SlideShare uma empresa Scribd logo
1 de 53
Baixar para ler offline
World Food
                                                       Government of
Programme                                                 Kenya




                    FOOD FOR ASSETS (FFA) GUIDELINES

                             Before         After




                                      For




                        PROJECT IMPLEMENTATION TEAMS



         THE KENYA PROTRACTED RELIEF AND RECOVERY
                        OPERATION

   Revised 21/05/2010
TABLE OF CONTENTS

1.INTRODUCTION ........................................................................................................................................................3

2. PROJECT IDENTIFICATION .................................................................................................................................4

3. FOOD AID REQUIREMENTS FOR THE PROJECT ...........................................................................................4

4. PROJECT PROPOSAL/ CRITERIA .......................................................................................................................5

5. PROJECT APPROVAL PROCESS..........................................................................................................................6

6. TARGETING FOOD AID .........................................................................................................................................6

7. FOOD AID DELIVERIES AND DISTRIBUTION .................................................................................................7

8. UTILIZATION OF TOOLS ..................................................................... ERROR! BOOKMARK NOT DEFINED.

9. CAPACITY BUILDING ............................................................................................................................................8

10. PROJECT MONITORING AND REPORTING ...................................................................................................8

11. PROJECT REVISION .............................................................................................................................................9

12. ROLES OF STAKEHOLDERS IN FFA PROJECTS ...........................................................................................9

ANNEX 1: WORKNORMS .........................................................................................................................................11

ANNEX 2: PROJECT PROPOSAL FOR FFA PROJECTS ....................................................................................15

ANNEX 3: PROJECT APPRAISAL FORM .............................................................................................................15

ANNEX 4: MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN THE KEY STAKEHOLDERS ....31

ANNEX 5: RC MONTHLY REPORT ........................................................................................................................32

ANNEX 6 A: FOOD FOR ASSETS SUMMARY SHEET (PLANNED AT THE BEGINNING OF THE EMOP
PHASE ...........................................................................................................................................................................34

ANNEX 6 B: FOOD FOR ASSETS SUMMARY SHEET (ACHIEVED AT THE OF THE END EMOP
PHASE) ..........................................................................................................................................................................36

ANNEX 6 C: MONTHLY FFA DISTRICT PROGRESS REPORT .......................................................................38

ANNEX 7: COOPERATING PARTNER MONTHLY DISTRIBUTION REPORT .............................................40

ANNEX 8: POST DISTRIBUTION MONITORING: HOUSEHOLD REPORT FORMAT ................................41

ANNEX 9: POST DISTRIBUTION MONITORING: COMMUNITY REPORT FORMAT ...............................45

ANNEX 10: FOOD FOR ASSETS SITE MONITORING FORMAT .....................................................................47

ANNEX 11: FOOD DISTRIBUTION MONITORING REPORT FORMAT .........................................................50
ANNEX: 12 FINAL REPORT………………………………………………………………………………………..35
ANNEX 13: INTERNAL EVALUATION OF FFA PROGRAMMES…………………………...………………..36

ANNEX 14: BUDEGT FORMAT................................................................................................................................55
INTRODUCTION

The Government of Kenya’s (GoK) Policy is to ensure that whole population is food secure all the time. It
is also the policy of GoK that Food for Assets (FFA) be used as the main food aid strategy whenever
possible. The FFA project selection should be in line with the Vision 2030 and Poverty Reduction Strategy
Paper (PRSP) and enhancement of food security in the respective districts. FFA activities are in line with
the Agricultural Sector Development Strategy (2009-2020) and the draft ASAL Policy documents
especially as they relate to Natural Resource and environmental management1

FFA’ is a food security strategy that meets immediate food needs and ensures building of assets for the
future. The long lasting effect of FFA is not only for the creation of assets, but also the building of adequate
skills to help people plan and manage micro-initiatives, and to continue to invest in their futures”2

The vision of WFP is that of a world in which every person has access at all times to the food needed for an
active and healthy life. More specifically, WFP’s mission is to:

    -   Save lives in emergency situation,
    -   Improve the nutritional status and quality of life of the most vulnerable people at critical times of
        their lives; and
    -   Help build assets and promote the self-reliance of poor people and communities.

This mission by policy means that food aid should be used for those that lack food and that the work
performed in exchange for food results in lasting benefits for the food-insecure (ref: ILO/WFP: Guide on
Food for Assets and Sustainable Employment-working document, Rome, June 1999, p. 7).

FFA activities contribute to WFP’s Strategic Objective two of the WFP Strategic Plan (2008-2011): Prevent
acute hunger and invest in disaster preparedness and mitigation measures.

These activities aim to achieve goal 2-“to support and strengthen resiliency of communities to shocks
through safety net or asset creation, including adaptation to climate change

The implemented FFA projects in Kenya are expected to improve food security in the Arid and Semi- Arid
Lands (ASALs) of Kenya by having the following impacts:
   1. Improved pasture and browse production
   2. Improved diversification of food sources(increased crop production, incomes from gums and resins,
       aloe vera, and other range plants
   3. Improved access to water for both human and livestock consumption
   4. Reduced environmental degradation
   5. Improved access to markets and other sources of food (feeder roads)

WFP has joined in the debate on the possible role of Cash transfers in humanitarian and development
work3. The report argues that there is role for both cash and food aid in development and humanitarian
activities. The appropriateness of each type of intervention will depend on how effective the market and
financial systems are in a given area. This guideline focuses of food aid and not cash interventions.

The following guidelines for implementation of FFA projects are based on WFP FFA guide lines
(mentioned above), the experiences of successful Food for Work Programmes under the Kenya Emergency
Operation Programme (EMOP-2000-2002, 2004-2009), Kenya Refugee Programme Host project in
Kakuma, and Disaster Preparedness Facility activities.

Below find guidelines for all the stages of the FFA.



1
  Natural Policy for the sustainable development of Arid and Semi-Arid lands of Kenya
2
  WFP Food for Asset Guide
3
  Cash and Food Transfers: A Primer
2. PROJECT IDENTIFICATION
The Kenya Food Security Group (KFSG) together with District Steering Group (DSG) and the District
Project Steering Committees (DPSC), the technical arm of the DSG, will conduct a food security analysis in
the districts that will determine the areas that FFA need to be implemented.

The selected FFA Cooperating Partner-CP- (selection process discussed in another document) will consult
the DSG so that the partner can start the process of project identification.
The CP will use participatory process to identify viable FFA projects. CP must ensure that Communities are
highly involved in all stages of the project (Project identification, implementation and providing resources,
and Monitoring & Evaluation).This is to ensure that the projects contribute to food security and that
communities will maintain the projects after the CP is not involved.

Two methods of project identification will be used:
The first option is where CPs will consult the Development Committees (on priority projects) where these
committees exist. The prioritized project will be verified in a public baraza called by the Chief/DO. In this
meeting the CP will rank the project using the pair wise ranking method or any other Participatory Rural
Appraisal (PRA) technique. In this meeting the public will be

Informed that it is only the food insecure households that will work and get food aid but the resultant
project outputs will benefit the whole community including those that did not work on them.

The second option of project identification is where communities by CP representative will (where
Development Committees do not exist) consult communities-using PRA techniques- on project priorities.
In a public meeting, facilitated by the CP, communities will brainstorm the community problems and
projects, and will prioritize them by ranking.

Communities will be encouraged (guided) to develop projects that will improve the food security of the
communities and those that will mitigate droughts. These projects include (see Annex 6A); construction of
small earth dams and water pans, de-silting existing dams, hand dug wells, small-scale surface irrigation, a
forestation and protection of water catchments, terracing and gabions. Capacity building activities are
encouraged which may include a few days for training – Food for Training (FFT). More than 70 % of the
resources (e.g. food aid and tools) will be allocated to the type of projects that have a direct impact on
improved food security.

District Project Steering Committees (DPSCs) will be formed in each District and will improve project
design (more details in section 5).


3. FOOD AID REQUIREMENTS FOR THE PROJECT
The total food aid requirement per project is a function of the volume of work (total work-norms); ration
size, and the household sizes (members per household).
Household size: For these FFA projects an average size of 6 members per household will be used.

Ration Size: A 50 % ration or a 75 % ration will be applied as guided by the Kenya Food Security
Group (KFSG)
A 50 % ration will be computed as follows: The ration size is the amount of food that will be provided to a
person working on the project after s/he has completed one work norm (estimated to be completed within
one day). The daily ration for a days work (one work norm) will be 3,400 gms cereals, 600 gms of pulses,
and 180 gms oil. The main rationale is for the ration to provide 50 % (1050 Kcal per person day) monthly
calorific needs for the identified food insecure household –of 6 members-(41.4 Kgs cereals, 7.2 Kgs pulses,
7.2 Kgs CSB and 2.16 Kgs vegetable oil) for a household that works for 12 days(achieves 12 worknorms)
 A 75 % ration will comprise a the following for each work norm achieved (each working day) : 5,100
gms of cereals, 900 gms of pulses, 600 CSB, and 300 gms oil. This ration will provide 75 % Kcal for the
targeted families per month (1575 Kcals per person per day).
Commodities that are not available will be replaced with the available commodities in the following ratios:
 Substituting Food Commodities
 Blended food and beans                               1 to 1
 Sugar and Oil                                        2 to 1
 Cereal and beans                                     2 to 1
 Cereal for oil (not oil for cereal)                  3 to 1

                     Source: WFP Food and Nutrition Handbook

Piecework is encouraged i.e. an allocation of a piece of work per household which can be done within a
flexible timeframe and may include various members of the household. Where piecework is not possible
one household representative is expected to work for 12 days in a month (6 hrs per day, within this time the
representative will complete one work norm) and receive a household ration based on the above-mentioned
daily ration. Participants are expected to work for 6 hours only so as not to disrupt beneficiaries’ regular
activities, mainly in agriculture and at household level for the women.

Food incentives/rations will be distributed based on work norms achieved but not attendance to the
project sites. Every household will receive food quantities of food (or cash) based on the actual work
norms achieved. In the same project site different households will receive different quantities of food
depending on the actual worknorms these households achieve.

The Work Days will be based on the ILO work norms issued for Kenya and practical experiences gained
from previous FFA projects that have been implemented in Kenya. For piecework, the household is free to
use as many household members as possible to complete the task. The household will be paid the agreed
ration when the task is completed.

Food aid calculations will be made in such a way that it is clear how much food is required for workers and
how much is required for vulnerable households that may not contribute some one to work e.g Child headed
HHs, HHs headed by elderly or physically challenged. It is expected that up to 20 % of HHs may not be
able to contribute a worker in one project site.

Work Norms: Each District Project Steering Committee (DPSC) will use worknorns as indicated in
Annex 1.


4. PROJECT PROPOSAL/ CRITERIA
The CP assisted will complete the Project Proposal Format (see Annex 2). The district level Project
Steering Committee (DPSC) will appraise the project and complete the Project Appraisal Form (Annex 3).

The following are key criteria that the project must meet:

    -   Project must be from the identified food insecure pockets of the district.
    -   Must be a community-managed project as opposed to Public works types of Project (e. g. village
        water point or feeder road instead of national road or public building rehabilitation)
    -   Community assets (e. g. Shallow wells, Dams,) must be created on public land and if done on a
        private land a legal document allowing public access to the produced project assets
    -   The Project must be labor intensive and uses appropriate technology that is familiar to the
        community
    -   Communities contribute resources (tools and materials) that are within their reach.
    -   The project will be completed within the specified period.
    -   The project must be feasible (technically feasible, manageable by the community and
        environmentally sound e.g. charcoal burning not acceptable).
    -   At least 25 % of the resulting outputs must directly benefit women.
    -   At least 50 % of the Project Committee members must be women
    -   Project has appropriate working conditions for women e.g. timing of the project, (time of the day
        and day of the week) and the security situation.
The project proposal must therefore include:
   - Clear indication that communities were involved in project identification (as a proof of this the CP
       has to develop a Tripartite Memorandum of Understanding (MoU) e drawn between the CP and the
       community. (see Annex 4). The agreement stipulates the roles and responsibilities of each party.
   - Clear indication that food aid will not create a disincentive to local food production
   - Clear indication that the project will have a positive impact on the food security for in the project
       area
   - Clear plan on how the created assets will be operated and maintained after the completion of the
       project (e. g. for any water project: water committee appointment and the means to run the
       maintenance)
   - Clear indication that women participated in identifying the project
   - Clear indication how the project benefits have a potential to save labor for women


5. PROJECT APPROVAL PROCESS
The CP submits the project to the District Project Steering Committee (DPSC) of the District Steering
Group (DSG) for grading and recommendation to WFP. The District Commissioner (DC) chairs. The other
members will be decided in the District depending on the sectors from which most projects are expected
(e.g. Agriculture, Roads, and Water). The DPSC will assess the projects and will also provide technical
advice on the project design and implementation.

The DPSC will use the criteria given above in section 4 to assess the project. DPSCs will provide a detailed
technical review of the projects and also provide a coordination of project activities to avoid duplication of
efforts by different projects. DPSC will complete the Project Appraisal Form (Annex 3).

The DPSC will grade the project into one of four categories:
A. Recommended with no amendments required.
B. Recommended with minor (does not change the resource requirements from the beneficiaries)
    amendments required. The CP will amend the project and forward it to Nairobi without being
    reviewed again by DPSC.
C. Project requires significant amendments and need to be reviewed again by the DPSC. This project will
    be returned to the CLP for more work and resubmitted to the District PSC.
D. Project rejected. There is no need for bringing it back to the DPSC.

Only projects in categories A and B together with the Project Appraisal Form (Annex 3) are sent to FFA
Co-ordinator (in the Ministry of Northern Kenya and other Arid Lands-MONKOALs) and a copy to WFP.
To ensure a fast process, the documents will be sent via e-mail where possible and hard copies to follow.

The approval and award of contract will be the National Project Steering Committee (NPSC) whose
members include MONKOALs and WFP among other members. Projects/contract awards based on the
following criteria:
• Cost effectiveness of the project.
• Budgetary contribution of the CP
• If the project address issues of food security. Does it have positive impact
• Project feasibility.
• Are there non food items essential and source not clearly identified and sourced
• Proper calculations of food aid requirements.
Once approved, the NPSC will in turn advise the CP, and DSG at the district level. The CP and WFP (on
behalf of the NPSC) will sign a contract for the implementation of the FFA project. Then CP will proceed
with the implementation of the project and advise the DPSC.
6. TARGETING FOOD AID
Targeting implies selection of a) areas of intervention at National, regional or district level, and 2)
Participants at community and/or household levels. Targeting requires participation of the stakeholders at
various levels in order to achieve:
    o Transparency/accountability for the collection, analysis and presentation of data
o Ownership of criteria for inclusion or exclusion of areas and participants
    o Effectiveness (both for problem identification and implementation)1
Geographical targeting at the national level is done by the Kenya Food Security Group (KFSG) based on
food security assessments conducted after each of the two rainy seasons.

Selection of the specific participants and households to be enrolled in the FFA project will be based on
criteria for food insecurity and done in a participatory manner:
Selection and Registration of Beneficiaries
Communities are advised that the participants (especially those that will receive food aid) are those that are
food insecure. The community in a public meeting develops the specific criteria for selection of food
insecure households that will participate in the project (may be by reviewing those already developed under
the free food distribution).

Sample list of selection criteria for beneficiary households4:
          - No cattle/livestock owned, or less than a defined small number;
          - Less than a defined small acreage of farmland (e.g. < 5 acres);
          - Very large families, HIV affected families;
          - No, or low food/cash crop harvest, animals not producing milk;
          - No fixed employment;
          - No food stocks held;
          - No petty trading or no small business;
          - Widows, widowers, orphans, aged, disabled;
          - Cattle rustling victims, displaced;
          - No kinship support
          - Single woman headed households
The HHs that meet the adopted criteria and are interested in participating in FFA are registered in a
notebook as outlined below.

Sample of beneficiary registration list:
         Sex of                       ID No.     Female                    Male
                      Name of HH                                                                     Total
HH       HH                           of   HH    Under    5- 18   Over     Under    5-18    Over
                      Head                                                                           in HH
         Head                         Head *     5 yrs    yrs.    18 yrs   5 yrs    yrs.    18 yrs
1        F            Lucy Mwangi     123456                      X                                  5
         X            Juma            -                                             x
                      Daniel          -                                    X
                      Alice           -          X
                      John            -                                    X
2        F            Esther Ogulla   7891112                     X                                  3
                      Maina           -                                             x
                      Mary            -                   X
                       ID number is recommended, but lack of it should not disqualify access to food.
                       Put X on the key person who will go to work on the project site

Households in the register should be ranked according to level of food insecurity i.e. the most vulnerable
first. Allocation of work (and hence food aid rations) will start with the most vulnerable coming down to
the less vulnerable. The number of households working on the project will be determined by the volume of
work i.e. the work norms and the project duration. Communities can start more than one FFA project but
must ensure that households do not work on more than one project at any given period.


7. FOOD AID DELIVERIES AND DISTRIBUTION
The CP will request from the District Warehouse (EDP) for the amount of food as per achieved worknorns
and as per the per the approved project proposal. The food will be delivered with a waybill which will be
signed by at least two members of the CP. The CP will store the food on a short-term basis before it is
distributed (only if storing is absolutely necessary). The CP will distribute the food to the beneficiaries that
have worked on the project.

4
    Examples gathered from workshops held in different districts in Kenya.
Regular Distribution/ Payment
 The payment will be based on the work norms (task rates achieved) by the beneficiaries. The CP will keep
a register that indicates the days that each beneficiary works and the amount of work norms achieved in
each workday. FFA participants will then receive a food ration based on the number of worknorms
achieved.

Food Distribution
The community facilitated by CP decides on distribution schedules. It is recommended that one distribution
is done per month and each participant receives the food based on the number of work days (work norms)
achieved.

