SlideShare uma empresa Scribd logo
1 de 36
COMPANY PRESENTATION 2009
[object Object],[object Object],[object Object],[object Object],International Team President  John Che Vice President of  European Market Andre Bahlmann Vice President of  North American Market Julia Yan
[object Object],[object Object],[object Object],North American Project Management Team   Project Manager Cindy Adkins  Project Manager Dan Leblanc Project Manager Cici Ding
 
2008 Sales:  13 Million USD
2008 Sales:  420 Sets of Molds
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Company Details
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],What We Can Do
We provide automotive molds
We Provide Packaging Molds
We Provide Molds for Other Industries
We provide automotive molds
We Provide Packaging Molds
We Provide Molds for Other Industries
We provide automotive molds
We provide automotive molds
Mold Manufacturing Lead Time Reference Complex Mold General Mold Mold Tonnage Project Finished Time 1 TON 7-8 Weeks 3 TON 8-10 Weeks 5 TON 12-14 Weeks Mold Tonnage Project Finished Time 1 TON 8-9 Weeks 3 TON 10-11 Weeks 5 TON 14-16 Weeks
Project Flow Chart Quotation Approval & P.O. Design & Engineering Design Check & Revision Design Approval Mold Construction Mold Testing & Refinement Mold Approval Final Mold Test Part Samples DELIVERY
ERP Manufacturing System  Flow Chart
ERP Manufacturing System We use personalized Enterprise Resource Planning (ERP) software, which is similar to SAP AG’s flagship platform ERP. These programs are being used by such companies as Porsche, Verizon Telcom, and Nissan. All parts are bar-coded, and then scanned at each step of the manufacturing process. The ERP program ensures tracking for every part and person involved in the complete manufacturing process. The ERP software integrates and controls:  Machine capacity planning Manufacturing planning Warehouse planning Purchasing software (the software results in less lag time on project start times) Quality Control (i.e. when Q.C. passes or fails a part).  The above information is integrated into the rest of the system. The system instantly updates the machine planning capacity, manufacturing planning, purchasing planning (repurchasing if required), and warehouse planning (location tracking all components of every mould). Changes required by the customer are updated and integrated by the system, flagging potential delays for finishing the product on schedule. If delays are expected, the system can give parts a priority status.  Automatic tracking, reporting, and correcting deviations in projected timelines allows us to hit our T1 target date 96% of the time; averaging over 700 moulds built per year.
Manufacturing and Process Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Engineering System
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],New Zhu Hai Factory Will Open For Production in October, 2009
Zhuhai Factory with  Advanced Automated Flexible Manufacturing System Completely automated logistics, storage, and manufacturing system
New Machines Coming August, 2009 Machines  Qty.  Origin DEPO HC 2012 (3 simultaneous & 1 adjustable axis) 1 German Gantry EAGLE 500 (EDM)  1 German OPS-ingersoll Gantry EAGLE  1200 (EDM) 1 German OPS-ingersoll HSC-machine SPEEDHAWK 550  (5-Axis's CNC) 1 German OPS-ingersoll HSC-machine SPEEDHAWK 750  (5-Axis's CNC) 2 German OPS-ingersoll DEPO Mill2012 (5 axis) 1 German DEPO HF2012  (5 simultaneous & 2 adjustable axis) 1 German DEPO VC3016  (5 simultaneous & 1 adjustable axis) 1 German DEPO VF3016  (5-Axis's CNC) 1 German
CNC Milling Machines  Qty.  Origin ShenZhen Factory Equipment List MORI-SEIKI NVD4000 DCG 1 Japan (Purchased 2006) MORI-SEIKI NVD5000 Alpha 1 (High speed milling – up to 20,000 RPM) 2 Japan (Purchased 2005) HARDINGE VMC800II 6 USA  (3 Purchased 2005) HARDINGE VMC1250II 1 USA  (Purchased 2006) Extrem DH1000 Gun Drill 1 Hong Kong  (Purchased 2007)
EDM Machines  Qty.  Origin ShenZhen Factory Equipment List CHARMILLES ROBOFORM 35P With EROWA tool changing system 2 Switzerland (Purchased 2006) ACTSPARK SE1  1 Switzerland DE-650  1 Taiwan DE-432  6 Taiwan
Wire Cutting Machines  Qty.  Origin Machining Centers  Qty.  Origin ShenZhen Factory Equipment List CHARMILLES ROBOFIL380 1 Switzerland SuSanGuang 7725   2 China HuaFang 7732   1 China HuaFang 7740   2 China HuaFang 7750  1 China YSG-614 Precision Grinding Machine   4 Japan M7312H Automatic Surface Grinding Machine   5 China Okamoto OGM-250UEXB Cylindrical Grinder 1 Japan (Purchased 2006)
Mold Fitting Machines  Qty.  Origin  ShenZhen Factory Equipment List AQUAmate LS-120t 1 Hong Kong (Purchased 2005) AQUAmate LS-200t   1 Hong Kong (Purchased 2006)
[object Object],[object Object],[object Object],[object Object],Mold Testing Injection Machines  Qty.  Origin   Hai Tian 86T Injection Machine  1 China Hai Tian 160T Injection Machine  1 China Hai Tian 300T Injection Machine  1 China Toshiba 650T Injection Machine 1 Japan Orfo Robot 2 China
Quality Control Equipment  Qty.  Origin Quality Control System ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],TESA CMM MICRO-HITE 3D Measuring Equipment   1 Switzerland Profile Project Equipment CM300-D   1 Taiwan WILSON Hardness Instrument HT500   1 USA Linear Measuring Equipment LH-600B   1 Japan Profile Project Equipment LJ-A3000   1 Japan
Maxuni’s Primary Customers
Maxuni’s Primary Customers
 
