CONSTRUCTIONAND WORKING OFCOAL HANDLING PLANT 6/18/2010 1
PRESENTED BY Shrikant S. Khating 6/18/2010 2
index ,[object Object]
Availability of Coal in India.
Transportation of Coal.
Analysis of Coal.
General Layout of CHP.
CHP Auxiliary And Equipments6/18/2010 3
Introduction What is CHP? ,[object Object]
Which properly handles the coal from its receipt to transferring it to bunkers. Objective of CHP :- ,[object Object]
To Stack the coal to coal yard.6/18/2010 4
Availability of Coal In India. Mostly E and F grade coal used in India. Blending Is Done To get Average D Grade. 6/18/2010 5
Transportation of Coal 5 ways of Transportation. ,[object Object]
2. Ropeways.
3. Roadways.
4. waterways.
5. Airway.6/18/2010 6 Best  and Cheap facility at Doorstep Available only for TPS nearer to coal mines Fear of thief waterway may not be possible till TPS and Problem of  recalling arises if coal dip in water Have to build Runway near TPS which is very costly.
By Rail Way 80-90% of the requirement is fulfilled by this way. Demurrage calculations on coal Rakes:-  We receive the coal wagons in the form of rakes  	(55-60 wagons in each rake). Free time normally 7 hrs. from Receipt of coal.  Free time is calculated from the receipt of written intimation of coal rakes from MAHAGENCO to the railway. Rate of demurrage is Rs.100 / wagon / hr. 6/18/2010 7
Analysis of Coal Chemical Analysis of Coal:- 	Sample of coal is randomly collected from each rake and detailed chemical analysis, calculation of calorific value is carried out and is confirmed whether it is as per agreement with the coal mines or not. 6/18/2010 8
General Layout Of CHP 6/18/2010 9 Wagon Tippler Crusher House Hopper Feeder Surge Hopper Conv. Belts Vibrating Screens Crushers Tripper Trolley Bunkers
6/18/2010 10
Operational Cycle 6/18/2010 11
Bunkering Cycle 6/18/2010 12 From W/T Crusher House Surge Hopper  Vibrating Feeder Crusher Bunkering Belts Bunkers
Stacking Cycle 6/18/2010 13 From W/T Crusher House Coal Is not required if bunker is full  or  Due any maintenance  By-Passed Coal Stacking Belts Bunkering Belts Crushed Yard Bunkers
Reclaiming Cycle 6/18/2010 14 If Outer Supply of coal Is Not Present From W/T Crusher House Non-Crushed Yard Reclaiming Belts Stacked Coal Bunkering Belts Crushed Yard Bunkers
Wagon Tippler These are used to unload the coal wagons into coal hoppers in very less time (e.g. 20 wagons/hr. or more). Weighing of coal is carried out at wagon tippler.  Normally 55-60 metric ton of coal come in each wagon. 6/18/2010 15 Wt of the coal =Wt. of loaded wagon – Wt. of empty wagon
Wagon Tippler Drive System 6/18/2010 16 Motor Thruster Brake G / B Pinion Spur Gear
General Layout Of W/t Wagon tippler Hopper Mesh of  250 mm * 250 mm Vibrating Feeder Conveyor Belt To crusher House 6/18/2010 17
Equipment Used In W/T Water Sprinkler System. Dust Extraction System. 6/18/2010 18
Conveyor Belt System Construction of Conveyor Belt Conveyor Belt Drive System Counter Weight Idlers Protection System Interlocking Magnetic Separator 6/18/2010 19

Mais conteúdo relacionado

Mais procurados

Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systemsArnab Chakraborty
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsSHIVAJI CHOUDHURY
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plantRohit Khatri
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAmay Jain
 
1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal HandlingNani Thirupathi
 
Handling of coal in thermal power plant
Handling of coal in thermal power plantHandling of coal in thermal power plant
Handling of coal in thermal power plantDhruv Amin
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training ReportShani Kumar Singh
 
THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING AFAQAHMED JAMADAR
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 

Mais procurados (20)

Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systems
 
Chp ppt
Chp pptChp ppt
Chp ppt
 
COAL HANDLING PLANT
COAL HANDLING PLANTCOAL HANDLING PLANT
COAL HANDLING PLANT
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 
Ash handeling1
Ash handeling1Ash handeling1
Ash handeling1
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
Coal and ash handling systems
Coal and ash handling systemsCoal and ash handling systems
Coal and ash handling systems
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
 
coal pulveriser
coal pulveriser coal pulveriser
coal pulveriser
 
1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling
 
Handling of coal in thermal power plant
Handling of coal in thermal power plantHandling of coal in thermal power plant
Handling of coal in thermal power plant
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
Coal and Ash Handling
Coal and Ash HandlingCoal and Ash Handling
Coal and Ash Handling
 