Example: Accounting for Food
                              Total      Ration (kg)                            Who           Signature
        Name of                                                                                           Signature or
 HH               ID No. of   Work                                              collected     or thumb
        HH                                                                                                thumb print
 No               HH Head     days per   Cereals       Pulses   Oil   Salt      food (Male/   print
        Head                                                                                              (September)
                              month                                             Female)       (August)
        Lucy
 1                123456      12                                                F
        Mwangi
        Esther
 2                7891112     10         0                                      F
        Ogulla




8. CAPACITY BUILDING
The FFA will be implemented with an underlying aim of building the capacity of the communities to be
able to analyze and solve their communal problems. A cascading approach to training is will be adopted.
WFP will provide training to district level field staff (CLP, WFP and GOK staff). CLP will in turn organize
trainings for the Project Monitors and PCs.


Training of the district level field staff will enable the workshop participants to:
1) Explain the Project cycle
2) Mobilize communities to develop viable FFA Projects using a participatory approach
3) Develop a FFA project proposal
4) Explain the systems and procedures that are detailed in the FFA guidelines
5) Draw action plans for the development of project proposals in the districts
6) Understand the need for and advantages in adopting the gender considerations required in FFA projects
7) Understand basics issues of nutrition, hygiene, care and HIV/AIDS

Training of Project Monitors and RCs will seek to enable the participants to plan and implement food-for-
work projects according t these guidelines. The topics will be similar to those trained at district level except
the depth of coverage will be lower than that of at district level. RCs and Project Monitors will on a
continuous basis be trained on technical skills required to implement major specific projects, leadership
skills, and general management of projects and record keeping.


9. PROJECT MONITORING AND REPORTING
The CP will supervise and monitor the progress of the projects. The District FFA Cordinator will further
monitor the implementation of the projects and verify the information provided by CP. CP will provide a
Monthly FFA District Progress Report (see Annex 6) to DSG/DPSC, National FFA Coordinator
(MONKOALs) and WFP. The report will indicate the progress of the projects. The following are key
information to be included in the monthly report:

1.    Status of the projects (completed/ongoing)
2.   Quantity of food and non food items delivered to each of the projects
3.   Number of beneficiaries by age, and sex
4.   Stocks balances of food and non food items at the district store
5.   Physical outputs of the projects e.g. km of terraces dug, dams desisted etc
6.   Percentage of women participating in the project (Workdays achieved by gender)

Post Distribution Monitoring (PDM) will be conducted at given intervals. The PDM will be both at
household level (see ANNEX 8) and community level (see ANNEX 9)


10. PROJECT REVISION
If in the course of project implementation it is realized that the project requires more food due to errors
during project design (e.g. some activities were omitted) then an addendum will be written for the project
justifying the need for the extra food aid. This addendum will be reviewed by the DPSC and approved by
NPSC. The changes will be documented and extra food required incorporated in the database. The
addendum will be written not letter than the third quarter of the project implementation.

If the communities decide not to undertake the original project and to do a totally different project then a
new project proposal will be developed and will go through the whole process of approval.



12. ROLES OF STAKEHOLDERS IN FFA PROJECTS
Community
- Identify the needs/projects
- Prioritize the needs/projects
- Provide community contributions (i.e. unskilled labor and local material) within reach
- Sustaining the project assets that have been created

Project Committees
- Discuss, identify and rank problems and solutions with the communities and development committees
- Develop a draft FFA proposal and submit it to the CLP
- Sign agreements on behalf of the community
- Identify and registering the FFA target populations based on criteria for food insecurity
- Organize the work on the project site
- Receive and store (only if absolutely necessary) the food from CLP
- Distribute the food aid to the workers/ beneficiaries based on entitlements
- Monitor and report the progress of the implementation of the project
- Receive, store and managing the working tools

Government of Kenya District Staff (Chiefs, DOs, Technical staff etc.)
- Call for Public meetings to discuss project matters
- Provide security of staff and food aid commodities.
- Provide technical and material support to the FFA projects
- DC chairs the DPSC


Cooperating Partner (CP)
- Identify the projects
- Sign the Tripartite agreement with the community
- Sign the Tripartite agreement with the community
- Ensure that the project proposal is appraised by DPSC and NPSC
- Sign MOU/Contract with WFP
- Train Project committees
- Implement the project
- Provide progress reports to DSG, WFP and the MONKOALs
- Ensure proper targeting of food aid to FFA beneficiaries
- Contribute non-food items to the project

DSG/DSDDC (i.e. the technical arm to run the FFA Projects)
- Coordinate FFA activities in the district including the establishment of a system to ensuring relevant
  knowledge, experience and resources are utilized for the benefit of the FFA programme
- Provide advisory assistance to the projects
- Recommend the projects (The Project Review Committees) to NPSC
- Monitoring and evaluation of the projects
- Provide technical review of projects in coordination with WFP

National Project Steering Committee (i.e. the technical arm of the Kenya Food Security Steering Group
(KFSSG)
- Coordinate FFA activities nationally.
- Develop policy guidelines on FFA implementation.
- Provide national coordination on the implementation of FFA
ANNEX 1: WORKNORMS
INDICATIVE WORK NORMS/TASK RATES FOR WFP FOOD-FOR-ASSETS PROJECT
IMPLEMENTATION IN KENYA

Site clearing norms (average m2 cleared per Work Day)
Dense bush                                     100
Medium bush                                    200
Light bush                                     300
Grubbing                                       175

De-stumping: To be decided by experience and the size of stumps

Excavation norms (average m3 excavated per Work Day)
Soft soil                                    3.1
Medium soil                                  2.2
Hard soil                                    1.9
Very hard soil                               1.3
Rock                                         0.5
Mitre drain                                  2.2

Wheelbarrow haulage norms (average by haul distance m3 per Work Day)
0 - 20 m                                     8.5
20 - 40 m                                    7.5
40 - 60 m                                    6.5
60 - 80 m                                    5.5
80 - 100 m                                   5.0
100 - 150 m                                  4.5

Loading, and unloading norms (average productivity rates m3)
Loading                                       8.5
Unloading                                     10.0

Manual compaction norms (m2 per worker day)
Manual compaction                           18
Spreading                                   18

Culvert laying norms
Culvert installation (m per worker day)        0.3
Concrete (m3 per worker day)                   1
Masonry (m3 per worker day)                    1.5


WORK NORMS/TASK RATES BASED ON PAST FFA PROJECTS IN KENYA

Project KEN4616 Support to Forestry Activities in Kenya:
Forest Management
Land Clearing                               20wd/ha
Staking our                                 7wd/ha
Pitting                                     23wd/ha
Planting                                    250 seedlings/wd
Weeding                                     12wd/ha
Pruning                                     3wd/ha
Thinning                                    14wd/ha
Creeper Cutting                             7wd/ha
Firebreak clearing                          20wd/km
Boundary clearing                           17wd/km
Project KEN3935 Food Aid to Core Activities in ASAL Areas
Maintenance/Control of gullies              20m/wd
Rehabilitation of irrigation schemes        90wd/ha
Water catchment area rehabilitation         200wd/ha
Tree nursery maintenance                    1000seedlings/wd
Filling tubes                               500-800/wd

Project KEN2669/1 Arid Lands Food for Work
Making blocks Nos.                       50/wd
Making tiles Nos.                        50/wd
Making poles Nos.                        4pieces/wd
Fetching water                           120liters/km/wd
Carrying/collecting materials            120kg/km/wd
Check dams Nos.                          5/wd
Terracing                                4 m/wd
Fencing with shrubs                      6m/wd
Clearing garden                          200m2/wd
Digging/tilling garden                   100m2/wd
Fencing garden                           5m/wd
Making Maendeleo stoves Nos              2/wd
Animal transport/haul                    4Mt/km/wd
Quarrying                                2.5 m/wd
Molding Jiko Liners                      8 pieces
Weeding- lightly infested                400m2
Weeding heavily infested                 200m2
Planting vegetables                      200m2
Pit renforcement                         2.4 m2
Slab making                              3 people/slab

From other Projects
Terracing (1M Width *0.7 M deep) for soil and water conservation and Irrigation canals
Soft soil                                         5M
Medium Soil                                       4M
Hard Soil                                         3M
Explanation and guidelines
All the data collected have essentially an indicative meaning and local conditions (nature of the work soil,
as well as social habits) should be taken in account. Specific work norms for the project should be discussed
and we are recommending the following guidelines:

The work norms fixed in a project proposal should not exceed 25 % differences with the data above.
Any wider difference should be precisely explained within the project proposal (cf. Technical issues) and
agreed upon by relevant stakeholders.

Source: Adapted from ILO, Productivity Norms for Roads Labor-based Construction, ASIST Information
Service, Technical Brief No 2, Nairobi 1998, and pp.-19 - 2
Annex 2A of the FFA Guideline Manual




FOOD FOR ASSETS (FFA) CLUSTER WIDE PROJECT PROPOSAL FOMART FOR
                     IMPLEMENTING PARTNERS

                              Name of organization……………….
                 Project Period: Start Date: ……………. End Date: ……..……

                                  District/location (of proposed intervention)

       Submitted By (Name) ------------------------------------------ Date -----------------Signature---------

                    Title: -----------------------------------

       Received By (Name) ----------------------------------------- Date -----------------Signature-----------

                   Organization: -----------------------------        Title-----------------------------
1. EXECUTIVE SUMMARY
      Main objective/goal of the operation
      Project outputs and outcomes
      Main activities
      Project period
      Target beneficiaries
      Total budget, various sources of funds(PRRO, other partners)

2. NEEDS ASSESSMENT
      Problem statement and stakeholder analysis (For all project sites). In stakeholders analysis highlight clearly which other agencies are
       operating in the area and in which sectors.
      Summarized finding of the previous food security assessment (LRA/SRA) and link the proposed project/action with the recommendations and
       findings of the assessment. (Indicate source of the data/report and date assessment conducted)
      Project identification process, including any participatory processes used (e.g. PRA)

3. ORGANIZATION/PARTNER PRESENCE IN THE PROPOSED AREA OF INTERVENTION
      Organizations presence in the district/Division, give a brief overview of strategy and current activities or recent activities in the area.
      Organization Structure/Organigram showing how FFA is fitted and staffed/or will be staffed.
      Actions/projects ongoing and funding requests submitted to other donors/funding agencies in the same area of intervention (indicate how
       overlap and double funding would be avoided).




4. OPERATIONAL FRAMEWORK
   4.1. Project site
      Exact location of the project area (include map of the project area)
      Briefly describe levels of vulnerability in the project area

                                                                         16
4.2. Beneficiaries:
   Total number of direct beneficiaries/households targeted (those to receive incentives) by location and FDP
   Vulnerable HHs( and beneficiaries) that will not be able to contribute labor but will receive PRRO incentives
   Available works (receiving incentives) and those not receiving incentives
   Direct beneficiaries identification mechanism and criteria (Highlight the process)
   Describe the extent to which beneficiaries were involved in the project formulation
   Estimate the number of other potential beneficiaries (indirect “catchment etc)
   Estimate the percentage of beneficiaries Male ______% Female ________%

4.3. Project Plan
     4.3 a) Project Plan First year (1 September 2010 to 31 August 2011)
     4.3 b) Project Plan First years (1 September 2011 to 30 April 2012)

       OUTPUTS                           LOCATION                  TARGET                                                        PARTNERSHIPs                    LABOR/Workdays
                                         /VILLAGE                                            IMPLEMENTATION                                                      required
                                                                                             PERIOD
                                                                                             Start date……End
                                                                                             date
    Outcome 1: Improved pasture and browse production (example)

       Construct 23                      In Villages x,            20 of size                Start date                          Ministry of water,
       Trapezoidal bunds,                y, z                      ….bunds in                Aug”10……End date                    Ministry of
       zai pits , semi                                             village x                 Dec 10                              Livestock, NGOs,
       circular hoops,                                             3 bunds in                                                    Donors
       negarims etc                                                Village y                 Start date……End
                                                                                             date
       Plants trees                      Village K,                50,000
                                                                   seedlings in
                                                                   Village K



    Outcome 2: Improved diversification of food sources(increased crop production, incomes from horticulture, gums and resins, aloe-vera, and other range plants (example)

                                                                                  17
Construct 40                    In Villages               10                          Ministry of
   greenhouses                     z,x, h                    greenhouses                 Agriculture,
                                                             of size… in                 AMIRAN etc
                                                             village x and
                                                             equip them
                                                             with drip
                                                             system
                                                             8
                                                             Greenhouses
                                                             of size…
  150 Ha of land put
  under small scale
  irrigation,
  Fishponds,
  silkworms,
  beekeeping , aloe
  vera, gums&resins
Outcome 3: Improved access to water for both human and livestock consumption (example)

   Construct 10 new                In                        In Village X
   water pans                      villages……                construct a
                                   x,y,m                     new pan of
                                                             volume
                                                             In Village m
                                                             construct
                                                             new pan of
                                                             Volume Q2
   Desilt 3 existing
   water pans
   Construct 8 rock
   Catchments
   Construct 10 Sand
   dams
   Dig and Equip 20

                                                                         18
shallow wells
           Outcome 4: Reduced environmental degradation

           Construct 10,000 Km               Village , Z,              3,000 km of
           of Fanya Juu soil                 K, M                      fanya juu
           and water terraces                                          terraces in
                                                                       Village Z,
                                                                       4,000
                                                                       Village K,
                                                                       3000
                                                                       Village M
          Gully rehabilitation
        Outcome 5: Improved access to markets and other sources of food (feeder roads) (example)
          Rehabilitate 7 Km of
          Feeder Roads etc
          Rehabilitate/construct
          holding grounds for
          livestock market

        Outcome 6: Improved capacity of community to implement food security projects (example)

           Form 10 Project
           Committees
           Train 2000
           Community leaders
           in…….
           TOTAL LABOR (Work days)



Sources of labor
            Total Workdays Required
            Workdays based on PRRO Incentives
            Workdays from Community Contribution
            Workdays from incentives by other stakeholders(specify)


                                                                                     19
4.4. Log frame (operational overview of the project)

                                        Intervention Logic      Objectively Verifiable Indicators   Sources of Verification        Risks and Assumptions



Specific Objective
(Purpose/outcome)

Outputs
(Result)


Activities (major to monitor
progress)

N/B: If more than two pages put it as an annex


    4.5. Monitoring and evaluation
             Baseline survey, all projects sites to be captured and be concise enough to enable measuring changes as per the log frame.
             Monitoring of activities (indicate frequency, how, by whom etc. Attach monitoring plan)
             Evaluation (indicate whether internal or external, when and by who)

5. CROSS CUTTING ISSUES
   5.1. Project sustainability
          Describe the expected level of sustainability and/or connectedness/linkages with other programmes. Community ownership to be highlighted.

    5.2. Environmental impacts
          Highlight potential negative impacts of the proposed project and the possible measures to mitigate them

    5.3. Gender mainstreaming


                                                                                20
   Explain how gender issues and concerns will addresses. More specifically explain woe women are going to be involved at different stages of the
       project cycle and how they will benefit from the project results.


6. PROJECT IMPLEMENTATION AND COORDINATION STRUCTURES

   6.1.    Coordination within the organization

      Clearly indicate the implementation and coordination structure within the organizational hierarchy, right from the top management to the
       field/project supervision staff)



   6.2. Coordination with other stakeholders

      Indicate the organization/partners participation in coordination mechanisms with other relevant stakeholders, e.g. DSGs, DDC, RCs, GOK line
       ministries, other development partners etc)
      Brief description of how the above coordination mechanisms will lead to programme synergy




7. RESOURCES REQUIRED
   7.1. Food requirements
                     HH Food Ration       Total Food Required for       Food aid for Vulnerable    Grand total food required
                        50/75%                   Workers                  non-working HHs          By the project
Cereals (MT)

Pulses (MT)



                                                                          21
Oil (MT)

CSB (MT)

Salt (MT)

TOTAL (MT)




    7.2. Non-food items requirements
List the type and number of non-food-items required for successful implementation of the project (e.g. wheel barrows, pick axes, spades, hoes, culverts, jerry cans,
sisal twines, register books, measuring tapes, technical input etc.) and specify who will provide them i.e. Government, Community or WFP.

Tools/Materials/Equipment          Total Required         Units, Numbers/Kgs        Community                     *NGO/GoK                    WFP
                                                                                    Contribution                  Contribution                Contribution




This includes tools in the community from previous FFA activities.
* Specify which Organization will provide this contribution

    7.3. Human resource requirements
Indicate the types/number expertise and competencies required
Function                     Expertise/competency required      Number of staff     Number of months in project          Comments




                                                                                   22
8. BUDGET
    See attached spreadsheet for a detailed project budget format
    Ensure detailed budget notes for every line item e.g. Item, units of the items required, Cost per unit, total cost
    OR if is a service e.g. transport … Item, Kms, cost per Km, total cost
    Contribution from other donors. Indicate total costs, WFP contribution, Partner contribution, other stakeholders contributions




                                                                          23
ANNEX 2B: SITE SPECIFIC PROJECT PROPOSAL FOR FOOD FOR
ASSETS (FFA) PROJECTS
1.0 PROJECT SUMMARY

                                                        COOPERATING
DISTRICT:
                                                        PARTNER:
DIVISION:                                               SIGNATURE OF CP:
                                                        NAME OF Project
LOCATION:
                                                        Committee Chair:
                                                        SIGNATURE OF PC
SUBMITTED (date):
                                                        CHAIR:
Other Partners

                                                                COORDINATES:
PROJECT NUMBER:                                                 S:
                                                                E:
(To be completed by DPSC. The format is: first 3 letters of district name, month of approval (2 numbers) year of
approval (2 numbers), and serial number (3 numbers). …..If it is an extension of a project from one phase to next
add dot and number of times project extended e.g. .1, .2 means this is the first extension, .2 second extension).
Coordinates taken on the center of the project


PROJECT TITLE:
Name/identity e.g. KWAHO Village Dam de-silting project, Barabara Road Rehabilitation Project

                          Soil& Water               Micro-               Water for
                                                                                                 Afforestation
Main Project Type         Conservation            catchments          Human/Livestock
(circle one):                Gulley
                                                   Irrigation           Access roads                 Other
                          Rehabilitation

PROJECT SUMMARY

                        Month 1         Month 2         Month3          Month 4         Month 5         TOTAL
                                                                  3
NAME OF               Key output e.g. 5 Km of Road, 20,000M of dam, Km trapezoidal
OUTPUT:*              bunds
QUANTITY OF           E.g. if road                4km          4km          2km                       17 km
                                    4km
OUTPUT:               3 km
TOTAL WORK
DAYS (W/D):

TOTAL No OF
WORKERS

No OF FEMALE
WORKERS
No OF MALE
WORKERS:
PROJECT
DAYS:**
PROJECT            Start Date                                  Completion Date
PERIOD:            Date--------Month------Year                Date--------Month------Year
*     E.g. Meters of terraces, Depth (meters) of shallow well, M3 of dam desilted, Km of road etc.)
**    Equal to W/D divided by number of targeted workers. These days should not go beyond the EMOP
      duration considering participants work 12 days in a month.