Yang Gang Industrial Area Ren Tian, Fu Yong, Bao An District Shenzhen, 518103 China Phone:  +86-755-2996-7108 Fax:  +86-755-2996-7708 Email:  [email_address] Main Office  located in Shenzhen, China German Office  serving Europe Emsteker Str. 13A 49661 Cloppenburg Germany Phone:  +49-4471-88-271-0 Fax: +49-4471-88-271-17 Email:  [email_address] ,[object Object],[object Object],[object Object],[object Object],North American Office to open in 2010

Mais conteúdo relacionado

Mais procurados

Leading manufacturer of customized carbide tools with three factories
Leading manufacturer of customized carbide tools with three factoriesLeading manufacturer of customized carbide tools with three factories
Leading manufacturer of customized carbide tools with three factoriesWendy Wen
 
2015-7-31 Goldwin profile
2015-7-31 Goldwin profile 2015-7-31 Goldwin profile
2015-7-31 Goldwin profile Annie Lee
 
Sanpin Presentation 2015
Sanpin Presentation 2015Sanpin Presentation 2015
Sanpin Presentation 2015Susan Ao
 
MAKE IN INDIA @ KONZERT_ATD_PTD_04_AUG_2015
MAKE IN INDIA @ KONZERT_ATD_PTD_04_AUG_2015MAKE IN INDIA @ KONZERT_ATD_PTD_04_AUG_2015
MAKE IN INDIA @ KONZERT_ATD_PTD_04_AUG_2015RAJIV SESHADRI
 
Shenzhen SZD Precision Mold Co.,Ltd. 2016
Shenzhen SZD Precision Mold Co.,Ltd. 2016 Shenzhen SZD Precision Mold Co.,Ltd. 2016
Shenzhen SZD Precision Mold Co.,Ltd. 2016 Grace Xiao
 
Mold solutions katalog a4 final
Mold solutions katalog a4 final Mold solutions katalog a4 final
Mold solutions katalog a4 final MoldSolutionsdoo
 
Bt presentation 2017.ppt
Bt presentation  2017.pptBt presentation  2017.ppt
Bt presentation 2017.pptGrace Zhong
 
2021 Leadpoint Company Overview
2021 Leadpoint Company Overview2021 Leadpoint Company Overview
2021 Leadpoint Company OverviewDavidWong412567
 
