CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 1 of 4
K. P. TOMY
E-Mail: tomykara@yahoo.com
Contact number: India: +91 8606038942 OR +91 9947624193, Skype ID: tomy.pappu1
Construction Management & Engineering Assignments
Over 26 years of cross-cultural experience in the areas of:
- Construction Management - PMC experience & Strategic Planning
- Civil/structural work supervision - Structural Fabrication & erection
- Design Reviews - Resource Management
- Site Management - Shutdown Work Management
- Relationship Management - General Administration
- Commissioning - Survey of damaged foundations & repair
A Construction Engineer; adept in handling multi-discipline contracts involving Civil & structural,
and Equipment related Jobs.
Following all necessary SAFETY, HEALTH & ENVIRONMENT (SHE) Standards and ensuring
application of the same in all aspects of the work being carried out.
Scheduling and Monitoring of Construction activity, Progress Report, Preparation of Checklist, Client
measurement, and Reconciliation Statement and Supervision of all industrial construction activities.
Construction management of critical civil & structural works with adequate resource planning of
materials & manpower.
Site Procurement of civil work & structural materials and other construction consumables.
Conversant with all civil & structural drawings, standard codes, symbols, specifications and
international standards like ASTM, ACI, ISA, ASME, and API etc.
Conversant with MS Office ,MS Word, MS Excel & Power Point Presentations
Experience in preparation of Preparation of plot plans, necessary rebar detail drawings, structural
detail drawings and construction method of statement.. etc. required for site constructions)
Conversant with all safety requirements in industry as per OSHA standards.
Inspection of all -civil and structural materials and other witness of form work fabrication, installation,
rebar work, concrete pouring, structural fabrication, erection and alignment…. Punch list liquidation
and pre-commissioning activities.
Position from January 29th,
2016 onwards Petrofac OPO Iraq, Rumaila GCMC project.
Site supervisor (Civil/structural)
Responsibilities:
Review civil/structural IDC drawings, prepare construction related comments.
Participation and Supervisions of lay outing rebar and form fabrication & erection.
Supervision of all civil/structural construction activities with quality and safety measures.
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 2 of 4
Resolve contractor issues with suitable solutions.
Resolve all construction related issues at site.
ITR’s preparation and documentation.
Prepare daily reports and circulate to managers.
Position From 5th
, September 2012 to 6th
February 2015. Civil/structural Engineer
Construction. (Petrofac OPO Iraq. Rumaila)
Responsibilities:
Supervision of all, civil and structural work with quality and safety measures.
Supervisions of lay outing, excavations, rebar/form fabrication & erection.
Review civil and structural IDC drawings and prepare comments.
Consolidate the findings, resolve all construction issues immediately at site and prepare
reports with suitable solutions.
Discuss the Project with Project Manager and prepare a detailed construction scope of work of
the project.
Prepare the method of statement, select the appropriate materials from Vendor and supervise
the execution.
Supervision and guiding of form work fabrication and rebar bending methods.
Supervision of structural fabrication, erection & bolt tightening with proper torque and quality
measures.
Thorough survey and evaluate the existing concrete foundations of static and rotating
equipment and prepare detailed reports.
Design the preliminary Civil Engineering drawings, prepare the plot plan and submit for final
approval.
KEY PROJECTS HANDLED
NITROGEN COMPRESSOR Installation, Project at NIGC Yanbu (As a CONSTRCTION
ENGINEER LEADER)
Review scope of work, Project coordination, discuss daily progress with Construction manager, call
meeting for each disciplines supervisors and preparing minutes meeting; Review IDC drawings
and prepare comments, preparation of construction method of statement, supervision of
construction activities, resolve all construction issues immediately, closely monitor construction
activities from beginning lay out, excavations, rebar & formwork fabrication & erection, pre
casting & site casting of foundations, pipe rack foundations. Supervision of structural fabrication,
erection of structural pipe racks, platforms and related structural works , pre alignment and
anchor bolt setting, grouting, final alignment and base grouting, Nitrogen compressor Erection,
cooler erection, lube oil skid erection and Alignment & grouting.
OLEFINS RECOVERY PROJECT at YANPET POLYMER-I&II (As a CONSTRUCTION ENGINEER)
Project coordination and Review IDC drawings and prepare comments, supervision site layout,
excavations, lean concreting, structural fabrication/erection & bolt tightening with proper torque.
