SlideShare uma empresa Scribd logo
1 de 15
From 1 June to 30 August 2014 
Submitted to :- Submitted by:- 
Mr.Nikhil Nigam Name:-Sheikh Shakir Zahoor 
(H O D of EEE Deptt) Branch:-Electrical and Electronics 
Engineering 
Semster:- 5th sem 
DELHI TECHNICAL CAMPUS 
4th km stone,Main Bahadurgarh Badli Gurgaon Road, 
Phone:+919541234040 
E-mail:info@delhitechnicalcampus.com
TO WHOMSOEVER IT MAY CONCERN 
This is to certify that Mr. Sheikh Shakir Zahoor student of Delhi Technical Campus 
NayaGaon, Bahadurgarh has undergone his Project training from 26/06/2014 to 14/08/2014 
at 132/33 kv substation,Wanpoh Anantnag. 
We wish him all the success in his future endeavours. 
For JKPDD 
Er.Anees ul Islam. 
JE Incharge at substation Wanpoh.
ACKNOWLEDGEMENT 
I would like to express my gratitude and appreciation to all those who gave me the possibility 
to complete this report. 
And to Er.Anees ul Islam ,who was my tutor in doing the project and helped me to complete 
my training under his supervision. 
And also those persons, who work in this Department by giving their useful time to me and 
shearing their knowledge with us. 
And mostly thanks to our ,H.O.D Er. Nikhil Nigam, who gave me permission to enhance my 
skills in Industry. 
And also I want to thank Delhi Technical Campus to give me a chance to get knowledge of 
industry by permitting thus training during my academic session. 
Signature of Head of Department: Signature of Student: 
Er Nikhil Nigam
Introduction 
Any sub-station which handles power at over 132KV is termed as extra High Voltage sub-station 
by the rules implemented by Indian government. The design process of an EHV sub-station 
begins with very elemental work of selection of site and estimation of requirements 
which includes capital and material. It is also needed to keep in mind, the civil aspects of a 
sub- station design. In India about 75% of electric power used is generated in thermal and 
nuclear plants, 23% from mostly hydro station and 2% comes from renewable and other 
resources. The distribution system supplies power to the end consumer, while the 
transmission system connects between the generating stations and distribution system through 
transmission line. The entire network forms a power grid and each power grid across the 
country is interconnected which facilitates uninterrupted supply. While designing a power 
grid the following aspects must be taken into consideration: 
1: Low capital cost. 
2: Reliability of the supply power. 
3: Low operating cost 
4: High efficiency 
5: Low cost of energy generation. 
6: Simplicity of design. 
7: Reserve capacity to meet future requirements 
Starting from the generating stations to the end users, voltage is needed to be stepped up and 
down several times in various substations. This ensures efficient transmission of power, 
minimizing the power losses. Our project was a training of six weeks at 132KV/33KV EHV 
sub-station where the incoming power is received at 132 KV from a generating station. The 
power factor is corrected here and the voltage is stepped down to 33KV and power is then 
transferred to distribution system of the grid to meet the requirements of the end consumers at 
their suitable voltage. 
ELECTRICAL SUBSTATION 
A substation is a part of an electrical generation, transmission, and distribution system. 
Substations transform voltage from high to low, or the reverse, or perform any of several
other important functions. Between the generating station and consumer, electric power 
may flow through several substations at different voltage levels. A substation may 
include transformers to change voltage levels between high transmission voltages and lower 
distribution voltages, or at the interconnection of two different transmission voltages . 
Image of a Substation 
Elements of a Substation 
The various elements of a substation are:- 
1. Lightening Arrester 
2. Wave Trap 
3. Instrument Transformer 
Current Transformer and Potential Transformer 
4. Bus Bar 
5. Circuit Breaker 
6. Main Transformer 
7. Isolator 
8. Control and Relay Panel 
9. Protective Relaying 
10. DC Power Supply 
11. Capacitor Bank 
12. Switch Gear
Lightening Arrester 
Lightening arrestors are the instrument that are used in the incoming feeders so that to 