                                                       24
PROJECT DESCRIPTION (Max 5 pages)

2.0 BACKGROUND/ PROBLEM STATEMENT (Provide a brief summary of the food
security problems outlining the causes, and possible contributions of this project in providing
solutions. Also indicate how the community was involved in problem analysis, project
identification and proposal development) (Max 5 lines)
Important: Use PRA skills with community in the entire process.
3.0 PROJECT OUTPUTS (outline the measurable output to tackle the above problem)
    Examples
     240 km of soil conservation terraces (covering 50 Ha of agricultural land)
     120 Km irrigation canals dug (covering 60 Ha).
     20 Trapezoidal Bunds (amounting to 5 Ha of farmland)
     12 Km feeder road from x to y opened up
     Develop/rehabilitate a water pan that increase water by 10,000 M3
     200 MT of food distributed to 5000 beneficiaries(This is for all projects receiving food aid)
4.0 PROJECT IMPACT/OUTCOMES (Provide a summary of the expected
impact/benefit of the planned project)
     Example for Agricultural project:
      The water pan will reduce by 30 % the walking distances (time taken) to collect water during
        the dry period.
      Increase (in value terms) seasonal farm production by at least 20 % percent in Borabu Village
      The road will improve food supply to local markets and reduce price by 10 % differentials
        between village market and the alternative town market.
5.0 ENVIRONMENTAL IMPACTS OF THE PROPOSED PROJECT
    a) Potential Negative Impacts of the proposed project
              i)
              ii)
              iii)
    b) Mitigation Measures to reduce the potential Negative Impacts
              i)
              ii)
              iii)

6.0 BASELINE AND EVALUATION DATA COLLECTION FORMATS
     Using a combination of methods, collect baseline information for the project. The baselines must
     have indicators and information that will assist in assessing the impact of the projects

7.0 PROJECT BENEFICIARIES
(Describe how many workers (HHs), how many vulnerable HHs will benefit without working, and total
number of people that will benefit from the asset when it is completed) (max. 5 lines).




8.0. GENDER STRATEGY (Explain how women are going to get involved at different stages of the
project cycle e.g. project planning, selection of beneficiaries, food distribution, as well as monitoring).
State how women in particular will benefit from the project and the project output) (max. 10 lines)

                                                     25
9.0 . PREVIOUS EXPERIENCE (Details of previous projects undertaken in the particular field by the
CP/ NGO and the Community) (max. 10 lines)



10. PROJECT MANAGEMENT AND MAINTENANCE (Illustrate the project management
structures and explain the arrangements for the use and maintenance of the assets created by the project.
For example how the water facility created will be maintained, who will take care of the recurrent costs
etc. Also indicate the Department at District level which will supervise the project e.g. Water, Roads,
Agriculture etc.) (max. 10 lines)
3



11.0 RISKS AND ASSUMPTIONS.

External factors: Identify factors external to your intervention which: (a) need to be in place if the
operation is to achieve the objectives identified at every level and/or; (b) could actively prevent you from
achieving those objectives.

 Security: Does your field operation have any written security rules and procedures? How the security
situation in the area of operation could affect in the achievement of the programme objectives.

(max. 10 lines)




12.0. WORKPLAN
                                        Target           Start            End          Average work
                                                                                                                 Labor
ACTIVITIES                                                                                norms*
                                    #        Unit        Month          Month                                   (W/D)**
                                                                                       (see annex 1)




SUBTOTAL:
ADD 20 % CONTINGENCY:
GRAND TOTAL:
* The amount of work per person per day or the amount of output, which can be produced by an average person within a period
of time e.g. 50 m2 of land cleared per person per day
** The W/D or Work days is equal to number of one-day rations for each activity




                                                            26
Sche




13.0 FOOD REQUIREMENTS
                        HH Food            Total Food Required               Food aid for
                                                                                                        Grand total food required
                         Ration                for Workers                  Vulnerable non-
                                                                                                        By the project
                        50/75%                                               working HHs
Cereals (MT)

Pulses (MT)

Oil (MT)

CSB (MT)

Salt (MT)

TOTAL (MT)
* As indicated as the Grand Total above
** An additional food which should not exceed 20 % of food will be added per project to cater for food insecure
households that do not have members that can work in FFA projects e.g. orphans, households where parents that
are physically challenged, parents that are sick etc. The workers and the vulnerable HHs should be equal to the
total HHs or beneficiaries allocated to the district or project sit . To get Food allocation for Vulnerables(Multiply
number of Vulnerables..section 7.0 ration size (section 3.0).

14. NON-FOOD ITEM (NFI) REQUIREMENTS

List the type and number of non-food-items required for successful implementation of the project (e.g.
wheel barrows, pick axes, spades, hoes, culverts, jerry cans, sisal twines, register books, measuring
tapes, technical input etc.) and specify who will provide them i.e. Government, Community or WFP.

Tools/Materials         Total           Units,      Community                   *NGO/GoK             WFP
                        Required        Numbers/Kgs Contribution                Contribution         Contribution




This includes tools in the community from previous FFA activities.
* Specify which Organization will provide this contribution
NB: Project proposal should indicate how NFI would be used /stored after completion of the FFA project




                                                         27
ANNEX 3:
PROJECT APPRAISAL CHECK LIST
To be filled by DPSC

1. JUSTIFICATION AND OUTPUTS/OBJECTIVE/IMPACT OF THE PROJECT
                                                                           If low, comment on the main
                                                                           shortcomings, risks and need for
TEST                                                             Marks)
                                                                           clarification.
                                                                           5 Marks for each test question
Impact of the project on enhancing food security in the
area(Based on established baseline and Projected change)
How realistic the objectives/outputs/outcomes/baselines and
the proposed activities are /within the given timeframe

Multi technology/outputs approach to food security

Appropriateness of the proposed technologies

Your assessment of impact of project on food security(Ha of
land, Volume of water, beneficiaries etc)
The Project has at least five projects targeting Primary
schools
Total Marks                                                                         Maximum 30 Marks

2. ACCESS OF PROJECT OUTPUTS BY THE BENEFICIARIES/COMMUNITY
TEST                                                             Marks      If low, comment on the main
Accessibility of project to beneficiaries (Are the assets                   shortcomings, risks and need for
created on public land, or if not, is there a legal document                clarification.
guaranteeing public access to assets?                                       5 Marks for each test question
Community owned as opposed to public work (e.g. national
roads, public buildings)
Total Marks                                                                   10 % maximum
3. CAPACITY OF COMMUNITY/PARTNER TO IMPLEMENT THE PROJECT
TEST                                                               Marks        If low, comment on the main
 Partner capacity (staff, vehicles, communication equipment)                    shortcomings, risks and need for
to implement the proposed FFA projects(See attached                             clarification.
Annexes)                                                                        5 Marks for each test question

Partners contribution to the budget
Partners ability to mobilize other partners to synergize( % of
the budget is contributed by other partners (other than WFP)
for this project evaluation carried out in the last three
Positive external
years, in the District, on Food Security interventions by the
organisation.
Communities’ participation in project identification?
Total Marks                                                                             25 % maximum




                                                           28
4. SUSTAINABILITY OF THE PROJECT
TEST                                                               Marks       If low, comment on the main
                                                                               risks lacking controls and need
Environmental sustainability( of the proposed project)
                                                                               for follow-up
(Environmental Checklist or NEMA etc ). Are effective
                                                                               5 Marks for each test
mitigation measures/activities included for any negative
                                                                               question
consequences
Risk of the project of NOT negative effects to other
livelihoods (eg community down stream of irrigation canal
etc
Total Marks                                                                            10 % Maximum

5. GENDER
TEST                                                               Marks)     If low, comment on the main risks
                                                                              lacking controls and need for
Potential of the project impacting positively on women?                       follow-up and include strategic
                                                                              plans to address gender concerns
                                                                                5 Marks for each test question
How favourable are the working conditions for the project
fitted for women? (e.g. the type and timing of the work and
security)
Total Marks                                                                            10 % Maximum

6. BASIC CHECKS
TEST                                                               Marks)     If low, comment on the main
                                                                              shortcomings, risks and need for
Quality of project document( correct work norms used, etc
                                                                              clarification.
How correct are the units for the outputs, targeting in the                    2.5 Marks for each test
project plan, clear verifiable indicators in the logfram sec 4.4              question
Total Marks                                                                             5 % Maximum
7. DISTRICT AUTHORITIES

Partner’s participation in District Steering Group meeting?
Consultation with Technical District Departments (Water, Roads, Agriculture, Livestock,
Fisheries , Education , Environment, etc.) during the development of this project proposal
 Total Marks                                                              10 % Maximum

5 Marks for each test question



GRADING OF THE PROJECT (Final %)




                                                          29
ADDITIONAL COMMENTS:




Members (Name and Title) Reviewing the Proposal




(Chairing)Name:


Title:                _______________________________________________


Signature:            _______________________________________________


Date:                 _______________________________________________


                                              30
ANNEX 4: COMMUNITY CONTRACT (MEMORANDUM                                          OF UNDERSTANDING-MOU-
BETWEEN THE KEY STAKEHOLDERS)



Between                                           Cooperating Partner/Partner Agency of

______________ District, DPSC of                                           District, and Community


Implementing (Title of Project)                                                     Project

Project Period________________________________________________________

This agreement specifies that the above named project is to be implemented by the above three partners.
Therefore, the three parties agree to the following roles and responsibilities.

The community and the Project Committee as the representative of the community will:
   o Provide all the labor and tools and materials within their reach
   o Organize the community for the implementation of the project
   o Receive and distribute food aid and tools and materials
   o Monitor the progress of the project and provide weekly progress reports
   o Maintain and meet the recurrent costs of the sustainability of the assets created after project
      completion

The Cooperating Partner (insert Name)                                                         will:
   o Provide food, tools and materials subject to their availability
   o Provide guidance in the implementation of the project
   o Monitor the implementation of the project

The DPSC of                            District will:
   o Provide advisory assistance to the project
   o Monitor and evaluate the project

The agreement will be in force from the date of signature by the three parties until superseded or replaced
by a subsequent agreement or until either party terminates it by giving thirty (30) days written notice. In the
event of termination, communities will surrender any tools provided through the project.


For Community                                                      Date

Name/ Title:                                               Witness:



For Cooperating Lead Partner (insert name)                 Date

Name/ Title:                                               Witness:



For DPSC                                                   Date

Name/ Title:                                               Witness:                                   ______


                                                      31
ANNEX 5: PROJECT MONTHLY REPORT
(Completed by Project Committee and sent to CP)
1. BACKGROUND
Project Title                                           Reporting Date:
Project Number                                          Reporting Month:
District                                                Report No:
Division                                                Work started on (date):
Location                                                Expected completion (date):

2. WORK ANALYSIS
                                       Work Days Target         Work Days this        Total Work       % of activity
OUTPUT/ ACTIVITY
                                       for the project          month                 Days to date     completed




                                                                                                              30 %*
TOTAL                                                                                                       A/B/C/O
    * indicate average for all outputs, Assess the project A=Ahead of schedule, B=Behind Schedule,
    C=Complete, O=On schedule
3. FOOD AID DISTRIBUTION ANALYSIS
FOOD COMMODITY          Total planned for the project        Distributed this month         Total distributed to date

CEREALS

PULSES

CSB

OIL

SALT

TOTAL


                                                        32
4. BENEFICIARIES
                              Female                                    Male
                                                                                                   Total
                Under 5 yrs   5-18 yrs   Over 18 yrs   Under 5 yrs   5 to 18 yrs.   Over 18 yrs
Number of
workers
Number of
beneficiaries

5. TOOLS AND MATERIALS RECEIVED
                           Total planned for the                Distributed this      Total distributed to
TYPE OF TOOL
                                  project                           month                    date




6. GENERAL COMMENTS BY RC

Comment on the reasons behind A, B, C O (see section 2, above)




Name:                                                        Chairman/Secretary of RC

Signature:                                                   Date:




                                                 33
ANNEX 6 A: FOOD FOR ASSETS SUMMARY SHEET (PLANNED AT THE
BEGINNING OF THE PROJECT PERIOD)
DISTRICT_____________________________ PROJECT PERIOD_________________________

S.No   Activity           Specific Activity      Project     Unit     Target                   Food
       Category                                  Number                        Male   Female   (MT)
1      Soil and         Fanya juu                           Km
       water            construction                        (ha)
       conservation     Soil bund                           Km
                        construction                        (ha)
                        Stone bund                          Km
                        construction                        (ha)
                        Diversion ditch                     Km
                        construction
                        Retention ditch                     Km
                        construction
                        Composting                          M3
                        Hedgerow planting                   Km
                        Grass strips                        Km
                        Planting on terraces                Km
2      Micro-           Zai pit construction                No (ha)
       catchment        Negarim construction                No (ha)
                        Trapezoidal bund                    No (ha)
                        construction
                        Semi-circular bund                  No (ha)
                        construction
                        Water        spreading              No (ha)
                        bunds
                        Retention ditch                     Km
                        construction
                        Water pan                           No
                        construction                        (m3)
3      Water            Rock catchment                      No
                        construction                        (m3)
                        Sand dam                            No
                        construction                        (m3)
                        Diversion ditch                     Km
                        construction
                        Desilting (pan)                     No
                                                            (m3)
                        Seedling produced                   No
                        Seedling planted                    No
                                                            (Ha)
4      Afforestation    Loose rock                          Km
                        checkdam                            (ha)
                        construction
                        Brushwood                           Km
                        checkdam                            (ha)
                        construction
                        Seedling planted                    No (ha)
5      Gully            Primary canal                       Km
       rehabilitation   construction
                        Secondary canal                     Km
                        construction
                        Road construction                   Km
                        Road rehabilitation                 Km
6      Irrigation

7      Access road
                                                       34
Other area (Ha) Related activities (Ha)
a)
b)
Other Distance related projects (KM)
a)
b)

PROJECT COMMITTEE MEMBERS PER DISTRICT
                 TOTAL RCs                                        Holding Management positions
     Male          Female          Total                   Male             Female               Total



BENEFICIARIES BY AGE AND GENDER

                         FEMALES                                              MALES
   0-5 yrs         6-18Yrs    Over 18yrs   Total        0-5 yrs     6-18Yrs       Over 18yrs       Total




                                                   35
ANNEX 6 B: FOOD FOR ASSETS SUMMARY SHEET (ACHIEVED AT
THE OF THE END PROJECT PERIOD)
FOOD FOR ASSETS PROJECT CATEGORIES

S.No   Activity           Specific Activity      Project        Unit   Target   Achievement    Participants   Food
       Category                                  Number                                       Male Female     (MT)
1      Soil and         Fanya juu                          Km
       water            construction                       (ha)
       conservation     Soil bund                          Km
                        construction                       (ha)
                        Stone bund                         Km
                        construction                       (ha)
                        Diversion ditch                    Km
                        construction
                        Retention ditch                    Km
                        construction
                        Composting                         m3
                        Hedgerow planting                  Km
                        Grass strips                       Km
                        Planting on terraces               Km
2      Micro-           Zai pit construction               No (ha)
       catchment        Negarim construction               No (ha)
                        Trapezoidal bund                   No (ha)
                        construction
                        Semi-circular bund                 No (ha)
                        construction
                        Water        spreading             No (ha)
                        bunds
                        Retention ditch                    Km
                        construction

3      Water            Water pan                          No (m3)
                        construction
                        Rock catchment                     No (m3)
                        construction
                        Sand dam                           No (m3)
                        construction
                        Diversion ditch                    Km
                        construction
                        Desilting (pan)                    No (m3)

4      Afforestation    Seedling produced                  No
                        Seedling planted                   No (Ha)

5      Gully            Loose rock                         Km
       rehabilitation   checkdam                           (ha)
                        construction
                        Brushwood                          Km
                        checkdam                           (ha)
                        construction
                        Seedling planted                   No (ha)

6      Irrigation       Primary canal                      Km
                        construction
                        Secondary canal                    Km
                        construction
7      Access road      Road construction                  Km
                        Road rehabilitation                Km

                                                           36
Other area (Ha) Related activities (Ha)
a)
b)
Other Distance related projects (KM)
a)
b)

PROJECT COMMITTEE MEMBERS PER DISTRICT
             TOTAL RC MEMBERS                                      Holding Management positions
     Male          Female          Total                    Male             Female               Total



BENEFICIARIES BY AGE AND GENDER

                          FEMALES                                               MALES
   0-5 yrs          6-18yrs    Over 18yrs   Total        0-5 yrs      6-18yrs       Over 18yrs      Total




                                                    37
ANNEX 6 C: MONTHLY FFA DISTRICT PROGRESS REPORT
 This form and a narrative report should be completed by the Cooperating Partner end of every month..
 Please fill in the form on the computer, printed it, sign it and send it toDPSC, MONKOALs, WFP, Nairobi by 7th of each month
  District                                                         Reporting Month                                Reporting Officer
  CLP                                                              Date                                               Signature

  Project      Project          Project Outputs Achieved                                                    Non-Food Items Distributed this
                                                                        W/Ds       No. of Workers                                                      Food distributed this month (MT)
  Number       Status                                                                                                   month
                                                                      achieved
               (circle)                            % of activity
                               Output Name                           this month   Female      Male      A      B     C     D      E      F     G      Cereals     Pulses      Oil       CSB
                                                    completed
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
               A   B   C   O
  TOTAL
NB: This Monthly FFA District Progress Report should only capture information at project level. Activity level information should be kept at District level!

