This document is being used in the EPA information sessions on the proposed storm water regulations to affect Bellingham, Franklin and Milford. Thanks to Mark Voorhees of the EPA for providing the copy of the document.
14. Summary of Individual Phosphorus Reduction Requirements Preliminary Phosphorus Reduction Plan submitted to municipality – 2 years Final Phosphorus Reduction Plan submitted to municipality – 3 years BMPs at the DD Site and/or Participation in a Certified Municipal Phosphorus Program (CMPP) Implementation of Final Phosphorus Reduction Plan – 5 years
15. Summary of Preliminary Phosphorus Reduction Plan Submit to municipality by Year 2 Site Suitability Analysis Site Engineering Statement of intent how permittee intends to comply with phosphorus load reduction requirements
16. One Inch Storm Water Control Provision Draft Permit App. D II(C) The capture and no discharge of one (1) inch of rainfall from impervious surfaces at the DD Site could eliminate permit requirements for DD Site engineering analyses
17.
18.
19.
20.
21.
22.
23.
24. Example – Small Office Complex (Site meeting One Inch Storm Water Control Provision)
30. Example – Shopping Plaza (post-retrofit) Curb cuts Curb cuts Infiltration trench Discontinue application of fertilizer containing phosphorus on all managed pervious areas Bioretention cell Enhanced organic waste and leaf litter collection program on all impervious areas