prevent the high voltage entering the main station. This high voltage is very dangerous to the 
instruments used in the substation. Even the instruments are very costly, so to prevent any 
damage lightening arrestors are used. The lightening arrestors do not let the lightening to fall 
on the station. If some lightening occurs the arrestors pull the lightening and ground it to the 
earth. In any substation the main important is of protection which is firstly done by these 
lightening arrestors. The lightening arrestors are grounded to the earth so that it can pull the 
lightening to the ground. The lightening arrestor works with an angle of 30° to 45° making a 
cone. 
Image of Lightening Arrestor 
Wave Trap 
Wave trap is an instrument using for tripping of the wave. The function of this trap is that it 
traps the unwanted waves. Its function is of trapping wave. Its shape is like a drum. It is 
connected to the main incoming feeder so that it can trap the waves which may be dangerous 
to the instruments here in the substation.
Image of Wave trap 
Instrument Transformer 
Instrument transformers are used to step-down the current or voltage to measurable values. 
They provide standardized, useable levels of current or voltage in a variety of power 
monitoring and measurement applications. Both current and voltage instrument transformers 
are designed to have predictable characteristics on overloads. Proper operation of over-current 
protection relays requires that current transformers provide a predictable 
transformation ratio even during a short circuit. 
These are further classified into two types which are discussed below. 
a. Current Transformers 
b. Potential Transformers 
Current Transformer 
Current transformers are basically used to take the readings of the currents entering the 
substation. This transformer steps down the current from 800 amps to 1 amp. This is done 
because we have no instrument for measuring of such a large current. The main use of this 
transformer is 
a. Distance Protection 
b. Backup Protection 
c. Measurement 
A current transformer is defined as an instrument transformer in which the secondary current 
is substantially proportional to the primary current (under normal conditions of operation) 
and differs in phase from it by an angle which is approximately zero for an appropriate 
direction of the connections. This highlights the accuracy requirement of the current
transformer but also important is the isolating function, which means no matter what the 
system voltage the secondary circuit need to be insulated only for a low voltage. 
Current Transformer 
Potential Transformer 
There are two potential transformers used in the bus connected both side of the bus. The 
potential transformer uses a bus isolator to protect itself. The main use of this transformer is 
to measure the voltage through the bus. This is done so as to get the detail information of the 
voltage passing through the bus to the instrument. There are two main parts in it 
a. Measurement 
b. Protection 
The standards define a voltage transformer as one in which the secondary voltage is 
substantially proportional to the primary voltage and differs in phase from it by an angle 
which is approximately equal to zero for an appropriate direction of the connections. This in 
essence means that the voltage transformer has to be as close as possible to the ideal 
transformer
. 
Bus Bar 
The bus is a line in which the incoming feeders come into and get into the instruments for 
further step up or step down. The first bus is used for putting the incoming feeders in la single 
line. There may be double line in the bus so that if any fault occurs in the one the other can 
still have the current and the supply will not stop. The two lines in the bus are separated by a 
little distance by a conductor having a connector between them. This is so that one can work 
at a time and the other works only if the first is having any fault. 
A bus bar in electrical power distribution refers to thick strips of 
copper or aluminium that conduct electricity within a switchboard, distribution board, 
substation, or other electrical apparatus. The size of the bus bar is important in determining 
the maximum amount of current that can be safely carried. Bus bars are typically either flat 