EXPLANATORY NOTES:
Project No.: Please provide project No. as given in the project proposal
Project Status: circle correct option A = Ahead of schedule, B = Behind schedule, C = Completed or O = on schedule
Output Name should be reported in measurable units e.g. Ha of land reclaimed/prepared for cultivation, km of irrigation canals built/repaired, km of road opened, # of boreholes
rehabilitated, # of bridges built, # of classrooms or schools built/rehabilitated, # of health facilities built/rehabilitated, # of people trained (by gender) etc. Use more lines if
necessary
Number of workers: Every active worker must be counted, even if he/she has only performed one day’s work during the month. However each worker can only be counted once
regardless of workdays performed and rations received!
Non food Items: A= wheelbarrows, B= Axes, spades, mattocks, pangas, hoes, C: Number of bags of cement, D: Culverts, E: Jerricans, buckets, sisal twines, F: Register books,
measuring tapes; G: Other tools and instruments
                                                                                            38
Narrative reporting sheet for FFA projects: (Max 2 pages)
1. Comments on progress of FFA activities (specify project. no)
2. List key implementation problems encountered and corrective action taken/to be taken (specify project. no.)
3. Other relevant information
4. Recommendations
5. Activities planned for next month
6. Comments by DPSC




                                                                                             39
ANNEX 7: COOPERATING PARTNER MONTHLY DISTRIBUTION REPORT
                                                                                                                                                    Report Number: _________________
                                                       Cooperating Partner
                                                              Distribution Report                                                                   Report Date: ______/_______/______



    Cooperating partner details
    Cooperating Partner            Location                          Project Number         Activity:                                  Distribution Site


                          Reporting Period                            LOU Number          Actual Number of Beneficiaries
              From:                              To:
                                                                                           Girls 0 - 5     Girls 6 -     Women      Boys 0 - 5      Boys 6 - 18        Men        Total
                                                                                             years         18 years                   years           years
……………………                          …………………………

    Stock movements/stock details
    Commodity          S.I.            Opening Stock            Receipts              Distributed          Food Returns                Losses              Closing Balance   Loss reasons
                      Number
                                      Net        Gross      Net        Gross       Net        Gross       Net          Gross     Net        Gross          Net       Gross




1          Comments:
2
Certification
Issued by:                                                                               Received by:

Title:                                                                                   Title: Head of Sub-Office

Signature:                               Date:                                           Signature:                              Date:

NB:        1) A separate form should be filled for each activity (GFD, School feeding, Selective feeding, FFA/ FFA)
           2) Commodities should be accounted for exactly as they appear on SIs e.g. Beans, Peas (not pulses), or Maize, Maize Meal (not cereals)




                                                                                               40
ANNEX 8: POST DISTRIBUTION MONITORING: HOUSEHOLD
REPORT FORMAT
     WFP/Lead Agency Household Questionnaire for Post Distribution Monitoring (General Food Distribution and Food for Assets) in Kenya
                           Follow all the instructions, carefully and make sure that your answers are legible.

SECTION 1: BASIC DATA

1.1 Interview Details
Project/Programme*              District                       Division                 FDP/Block/ Cluster                HH Number

Date of Interview               Name of Interviewer

                        Name of Reporter
___/___/___
Has the HH received food aid in the last month (4 weeks)? (Circle)                                                         Yes           No
Are you (respondent) the one who collect food during the last distribution? (Circle)                                       Yes           No
Were you (respondent) aware of your ration entitlements? (Circle)                                                          Yes           No
                       To be answered only by FFA Project Beneficiaries
Did any household member participate in FFA in the last 4 weeks? (Y/N)                                                     Yes           No
If no member of the                   1      Not applicable: Household in not registered
registered household                  2      Wage is not attractive
participated in FFA in the            3      Have more lucrative work elsewhere
last 4 weeks give the                 4      Wanted to work, but was prevented for other reason
reason                                5      No able bodied adults in the household
(Tick the response that is            6      Nobody in household wanted to work
closest)
* Use attached List

1.2 Details of Household Members
  HH Member      Registered? Partici                 Approx.*         Marital         Sex          Relationship to           Occupation
    (Circle                   pates                   Age in          Status        (Circle)      Household Head
 Respondent)                 in FFA                   Years                                       (Enter from list)
1                         □                 □                                      M    F
2                         □                 □                                      M    F
3                         □                 □                                      M    F
4                         □                 □                                      M    F
5                         □                 □                                      M    F
6                         □                 □                                      M    F
7                         □                 □                                      M    F
8                         □                 □                                      M    F
9                         □                 □                                      M    F
10                        □                 □                                      M    F
            RELATIONSHIP TYPES                                                     MAIN OCCUPATIONS
A     Is head                                                     A      Agricultural labour
B     Spouse of head                                              B      Livestock herding
C     Child of head                                               C      Other farm
D     Parent of Head                                              D      Waged labour (salaried)
E     Grandparent of head                                         E      Waged labour (casual)
F     Other relation of head                                      F      Petty trade
G     Adopted/fostered child                                      G      Unemployed
H     Friend of head                                              H      Student
I     Employee of head                                            I      Infant
                                                                  J      School Going Age but not attending school
                                                                  K      Retired
                                                                  L      Housewife
                                                                  M      Domestic help
                                                                  N      Hunting, gathering, firewood/charcoal
                   If the respondent does not know, ask for a rough guess, don’t leave this blank



                                                                   41
SECTION 2: FOOD AID RELATED QUESTIONS (ONLY WFP BENEFICIARIES)

2.1 Receipt of Food Aid Commodities
            How much food aid was received in last month        Was the amount       IF NOT: Reason
                                 in KG?                       received equal to the Given for incorrect
Food        Direct      From          From       No. of Days      correct ration         Rations
Aid       from FDP      Gov.      Friends / kin/ Food Lasted      entitlement?         (Circle code)
Item                              Faith based                       (Tick yes)
 Cereals                                                                               □
                                                                                    0 1 2 3 4 5
 Pulses                                                                                □
                                                                                    0 1 2 3 4 5
   Oil                                                                                 □
                                                                                    0 1 2 3 4 5
  CSB                                                                                  □
                                                                                    0 1 2 3 4 5
   Salt                                                                                □
                                                                                    0 1 2 3 4 5
KEY: REASON FOR INADEQUATE RATIONS                           CODE
Not applicable: ration was adequate                            0
Not enough available at FDP                                    1
Under-scooping, or unfair distribution                         2
Misappropriation/diversion of food by RC                       4
Distribution to beneficiaries not on the register              5

Verify the quantity of food received by the HH by checking food balances at the time of the visit

2.2 Opportunity Cost of Food Collection
2.2.1     Time taken by beneficiaries to in hours
2.2.2     Time taken receiving rations and carrying home (hours)
2.2.3     Payment in Ksh for transport of food to home (0 if no payment)
2.2.4     Payment in Ksh for milling (include all milling related costs)
2.2.5     Payment in Ksh for service rendered at the FDP if any( offloading, security,
          storage, scooping etc)
2.2.6     What activities are sacrificed for collecting the food? (Tick the one most appropriate)
Not applicable (No activities sacrificed)                                                                       □
Farm labour and animal husbandry                                                                                □
Paid labour                                                                                                     □
Domestic tasks including childcare                                                                              □
Leisure                                                                                                         □
Schooling
2.2.6   Who collected the food aid from the distribution                           Adult       Child    Adult    Child
        point?                                                                     Male        Male    Female   Female
Comments




Hints
 2.2.1 - Ensure that this time accounts only for actual travelling hours and not time take chatting with friends
    along the way or passing through other places
 2.2.2 This time should only account for effective waiting time and exclude early arrivals for other purposes
    like catching up with friends
 2.2.4 Enumerators should gather further information on dynamics of milling. Do beneficiaries mill before
    they go home, if not how far are milling facilities from their households, if payments are made in kind then
    they should all be converted to cash based on the prevailing market price
 2.2.6 If it is the respondent who collected food then the enumerator do not have to ask this question. This
    question could be answered together with the question in section one to avoid tiring the respondent




                                                               42
2.3 Food Aid Utilization
                 Of the food aid received, approximately what percentage was used for each of these purposes?          If any quantity of food aid was sold
                                           Use proportional piling to derive the answers.                              … (answer this only if food aid was
                                                                                                                                       sold)
                Sold on    Bartered    Shared     Brewed    Saved       Lost     Consumed     Fed to   Other   TOTAL      Price       Revenue       Most Important
                  the      for other   with kin            for seed   through       by       animals                    Received       received      Reason for
                market       Items                                    theft or   household                             for Sale in    from food        Resale
FOOD AID                                                                poor     members
COMMODITY                                                                                                               KSH/KG       aid sales in      (circle)
                                                                      storage
                                                                                                                                         KSH
Cereals                                                                                                          100                                0 1 2 3 4 5
Pulses                                                                                                           100                                0 1 2 3 4 5
Oil                                                                                                              100                                0 1 2 3 4 5
UNIMIX/CSB                                                                                                       100                                0 1 2 3 4 5
Salt                                                                                                             100                                0 1 2 3 4 5
Hints:
Check totals add up to 100
Check that the total income received = price times the total quantity resold
      KEY: REASONS GIVEN FOR RESALE OF FOOD AID
                   REASON GIVEN             CODE
Not Applicable: Did not resell                 0
Don’t have any other source of money           1
Household food resources are adequate          2
Food aid commodities are not appropriate       3
Costs too much to take food aid home           4
In need of other items                         5




                                                                                 43
SECTION 3: HOUSEHOLD WELFARE (All Households Answer This Section)

3.1 Coping Strategies
               In the previous month, has the household done any of the following? (Tick)
3.4.1          Reduction in the number of meals per day                                                        □
3.4.2          Skip food consumption for an entire day                                                         □
3.4.3          Reduction in size of meals                                                                      □
3.4.4          Restrict consumption of adults to allow more for children                                       □
3.4.5          Feed working members at expense of non-working                                                  □
3.4.6          Swapped consumption to less preferred or cheaper foods                                          □
3.4.7          Borrow food from a friend or relative                                                           □
3.4.8          Purchase food on credit                                                                         □
3.4.9          Consume wild foods                                                                              □
3.4.10         Consume immature crop                                                                           □
3.4.11         Consume toxic/taboo foods                                                                       □
3.4.12         Food consumption of seed stock                                                                  □
3.4.13         Send household members to eat elsewhere                                                         □
3.4.14         Withdraw child (ren) from school                                                                □
3.4.15         Begging or engaging in degrading jobs                                                           □
3.4.16         Individual migration out of the area                                                            □
3.4.17         Household migration out of the area                                                             □
3.4.18         Sale of farm implements                                                                         □
3.4.19         Sale of milking livestock                                                                       □
3.4.20         Sale of household goods                                                                         □
3.4.21         Disintegration of families                                                                      □
3.4.22         Abandonment of children or elderly                                                              □

3.2 Food Consumption
3.2.1 Frequency
Refer to the current month only (meals only)
How many meals do your family adults (>18yrs) eat per day?
How many snacks do your family adults (>18yrs) eat per day?
How many meals your family members, 5 – 18 yrs eat per day?
How many snacks your family members, 5 – 18 yrs eat per day?
How many meals do your family children (6 – 59 months) eat per day?
How many snacks do your family children (6 – 59 months) eat per day?

3.2.2 Dietary Diversity
Have you eaten any of the following foods in the last seven days? Indicate the number of days each of the foods have been
consumed also indicating the primary and secondary source
Food                                                     Days eaten in the        Primary        Secondary
                                                         past seven days          Source of food Source of food
Maize, Porridge, rice, pasta, bread and other
cereals
Cassava, potatoes, sweet potatoes
Bean, peas, groundnuts, cashew nuts
Vegetables – kales and cabbage
Fruits
Beef, goat, pork, eggs and fish
Milk, mala, yoghurt, cheese
Sugar and sugar products
Oils, fat and butter
Code          Source                                Code         Source
1             From own production                   5            Purchases
2             Casual labour                         6            Food Aid
3             Borrowed                              7            Barter
4             Gift                                  8            Not applicable

                                                            44
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010

Mais conteúdo relacionado

Mais procurados

Charles reid portrait painting watercolor
Charles reid   portrait painting watercolorCharles reid   portrait painting watercolor
Charles reid portrait painting watercolorjoaoubaldo
 
German uniforms of the Third Reich 1933 1945
German uniforms of the Third Reich 1933 1945German uniforms of the Third Reich 1933 1945
German uniforms of the Third Reich 1933 1945Odal Rune
 
ฟิสิกส์เพื่ออนาคต
ฟิสิกส์เพื่ออนาคตฟิสิกส์เพื่ออนาคต
ฟิสิกส์เพื่ออนาคตnsumato
 
Timothy samara design elements a graphic style manual
Timothy samara   design elements a graphic style manualTimothy samara   design elements a graphic style manual
Timothy samara design elements a graphic style manualSolange Ackermann
 
หนังสือเรียนภาษาไทย ประถม 2 เล่ม 2
หนังสือเรียนภาษาไทย ประถม 2 เล่ม 2หนังสือเรียนภาษาไทย ประถม 2 เล่ม 2
หนังสือเรียนภาษาไทย ประถม 2 เล่ม 2kanidta vatanyoo
 
Enfermagem Medico - Cirurgica - Phipps Sands Marek-2003.pdf
Enfermagem Medico - Cirurgica - Phipps Sands Marek-2003.pdfEnfermagem Medico - Cirurgica - Phipps Sands Marek-2003.pdf
Enfermagem Medico - Cirurgica - Phipps Sands Marek-2003.pdfssuser64560d2
 
ADIDAS STELLA Recommendation letter
ADIDAS STELLA Recommendation letterADIDAS STELLA Recommendation letter
ADIDAS STELLA Recommendation letterMorgane Parizot
 
26 tajna rusevina uruapana
26  tajna rusevina uruapana26  tajna rusevina uruapana
26 tajna rusevina uruapanaMilenko Gavric
 
Minna no Nihongo Shokyuu 1 - Mondai Script
Minna no Nihongo Shokyuu 1 - Mondai ScriptMinna no Nihongo Shokyuu 1 - Mondai Script
Minna no Nihongo Shokyuu 1 - Mondai ScriptArtur Filipe Segumdo
 
Cisco introduction to iot chapter 5 quiz
Cisco introduction to iot chapter 5 quizCisco introduction to iot chapter 5 quiz
Cisco introduction to iot chapter 5 quizDun Automation Academy
 
Microsoft Excel у профільному навчанні і. О. Завадський П. Забарна
Microsoft Excel у профільному навчанні і. О. Завадський П. ЗабарнаMicrosoft Excel у профільному навчанні і. О. Завадський П. Забарна
Microsoft Excel у профільному навчанні і. О. Завадський П. ЗабарнаStAlKeRoV
 
0513. Uzareni Kotao
0513. Uzareni Kotao0513. Uzareni Kotao
0513. Uzareni KotaoTompa *
 

Mais procurados (17)

Charles reid portrait painting watercolor
Charles reid   portrait painting watercolorCharles reid   portrait painting watercolor
Charles reid portrait painting watercolor
 
Policy Brief 2016 (Potensi SDM)
Policy Brief 2016 (Potensi SDM)Policy Brief 2016 (Potensi SDM)
Policy Brief 2016 (Potensi SDM)
 
10th Std. Certificate
10th Std. Certificate10th Std. Certificate
10th Std. Certificate
 
German uniforms of the Third Reich 1933 1945
German uniforms of the Third Reich 1933 1945German uniforms of the Third Reich 1933 1945
German uniforms of the Third Reich 1933 1945
 
ฟิสิกส์เพื่ออนาคต
ฟิสิกส์เพื่ออนาคตฟิสิกส์เพื่ออนาคต
ฟิสิกส์เพื่ออนาคต
 
Timothy samara design elements a graphic style manual
Timothy samara   design elements a graphic style manualTimothy samara   design elements a graphic style manual
Timothy samara design elements a graphic style manual
 
หนังสือเรียนภาษาไทย ประถม 2 เล่ม 2
หนังสือเรียนภาษาไทย ประถม 2 เล่ม 2หนังสือเรียนภาษาไทย ประถม 2 เล่ม 2
หนังสือเรียนภาษาไทย ประถม 2 เล่ม 2
 
Enfermagem Medico - Cirurgica - Phipps Sands Marek-2003.pdf
Enfermagem Medico - Cirurgica - Phipps Sands Marek-2003.pdfEnfermagem Medico - Cirurgica - Phipps Sands Marek-2003.pdf
Enfermagem Medico - Cirurgica - Phipps Sands Marek-2003.pdf
 
ADIDAS STELLA Recommendation letter
ADIDAS STELLA Recommendation letterADIDAS STELLA Recommendation letter
ADIDAS STELLA Recommendation letter
 
26 tajna rusevina uruapana
26  tajna rusevina uruapana26  tajna rusevina uruapana
26 tajna rusevina uruapana
 
Minna no Nihongo Shokyuu 1 - Mondai Script
Minna no Nihongo Shokyuu 1 - Mondai ScriptMinna no Nihongo Shokyuu 1 - Mondai Script
Minna no Nihongo Shokyuu 1 - Mondai Script
 