Construction supervision pipe supports pre casting, site casting of membrane foundations, pipe
supports and structural supports, Erection of structural’s, membrane skid, alignment, grouting &
pre commissioning and pre commissioning.
GAN GOX CROSS COUNTRY PIPE LINE at NIGC Yanbu (As a IN CHARGE/ SUPERINTENDENT)
Project coordination, IFC Drawing review, Civil works, like layout, excavation, lean concreting,
pipe support construction, sleeper pre casting and erection, also Fabrication, erection & welding,
hydro testing and pre commissioning of 21 km pipe line from GAS/Yanbu to Cristal Yanbu, and
construction of related pipe supports.
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 3 of 4
SUMP PIT CONSTRUCTION in ARAMCO Ras Tanura Terminal (As a CONSTRUCTION
SUPERINTENDENT)
Project coordination and supervision of Sheet piling, well point installation, dewatering of
excavated trench, layout & lean concreting, supervision of rebar fabrication, prepare rebar
bending schedule, Construction supervision of sump pit, erection of sump Pump & alignments and
related pipe line works
SHELL PLATE, AND BOTTOM PLATE REPLACEMENT IN STORAGE TANK at ARAMCO Ras
Tanura Terminal.
Supervision of Tank shell extension, bottom plate replacement including oil sand sand
replacement, sand blasting & painting, Nozzle welding, tank hydro testing..etc
Styrene-ll Project in SADAF Jubail (As a CONSTRUCTION SUPERINTENDENT)
Coordination the project and Supervision of Erection of structural pipe rack, construction of tank
ring wall, sump pit, pipe rack foundations, pipe sleepers,..etc
HIGH PRESSURE & LOW PRESSURE BOILER, AND FLASH EVAPORATOR SHUT DOWN WORKS at
ARAMCO Ras Tanura Refinery ( As a CONSTRUCTION SUPERVISOR)
Boiler tube replacement & Hydro testing, refractory repairing and Steam drum demister pads
replacement, Heat exchanger tube bundle replacement & hydro testing, Pie line fabrication,
erection an, hydro testing and pre commissioning, Valve hydro testing,
Column shut down like Isolation, blinding, filter replacement, Nozzle welding…etc
SPC Plant Shut down Jubail (2004)
Supervision of Heat Exchanger Tube bundle replacement & hydro test of newly installed tubes.
Erection and replacement of pipe lines, Boiler Steam Drum internal demister pads replacement,
valves erection
Community Maintenance Project at Dhahran – Saudi Aramco (1995-1998)
Supervision of construction works for the 10 floored two apartment major renovation and different
house renovation, offices and Hospital renovations in project complex.
CAREER CONTOUR
Since Oct2008 to Aug 2012: SABIC (Saudi Basic Industries Corporation/DAR)
Construction Engineer
Accountabilities:
Construction Management including scheduling the construction activities for civil/structural,
mechanical & piping disciplines supervision of contractor jobs, ensuring the work completion as per
the schedule and Quality and Safety standards.
Reporting Progress reports (Actual Vs Plan) to the Management and scheduling the critical activities,
managing recovery plans to avoid delays in schedules.
Reviewing of ITPs, Method of Statement, Job procedures, Construction Check lists, Lifting Plans,
Equipment Erection Schemes and preparation of Punch lists and carryout the safety and project
walkthrough.
Assistance in commissioning and start up of the projects to rectify any construction backlogs in
priority wise.
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 4 of 4
Inspection of materials, package items, consumables and other construction tools and tackles.
Review and certifying of contractor progress versus billing submissions.
Review the Issued for Construction packages and to support engineering team to finalize the
packages in execution based on actual site conditions.
Major Projects Handled :
Nitrogen Compressor Installation, Associated Piping & Instrumentation
Olefins Recovery Project at Yanpet Polymer-I&II
API/CPI Odor Control System Project
PCVs and PSVs for YANPET-I
PDS valves & related piping at Polymer Unit.
Upgrading Sump Pumps
Quench Oil Pump Upgrading
PREVIOUS ASSIGNMENTS
H K Al-Sadiq Sons, Saudi Arabia Project In charge/Suptd Mar ’91 – Dec ‘07
GBT Engineering Works, Kerala, India Construction Engineer Feb ’88 – Jul ‘90
Since Mar ’91 Till Dec ‘07: H K Al-Sadiq Sons, Saudi Arabia
Project Superintendent
Accountabilities:
Construction Management & Supervision of all the works at site.