strips or hollow tubes as these shapes allow heat to dissipate more efficiently due to their high 
surface area to cross sectional area ratio. The skin effect makes 50-60 Hz AC bus bars more 
than about 8 mm (1/3 in) thick inefficient, so hollow or flat shapes are prevalent in higher 
current applications. A hollow section has higher stiffness than a solid rod of equivalent 
current carrying capacity, which allows a greater span between bus bar supports in outdoor 
switchyards. A bus bar may either be supported on insulators or else insulation may 
completely surround it. Bus bars are protected from accidental contact either by a metal 
enclosure or by elevation out of normal reach. 
Neutral bus bars may also be insulated. Earth bus bars are typically bolted directly 
onto any metal chassis of their enclosure. Bus bars may be enclosed in a metal housing, in the 
form of bus duct or bus way, segregated-phase bus, or isolated-phase bus.
Image of Bus Bar 
Circuit Breaker 
The circuit breakers are used to break the circuit if any fault occurs in any of the instrument. 
These circuit breaker breaks for a fault which can damage other instrument in the station. For 
any unwanted fault over the station we need to break the line current. This is only done 
automatically by the circuit breaker. There are mainly two types of circuit breakers used for 
any substations. They are 
a. SF6 circuit breakers 
b. Spring circuit breakers. 
The use of SF6 circuit breaker is mainly in the substations which are having high 
input kv input, say above 220kv and more. The gas is put inside the circuit breaker by force 
i.e. under high pressure. When if the gas gets decreases there is a motor connected to the 
circuit breaker. The motor starts operating if the gas went lower than 20.8 bar. There is a 
meter connected to the breaker so that it can be manually seen if the gas goes low. The circuit 
breaker uses the SF6 gas to reduce the torque produce in it due to any fault in the line. The 
circuit breaker has a direct link with the instruments in the station, when any fault occur 
alarm bell rings. 
The spring type of circuit breakers is used for small kv stations. The spring here 
reduces the torque produced so that the breaker can function again. The spring type is used 
for step down side of 132kv to 33kv also in 33kv to 11kv and so on. They are only used in 
low distribution side.
Sketch of Circuit Breaker 
Power Transformer 
In substation, transformers are applied to step-up the voltage or step-down the voltage. power 
plant substation steps up the voltage on the other hand distribution substation step-down the 
voltage using power transformer. There are three transformers in the incoming feeders so that 
the three lines are step down at the same time. In case of a 220KV or more KV line station 
auto transformers are used. While in case of lower KV line such as less than 132KV line 
double winding transformers are used. 
The transformer is transported on trailers to substation site and as far as possible 
directly unloaded on the plinth. Transformer tanks up to 25 MVA capacity are generally oil 
filled, and those of higher capacity are transported with N2 gas filled in them. Positive 
pressure of N2 is maintained in transformer tank to avoid the ingress of moisture. Radiators 
should be stored with ends duly blanked with gaskets and end plates to avoid in gross of 
moisture, dust, and any foreign materials inside. The care should be taken to protect the fins 
of radiators while unloading and storage to avoid further oil leakages. The radiators should be 
stored on raised ground keeping the fins intact.
Image of Power Transformer 
Isolator 
The use of this isolator is to protect the transformer and the other instrument in the line. The 
isolator isolates the extra voltage to the ground and thus any extra voltage cannot enter the 
line. Thus an isolator is used after the bus also for protection. 
Image of Isolator 
Control and Relay Panel 
The control and relay panel is of cubical construction suitable for floor mounting. All 
protective, indicating and control elements are mounted on the front panel for ease of 
operation and control. The hinged rear door will provide access to all the internal components 