Ahp presentation
Ahp presentationAhp presentation
Ahp presentation
 
THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 

Semelhante a Coal Handling Plant ( CHP )

Chpppt 100617141038-phpapp01
Chpppt 100617141038-phpapp01Chpppt 100617141038-phpapp01
Chpppt 100617141038-phpapp01Aashutosh Rathore
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal ComplexKumar Saurabh
 
Finalelectricalreport
FinalelectricalreportFinalelectricalreport
FinalelectricalreportNAVEENGEHLOT5
 
Longwall method thin coal seam hot mining-rev.r
Longwall method thin coal seam hot mining-rev.rLongwall method thin coal seam hot mining-rev.r
Longwall method thin coal seam hot mining-rev.rLolita Liao
 
Longwall Method_Thin Coal Seam_HOT Mining-Rev.R
Longwall Method_Thin Coal Seam_HOT Mining-Rev.RLongwall Method_Thin Coal Seam_HOT Mining-Rev.R
Longwall Method_Thin Coal Seam_HOT Mining-Rev.RJack li
 
Training
TrainingTraining
Trainingkulrao
 
37-FA10871S-J0201-17-Coal mill DESIGN DESCRIPTION.pdf
37-FA10871S-J0201-17-Coal mill DESIGN DESCRIPTION.pdf37-FA10871S-J0201-17-Coal mill DESIGN DESCRIPTION.pdf
37-FA10871S-J0201-17-Coal mill DESIGN DESCRIPTION.pdfssuser28a1a31
 
OCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUROCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPURSudhanshu Shekhar
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019David H Moloney
 
Modification of Coal Handling System in Boiler Power Plant
Modification of Coal Handling System in Boiler Power PlantModification of Coal Handling System in Boiler Power Plant
Modification of Coal Handling System in Boiler Power Plantpaperpublications3
 
FECTO CFPP Presentation Updated 13-3-15
FECTO CFPP Presentation Updated 13-3-15FECTO CFPP Presentation Updated 13-3-15
FECTO CFPP Presentation Updated 13-3-15NAVEED SABIR
 
Iveco Jon Stokes
Iveco Jon StokesIveco Jon Stokes
Iveco Jon StokesEggfuel
 

Semelhante a Coal Handling Plant ( CHP ) (20)

Chpppt 100617141038-phpapp01
Chpppt 100617141038-phpapp01Chpppt 100617141038-phpapp01
Chpppt 100617141038-phpapp01
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Sourish bhattacharyya
Sourish bhattacharyyaSourish bhattacharyya
Sourish bhattacharyya
 
Dalmia cement Dalmiapuram.pdf
Dalmia cement Dalmiapuram.pdfDalmia cement Dalmiapuram.pdf
Dalmia cement Dalmiapuram.pdf
 
Training chp
Training chpTraining chp
Training chp
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Finalelectricalreport
FinalelectricalreportFinalelectricalreport
Finalelectricalreport
 
Sbhep vivek kumar
Sbhep vivek kumarSbhep vivek kumar
Sbhep vivek kumar
 
Longwall method thin coal seam hot mining-rev.r
Longwall method thin coal seam hot mining-rev.rLongwall method thin coal seam hot mining-rev.r
Longwall method thin coal seam hot mining-rev.r
 
Longwall Method_Thin Coal Seam_HOT Mining-Rev.R
Longwall Method_Thin Coal Seam_HOT Mining-Rev.RLongwall Method_Thin Coal Seam_HOT Mining-Rev.R
Longwall Method_Thin Coal Seam_HOT Mining-Rev.R
 
Training
TrainingTraining
Training
 
RWFfinal
RWFfinalRWFfinal
RWFfinal
 
37-FA10871S-J0201-17-Coal mill DESIGN DESCRIPTION.pdf
37-FA10871S-J0201-17-Coal mill DESIGN DESCRIPTION.pdf37-FA10871S-J0201-17-Coal mill DESIGN DESCRIPTION.pdf
37-FA10871S-J0201-17-Coal mill DESIGN DESCRIPTION.pdf
 
OCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUROCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUR
 
Nitin
NitinNitin
Nitin
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
 
Modification of Coal Handling System in Boiler Power Plant
Modification of Coal Handling System in Boiler Power PlantModification of Coal Handling System in Boiler Power Plant
Modification of Coal Handling System in Boiler Power Plant
 
FECTO CFPP Presentation Updated 13-3-15
FECTO CFPP Presentation Updated 13-3-15FECTO CFPP Presentation Updated 13-3-15
FECTO CFPP Presentation Updated 13-3-15
 
Bsp sail project
Bsp sail projectBsp sail project
Bsp sail project
 
Iveco Jon Stokes
Iveco Jon StokesIveco Jon Stokes
Iveco Jon Stokes
 

Último

AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 

Último (20)

AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 

Coal Handling Plant ( CHP )

