy with IOT.pptx
electricity generation from food waste - based bioenergy with IOT.pptxelectricity generation from food waste - based bioenergy with IOT.pptx
electricity generation from food waste - based bioenergy with IOT.pptx
ย 
Ppt on design of solar photovoltaic generation for residential building
Ppt on design of solar photovoltaic generation for residential buildingPpt on design of solar photovoltaic generation for residential building
Ppt on design of solar photovoltaic generation for residential building
ย 
IRJET- Planning and Designing of Zero Energy Residential Building
IRJET-  	  Planning and Designing of  Zero Energy Residential BuildingIRJET-  	  Planning and Designing of  Zero Energy Residential Building
IRJET- Planning and Designing of Zero Energy Residential Building
ย 
Ub energy efficient concepts for smart city ibc
Ub energy efficient concepts for smart city ibcUb energy efficient concepts for smart city ibc
Ub energy efficient concepts for smart city ibc
ย 
Introduction and Present Status of Renewable Energies.ppt
Introduction and Present Status of Renewable Energies.pptIntroduction and Present Status of Renewable Energies.ppt
Introduction and Present Status of Renewable Energies.ppt
ย 
Renewable Energy Integration Limits
Renewable Energy Integration LimitsRenewable Energy Integration Limits
Renewable Energy Integration Limits
ย 
Ebi may 2015 overview sg b1
Ebi may 2015 overview sg b1Ebi may 2015 overview sg b1
Ebi may 2015 overview sg b1
ย 

Recently uploaded

VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...SUHANI PANDEY
ย 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
ย 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
ย 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
ย 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxhossanmdjobayer103
ย 
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹nirzagarg
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
ย 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...tanu pandey
ย 

Recently uploaded (20)

VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
ย 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
ย 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
ย 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
ย 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
ย 
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 
Water Pollution
Water Pollution Water Pollution
Water Pollution
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
ย 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
ย 
Deforestation
DeforestationDeforestation
Deforestation
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
ย 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 