ناظر كنترل كيفي پروژه هاي صنعتي
ناظر كنترل كيفي پروژه هاي صنعتيناظر كنترل كيفي پروژه هاي صنعتي
ناظر كنترل كيفي پروژه هاي صنعتيSaleh Sojoudi
 
Best Tooling presentation 2016
Best Tooling presentation  2016Best Tooling presentation  2016
Best Tooling presentation 2016Grace Zhong
 
NTT Mould Presentation
NTT Mould PresentationNTT Mould Presentation
NTT Mould PresentationKelly Fuu
 
IEC Mould Engineering Making Company Profile
IEC Mould Engineering Making Company ProfileIEC Mould Engineering Making Company Profile
IEC Mould Engineering Making Company Profileyoyo--IEC MOULD Qiu
 
HI-PRECISION TECHNOLOGY
HI-PRECISION TECHNOLOGYHI-PRECISION TECHNOLOGY
HI-PRECISION TECHNOLOGYvico xiao
 
How to view the material certificate part 2
How to view the material certificate part 2How to view the material certificate part 2
How to view the material certificate part 2Mohamed Farouk
 

Mais procurados (18)

Leading manufacturer of customized carbide tools with three factories
Leading manufacturer of customized carbide tools with three factoriesLeading manufacturer of customized carbide tools with three factories
Leading manufacturer of customized carbide tools with three factories
 
2015-7-31 Goldwin profile
2015-7-31 Goldwin profile 2015-7-31 Goldwin profile
2015-7-31 Goldwin profile
 
Sanpin Presentation 2015
Sanpin Presentation 2015Sanpin Presentation 2015
Sanpin Presentation 2015
 
MAKE IN INDIA @ KONZERT_ATD_PTD_04_AUG_2015
MAKE IN INDIA @ KONZERT_ATD_PTD_04_AUG_2015MAKE IN INDIA @ KONZERT_ATD_PTD_04_AUG_2015
MAKE IN INDIA @ KONZERT_ATD_PTD_04_AUG_2015
 
Shenzhen SZD Precision Mold Co.,Ltd. 2016
Shenzhen SZD Precision Mold Co.,Ltd. 2016 Shenzhen SZD Precision Mold Co.,Ltd. 2016
Shenzhen SZD Precision Mold Co.,Ltd. 2016
 
Mold solutions katalog a4 final
Mold solutions katalog a4 final Mold solutions katalog a4 final
Mold solutions katalog a4 final
 
Bt presentation 2017.ppt
Bt presentation  2017.pptBt presentation  2017.ppt
Bt presentation 2017.ppt
 
2021 Leadpoint Company Overview
2021 Leadpoint Company Overview2021 Leadpoint Company Overview
2021 Leadpoint Company Overview
 
ناظر كنترل كيفي پروژه هاي صنعتي
ناظر كنترل كيفي پروژه هاي صنعتيناظر كنترل كيفي پروژه هاي صنعتي
ناظر كنترل كيفي پروژه هاي صنعتي
 
COMPANY PROFILE pdf2
COMPANY PROFILE pdf2COMPANY PROFILE pdf2
COMPANY PROFILE pdf2
 
Best Tooling presentation 2016
Best Tooling presentation  2016Best Tooling presentation  2016
Best Tooling presentation 2016
 
Presentation
PresentationPresentation
Presentation
 
MK_MFG_US 2014.pptx-1
MK_MFG_US 2014.pptx-1MK_MFG_US 2014.pptx-1
MK_MFG_US 2014.pptx-1
 
Gud 2021-1
Gud 2021-1Gud 2021-1
Gud 2021-1
 
NTT Mould Presentation
NTT Mould PresentationNTT Mould Presentation
NTT Mould Presentation
 
IEC Mould Engineering Making Company Profile
IEC Mould Engineering Making Company ProfileIEC Mould Engineering Making Company Profile
IEC Mould Engineering Making Company Profile
 
HI-PRECISION TECHNOLOGY
HI-PRECISION TECHNOLOGYHI-PRECISION TECHNOLOGY
HI-PRECISION TECHNOLOGY
 
How to view the material certificate part 2
How to view the material certificate part 2How to view the material certificate part 2
How to view the material certificate part 2
 

Destaque

Maxuni Presentation 2012 English
Maxuni Presentation 2012 EnglishMaxuni Presentation 2012 English
Maxuni Presentation 2012 Englishmaxuni
 
Shero Company profile,2016
Shero Company profile,2016Shero Company profile,2016
Shero Company profile,2016?? ?
 