to facilitate easy inspection and maintenance. Provision is made for terminating incoming 
cables at the bottom of the panels by providing separate line-up terminal blocks. For cable 
entry provision is made both from top and bottom. The control and relay panel accepts CT, 
PT aux 230 AC and 220V/10V DC connections at respective designated terminal points.
220V/10V DC supply is used for control supply of all internal relays and timers and also for 
energizing closing and tripping coils of the breakers. 230V AC station auxiliary supply is 
used for internal illumination lamp of the panel and the space heater. Protective HRC fuse are 
provided within the panel for P.T secondary, Aux AC and battery supplies. Each Capacitor 
Bank is controlled by breaker and provided with a line ammeter with selector switch for 3 
phase system & over current relay (2 phases and 1 Earth fault for 3 ph system). Under voltage 
and over voltage relays. Neutral Current Unbalance Relays are for both Alarm and Trip 
facilities breaker control switch with local/remote selector switch, master trip relay and trip 
alarms acknowledge and reset facilities. 
Control and Relay Panel 
Protective Relaying 
Protective relays are used to detect defective lines or apparatus and to initiate the operation of 
circuit interrupting devices to isolate the defective equipment. Relays are also used to detect 
abnormal or undesirable operating conditions other than those caused by defective equipment 
and either operate an alarm or initiate operation of circuit interrupting devices. Protective 
relays protect the electrical system by causing the defective apparatus or lines to be 
disconnected to minimize damage and maintain service continuity to the rest of the system. 
There are different types of relays. 
i. Over current relay 
ii. Distance relay 
iii. Differential relay 
iv. Directional over current relay 
DC Power Supply 
DC Battery and Charger 
All but the smallest substations include auxiliary power supplies. AC power is required for 
substation building small power, lighting, heating and ventilation, some communications 
equipment, switchgear operating mechanisms, anti-condensation heaters and motors. DC
power is used to feed essential services such as circuit breaker trip coils and associated relays, 
supervisory control and data acquisition (SCADA) and communications equipment. This 
describes how these auxiliary supplies are derived and explains how to specify such 
equipment. It has Single 100% battery and 100% charger, Low capital cost, No standby DC 
System outage for maintenance. Need to isolate battery/charger combination from load under 
boost charge conditions in order to prevent high boost voltages. 
Capacitor bank 
In substation shunt capacitors are used for improving the power factor of the system. Shunt 
capacitors provide reactive power to improve the power factor. 
During low load condition the shunt capacitance predominates to compensate 
the shunt capacitance shunt reactance are employed in substation and will be switched on 
during low load conditions. 
Capacitor Bank 
SWITCHGEAR 
The term switchgear, used in association with the electric power system, or grid, refers to the 
combination of electrical disconnects, fuses and/or circuit breakers used to isolate electrical 
equipment. Switchgear is used both to de-energize equipment to allow work to be done and to 
clear faults downstream. Switchgear is already a plural, much like the software term 
code/codes, and is never used as switchgears. 
The very earliest central power stations used simple open knife switches, mounted on 
insulating panels of marble or asbestos. Power levels and voltages rapidly escalated, making 
open manually-operated switches too dangerous to use for anything other than isolation of a 
de-energized circuit. Oil-filled equipment allowed arc energy to be contained and safely 
controlled. By the early 20th century, a switchgear line-up would be a metal- enclosed 
structure with electrically-operated switching elements, using oil circuit breakers. Today, oil-filled 
equipment has largely been replaced by air-blast, vacuum, or SF6 equipment, allowing 
large currents and power levels to be safely controlled by automatic equipment incorporating 
digital controls, protection, metering and communications.
Switchgear