Cisco introduction to iot chapter 5 quiz
Cisco introduction to iot chapter 5 quizCisco introduction to iot chapter 5 quiz
Cisco introduction to iot chapter 5 quiz
 
Microsoft Excel у профільному навчанні і. О. Завадський П. Забарна
Microsoft Excel у профільному навчанні і. О. Завадський П. ЗабарнаMicrosoft Excel у профільному навчанні і. О. Завадський П. Забарна
Microsoft Excel у профільному навчанні і. О. Завадський П. Забарна
 
GCE Advanced Level Certificate
GCE Advanced Level CertificateGCE Advanced Level Certificate
GCE Advanced Level Certificate
 
Darood e akbar
Darood e akbarDarood e akbar
Darood e akbar
 
0513. Uzareni Kotao
0513. Uzareni Kotao0513. Uzareni Kotao
0513. Uzareni Kotao
 
O meu pai
O meu paiO meu pai
O meu pai
 

Destaque

The White Hat Calls For Information Known Or Needed
The White Hat Calls For Information Known Or NeededThe White Hat Calls For Information Known Or Needed
The White Hat Calls For Information Known Or Needednatek7474
 
trabajo de informatica
trabajo de informaticatrabajo de informatica
trabajo de informaticajosuekumas
 
Articles 186363 guia-aut_myd
Articles 186363 guia-aut_mydArticles 186363 guia-aut_myd
Articles 186363 guia-aut_mydFernando Melo
 
Glosario sistema cardiovascular santiago perez
Glosario sistema cardiovascular   santiago perezGlosario sistema cardiovascular   santiago perez
Glosario sistema cardiovascular santiago perezSantiago David
 
CóPia De Curso De Esquizofrenia MóDulo Ix
CóPia De Curso De Esquizofrenia MóDulo IxCóPia De Curso De Esquizofrenia MóDulo Ix
CóPia De Curso De Esquizofrenia MóDulo IxAntonio Luis Sanfim
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017Drift
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheLeslie Samuel
 

Destaque (8)

The White Hat Calls For Information Known Or Needed
The White Hat Calls For Information Known Or NeededThe White Hat Calls For Information Known Or Needed
The White Hat Calls For Information Known Or Needed
 
trabajo de informatica
trabajo de informaticatrabajo de informatica
trabajo de informatica
 
Articles 186363 guia-aut_myd
Articles 186363 guia-aut_mydArticles 186363 guia-aut_myd
Articles 186363 guia-aut_myd
 
Glosario sistema cardiovascular santiago perez
Glosario sistema cardiovascular   santiago perezGlosario sistema cardiovascular   santiago perez
Glosario sistema cardiovascular santiago perez
 
Asma shirley
Asma shirleyAsma shirley
Asma shirley
 
CóPia De Curso De Esquizofrenia MóDulo Ix
CóPia De Curso De Esquizofrenia MóDulo IxCóPia De Curso De Esquizofrenia MóDulo Ix
CóPia De Curso De Esquizofrenia MóDulo Ix
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Semelhante a FFA PROCESS MANUALRevised 21-05-2010

06 kamloops foodactionplan
06 kamloops foodactionplan06 kamloops foodactionplan
06 kamloops foodactionplanericamgaa
 
STRATEGIC PROGRAMMING FOR COMMUNITY NUTRITION INTERVENTIONS
STRATEGIC PROGRAMMING FOR COMMUNITY NUTRITION INTERVENTIONSSTRATEGIC PROGRAMMING FOR COMMUNITY NUTRITION INTERVENTIONS
STRATEGIC PROGRAMMING FOR COMMUNITY NUTRITION INTERVENTIONSkaminandos
 
IFAD Biogas support Mission in Rwanda
IFAD Biogas support Mission in RwandaIFAD Biogas support Mission in Rwanda
IFAD Biogas support Mission in Rwandacopppldsecretariat
 
Annexures sia rap shamozai to dadahara
Annexures sia rap shamozai to dadaharaAnnexures sia rap shamozai to dadahara
Annexures sia rap shamozai to dadaharazubeditufail
 
Lao pdr ssfsnp presentation 19 apr. 16
Lao pdr ssfsnp presentation 19 apr. 16Lao pdr ssfsnp presentation 19 apr. 16
Lao pdr ssfsnp presentation 19 apr. 16ifadseahub
 
The national food_policy_plan_of_action_(2008-15)
The national food_policy_plan_of_action_(2008-15)The national food_policy_plan_of_action_(2008-15)
The national food_policy_plan_of_action_(2008-15)SM Lalon
 
Final draft of Producer Group guideline 2013
Final draft of Producer Group guideline 2013Final draft of Producer Group guideline 2013
Final draft of Producer Group guideline 2013Apurba Deb Roy
 
010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Sus...
010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Sus...010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Sus...
010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Sus...PiLNAfrica
 
2010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Su...
2010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Su...2010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Su...
2010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Su...Saide OER Africa
 
Evaluation of the Heifer International Medium and Small Enterprises Programme...
Evaluation of the Heifer International Medium and Small Enterprises Programme...Evaluation of the Heifer International Medium and Small Enterprises Programme...
Evaluation of the Heifer International Medium and Small Enterprises Programme...copppldsecretariat
 
Report on water storage and use from tarpaulin lining pond
Report on water storage and use from tarpaulin lining pondReport on water storage and use from tarpaulin lining pond
Report on water storage and use from tarpaulin lining pondSoksophors yim
 

Semelhante a FFA PROCESS MANUALRevised 21-05-2010 (20)

06 kamloops foodactionplan
06 kamloops foodactionplan06 kamloops foodactionplan
06 kamloops foodactionplan
 
STRATEGIC PROGRAMMING FOR COMMUNITY NUTRITION INTERVENTIONS
STRATEGIC PROGRAMMING FOR COMMUNITY NUTRITION INTERVENTIONSSTRATEGIC PROGRAMMING FOR COMMUNITY NUTRITION INTERVENTIONS
STRATEGIC PROGRAMMING FOR COMMUNITY NUTRITION INTERVENTIONS
 
wfp275565
wfp275565wfp275565
wfp275565
 
The Implementation of ECOWAP/CAADP: The road thus far
The Implementation of ECOWAP/CAADP: The road thus farThe Implementation of ECOWAP/CAADP: The road thus far
The Implementation of ECOWAP/CAADP: The road thus far
 
IFAD Biogas support Mission in Rwanda
IFAD Biogas support Mission in RwandaIFAD Biogas support Mission in Rwanda
IFAD Biogas support Mission in Rwanda
 
Annexures sia rap shamozai to dadahara
Annexures sia rap shamozai to dadaharaAnnexures sia rap shamozai to dadahara
Annexures sia rap shamozai to dadahara
 
Lao pdr ssfsnp presentation 19 apr. 16
Lao pdr ssfsnp presentation 19 apr. 16Lao pdr ssfsnp presentation 19 apr. 16
Lao pdr ssfsnp presentation 19 apr. 16
 
The national food_policy_plan_of_action_(2008-15)
The national food_policy_plan_of_action_(2008-15)The national food_policy_plan_of_action_(2008-15)
The national food_policy_plan_of_action_(2008-15)
 
Portfolio projects 2010
Portfolio projects 2010Portfolio projects 2010
Portfolio projects 2010
 
NLM_Guidelines.pdf
NLM_Guidelines.pdfNLM_Guidelines.pdf
NLM_Guidelines.pdf
 
Feed Manual Review Workshop Report
Feed Manual Review Workshop ReportFeed Manual Review Workshop Report
Feed Manual Review Workshop Report
 
Concept note
Concept noteConcept note
Concept note
 
Final draft of Producer Group guideline 2013
Final draft of Producer Group guideline 2013Final draft of Producer Group guideline 2013
Final draft of Producer Group guideline 2013
 
010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Sus...
010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Sus...010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Sus...
010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Sus...
 
2010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Su...
2010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Su...2010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Su...
2010-2011 African Health OER Network Phase 2 Evaluation: Consolidation and Su...
 
National Plan for Adaptation and Mitigation to Climate Change in the Agricult...
National Plan for Adaptation and Mitigation to Climate Change in the Agricult...National Plan for Adaptation and Mitigation to Climate Change in the Agricult...
National Plan for Adaptation and Mitigation to Climate Change in the Agricult...
 
Cross-cutting issues: Governance and gender
Cross-cutting issues: Governance and genderCross-cutting issues: Governance and gender
Cross-cutting issues: Governance and gender
 
Essaf for MDTF
Essaf for MDTFEssaf for MDTF
Essaf for MDTF
 
Evaluation of the Heifer International Medium and Small Enterprises Programme...
Evaluation of the Heifer International Medium and Small Enterprises Programme...Evaluation of the Heifer International Medium and Small Enterprises Programme...
Evaluation of the Heifer International Medium and Small Enterprises Programme...
 
Report on water storage and use from tarpaulin lining pond
Report on water storage and use from tarpaulin lining pondReport on water storage and use from tarpaulin lining pond
Report on water storage and use from tarpaulin lining pond
 

Mais de Stephen Musimba

Kilifi District Food For Asset photo album 2011
Kilifi District Food For Asset  photo album 2011Kilifi District Food For Asset  photo album 2011
Kilifi District Food For Asset photo album 2011Stephen Musimba
 
Seasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSGSeasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSGStephen Musimba
 
Children Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFIChildren Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFIStephen Musimba
 
Kilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentationKilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentationStephen Musimba
 
Kilifi District Work plan
Kilifi District Work planKilifi District Work plan
Kilifi District Work planStephen Musimba
 
For Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessingFor Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessingStephen Musimba
 
Improving_food_security_of_the_poor
Improving_food_security_of_the_poorImproving_food_security_of_the_poor
Improving_food_security_of_the_poorStephen Musimba
 
The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2Stephen Musimba
 
Kilifi FFA team exchange visit
Kilifi FFA team exchange visitKilifi FFA team exchange visit
Kilifi FFA team exchange visitStephen Musimba
 
water for rural communities
water for rural communitieswater for rural communities
water for rural communitiesStephen Musimba
 
JIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itineraryJIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itineraryStephen Musimba
 
Operation and Maintenance of RWH Structures
Operation and Maintenance of RWH StructuresOperation and Maintenance of RWH Structures
Operation and Maintenance of RWH StructuresStephen Musimba
 
Irrigation Design Manual
Irrigation Design ManualIrrigation Design Manual
Irrigation Design ManualStephen Musimba
 
mita mitaTrade Project Final
mita mitaTrade Project Finalmita mitaTrade Project Final
mita mitaTrade Project FinalStephen Musimba
 

Mais de Stephen Musimba (20)

Kilifi District Food For Asset photo album 2011
Kilifi District Food For Asset  photo album 2011Kilifi District Food For Asset  photo album 2011
Kilifi District Food For Asset photo album 2011
 
Seasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSGSeasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSG
 
Children Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFIChildren Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFI
 
Kilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentationKilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentation
 
Kilifi District Work plan
Kilifi District Work planKilifi District Work plan
Kilifi District Work plan
 
viragoni FDP
viragoni FDPviragoni FDP
viragoni FDP
 
Ndugu mnani proposal
Ndugu mnani proposalNdugu mnani proposal
Ndugu mnani proposal
 
For Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessingFor Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessing
 
Improving_food_security_of_the_poor
Improving_food_security_of_the_poorImproving_food_security_of_the_poor
Improving_food_security_of_the_poor
 
WFP RWH Planning 3
WFP RWH Planning 3WFP RWH Planning 3
WFP RWH Planning 3
 
The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2
 
Probability Analysisx
Probability AnalysisxProbability Analysisx
Probability Analysisx
 
Water from small dams
Water from small damsWater from small dams
Water from small dams
 
Kilifi FFA team exchange visit
Kilifi FFA team exchange visitKilifi FFA team exchange visit
Kilifi FFA team exchange visit
 
water for rural communities
water for rural communitieswater for rural communities
water for rural communities
 
JIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itineraryJIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itinerary
 
WFP Hydrologic cycle
WFP Hydrologic cycleWFP Hydrologic cycle
WFP Hydrologic cycle
 
Operation and Maintenance of RWH Structures
Operation and Maintenance of RWH StructuresOperation and Maintenance of RWH Structures
Operation and Maintenance of RWH Structures
 
Irrigation Design Manual
Irrigation Design ManualIrrigation Design Manual
Irrigation Design Manual
 
mita mitaTrade Project Final
mita mitaTrade Project Finalmita mitaTrade Project Final
mita mitaTrade Project Final
 

Último

What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 

Último (20)