Kemalmfg Brochure 080929 1
Kemalmfg Brochure 080929 1Kemalmfg Brochure 080929 1
Kemalmfg Brochure 080929 1PolymerSalesInc
 
GBC - General Broach Sales Brochure (Chinese)
GBC - General Broach Sales Brochure (Chinese)GBC - General Broach Sales Brochure (Chinese)
GBC - General Broach Sales Brochure (Chinese)AqabaBen
 
XY Mold Presentation.
XY Mold Presentation.XY Mold Presentation.
XY Mold Presentation.June Chen
 
20151230_SAP Commercial Project Management - Overview
20151230_SAP Commercial Project Management - Overview20151230_SAP Commercial Project Management - Overview
20151230_SAP Commercial Project Management - OverviewLeslie Kuo
 
Pet house catalogue,SHERO
Pet house catalogue,SHEROPet house catalogue,SHERO
Pet house catalogue,SHERO?? ?
 

Destaque (8)

Maxuni Presentation 2012 English
Maxuni Presentation 2012 EnglishMaxuni Presentation 2012 English
Maxuni Presentation 2012 English
 
Shero Company profile,2016
Shero Company profile,2016Shero Company profile,2016
Shero Company profile,2016
 
Maxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us NewMaxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us New
 
Kemalmfg Brochure 080929 1
Kemalmfg Brochure 080929 1Kemalmfg Brochure 080929 1
Kemalmfg Brochure 080929 1
 
GBC - General Broach Sales Brochure (Chinese)
GBC - General Broach Sales Brochure (Chinese)GBC - General Broach Sales Brochure (Chinese)
GBC - General Broach Sales Brochure (Chinese)
 
XY Mold Presentation.
XY Mold Presentation.XY Mold Presentation.
XY Mold Presentation.
 
20151230_SAP Commercial Project Management - Overview
20151230_SAP Commercial Project Management - Overview20151230_SAP Commercial Project Management - Overview
20151230_SAP Commercial Project Management - Overview
 
Pet house catalogue,SHERO
Pet house catalogue,SHEROPet house catalogue,SHERO
Pet house catalogue,SHERO
 

Semelhante a Maxuni Presentation 2009 Us New

Maxuni Presentation 2011 Updated
Maxuni Presentation 2011 UpdatedMaxuni Presentation 2011 Updated
Maxuni Presentation 2011 Updatedmaxuni
 
POM_ Mold Presentation 2016.8.12
POM_ Mold Presentation 2016.8.12POM_ Mold Presentation 2016.8.12
POM_ Mold Presentation 2016.8.12Jenny Xie
 
CY Molds Presentation
CY Molds PresentationCY Molds Presentation
CY Molds PresentationFanny Lee
 
Bsm profile automotive
Bsm profile automotiveBsm profile automotive
Bsm profile automotiveHuy Bui Van
 
★Topwell Presentation
★Topwell Presentation★Topwell Presentation
★Topwell PresentationEmily Xu
 
Kbx presentation stampings
Kbx presentation stampingsKbx presentation stampings
Kbx presentation stampingschcrane
 
Bluestar profile 2013
Bluestar profile 2013Bluestar profile 2013
Bluestar profile 2013Huy Dickens
 
IEC Russia — Automotive Industry
IEC Russia — Automotive IndustryIEC Russia — Automotive Industry
IEC Russia — Automotive IndustryRoman Fedorov
 
Export mold updates
Export mold  updatesExport mold  updates
Export mold updatesSpring Xiao
 
Presentation of Shenzhen Jinway Mold Co.,Ltd
Presentation of Shenzhen Jinway Mold Co.,LtdPresentation of Shenzhen Jinway Mold Co.,Ltd
Presentation of Shenzhen Jinway Mold Co.,LtdVina K
 