Generating progress reports and scheduling day to day construction activities to meet the schedule.
Distribution of labors and workmen to achieve maximum output and optimize cost control.
Conducting site visits, review the engineering packages on site conditions and raising technical
queries to cater the best engineering and industrial practice of construction.
Attending meetings with clients and discussing project progress and take steps to improve technical
quality and safety measures continuously as per client requirements.
Arranging Manpower and Tools & Tackles Deployment, Monitoring the critical paths.
Data collection & Constructions sketches, Client Measurements to assist the planning team in raising
billing progress.
Material and Consumables procurement for the construction activities
Ensuring the construction as per safety practices and client standards, conducting Tool Box meeting,
Safety presentations, empowering workmen for using PPE.
Projects Handled:
1) Erection of Packaging Conveyor System at Polymer Unit Dry End at Yanpet, SABIC (2007)
a) Erection and Alignment of Beumer Bagging Machine ,Conveyors ,Palletizing Units, Stretching Units
and related all kinds of Platform Erections .
b) Commissioning Assistance for the project and supervision of Pre-commissioning Activities like
hydro and leak tests of pipe and instrument utility lines.
c) Cabling & Terminations of Bagging Machine Interfacing to Control Systems.
2) Upgrading of PSVs in U#10 at Yanpet. (2006)
a) Inlet and Outlet pipe lines of PSV (8”x10”, 10”x12” Anderson Greenwood) –Fabrication and
Erection.
b) Columns and Drum Erection, New Platform Fabrication and Erection for PSV Accessibility.
3) Gan Gox pipeline Project from Gas Yanbu to Cristal Yanbu (2006-2007)
a) New pipeline installation from Gas Company to Cristal Company (21 Km Cross Country ) including
pipe support and sleepers .The line was Oxygen Service and supervised the pneumatic testing and
inner blasting of the pipe lines.
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 5 of 4
4) SPC Plant Shut down Jubail (2004)
a) Supervision of Heat Exchanger Bundle Tube replacement & hydro test of newly installed tubes.
Erection and replacement of pipe lines, Boiler Steam Drum internal demister pads replacement,
valves erection.
5) Pipe line and Civil Works at PetroKemya plant in various units.(2003-2005)
a) Replacement of underground pipe lines.
b) Construction of tank ring wall, fire wall and dike wall.
c) Construction and Erection of pipe supports & packaging conveyor system.
6) Styrene –II project in Sadaf Jubail (1998-2000)
a) Construction of various concrete skids like column foundations compressor foundations pipe
supports pipe sleepers pipe rack foundations.
b) Structural Erection, supervision of critical welding of exchanger bundle tubes.
7) Tank Farm and Pipe line Execution with Gulf Arabia Jubail Corridor (2000-2002)
a) Pipe Sleeper foundation construction, Concrete foundations for structural pipe rack structural
erection, pipe line fabrication erection done.
b) Procurement assistance in collecting data and comparing and finalizing Material Take -offs as per
actual site conditions.
8) Community Maintenance Project at Dhahran – Saudi Aramco (1995-1998)
a) Supervision of construction works for the 10 floored two apartment major renovation and
different house renovation, offices and Hospital renovations in project complex.
9) Saudi Aramco (1991-1995)
a) Supervised different shutdown works like boiler ,flash evaporator ,exchanger bundle tube
replacement including hydro testing ,valve hydro testing and installation, pipe line fabrication &
erection, nozzle welding ,column erection ,storage tank shell welding ,Tank bottom plate
replacement and repair ,Tank sand blasting ,Painting & Hydro testing . Sheet piling and
construction of sump pits… et
SCHOLASTICS
Civil Engineering in 1987.(State Board of Technical Education-India)
ITI in FITTER in 1983. (National Council for Vocational Training-India)
PERSONAL PROFILE
Date of Birth : 01st
June 1963
Address : K P Tomy
Karavattappuram (House)
Neeleeswaram PO,
Kalady (Via),
Ernakulam(Dist, Kerla
India, Pin # 683574
Nationality : Indian
Marital Status : Married
Passport Number : Z1971919