What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 

FFA PROCESS MANUALRevised 21-05-2010

  • 1. World Food Government of Programme Kenya FOOD FOR ASSETS (FFA) GUIDELINES Before After For PROJECT IMPLEMENTATION TEAMS THE KENYA PROTRACTED RELIEF AND RECOVERY OPERATION Revised 21/05/2010
  • 2. TABLE OF CONTENTS 1.INTRODUCTION ........................................................................................................................................................3 2. PROJECT IDENTIFICATION .................................................................................................................................4 3. FOOD AID REQUIREMENTS FOR THE PROJECT ...........................................................................................4 4. PROJECT PROPOSAL/ CRITERIA .......................................................................................................................5 5. PROJECT APPROVAL PROCESS..........................................................................................................................6 6. TARGETING FOOD AID .........................................................................................................................................6 7. FOOD AID DELIVERIES AND DISTRIBUTION .................................................................................................7 8. UTILIZATION OF TOOLS ..................................................................... ERROR! BOOKMARK NOT DEFINED. 9. CAPACITY BUILDING ............................................................................................................................................8 10. PROJECT MONITORING AND REPORTING ...................................................................................................8 11. PROJECT REVISION .............................................................................................................................................9 12. ROLES OF STAKEHOLDERS IN FFA PROJECTS ...........................................................................................9 ANNEX 1: WORKNORMS .........................................................................................................................................11 ANNEX 2: PROJECT PROPOSAL FOR FFA PROJECTS ....................................................................................15 ANNEX 3: PROJECT APPRAISAL FORM .............................................................................................................15 ANNEX 4: MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN THE KEY STAKEHOLDERS ....31 ANNEX 5: RC MONTHLY REPORT ........................................................................................................................32 ANNEX 6 A: FOOD FOR ASSETS SUMMARY SHEET (PLANNED AT THE BEGINNING OF THE EMOP PHASE ...........................................................................................................................................................................34 ANNEX 6 B: FOOD FOR ASSETS SUMMARY SHEET (ACHIEVED AT THE OF THE END EMOP PHASE) ..........................................................................................................................................................................36 ANNEX 6 C: MONTHLY FFA DISTRICT PROGRESS REPORT .......................................................................38 ANNEX 7: COOPERATING PARTNER MONTHLY DISTRIBUTION REPORT .............................................40 ANNEX 8: POST DISTRIBUTION MONITORING: HOUSEHOLD REPORT FORMAT ................................41 ANNEX 9: POST DISTRIBUTION MONITORING: COMMUNITY REPORT FORMAT ...............................45 ANNEX 10: FOOD FOR ASSETS SITE MONITORING FORMAT .....................................................................47 ANNEX 11: FOOD DISTRIBUTION MONITORING REPORT FORMAT .........................................................50 ANNEX: 12 FINAL REPORT………………………………………………………………………………………..35 ANNEX 13: INTERNAL EVALUATION OF FFA PROGRAMMES…………………………...………………..36 ANNEX 14: BUDEGT FORMAT................................................................................................................................55
  • 3. INTRODUCTION The Government of Kenya’s (GoK) Policy is to ensure that whole population is food secure all the time. It is also the policy of GoK that Food for Assets (FFA) be used as the main food aid strategy whenever possible. The FFA project selection should be in line with the Vision 2030 and Poverty Reduction Strategy Paper (PRSP) and enhancement of food security in the respective districts. FFA activities are in line with the Agricultural Sector Development Strategy (2009-2020) and the draft ASAL Policy documents especially as they relate to Natural Resource and environmental management1 FFA’ is a food security strategy that meets immediate food needs and ensures building of assets for the future. The long lasting effect of FFA is not only for the creation of assets, but also the building of adequate skills to help people plan and manage micro-initiatives, and to continue to invest in their futures”2 The vision of WFP is that of a world in which every person has access at all times to the food needed for an active and healthy life. More specifically, WFP’s mission is to: - Save lives in emergency situation, - Improve the nutritional status and quality of life of the most vulnerable people at critical times of their lives; and - Help build assets and promote the self-reliance of poor people and communities. This mission by policy means that food aid should be used for those that lack food and that the work performed in exchange for food results in lasting benefits for the food-insecure (ref: ILO/WFP: Guide on Food for Assets and Sustainable Employment-working document, Rome, June 1999, p. 7). FFA activities contribute to WFP’s Strategic Objective two of the WFP Strategic Plan (2008-2011): Prevent acute hunger and invest in disaster preparedness and mitigation measures. These activities aim to achieve goal 2-“to support and strengthen resiliency of communities to shocks through safety net or asset creation, including adaptation to climate change The implemented FFA projects in Kenya are expected to improve food security in the Arid and Semi- Arid Lands (ASALs) of Kenya by having the following impacts: 1. Improved pasture and browse production 2. Improved diversification of food sources(increased crop production, incomes from gums and resins, aloe vera, and other range plants 3. Improved access to water for both human and livestock consumption 4. Reduced environmental degradation 5. Improved access to markets and other sources of food (feeder roads) WFP has joined in the debate on the possible role of Cash transfers in humanitarian and development work3. The report argues that there is role for both cash and food aid in development and humanitarian activities. The appropriateness of each type of intervention will depend on how effective the market and financial systems are in a given area. This guideline focuses of food aid and not cash interventions. The following guidelines for implementation of FFA projects are based on WFP FFA guide lines (mentioned above), the experiences of successful Food for Work Programmes under the Kenya Emergency Operation Programme (EMOP-2000-2002, 2004-2009), Kenya Refugee Programme Host project in Kakuma, and Disaster Preparedness Facility activities. Below find guidelines for all the stages of the FFA. 1 Natural Policy for the sustainable development of Arid and Semi-Arid lands of Kenya 2 WFP Food for Asset Guide 3 Cash and Food Transfers: A Primer
  • 4. 2. PROJECT IDENTIFICATION The Kenya Food Security Group (KFSG) together with District Steering Group (DSG) and the District Project Steering Committees (DPSC), the technical arm of the DSG, will conduct a food security analysis in the districts that will determine the areas that FFA need to be implemented. The selected FFA Cooperating Partner-CP- (selection process discussed in another document) will consult the DSG so that the partner can start the process of project identification. The CP will use participatory process to identify viable FFA projects. CP must ensure that Communities are highly involved in all stages of the project (Project identification, implementation and providing resources, and Monitoring & Evaluation).This is to ensure that the projects contribute to food security and that communities will maintain the projects after the CP is not involved. Two methods of project identification will be used: The first option is where CPs will consult the Development Committees (on priority projects) where these committees exist. The prioritized project will be verified in a public baraza called by the Chief/DO. In this meeting the CP will rank the project using the pair wise ranking method or any other Participatory Rural Appraisal (PRA) technique. In this meeting the public will be Informed that it is only the food insecure households that will work and get food aid but the resultant project outputs will benefit the whole community including those that did not work on them. The second option of project identification is where communities by CP representative will (where Development Committees do not exist) consult communities-using PRA techniques- on project priorities. In a public meeting, facilitated by the CP, communities will brainstorm the community problems and projects, and will prioritize them by ranking. Communities will be encouraged (guided) to develop projects that will improve the food security of the communities and those that will mitigate droughts. These projects include (see Annex 6A); construction of small earth dams and water pans, de-silting existing dams, hand dug wells, small-scale surface irrigation, a forestation and protection of water catchments, terracing and gabions. Capacity building activities are encouraged which may include a few days for training – Food for Training (FFT). More than 70 % of the resources (e.g. food aid and tools) will be allocated to the type of projects that have a direct impact on improved food security. District Project Steering Committees (DPSCs) will be formed in each District and will improve project design (more details in section 5). 3. FOOD AID REQUIREMENTS FOR THE PROJECT The total food aid requirement per project is a function of the volume of work (total work-norms); ration size, and the household sizes (members per household). Household size: For these FFA projects an average size of 6 members per household will be used. Ration Size: A 50 % ration or a 75 % ration will be applied as guided by the Kenya Food Security Group (KFSG) A 50 % ration will be computed as follows: The ration size is the amount of food that will be provided to a person working on the project after s/he has completed one work norm (estimated to be completed within one day). The daily ration for a days work (one work norm) will be 3,400 gms cereals, 600 gms of pulses, and 180 gms oil. The main rationale is for the ration to provide 50 % (1050 Kcal per person day) monthly calorific needs for the identified food insecure household –of 6 members-(41.4 Kgs cereals, 7.2 Kgs pulses, 7.2 Kgs CSB and 2.16 Kgs vegetable oil) for a household that works for 12 days(achieves 12 worknorms) A 75 % ration will comprise a the following for each work norm achieved (each working day) : 5,100 gms of cereals, 900 gms of pulses, 600 CSB, and 300 gms oil. This ration will provide 75 % Kcal for the targeted families per month (1575 Kcals per person per day).
  • 5. Commodities that are not available will be replaced with the available commodities in the following ratios: Substituting Food Commodities Blended food and beans 1 to 1 Sugar and Oil 2 to 1 Cereal and beans 2 to 1 Cereal for oil (not oil for cereal) 3 to 1 Source: WFP Food and Nutrition Handbook Piecework is encouraged i.e. an allocation of a piece of work per household which can be done within a flexible timeframe and may include various members of the household. Where piecework is not possible one household representative is expected to work for 12 days in a month (6 hrs per day, within this time the representative will complete one work norm) and receive a household ration based on the above-mentioned daily ration. Participants are expected to work for 6 hours only so as not to disrupt beneficiaries’ regular activities, mainly in agriculture and at household level for the women. Food incentives/rations will be distributed based on work norms achieved but not attendance to the project sites. Every household will receive food quantities of food (or cash) based on the actual work norms achieved. In the same project site different households will receive different quantities of food depending on the actual worknorms these households achieve. The Work Days will be based on the ILO work norms issued for Kenya and practical experiences gained from previous FFA projects that have been implemented in Kenya. For piecework, the household is free to use as many household members as possible to complete the task. The household will be paid the agreed ration when the task is completed. Food aid calculations will be made in such a way that it is clear how much food is required for workers and how much is required for vulnerable households that may not contribute some one to work e.g Child headed HHs, HHs headed by elderly or physically challenged. It is expected that up to 20 % of HHs may not be able to contribute a worker in one project site. Work Norms: Each District Project Steering Committee (DPSC) will use worknorns as indicated in Annex 1. 4. PROJECT PROPOSAL/ CRITERIA The CP assisted will complete the Project Proposal Format (see Annex 2). The district level Project Steering Committee (DPSC) will appraise the project and complete the Project Appraisal Form (Annex 3). The following are key criteria that the project must meet: - Project must be from the identified food insecure pockets of the district. - Must be a community-managed project as opposed to Public works types of Project (e. g. village water point or feeder road instead of national road or public building rehabilitation) - Community assets (e. g. Shallow wells, Dams,) must be created on public land and if done on a private land a legal document allowing public access to the produced project assets - The Project must be labor intensive and uses appropriate technology that is familiar to the community - Communities contribute resources (tools and materials) that are within their reach. - The project will be completed within the specified period. - The project must be feasible (technically feasible, manageable by the community and environmentally sound e.g. charcoal burning not acceptable). - At least 25 % of the resulting outputs must directly benefit women. - At least 50 % of the Project Committee members must be women - Project has appropriate working conditions for women e.g. timing of the project, (time of the day and day of the week) and the security situation.
  • 6. The project proposal must therefore include: - Clear indication that communities were involved in project identification (as a proof of this the CP has to develop a Tripartite Memorandum of Understanding (MoU) e drawn between the CP and the community. (see Annex 4). The agreement stipulates the roles and responsibilities of each party. - Clear indication that food aid will not create a disincentive to local food production - Clear indication that the project will have a positive impact on the food security for in the project area - Clear plan on how the created assets will be operated and maintained after the completion of the project (e. g. for any water project: water committee appointment and the means to run the maintenance) - Clear indication that women participated in identifying the project - Clear indication how the project benefits have a potential to save labor for women 5. PROJECT APPROVAL PROCESS The CP submits the project to the District Project Steering Committee (DPSC) of the District Steering Group (DSG) for grading and recommendation to WFP. The District Commissioner (DC) chairs. The other members will be decided in the District depending on the sectors from which most projects are expected (e.g. Agriculture, Roads, and Water). The DPSC will assess the projects and will also provide technical advice on the project design and implementation. The DPSC will use the criteria given above in section 4 to assess the project. DPSCs will provide a detailed technical review of the projects and also provide a coordination of project activities to avoid duplication of efforts by different projects. DPSC will complete the Project Appraisal Form (Annex 3). The DPSC will grade the project into one of four categories: A. Recommended with no amendments required. B. Recommended with minor (does not change the resource requirements from the beneficiaries) amendments required. The CP will amend the project and forward it to Nairobi without being reviewed again by DPSC. C. Project requires significant amendments and need to be reviewed again by the DPSC. This project will be returned to the CLP for more work and resubmitted to the District PSC. D. Project rejected. There is no need for bringing it back to the DPSC. Only projects in categories A and B together with the Project Appraisal Form (Annex 3) are sent to FFA Co-ordinator (in the Ministry of Northern Kenya and other Arid Lands-MONKOALs) and a copy to WFP. To ensure a fast process, the documents will be sent via e-mail where possible and hard copies to follow. The approval and award of contract will be the National Project Steering Committee (NPSC) whose members include MONKOALs and WFP among other members. Projects/contract awards based on the following criteria: • Cost effectiveness of the project. • Budgetary contribution of the CP • If the project address issues of food security. Does it have positive impact • Project feasibility. • Are there non food items essential and source not clearly identified and sourced • Proper calculations of food aid requirements. Once approved, the NPSC will in turn advise the CP, and DSG at the district level. The CP and WFP (on behalf of the NPSC) will sign a contract for the implementation of the FFA project. Then CP will proceed with the implementation of the project and advise the DPSC. 6. TARGETING FOOD AID Targeting implies selection of a) areas of intervention at National, regional or district level, and 2) Participants at community and/or household levels. Targeting requires participation of the stakeholders at various levels in order to achieve: o Transparency/accountability for the collection, analysis and presentation of data
  • 7. o Ownership of criteria for inclusion or exclusion of areas and participants o Effectiveness (both for problem identification and implementation)1 Geographical targeting at the national level is done by the Kenya Food Security Group (KFSG) based on food security assessments conducted after each of the two rainy seasons. Selection of the specific participants and households to be enrolled in the FFA project will be based on criteria for food insecurity and done in a participatory manner: Selection and Registration of Beneficiaries Communities are advised that the participants (especially those that will receive food aid) are those that are food insecure. The community in a public meeting develops the specific criteria for selection of food insecure households that will participate in the project (may be by reviewing those already developed under the free food distribution). Sample list of selection criteria for beneficiary households4: - No cattle/livestock owned, or less than a defined small number; - Less than a defined small acreage of farmland (e.g. < 5 acres); - Very large families, HIV affected families; - No, or low food/cash crop harvest, animals not producing milk; - No fixed employment; - No food stocks held; - No petty trading or no small business; - Widows, widowers, orphans, aged, disabled; - Cattle rustling victims, displaced; - No kinship support - Single woman headed households The HHs that meet the adopted criteria and are interested in participating in FFA are registered in a notebook as outlined below. Sample of beneficiary registration list: Sex of ID No. Female Male Name of HH Total HH HH of HH Under 5- 18 Over Under 5-18 Over Head in HH Head Head * 5 yrs yrs. 18 yrs 5 yrs yrs. 18 yrs 1 F Lucy Mwangi 123456 X 5 X Juma - x Daniel - X Alice - X John - X 2 F Esther Ogulla 7891112 X 3 Maina - x Mary - X  ID number is recommended, but lack of it should not disqualify access to food.  Put X on the key person who will go to work on the project site Households in the register should be ranked according to level of food insecurity i.e. the most vulnerable first. Allocation of work (and hence food aid rations) will start with the most vulnerable coming down to the less vulnerable. The number of households working on the project will be determined by the volume of work i.e. the work norms and the project duration. Communities can start more than one FFA project but must ensure that households do not work on more than one project at any given period. 7. FOOD AID DELIVERIES AND DISTRIBUTION The CP will request from the District Warehouse (EDP) for the amount of food as per achieved worknorns and as per the per the approved project proposal. The food will be delivered with a waybill which will be signed by at least two members of the CP. The CP will store the food on a short-term basis before it is distributed (only if storing is absolutely necessary). The CP will distribute the food to the beneficiaries that have worked on the project. 4 Examples gathered from workshops held in different districts in Kenya.