Company presentation of Derco Mould Engineering 2016
Company presentation of Derco Mould Engineering 2016Company presentation of Derco Mould Engineering 2016
Company presentation of Derco Mould Engineering 2016John Gao
 
Derco mould engineering company profile 2017
Derco mould engineering company profile 2017Derco mould engineering company profile 2017
Derco mould engineering company profile 2017John Gao
 
Triple Incorporated
Triple IncorporatedTriple Incorporated
Triple Incorporatedsonntag3
 
Navitas Plastic Injection Moulds
Navitas Plastic Injection MouldsNavitas Plastic Injection Moulds
Navitas Plastic Injection MouldsArshi_Narang
 
Company Profile_OST SBU 1
Company Profile_OST SBU 1Company Profile_OST SBU 1
Company Profile_OST SBU 1James Chua
 

Semelhante a Maxuni Presentation 2009 Us New (20)

Maxuni Presentation 2011 Updated
Maxuni Presentation 2011 UpdatedMaxuni Presentation 2011 Updated
Maxuni Presentation 2011 Updated
 
Tooling
ToolingTooling
Tooling
 
POM_ Mold Presentation 2016.8.12
POM_ Mold Presentation 2016.8.12POM_ Mold Presentation 2016.8.12
POM_ Mold Presentation 2016.8.12
 
CY Molds Presentation
CY Molds PresentationCY Molds Presentation
CY Molds Presentation
 
Bsm profile automotive
Bsm profile automotiveBsm profile automotive
Bsm profile automotive
 
Automotive molds - BSM Group (Shenzhen)
Automotive molds - BSM Group (Shenzhen) Automotive molds - BSM Group (Shenzhen)
Automotive molds - BSM Group (Shenzhen)
 
★Topwell Presentation
★Topwell Presentation★Topwell Presentation
★Topwell Presentation
 
Kbx presentation stampings
Kbx presentation stampingsKbx presentation stampings
Kbx presentation stampings
 
Bluestar profile 2013
Bluestar profile 2013Bluestar profile 2013
Bluestar profile 2013
 
RADIX Presentation
RADIX PresentationRADIX Presentation
RADIX Presentation
 
IEC Russia — Automotive Industry
IEC Russia — Automotive IndustryIEC Russia — Automotive Industry
IEC Russia — Automotive Industry
 
Export mold updates
Export mold  updatesExport mold  updates
Export mold updates
 
Presentation of Shenzhen Jinway Mold Co.,Ltd
Presentation of Shenzhen Jinway Mold Co.,LtdPresentation of Shenzhen Jinway Mold Co.,Ltd
Presentation of Shenzhen Jinway Mold Co.,Ltd
 
Company presentation of Derco Mould Engineering 2016
Company presentation of Derco Mould Engineering 2016Company presentation of Derco Mould Engineering 2016
Company presentation of Derco Mould Engineering 2016
 
Derco mould engineering company profile 2017
Derco mould engineering company profile 2017Derco mould engineering company profile 2017
Derco mould engineering company profile 2017
 
THREEGON
THREEGONTHREEGON
THREEGON
 
Triple Incorporated
Triple IncorporatedTriple Incorporated
Triple Incorporated
 
Navitas Plastic Injection Moulds
Navitas Plastic Injection MouldsNavitas Plastic Injection Moulds
Navitas Plastic Injection Moulds
 
Presentation of Precisioner 2016
Presentation of Precisioner 2016Presentation of Precisioner 2016
Presentation of Precisioner 2016
 
Company Profile_OST SBU 1
Company Profile_OST SBU 1Company Profile_OST SBU 1
Company Profile_OST SBU 1
 

