is there any surveying expert there to solve my question? thank you A traverse has been surveyed from A-1-2-3-B in order. Distance and angle observations are shown in the following diagram. The coordinates of A, B, C and D are known and shown below: Calculate the angular misclose of the traverse. Correct the original angles by distributing the angular misclose. Calculate the bearings of the traverse lines using the corrected angles from (b). Calculate the bearing and distance misclose and misclose ratio of the traverse. Using a Bowditch adjustment to calculate the adjusted bearings, distances and coordinates of the traverse. Solution there is an error of about 17.82 degrees. It has to be applied on all the angles..