  • 1. CONSTRUCTIONAND WORKING OFCOAL HANDLING PLANT 6/18/2010 1
  • 2. PRESENTED BY Shrikant S. Khating 6/18/2010 2
  • 3.
  • 8. CHP Auxiliary And Equipments6/18/2010 3
  • 9.
  • 10.
  • 11. To Stack the coal to coal yard.6/18/2010 4
  • 12. Availability of Coal In India. Mostly E and F grade coal used in India. Blending Is Done To get Average D Grade. 6/18/2010 5
  • 13.
  • 17. 5. Airway.6/18/2010 6 Best and Cheap facility at Doorstep Available only for TPS nearer to coal mines Fear of thief waterway may not be possible till TPS and Problem of recalling arises if coal dip in water Have to build Runway near TPS which is very costly.
  • 18. By Rail Way 80-90% of the requirement is fulfilled by this way. Demurrage calculations on coal Rakes:-  We receive the coal wagons in the form of rakes (55-60 wagons in each rake). Free time normally 7 hrs. from Receipt of coal. Free time is calculated from the receipt of written intimation of coal rakes from MAHAGENCO to the railway. Rate of demurrage is Rs.100 / wagon / hr. 6/18/2010 7
  • 19. Analysis of Coal Chemical Analysis of Coal:- Sample of coal is randomly collected from each rake and detailed chemical analysis, calculation of calorific value is carried out and is confirmed whether it is as per agreement with the coal mines or not. 6/18/2010 8
  • 20. General Layout Of CHP 6/18/2010 9 Wagon Tippler Crusher House Hopper Feeder Surge Hopper Conv. Belts Vibrating Screens Crushers Tripper Trolley Bunkers
  • 23. Bunkering Cycle 6/18/2010 12 From W/T Crusher House Surge Hopper Vibrating Feeder Crusher Bunkering Belts Bunkers
  • 24. Stacking Cycle 6/18/2010 13 From W/T Crusher House Coal Is not required if bunker is full or Due any maintenance By-Passed Coal Stacking Belts Bunkering Belts Crushed Yard Bunkers
  • 25. Reclaiming Cycle 6/18/2010 14 If Outer Supply of coal Is Not Present From W/T Crusher House Non-Crushed Yard Reclaiming Belts Stacked Coal Bunkering Belts Crushed Yard Bunkers
  • 26. Wagon Tippler These are used to unload the coal wagons into coal hoppers in very less time (e.g. 20 wagons/hr. or more). Weighing of coal is carried out at wagon tippler. Normally 55-60 metric ton of coal come in each wagon. 6/18/2010 15 Wt of the coal =Wt. of loaded wagon – Wt. of empty wagon
  • 27. Wagon Tippler Drive System 6/18/2010 16 Motor Thruster Brake G / B Pinion Spur Gear
  • 28. General Layout Of W/t Wagon tippler Hopper Mesh of 250 mm * 250 mm Vibrating Feeder Conveyor Belt To crusher House 6/18/2010 17
  • 29. Equipment Used In W/T Water Sprinkler System. Dust Extraction System. 6/18/2010 18
  • 30. Conveyor Belt System Construction of Conveyor Belt Conveyor Belt Drive System Counter Weight Idlers Protection System Interlocking Magnetic Separator 6/18/2010 19
  • 31. Construction of Conveyor Belt Synthetic rubber. 4 ply means 4 nylon net in between 2 mm thick rubber coating is used. At KTPS belt of 1000 mm width is used. Width varies from 500 mm -1400 mm. 6/18/2010 20 Strength = 600 N 1000 mm Net
  • 32.
  • 33.
  • 34. Idlers 6/18/2010 23 Carry Side Return Side Self Alignment Impact Return Roller Return Adjustment Roller ( Installed after every 25m ) Below Discharge chute ( rubber coating ) 35°
  • 35. Angle Of Idlers 6/18/2010 24
  • 36. Protection System Interlocking is used for safety purpose. If any belt fails all other belts stop working which are interconnected. Magnetic Separator is used to remove metal particle from coal conveyed through conveyor belt for improving boiler efficiency. 6/18/2010 25
  • 37. Crushing Mechanism In CHP Three Stage Crushing System is used in Plant. 1.Double Roll Crusher 2.Rotary Breaker Crusher 3.Impact Crusher 6/18/2010 26 W / T No.4 600 mm Impact DRCR RBCR Stage 3 80 mm 250 mm Stage 1 Stage 2 20-25 mm
  • 38. Double Roll Crusher ( DRCR ) 6/18/2010 27 Roller Teeth 300 mm
  • 39. Rotary Breaker Crusher ( RBCR ) 6/18/2010 28 250 mm Striking Plate Hole of diameter 100 mm Stone shell 80 mm
  • 40. Impact Crusher 6/18/2010 29 Coal Hammer 30 mm Rotor