Maxuni Presentation 2009 Us New

  • 2.
  • 3.
  • 4.  
  • 5. 2008 Sales: 13 Million USD
  • 6. 2008 Sales: 420 Sets of Molds
  • 7.
  • 8.
  • 11. We Provide Molds for Other Industries
  • 14. We Provide Molds for Other Industries
  • 17. Mold Manufacturing Lead Time Reference Complex Mold General Mold Mold Tonnage Project Finished Time 1 TON 7-8 Weeks 3 TON 8-10 Weeks 5 TON 12-14 Weeks Mold Tonnage Project Finished Time 1 TON 8-9 Weeks 3 TON 10-11 Weeks 5 TON 14-16 Weeks
  • 18. Project Flow Chart Quotation Approval & P.O. Design & Engineering Design Check & Revision Design Approval Mold Construction Mold Testing & Refinement Mold Approval Final Mold Test Part Samples DELIVERY
  • 20. ERP Manufacturing System We use personalized Enterprise Resource Planning (ERP) software, which is similar to SAP AG’s flagship platform ERP. These programs are being used by such companies as Porsche, Verizon Telcom, and Nissan. All parts are bar-coded, and then scanned at each step of the manufacturing process. The ERP program ensures tracking for every part and person involved in the complete manufacturing process. The ERP software integrates and controls: Machine capacity planning Manufacturing planning Warehouse planning Purchasing software (the software results in less lag time on project start times) Quality Control (i.e. when Q.C. passes or fails a part). The above information is integrated into the rest of the system. The system instantly updates the machine planning capacity, manufacturing planning, purchasing planning (repurchasing if required), and warehouse planning (location tracking all components of every mould). Changes required by the customer are updated and integrated by the system, flagging potential delays for finishing the product on schedule. If delays are expected, the system can give parts a priority status. Automatic tracking, reporting, and correcting deviations in projected timelines allows us to hit our T1 target date 96% of the time; averaging over 700 moulds built per year.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Zhuhai Factory with Advanced Automated Flexible Manufacturing System Completely automated logistics, storage, and manufacturing system
  • 26. New Machines Coming August, 2009 Machines Qty. Origin DEPO HC 2012 (3 simultaneous & 1 adjustable axis) 1 German Gantry EAGLE 500 (EDM) 1 German OPS-ingersoll Gantry EAGLE 1200 (EDM) 1 German OPS-ingersoll HSC-machine SPEEDHAWK 550 (5-Axis's CNC) 1 German OPS-ingersoll HSC-machine SPEEDHAWK 750 (5-Axis's CNC) 2 German OPS-ingersoll DEPO Mill2012 (5 axis) 1 German DEPO HF2012 (5 simultaneous & 2 adjustable axis) 1 German DEPO VC3016 (5 simultaneous & 1 adjustable axis) 1 German DEPO VF3016 (5-Axis's CNC) 1 German
  • 27. CNC Milling Machines Qty. Origin ShenZhen Factory Equipment List MORI-SEIKI NVD4000 DCG 1 Japan (Purchased 2006) MORI-SEIKI NVD5000 Alpha 1 (High speed milling – up to 20,000 RPM) 2 Japan (Purchased 2005) HARDINGE VMC800II 6 USA (3 Purchased 2005) HARDINGE VMC1250II 1 USA (Purchased 2006) Extrem DH1000 Gun Drill 1 Hong Kong (Purchased 2007)
  • 28. EDM Machines Qty. Origin ShenZhen Factory Equipment List CHARMILLES ROBOFORM 35P With EROWA tool changing system 2 Switzerland (Purchased 2006) ACTSPARK SE1 1 Switzerland DE-650 1 Taiwan DE-432 6 Taiwan
  • 29. Wire Cutting Machines Qty. Origin Machining Centers Qty. Origin ShenZhen Factory Equipment List CHARMILLES ROBOFIL380 1 Switzerland SuSanGuang 7725 2 China HuaFang 7732 1 China HuaFang 7740 2 China HuaFang 7750 1 China YSG-614 Precision Grinding Machine 4 Japan M7312H Automatic Surface Grinding Machine 5 China Okamoto OGM-250UEXB Cylindrical Grinder 1 Japan (Purchased 2006)
  • 30. Mold Fitting Machines Qty. Origin ShenZhen Factory Equipment List AQUAmate LS-120t 1 Hong Kong (Purchased 2005) AQUAmate LS-200t 1 Hong Kong (Purchased 2006)
  • 31.
  • 32.
  • 35.  
  • 36.

Notas do Editor

  1. 58