  • 8. Regular Distribution/ Payment The payment will be based on the work norms (task rates achieved) by the beneficiaries. The CP will keep a register that indicates the days that each beneficiary works and the amount of work norms achieved in each workday. FFA participants will then receive a food ration based on the number of worknorms achieved. Food Distribution The community facilitated by CP decides on distribution schedules. It is recommended that one distribution is done per month and each participant receives the food based on the number of work days (work norms) achieved. Example: Accounting for Food Total Ration (kg) Who Signature Name of Signature or HH ID No. of Work collected or thumb HH thumb print No HH Head days per Cereals Pulses Oil Salt food (Male/ print Head (September) month Female) (August) Lucy 1 123456 12 F Mwangi Esther 2 7891112 10 0 F Ogulla 8. CAPACITY BUILDING The FFA will be implemented with an underlying aim of building the capacity of the communities to be able to analyze and solve their communal problems. A cascading approach to training is will be adopted. WFP will provide training to district level field staff (CLP, WFP and GOK staff). CLP will in turn organize trainings for the Project Monitors and PCs. Training of the district level field staff will enable the workshop participants to: 1) Explain the Project cycle 2) Mobilize communities to develop viable FFA Projects using a participatory approach 3) Develop a FFA project proposal 4) Explain the systems and procedures that are detailed in the FFA guidelines 5) Draw action plans for the development of project proposals in the districts 6) Understand the need for and advantages in adopting the gender considerations required in FFA projects 7) Understand basics issues of nutrition, hygiene, care and HIV/AIDS Training of Project Monitors and RCs will seek to enable the participants to plan and implement food-for- work projects according t these guidelines. The topics will be similar to those trained at district level except the depth of coverage will be lower than that of at district level. RCs and Project Monitors will on a continuous basis be trained on technical skills required to implement major specific projects, leadership skills, and general management of projects and record keeping. 9. PROJECT MONITORING AND REPORTING The CP will supervise and monitor the progress of the projects. The District FFA Cordinator will further monitor the implementation of the projects and verify the information provided by CP. CP will provide a Monthly FFA District Progress Report (see Annex 6) to DSG/DPSC, National FFA Coordinator (MONKOALs) and WFP. The report will indicate the progress of the projects. The following are key information to be included in the monthly report: 1. Status of the projects (completed/ongoing)
  • 9. 2. Quantity of food and non food items delivered to each of the projects 3. Number of beneficiaries by age, and sex 4. Stocks balances of food and non food items at the district store 5. Physical outputs of the projects e.g. km of terraces dug, dams desisted etc 6. Percentage of women participating in the project (Workdays achieved by gender) Post Distribution Monitoring (PDM) will be conducted at given intervals. The PDM will be both at household level (see ANNEX 8) and community level (see ANNEX 9) 10. PROJECT REVISION If in the course of project implementation it is realized that the project requires more food due to errors during project design (e.g. some activities were omitted) then an addendum will be written for the project justifying the need for the extra food aid. This addendum will be reviewed by the DPSC and approved by NPSC. The changes will be documented and extra food required incorporated in the database. The addendum will be written not letter than the third quarter of the project implementation. If the communities decide not to undertake the original project and to do a totally different project then a new project proposal will be developed and will go through the whole process of approval. 12. ROLES OF STAKEHOLDERS IN FFA PROJECTS Community - Identify the needs/projects - Prioritize the needs/projects - Provide community contributions (i.e. unskilled labor and local material) within reach - Sustaining the project assets that have been created Project Committees - Discuss, identify and rank problems and solutions with the communities and development committees - Develop a draft FFA proposal and submit it to the CLP - Sign agreements on behalf of the community - Identify and registering the FFA target populations based on criteria for food insecurity - Organize the work on the project site - Receive and store (only if absolutely necessary) the food from CLP - Distribute the food aid to the workers/ beneficiaries based on entitlements - Monitor and report the progress of the implementation of the project - Receive, store and managing the working tools Government of Kenya District Staff (Chiefs, DOs, Technical staff etc.) - Call for Public meetings to discuss project matters - Provide security of staff and food aid commodities. - Provide technical and material support to the FFA projects - DC chairs the DPSC Cooperating Partner (CP) - Identify the projects - Sign the Tripartite agreement with the community - Sign the Tripartite agreement with the community - Ensure that the project proposal is appraised by DPSC and NPSC - Sign MOU/Contract with WFP - Train Project committees - Implement the project
  • 10. - Provide progress reports to DSG, WFP and the MONKOALs - Ensure proper targeting of food aid to FFA beneficiaries - Contribute non-food items to the project DSG/DSDDC (i.e. the technical arm to run the FFA Projects) - Coordinate FFA activities in the district including the establishment of a system to ensuring relevant knowledge, experience and resources are utilized for the benefit of the FFA programme - Provide advisory assistance to the projects - Recommend the projects (The Project Review Committees) to NPSC - Monitoring and evaluation of the projects - Provide technical review of projects in coordination with WFP National Project Steering Committee (i.e. the technical arm of the Kenya Food Security Steering Group (KFSSG) - Coordinate FFA activities nationally. - Develop policy guidelines on FFA implementation. - Provide national coordination on the implementation of FFA
  • 11. ANNEX 1: WORKNORMS INDICATIVE WORK NORMS/TASK RATES FOR WFP FOOD-FOR-ASSETS PROJECT IMPLEMENTATION IN KENYA Site clearing norms (average m2 cleared per Work Day) Dense bush 100 Medium bush 200 Light bush 300 Grubbing 175 De-stumping: To be decided by experience and the size of stumps Excavation norms (average m3 excavated per Work Day) Soft soil 3.1 Medium soil 2.2 Hard soil 1.9 Very hard soil 1.3 Rock 0.5 Mitre drain 2.2 Wheelbarrow haulage norms (average by haul distance m3 per Work Day) 0 - 20 m 8.5 20 - 40 m 7.5 40 - 60 m 6.5 60 - 80 m 5.5 80 - 100 m 5.0 100 - 150 m 4.5 Loading, and unloading norms (average productivity rates m3) Loading 8.5 Unloading 10.0 Manual compaction norms (m2 per worker day) Manual compaction 18 Spreading 18 Culvert laying norms Culvert installation (m per worker day) 0.3 Concrete (m3 per worker day) 1 Masonry (m3 per worker day) 1.5 WORK NORMS/TASK RATES BASED ON PAST FFA PROJECTS IN KENYA Project KEN4616 Support to Forestry Activities in Kenya: Forest Management Land Clearing 20wd/ha Staking our 7wd/ha Pitting 23wd/ha Planting 250 seedlings/wd Weeding 12wd/ha Pruning 3wd/ha Thinning 14wd/ha Creeper Cutting 7wd/ha Firebreak clearing 20wd/km Boundary clearing 17wd/km
  • 12. Project KEN3935 Food Aid to Core Activities in ASAL Areas Maintenance/Control of gullies 20m/wd Rehabilitation of irrigation schemes 90wd/ha Water catchment area rehabilitation 200wd/ha Tree nursery maintenance 1000seedlings/wd Filling tubes 500-800/wd Project KEN2669/1 Arid Lands Food for Work Making blocks Nos. 50/wd Making tiles Nos. 50/wd Making poles Nos. 4pieces/wd Fetching water 120liters/km/wd Carrying/collecting materials 120kg/km/wd Check dams Nos. 5/wd Terracing 4 m/wd Fencing with shrubs 6m/wd Clearing garden 200m2/wd Digging/tilling garden 100m2/wd Fencing garden 5m/wd Making Maendeleo stoves Nos 2/wd Animal transport/haul 4Mt/km/wd Quarrying 2.5 m/wd Molding Jiko Liners 8 pieces Weeding- lightly infested 400m2 Weeding heavily infested 200m2 Planting vegetables 200m2 Pit renforcement 2.4 m2 Slab making 3 people/slab From other Projects Terracing (1M Width *0.7 M deep) for soil and water conservation and Irrigation canals Soft soil 5M Medium Soil 4M Hard Soil 3M Explanation and guidelines All the data collected have essentially an indicative meaning and local conditions (nature of the work soil, as well as social habits) should be taken in account. Specific work norms for the project should be discussed and we are recommending the following guidelines: The work norms fixed in a project proposal should not exceed 25 % differences with the data above. Any wider difference should be precisely explained within the project proposal (cf. Technical issues) and agreed upon by relevant stakeholders. Source: Adapted from ILO, Productivity Norms for Roads Labor-based Construction, ASIST Information Service, Technical Brief No 2, Nairobi 1998, and pp.-19 - 2
  • 13. Annex 2A of the FFA Guideline Manual FOOD FOR ASSETS (FFA) CLUSTER WIDE PROJECT PROPOSAL FOMART FOR IMPLEMENTING PARTNERS Name of organization………………. Project Period: Start Date: ……………. End Date: ……..…… District/location (of proposed intervention) Submitted By (Name) ------------------------------------------ Date -----------------Signature--------- Title: ----------------------------------- Received By (Name) ----------------------------------------- Date -----------------Signature----------- Organization: ----------------------------- Title-----------------------------
  • 14. 1. EXECUTIVE SUMMARY  Main objective/goal of the operation  Project outputs and outcomes  Main activities  Project period  Target beneficiaries  Total budget, various sources of funds(PRRO, other partners) 2. NEEDS ASSESSMENT  Problem statement and stakeholder analysis (For all project sites). In stakeholders analysis highlight clearly which other agencies are operating in the area and in which sectors.  Summarized finding of the previous food security assessment (LRA/SRA) and link the proposed project/action with the recommendations and findings of the assessment. (Indicate source of the data/report and date assessment conducted)  Project identification process, including any participatory processes used (e.g. PRA) 3. ORGANIZATION/PARTNER PRESENCE IN THE PROPOSED AREA OF INTERVENTION  Organizations presence in the district/Division, give a brief overview of strategy and current activities or recent activities in the area.  Organization Structure/Organigram showing how FFA is fitted and staffed/or will be staffed.  Actions/projects ongoing and funding requests submitted to other donors/funding agencies in the same area of intervention (indicate how overlap and double funding would be avoided). 4. OPERATIONAL FRAMEWORK 4.1. Project site  Exact location of the project area (include map of the project area)  Briefly describe levels of vulnerability in the project area 16
  • 15. 4.2. Beneficiaries:  Total number of direct beneficiaries/households targeted (those to receive incentives) by location and FDP  Vulnerable HHs( and beneficiaries) that will not be able to contribute labor but will receive PRRO incentives  Available works (receiving incentives) and those not receiving incentives  Direct beneficiaries identification mechanism and criteria (Highlight the process)  Describe the extent to which beneficiaries were involved in the project formulation  Estimate the number of other potential beneficiaries (indirect “catchment etc)  Estimate the percentage of beneficiaries Male ______% Female ________% 4.3. Project Plan 4.3 a) Project Plan First year (1 September 2010 to 31 August 2011) 4.3 b) Project Plan First years (1 September 2011 to 30 April 2012) OUTPUTS LOCATION TARGET PARTNERSHIPs LABOR/Workdays /VILLAGE IMPLEMENTATION required PERIOD Start date……End date Outcome 1: Improved pasture and browse production (example) Construct 23 In Villages x, 20 of size Start date Ministry of water, Trapezoidal bunds, y, z ….bunds in Aug”10……End date Ministry of zai pits , semi village x Dec 10 Livestock, NGOs, circular hoops, 3 bunds in Donors negarims etc Village y Start date……End date Plants trees Village K, 50,000 seedlings in Village K Outcome 2: Improved diversification of food sources(increased crop production, incomes from horticulture, gums and resins, aloe-vera, and other range plants (example) 17
  • 16. Construct 40 In Villages 10 Ministry of greenhouses z,x, h greenhouses Agriculture, of size… in AMIRAN etc village x and equip them with drip system 8 Greenhouses of size… 150 Ha of land put under small scale irrigation, Fishponds, silkworms, beekeeping , aloe vera, gums&resins Outcome 3: Improved access to water for both human and livestock consumption (example) Construct 10 new In In Village X water pans villages…… construct a x,y,m new pan of volume In Village m construct new pan of Volume Q2 Desilt 3 existing water pans Construct 8 rock Catchments Construct 10 Sand dams Dig and Equip 20 18
  • 17. shallow wells Outcome 4: Reduced environmental degradation Construct 10,000 Km Village , Z, 3,000 km of of Fanya Juu soil K, M fanya juu and water terraces terraces in Village Z, 4,000 Village K, 3000 Village M Gully rehabilitation Outcome 5: Improved access to markets and other sources of food (feeder roads) (example) Rehabilitate 7 Km of Feeder Roads etc Rehabilitate/construct holding grounds for livestock market Outcome 6: Improved capacity of community to implement food security projects (example) Form 10 Project Committees Train 2000 Community leaders in……. TOTAL LABOR (Work days) Sources of labor Total Workdays Required Workdays based on PRRO Incentives Workdays from Community Contribution Workdays from incentives by other stakeholders(specify) 19
  • 18. 4.4. Log frame (operational overview of the project) Intervention Logic Objectively Verifiable Indicators Sources of Verification Risks and Assumptions Specific Objective (Purpose/outcome) Outputs (Result) Activities (major to monitor progress) N/B: If more than two pages put it as an annex 4.5. Monitoring and evaluation  Baseline survey, all projects sites to be captured and be concise enough to enable measuring changes as per the log frame.  Monitoring of activities (indicate frequency, how, by whom etc. Attach monitoring plan)  Evaluation (indicate whether internal or external, when and by who) 5. CROSS CUTTING ISSUES 5.1. Project sustainability  Describe the expected level of sustainability and/or connectedness/linkages with other programmes. Community ownership to be highlighted. 5.2. Environmental impacts  Highlight potential negative impacts of the proposed project and the possible measures to mitigate them 5.3. Gender mainstreaming 20
  • 19. Explain how gender issues and concerns will addresses. More specifically explain woe women are going to be involved at different stages of the project cycle and how they will benefit from the project results. 6. PROJECT IMPLEMENTATION AND COORDINATION STRUCTURES 6.1. Coordination within the organization  Clearly indicate the implementation and coordination structure within the organizational hierarchy, right from the top management to the field/project supervision staff) 6.2. Coordination with other stakeholders  Indicate the organization/partners participation in coordination mechanisms with other relevant stakeholders, e.g. DSGs, DDC, RCs, GOK line ministries, other development partners etc)  Brief description of how the above coordination mechanisms will lead to programme synergy 7. RESOURCES REQUIRED 7.1. Food requirements HH Food Ration Total Food Required for Food aid for Vulnerable Grand total food required 50/75% Workers non-working HHs By the project Cereals (MT) Pulses (MT) 21
  • 20. Oil (MT) CSB (MT) Salt (MT) TOTAL (MT) 7.2. Non-food items requirements List the type and number of non-food-items required for successful implementation of the project (e.g. wheel barrows, pick axes, spades, hoes, culverts, jerry cans, sisal twines, register books, measuring tapes, technical input etc.) and specify who will provide them i.e. Government, Community or WFP. Tools/Materials/Equipment Total Required Units, Numbers/Kgs Community *NGO/GoK WFP Contribution Contribution Contribution This includes tools in the community from previous FFA activities. * Specify which Organization will provide this contribution 7.3. Human resource requirements Indicate the types/number expertise and competencies required Function Expertise/competency required Number of staff Number of months in project Comments 22
  • 21. 8. BUDGET  See attached spreadsheet for a detailed project budget format  Ensure detailed budget notes for every line item e.g. Item, units of the items required, Cost per unit, total cost  OR if is a service e.g. transport … Item, Kms, cost per Km, total cost  Contribution from other donors. Indicate total costs, WFP contribution, Partner contribution, other stakeholders contributions 23
  • 22. ANNEX 2B: SITE SPECIFIC PROJECT PROPOSAL FOR FOOD FOR ASSETS (FFA) PROJECTS 1.0 PROJECT SUMMARY COOPERATING DISTRICT: PARTNER: DIVISION: SIGNATURE OF CP: NAME OF Project LOCATION: Committee Chair: SIGNATURE OF PC SUBMITTED (date): CHAIR: Other Partners COORDINATES: PROJECT NUMBER: S: E: (To be completed by DPSC. The format is: first 3 letters of district name, month of approval (2 numbers) year of approval (2 numbers), and serial number (3 numbers). …..If it is an extension of a project from one phase to next add dot and number of times project extended e.g. .1, .2 means this is the first extension, .2 second extension). Coordinates taken on the center of the project PROJECT TITLE: Name/identity e.g. KWAHO Village Dam de-silting project, Barabara Road Rehabilitation Project Soil& Water Micro- Water for Afforestation Main Project Type Conservation catchments Human/Livestock (circle one): Gulley Irrigation Access roads Other Rehabilitation PROJECT SUMMARY Month 1 Month 2 Month3 Month 4 Month 5 TOTAL 3 NAME OF Key output e.g. 5 Km of Road, 20,000M of dam, Km trapezoidal OUTPUT:* bunds QUANTITY OF E.g. if road 4km 4km 2km 17 km 4km OUTPUT: 3 km TOTAL WORK DAYS (W/D): TOTAL No OF WORKERS No OF FEMALE WORKERS No OF MALE WORKERS: PROJECT DAYS:** PROJECT Start Date Completion Date PERIOD: Date--------Month------Year Date--------Month------Year * E.g. Meters of terraces, Depth (meters) of shallow well, M3 of dam desilted, Km of road etc.) ** Equal to W/D divided by number of targeted workers. These days should not go beyond the EMOP duration considering participants work 12 days in a month. 24
  • 23. PROJECT DESCRIPTION (Max 5 pages) 2.0 BACKGROUND/ PROBLEM STATEMENT (Provide a brief summary of the food security problems outlining the causes, and possible contributions of this project in providing solutions. Also indicate how the community was involved in problem analysis, project identification and proposal development) (Max 5 lines) Important: Use PRA skills with community in the entire process. 3.0 PROJECT OUTPUTS (outline the measurable output to tackle the above problem) Examples  240 km of soil conservation terraces (covering 50 Ha of agricultural land)  120 Km irrigation canals dug (covering 60 Ha).  20 Trapezoidal Bunds (amounting to 5 Ha of farmland)  12 Km feeder road from x to y opened up  Develop/rehabilitate a water pan that increase water by 10,000 M3  200 MT of food distributed to 5000 beneficiaries(This is for all projects receiving food aid) 4.0 PROJECT IMPACT/OUTCOMES (Provide a summary of the expected impact/benefit of the planned project) Example for Agricultural project:  The water pan will reduce by 30 % the walking distances (time taken) to collect water during the dry period.  Increase (in value terms) seasonal farm production by at least 20 % percent in Borabu Village  The road will improve food supply to local markets and reduce price by 10 % differentials between village market and the alternative town market. 5.0 ENVIRONMENTAL IMPACTS OF THE PROPOSED PROJECT a) Potential Negative Impacts of the proposed project i) ii) iii) b) Mitigation Measures to reduce the potential Negative Impacts i) ii) iii) 6.0 BASELINE AND EVALUATION DATA COLLECTION FORMATS Using a combination of methods, collect baseline information for the project. The baselines must have indicators and information that will assist in assessing the impact of the projects 7.0 PROJECT BENEFICIARIES (Describe how many workers (HHs), how many vulnerable HHs will benefit without working, and total number of people that will benefit from the asset when it is completed) (max. 5 lines). 8.0. GENDER STRATEGY (Explain how women are going to get involved at different stages of the project cycle e.g. project planning, selection of beneficiaries, food distribution, as well as monitoring). State how women in particular will benefit from the project and the project output) (max. 10 lines) 25
  • 24. 9.0 . PREVIOUS EXPERIENCE (Details of previous projects undertaken in the particular field by the CP/ NGO and the Community) (max. 10 lines) 10. PROJECT MANAGEMENT AND MAINTENANCE (Illustrate the project management structures and explain the arrangements for the use and maintenance of the assets created by the project. For example how the water facility created will be maintained, who will take care of the recurrent costs etc. Also indicate the Department at District level which will supervise the project e.g. Water, Roads, Agriculture etc.) (max. 10 lines) 3 11.0 RISKS AND ASSUMPTIONS. External factors: Identify factors external to your intervention which: (a) need to be in place if the operation is to achieve the objectives identified at every level and/or; (b) could actively prevent you from achieving those objectives. Security: Does your field operation have any written security rules and procedures? How the security situation in the area of operation could affect in the achievement of the programme objectives. (max. 10 lines) 12.0. WORKPLAN Target Start End Average work Labor ACTIVITIES norms* # Unit Month Month (W/D)** (see annex 1) SUBTOTAL: ADD 20 % CONTINGENCY: GRAND TOTAL: * The amount of work per person per day or the amount of output, which can be produced by an average person within a period of time e.g. 50 m2 of land cleared per person per day ** The W/D or Work days is equal to number of one-day rations for each activity 26