Solar Energy in Telecom Sector

  • 2. INTRODUCTION โ€ข India is the second largest telecom market in the world followed by China. The telecom subscriber base in the country is dominated by the wireless segment which accounts for about 97% of the total subscriber base. โ€ข The wireless subscriber base in India stood at 1,033.6 million at the end of 2015-2016 financial year. โ€ข Approximate consumption of mobile tower is 3-5 kilowatts depending on the numbers of operator using the tower. โ€ข According to TRAI an average fuel consumption of 8,760 liters diesel every year per tower assuming 8 hours of operation by diesel. โ€ข Total Co2 Emission by using of Diesel is 10 metric tone. โ€ข By using of Renewable Energy Like Solar Energy can reduce the Co2 foot print And consumption of Diesel. โ€ข Now TRAI(Telecom regulatory Authority of India)And DOT(Department of telecommunication) jointly Working to reduce the carbon Emission by 25% by 2020.
  • 3. Why Solar Power ? โ€ข Clean and efficient: traditional electricity is powered by coal & fuel which release harmful emission causes green house effect. From supply to distribution there are 21% transmission loss. โ€ข No maintenance: Solar panels have no moving parts and not damaged easily. โ€ข Environmental Benefits: By going solar you are helping society towards a greener and sustainable future. โ€ข Noise Minimization : Photovoltaic (PV) panels operate without any noise, a property of key value in hospitals because they do not incorporate any moving mechanical parts
  • 4. Comparison of Energy Source SPV WIND TURBINE BIOMASS FUEL CELL ENERGY SOURCE PV energy generating systems coverts sun energy into electric energy The kinetic energy of wind converted mechanical energy into electrical energy Waste composed or recently dead organisms are used to produce alternative fuels for producing energy. Chemical energy hydrogen converted to electricity ,water vapor and heat. EFFIENCY 6.2-19.7% 20% 20% 20% Co2 FOOT PRINT Zero at point of use Zero at point of use Minimal Zero at point of use MAINTAINANCE Minimal Minimal Biomass fuel cost and plant maintenance. Hydrogen fuel cost and system maintenance.
  • 5. ENERGY MANAGEMENT AND CHALLENGES โ€ข Energy is a dominant cost component for telecom companies. โ€ข The energy consumption is mainly for operating the Base Transceiver Station(BTS) or simply mobile towers. โ€ข Majority of the mobile towers are in the rural sector, where continuous supply of grid connected electricity is not available. โ€ข Moving further 25 % of these towers are located in areas with no grid connectivity. โ€ข Electricity availability in a day ranges from about 7 to 21 hrs. across the major telecom circles in India. โ€ข In order to curb this menace the telecom companies keep a backup power source. โ€ข The back up power source will be a 15-25kva 40kva diesel generator. โ€ข Energy expenses constitute one third of total OPEX costs for telecom towers. โ€ข Each tower consumes an average of 4000 liters of diesel every year. A telecom operator should have to spend Rs 3 billion every month for running this generators. By using the diesel generator the telecom sector is responsible for over 10 metric tones of CO2 emissions annually.
  • 6.
  • 7. BENIFITS โ€ข Dependency upon Diesel will Reduce . โ€ข It Will helps the Environment to Reduce the green house gas. โ€ข Low Cost than the other sources like Biomass, Wind turbine. โ€ข Power interruption chance is very Low. โ€ข Solar energy easily available and having low maintenance. โ€ข it can be installed in the unused space.it not required any extra Space for installation.
  • 8. WHAT ARE THE COMPANIES DOING ? โ€ข The major players are BSNL, Airtel, Reliance, Vodafone, Idea. โ€ข Bharti Airtel has no clear cut policies regarding the emission of GHG(Green House Gas). โ€ข But it is saying that Bharti Infratel has committed to solarizing 2000 mobile towers. โ€ข Reliance has no plans for cutting their emission. โ€ข The Vodafone group has set a reduction target for Carbon emissions of 50 % by 2020. โ€ข BSNL calls for increasing the number of towers working under solar energy. But they donโ€™t have other plans. โ€ข Idea Cellular wants to develop solar-DG hybrid solutions and Hydrogen fuel cell solutions but nothing comes into practice yet.
  • 9. CASE STUDY โ€ข This case assumes an outdoor site with 3 kW load and with 8 hours of grid power outage per day on average โ€ข Case scenario โ€ข The site requires 8 hours or 24 kWh/day equivalent of back-up power . โ€ข To meet the site off grid energy requirement of 24kWhr/day, the solar photovoltaic solution should be capable of providing 33kWhr/day. Site Type Outdoor Site Load kW 3 Grid Power Availability hrs/day 16 Output Power Requirement kWhr/day 24 Battery Output Voltage volt 48
  • 10. CASE STUDY โ€ข Assuming average of 4 hours of sunshine per day, an 8kW solar photovoltaic system will need to be installed. It is assumed that, the 8 hours of outage can occur during sunshine availability hours or during non-availability hours. โ€ข Considering average standard sunshine of 4 hours and 30% depth of battery discharge per day, a battery capacity of 1720 Ah @ 48 volts will be required . As per energy requirement of this site the installation area required is 900sq.ft. SPV solution Avg. Sunshine availability hrs/per day 4 1 Kwp SPV Panel generates KWh/day 4 Efficiency Loss Charge controller efficiency % 90 Loss due to Dust % 95 Battery Effiency % 85
  • 11. CASE STUDY โ€ข At the current price of INR 125/Wp panel, this installation will cost INR 10,00,000. โ€ข It is to be noted here that the system life of a solar photovoltaic system is estimated to be 20 years and that of the battery is 3 years.
  • 12. Govt. Initiatives โ€ข Some initiatives have been taken by govt. organizations to encourage the use of renewable energy resources. โ€ข As part of the NAPCC the Jawaharlal Nehru National Solar Mission(JNNSM) provides support for installing photovoltaic cells. โ€ข In order to decrease the risk of developers the NVVN would share the costs of the project. โ€ข The government also provide help to developers harnessing power through other sources like wind energy. โ€ข In India the government set a target to run 75% of tower in rural area and 33% in the urban area under solar Energy.