  • 25. Sche 13.0 FOOD REQUIREMENTS HH Food Total Food Required Food aid for Grand total food required Ration for Workers Vulnerable non- By the project 50/75% working HHs Cereals (MT) Pulses (MT) Oil (MT) CSB (MT) Salt (MT) TOTAL (MT) * As indicated as the Grand Total above ** An additional food which should not exceed 20 % of food will be added per project to cater for food insecure households that do not have members that can work in FFA projects e.g. orphans, households where parents that are physically challenged, parents that are sick etc. The workers and the vulnerable HHs should be equal to the total HHs or beneficiaries allocated to the district or project sit . To get Food allocation for Vulnerables(Multiply number of Vulnerables..section 7.0 ration size (section 3.0). 14. NON-FOOD ITEM (NFI) REQUIREMENTS List the type and number of non-food-items required for successful implementation of the project (e.g. wheel barrows, pick axes, spades, hoes, culverts, jerry cans, sisal twines, register books, measuring tapes, technical input etc.) and specify who will provide them i.e. Government, Community or WFP. Tools/Materials Total Units, Community *NGO/GoK WFP Required Numbers/Kgs Contribution Contribution Contribution This includes tools in the community from previous FFA activities. * Specify which Organization will provide this contribution NB: Project proposal should indicate how NFI would be used /stored after completion of the FFA project 27
  • 26. ANNEX 3: PROJECT APPRAISAL CHECK LIST To be filled by DPSC 1. JUSTIFICATION AND OUTPUTS/OBJECTIVE/IMPACT OF THE PROJECT If low, comment on the main shortcomings, risks and need for TEST Marks) clarification. 5 Marks for each test question Impact of the project on enhancing food security in the area(Based on established baseline and Projected change) How realistic the objectives/outputs/outcomes/baselines and the proposed activities are /within the given timeframe Multi technology/outputs approach to food security Appropriateness of the proposed technologies Your assessment of impact of project on food security(Ha of land, Volume of water, beneficiaries etc) The Project has at least five projects targeting Primary schools Total Marks Maximum 30 Marks 2. ACCESS OF PROJECT OUTPUTS BY THE BENEFICIARIES/COMMUNITY TEST Marks If low, comment on the main Accessibility of project to beneficiaries (Are the assets shortcomings, risks and need for created on public land, or if not, is there a legal document clarification. guaranteeing public access to assets? 5 Marks for each test question Community owned as opposed to public work (e.g. national roads, public buildings) Total Marks 10 % maximum 3. CAPACITY OF COMMUNITY/PARTNER TO IMPLEMENT THE PROJECT TEST Marks If low, comment on the main Partner capacity (staff, vehicles, communication equipment) shortcomings, risks and need for to implement the proposed FFA projects(See attached clarification. Annexes) 5 Marks for each test question Partners contribution to the budget Partners ability to mobilize other partners to synergize( % of the budget is contributed by other partners (other than WFP) for this project evaluation carried out in the last three Positive external years, in the District, on Food Security interventions by the organisation. Communities’ participation in project identification? Total Marks 25 % maximum 28
  • 27. 4. SUSTAINABILITY OF THE PROJECT TEST Marks If low, comment on the main risks lacking controls and need Environmental sustainability( of the proposed project) for follow-up (Environmental Checklist or NEMA etc ). Are effective 5 Marks for each test mitigation measures/activities included for any negative question consequences Risk of the project of NOT negative effects to other livelihoods (eg community down stream of irrigation canal etc Total Marks 10 % Maximum 5. GENDER TEST Marks) If low, comment on the main risks lacking controls and need for Potential of the project impacting positively on women? follow-up and include strategic plans to address gender concerns 5 Marks for each test question How favourable are the working conditions for the project fitted for women? (e.g. the type and timing of the work and security) Total Marks 10 % Maximum 6. BASIC CHECKS TEST Marks) If low, comment on the main shortcomings, risks and need for Quality of project document( correct work norms used, etc clarification. How correct are the units for the outputs, targeting in the 2.5 Marks for each test project plan, clear verifiable indicators in the logfram sec 4.4 question Total Marks 5 % Maximum 7. DISTRICT AUTHORITIES Partner’s participation in District Steering Group meeting? Consultation with Technical District Departments (Water, Roads, Agriculture, Livestock, Fisheries , Education , Environment, etc.) during the development of this project proposal Total Marks 10 % Maximum 5 Marks for each test question GRADING OF THE PROJECT (Final %) 29
  • 28. ADDITIONAL COMMENTS: Members (Name and Title) Reviewing the Proposal (Chairing)Name: Title: _______________________________________________ Signature: _______________________________________________ Date: _______________________________________________ 30
  • 29. ANNEX 4: COMMUNITY CONTRACT (MEMORANDUM OF UNDERSTANDING-MOU- BETWEEN THE KEY STAKEHOLDERS) Between Cooperating Partner/Partner Agency of ______________ District, DPSC of District, and Community Implementing (Title of Project) Project Project Period________________________________________________________ This agreement specifies that the above named project is to be implemented by the above three partners. Therefore, the three parties agree to the following roles and responsibilities. The community and the Project Committee as the representative of the community will: o Provide all the labor and tools and materials within their reach o Organize the community for the implementation of the project o Receive and distribute food aid and tools and materials o Monitor the progress of the project and provide weekly progress reports o Maintain and meet the recurrent costs of the sustainability of the assets created after project completion The Cooperating Partner (insert Name) will: o Provide food, tools and materials subject to their availability o Provide guidance in the implementation of the project o Monitor the implementation of the project The DPSC of District will: o Provide advisory assistance to the project o Monitor and evaluate the project The agreement will be in force from the date of signature by the three parties until superseded or replaced by a subsequent agreement or until either party terminates it by giving thirty (30) days written notice. In the event of termination, communities will surrender any tools provided through the project. For Community Date Name/ Title: Witness: For Cooperating Lead Partner (insert name) Date Name/ Title: Witness: For DPSC Date Name/ Title: Witness: ______ 31
  • 30. ANNEX 5: PROJECT MONTHLY REPORT (Completed by Project Committee and sent to CP) 1. BACKGROUND Project Title Reporting Date: Project Number Reporting Month: District Report No: Division Work started on (date): Location Expected completion (date): 2. WORK ANALYSIS Work Days Target Work Days this Total Work % of activity OUTPUT/ ACTIVITY for the project month Days to date completed 30 %* TOTAL A/B/C/O * indicate average for all outputs, Assess the project A=Ahead of schedule, B=Behind Schedule, C=Complete, O=On schedule 3. FOOD AID DISTRIBUTION ANALYSIS FOOD COMMODITY Total planned for the project Distributed this month Total distributed to date CEREALS PULSES CSB OIL SALT TOTAL 32
  • 31. 4. BENEFICIARIES Female Male Total Under 5 yrs 5-18 yrs Over 18 yrs Under 5 yrs 5 to 18 yrs. Over 18 yrs Number of workers Number of beneficiaries 5. TOOLS AND MATERIALS RECEIVED Total planned for the Distributed this Total distributed to TYPE OF TOOL project month date 6. GENERAL COMMENTS BY RC Comment on the reasons behind A, B, C O (see section 2, above) Name: Chairman/Secretary of RC Signature: Date: 33
  • 32. ANNEX 6 A: FOOD FOR ASSETS SUMMARY SHEET (PLANNED AT THE BEGINNING OF THE PROJECT PERIOD) DISTRICT_____________________________ PROJECT PERIOD_________________________ S.No Activity Specific Activity Project Unit Target Food Category Number Male Female (MT) 1 Soil and Fanya juu Km water construction (ha) conservation Soil bund Km construction (ha) Stone bund Km construction (ha) Diversion ditch Km construction Retention ditch Km construction Composting M3 Hedgerow planting Km Grass strips Km Planting on terraces Km 2 Micro- Zai pit construction No (ha) catchment Negarim construction No (ha) Trapezoidal bund No (ha) construction Semi-circular bund No (ha) construction Water spreading No (ha) bunds Retention ditch Km construction Water pan No construction (m3) 3 Water Rock catchment No construction (m3) Sand dam No construction (m3) Diversion ditch Km construction Desilting (pan) No (m3) Seedling produced No Seedling planted No (Ha) 4 Afforestation Loose rock Km checkdam (ha) construction Brushwood Km checkdam (ha) construction Seedling planted No (ha) 5 Gully Primary canal Km rehabilitation construction Secondary canal Km construction Road construction Km Road rehabilitation Km 6 Irrigation 7 Access road 34
  • 33. Other area (Ha) Related activities (Ha) a) b) Other Distance related projects (KM) a) b) PROJECT COMMITTEE MEMBERS PER DISTRICT TOTAL RCs Holding Management positions Male Female Total Male Female Total BENEFICIARIES BY AGE AND GENDER FEMALES MALES 0-5 yrs 6-18Yrs Over 18yrs Total 0-5 yrs 6-18Yrs Over 18yrs Total 35
  • 34. ANNEX 6 B: FOOD FOR ASSETS SUMMARY SHEET (ACHIEVED AT THE OF THE END PROJECT PERIOD) FOOD FOR ASSETS PROJECT CATEGORIES S.No Activity Specific Activity Project Unit Target Achievement Participants Food Category Number Male Female (MT) 1 Soil and Fanya juu Km water construction (ha) conservation Soil bund Km construction (ha) Stone bund Km construction (ha) Diversion ditch Km construction Retention ditch Km construction Composting m3 Hedgerow planting Km Grass strips Km Planting on terraces Km 2 Micro- Zai pit construction No (ha) catchment Negarim construction No (ha) Trapezoidal bund No (ha) construction Semi-circular bund No (ha) construction Water spreading No (ha) bunds Retention ditch Km construction 3 Water Water pan No (m3) construction Rock catchment No (m3) construction Sand dam No (m3) construction Diversion ditch Km construction Desilting (pan) No (m3) 4 Afforestation Seedling produced No Seedling planted No (Ha) 5 Gully Loose rock Km rehabilitation checkdam (ha) construction Brushwood Km checkdam (ha) construction Seedling planted No (ha) 6 Irrigation Primary canal Km construction Secondary canal Km construction 7 Access road Road construction Km Road rehabilitation Km 36
  • 35. Other area (Ha) Related activities (Ha) a) b) Other Distance related projects (KM) a) b) PROJECT COMMITTEE MEMBERS PER DISTRICT TOTAL RC MEMBERS Holding Management positions Male Female Total Male Female Total BENEFICIARIES BY AGE AND GENDER FEMALES MALES 0-5 yrs 6-18yrs Over 18yrs Total 0-5 yrs 6-18yrs Over 18yrs Total 37
  • 36. ANNEX 6 C: MONTHLY FFA DISTRICT PROGRESS REPORT This form and a narrative report should be completed by the Cooperating Partner end of every month.. Please fill in the form on the computer, printed it, sign it and send it toDPSC, MONKOALs, WFP, Nairobi by 7th of each month District Reporting Month Reporting Officer CLP Date Signature Project Project Project Outputs Achieved Non-Food Items Distributed this W/Ds No. of Workers Food distributed this month (MT) Number Status month achieved (circle) % of activity Output Name this month Female Male A B C D E F G Cereals Pulses Oil CSB completed A B C O A B C O A B C O A B C O A B C O A B C O A B C O A B C O A B C O A B C O A B C O A B C O A B C O A B C O A B C O TOTAL NB: This Monthly FFA District Progress Report should only capture information at project level. Activity level information should be kept at District level! EXPLANATORY NOTES: Project No.: Please provide project No. as given in the project proposal Project Status: circle correct option A = Ahead of schedule, B = Behind schedule, C = Completed or O = on schedule Output Name should be reported in measurable units e.g. Ha of land reclaimed/prepared for cultivation, km of irrigation canals built/repaired, km of road opened, # of boreholes rehabilitated, # of bridges built, # of classrooms or schools built/rehabilitated, # of health facilities built/rehabilitated, # of people trained (by gender) etc. Use more lines if necessary Number of workers: Every active worker must be counted, even if he/she has only performed one day’s work during the month. However each worker can only be counted once regardless of workdays performed and rations received! Non food Items: A= wheelbarrows, B= Axes, spades, mattocks, pangas, hoes, C: Number of bags of cement, D: Culverts, E: Jerricans, buckets, sisal twines, F: Register books, measuring tapes; G: Other tools and instruments 38
  • 37. Narrative reporting sheet for FFA projects: (Max 2 pages) 1. Comments on progress of FFA activities (specify project. no) 2. List key implementation problems encountered and corrective action taken/to be taken (specify project. no.) 3. Other relevant information 4. Recommendations 5. Activities planned for next month 6. Comments by DPSC 39
  • 38. ANNEX 7: COOPERATING PARTNER MONTHLY DISTRIBUTION REPORT Report Number: _________________ Cooperating Partner Distribution Report Report Date: ______/_______/______ Cooperating partner details Cooperating Partner Location Project Number Activity: Distribution Site Reporting Period LOU Number Actual Number of Beneficiaries From: To: Girls 0 - 5 Girls 6 - Women Boys 0 - 5 Boys 6 - 18 Men Total years 18 years years years …………………… ………………………… Stock movements/stock details Commodity S.I. Opening Stock Receipts Distributed Food Returns Losses Closing Balance Loss reasons Number Net Gross Net Gross Net Gross Net Gross Net Gross Net Gross 1 Comments: 2 Certification Issued by: Received by: Title: Title: Head of Sub-Office Signature: Date: Signature: Date: NB: 1) A separate form should be filled for each activity (GFD, School feeding, Selective feeding, FFA/ FFA) 2) Commodities should be accounted for exactly as they appear on SIs e.g. Beans, Peas (not pulses), or Maize, Maize Meal (not cereals) 40
  • 39. ANNEX 8: POST DISTRIBUTION MONITORING: HOUSEHOLD REPORT FORMAT WFP/Lead Agency Household Questionnaire for Post Distribution Monitoring (General Food Distribution and Food for Assets) in Kenya Follow all the instructions, carefully and make sure that your answers are legible. SECTION 1: BASIC DATA 1.1 Interview Details Project/Programme* District Division FDP/Block/ Cluster HH Number Date of Interview Name of Interviewer Name of Reporter ___/___/___ Has the HH received food aid in the last month (4 weeks)? (Circle) Yes No Are you (respondent) the one who collect food during the last distribution? (Circle) Yes No Were you (respondent) aware of your ration entitlements? (Circle) Yes No To be answered only by FFA Project Beneficiaries Did any household member participate in FFA in the last 4 weeks? (Y/N) Yes No If no member of the 1 Not applicable: Household in not registered registered household 2 Wage is not attractive participated in FFA in the 3 Have more lucrative work elsewhere last 4 weeks give the 4 Wanted to work, but was prevented for other reason reason 5 No able bodied adults in the household (Tick the response that is 6 Nobody in household wanted to work closest) * Use attached List 1.2 Details of Household Members HH Member Registered? Partici Approx.* Marital Sex Relationship to Occupation (Circle pates Age in Status (Circle) Household Head Respondent) in FFA Years (Enter from list) 1 □ □ M F 2 □ □ M F 3 □ □ M F 4 □ □ M F 5 □ □ M F 6 □ □ M F 7 □ □ M F 8 □ □ M F 9 □ □ M F 10 □ □ M F RELATIONSHIP TYPES MAIN OCCUPATIONS A Is head A Agricultural labour B Spouse of head B Livestock herding C Child of head C Other farm D Parent of Head D Waged labour (salaried) E Grandparent of head E Waged labour (casual) F Other relation of head F Petty trade G Adopted/fostered child G Unemployed H Friend of head H Student I Employee of head I Infant J School Going Age but not attending school K Retired L Housewife M Domestic help N Hunting, gathering, firewood/charcoal  If the respondent does not know, ask for a rough guess, don’t leave this blank 41
  • 40. SECTION 2: FOOD AID RELATED QUESTIONS (ONLY WFP BENEFICIARIES) 2.1 Receipt of Food Aid Commodities How much food aid was received in last month Was the amount IF NOT: Reason in KG? received equal to the Given for incorrect Food Direct From From No. of Days correct ration Rations Aid from FDP Gov. Friends / kin/ Food Lasted entitlement? (Circle code) Item Faith based (Tick yes) Cereals □ 0 1 2 3 4 5 Pulses □ 0 1 2 3 4 5 Oil □ 0 1 2 3 4 5 CSB □ 0 1 2 3 4 5 Salt □ 0 1 2 3 4 5 KEY: REASON FOR INADEQUATE RATIONS CODE Not applicable: ration was adequate 0 Not enough available at FDP 1 Under-scooping, or unfair distribution 2 Misappropriation/diversion of food by RC 4 Distribution to beneficiaries not on the register 5 Verify the quantity of food received by the HH by checking food balances at the time of the visit 2.2 Opportunity Cost of Food Collection 2.2.1 Time taken by beneficiaries to in hours 2.2.2 Time taken receiving rations and carrying home (hours) 2.2.3 Payment in Ksh for transport of food to home (0 if no payment) 2.2.4 Payment in Ksh for milling (include all milling related costs) 2.2.5 Payment in Ksh for service rendered at the FDP if any( offloading, security, storage, scooping etc) 2.2.6 What activities are sacrificed for collecting the food? (Tick the one most appropriate) Not applicable (No activities sacrificed) □ Farm labour and animal husbandry □ Paid labour □ Domestic tasks including childcare □ Leisure □ Schooling 2.2.6 Who collected the food aid from the distribution Adult Child Adult Child point? Male Male Female Female Comments Hints  2.2.1 - Ensure that this time accounts only for actual travelling hours and not time take chatting with friends along the way or passing through other places  2.2.2 This time should only account for effective waiting time and exclude early arrivals for other purposes like catching up with friends  2.2.4 Enumerators should gather further information on dynamics of milling. Do beneficiaries mill before they go home, if not how far are milling facilities from their households, if payments are made in kind then they should all be converted to cash based on the prevailing market price  2.2.6 If it is the respondent who collected food then the enumerator do not have to ask this question. This question could be answered together with the question in section one to avoid tiring the respondent 42
  • 41. 2.3 Food Aid Utilization Of the food aid received, approximately what percentage was used for each of these purposes? If any quantity of food aid was sold Use proportional piling to derive the answers. … (answer this only if food aid was sold) Sold on Bartered Shared Brewed Saved Lost Consumed Fed to Other TOTAL Price Revenue Most Important the for other with kin for seed through by animals Received received Reason for market Items theft or household for Sale in from food Resale FOOD AID poor members COMMODITY KSH/KG aid sales in (circle) storage KSH Cereals 100 0 1 2 3 4 5 Pulses 100 0 1 2 3 4 5 Oil 100 0 1 2 3 4 5 UNIMIX/CSB 100 0 1 2 3 4 5 Salt 100 0 1 2 3 4 5 Hints: Check totals add up to 100 Check that the total income received = price times the total quantity resold KEY: REASONS GIVEN FOR RESALE OF FOOD AID REASON GIVEN CODE Not Applicable: Did not resell 0 Don’t have any other source of money 1 Household food resources are adequate 2 Food aid commodities are not appropriate 3 Costs too much to take food aid home 4 In need of other items 5 43
  • 42. SECTION 3: HOUSEHOLD WELFARE (All Households Answer This Section) 3.1 Coping Strategies In the previous month, has the household done any of the following? (Tick) 3.4.1 Reduction in the number of meals per day □ 3.4.2 Skip food consumption for an entire day □ 3.4.3 Reduction in size of meals □ 3.4.4 Restrict consumption of adults to allow more for children □ 3.4.5 Feed working members at expense of non-working □ 3.4.6 Swapped consumption to less preferred or cheaper foods □ 3.4.7 Borrow food from a friend or relative □ 3.4.8 Purchase food on credit □ 3.4.9 Consume wild foods □ 3.4.10 Consume immature crop □ 3.4.11 Consume toxic/taboo foods □ 3.4.12 Food consumption of seed stock □ 3.4.13 Send household members to eat elsewhere □ 3.4.14 Withdraw child (ren) from school □ 3.4.15 Begging or engaging in degrading jobs □ 3.4.16 Individual migration out of the area □ 3.4.17 Household migration out of the area □ 3.4.18 Sale of farm implements □ 3.4.19 Sale of milking livestock □ 3.4.20 Sale of household goods □ 3.4.21 Disintegration of families □ 3.4.22 Abandonment of children or elderly □ 3.2 Food Consumption 3.2.1 Frequency Refer to the current month only (meals only) How many meals do your family adults (>18yrs) eat per day? How many snacks do your family adults (>18yrs) eat per day? How many meals your family members, 5 – 18 yrs eat per day? How many snacks your family members, 5 – 18 yrs eat per day? How many meals do your family children (6 – 59 months) eat per day? How many snacks do your family children (6 – 59 months) eat per day? 3.2.2 Dietary Diversity Have you eaten any of the following foods in the last seven days? Indicate the number of days each of the foods have been consumed also indicating the primary and secondary source Food Days eaten in the Primary Secondary past seven days Source of food Source of food Maize, Porridge, rice, pasta, bread and other cereals Cassava, potatoes, sweet potatoes Bean, peas, groundnuts, cashew nuts Vegetables – kales and cabbage Fruits Beef, goat, pork, eggs and fish Milk, mala, yoghurt, cheese Sugar and sugar products Oils, fat and butter Code Source Code Source 1 From own production 5 Purchases 2 Casual labour 6 Food Aid 3 Borrowed 7 Barter 4 Gift 8 Not applicable 44