Mais conteúdo relacionado

Mais procurados

Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONRavi Phadtare
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation Tejveer Choudhary
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 
POWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxPOWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxJeffrey Dorsey
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
132 kv substation
132 kv substation132 kv substation
132 kv substationWipro
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv student
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training pptsitesh95074
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 

Mais procurados (20)

132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
substation internship report
substation internship report substation internship report
substation internship report
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
POWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxPOWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docx
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
132 kv substation
132 kv substation132 kv substation
132 kv substation
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 

Destaque

132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipurmonga786
 
Training Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYTraining Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYRohitashav Goyal
 
Scadasubstationautomation
ScadasubstationautomationScadasubstationautomation
Scadasubstationautomationshailendrashael
 
INTERNSHIP REPORT-ORIGINAL (Autosaved)
INTERNSHIP REPORT-ORIGINAL (Autosaved)INTERNSHIP REPORT-ORIGINAL (Autosaved)
INTERNSHIP REPORT-ORIGINAL (Autosaved)Asafak Husain
 
132 gss ppt
132 gss ppt132 gss ppt
132 gss ppthunk143
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training reportMuntazir Mehdi
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurkishankky
 
Basic power distribution system007
Basic power distribution system007Basic power distribution system007
Basic power distribution system007Vaishnavee Patel
 
electricity supply ppt
electricity supply pptelectricity supply ppt
electricity supply pptsameerchat
 
electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221saikrishna kandhikatla
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in indiaJasgt Singh
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)zeeshan715
 
Distribution systems
Distribution systemsDistribution systems
Distribution systemsSURAJ PRASAD
 
BASIC ENGINE KNOWLEDGE- LEVEL 1
BASIC ENGINE KNOWLEDGE- LEVEL 1BASIC ENGINE KNOWLEDGE- LEVEL 1
BASIC ENGINE KNOWLEDGE- LEVEL 1Raghunath Patil
 

Destaque (20)

132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
 
Substation
SubstationSubstation
Substation
 
Training Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYTraining Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITY
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
Scadasubstationautomation
ScadasubstationautomationScadasubstationautomation
Scadasubstationautomation
 
INTERNSHIP REPORT-ORIGINAL (Autosaved)
INTERNSHIP REPORT-ORIGINAL (Autosaved)INTERNSHIP REPORT-ORIGINAL (Autosaved)
INTERNSHIP REPORT-ORIGINAL (Autosaved)
 
132 gss ppt
132 gss ppt132 gss ppt
132 gss ppt
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
 
Control of machines
Control of machinesControl of machines
Control of machines
 
A 220kV Substation
A 220kV SubstationA 220kV Substation
A 220kV Substation
 
Basic power distribution system007
Basic power distribution system007Basic power distribution system007
Basic power distribution system007
 
electricity supply ppt
electricity supply pptelectricity supply ppt
electricity supply ppt
 
electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221
 
Power transmission & distribution
Power transmission & distributionPower transmission & distribution
Power transmission & distribution
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in india
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
 
ELECTRICAL WIRING
ELECTRICAL WIRINGELECTRICAL WIRING
ELECTRICAL WIRING
 
Distribution systems
Distribution systemsDistribution systems
Distribution systems
 
BASIC ENGINE KNOWLEDGE- LEVEL 1
BASIC ENGINE KNOWLEDGE- LEVEL 1BASIC ENGINE KNOWLEDGE- LEVEL 1
BASIC ENGINE KNOWLEDGE- LEVEL 1
 

Semelhante a Electrical 132kv substation project .. shakir

PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSSMohitkalal4
 
Power Corporation ppt
Power Corporation pptPower Corporation ppt
Power Corporation pptKamal Tiwari
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxfallinhay
 
Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
Substation equipments & its functions
Substation equipments & its functionsSubstation equipments & its functions
Substation equipments & its functionsMonzer Abdallah Eisa
 
66%20Industrial%20Visit%20Report.docx
66%20Industrial%20Visit%20Report.docx66%20Industrial%20Visit%20Report.docx
66%20Industrial%20Visit%20Report.docxdnyaneshwarvidhate2
 
Report On Industrial Tour At Khulshi Grid Sub-Station
Report On Industrial Tour At Khulshi Grid Sub-StationReport On Industrial Tour At Khulshi Grid Sub-Station
Report On Industrial Tour At Khulshi Grid Sub-StationEkram Bin Mamun
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overviewMilind Punj
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Mohit Kothari
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Mohit Kothari
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Mohit Kothari
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at JassureShuvam Pathania
 
Electrical power distribution and utilization
Electrical power distribution and utilizationElectrical power distribution and utilization
Electrical power distribution and utilizationMuhammadAliImran11
 
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptxTRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptxPrabhakarTripathi16
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving stationH.C.Naveen Kumar
 

Semelhante a Electrical 132kv substation project .. shakir (20)

PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
Power Corporation ppt
Power Corporation pptPower Corporation ppt
Power Corporation ppt
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
Design of substation
Design of substationDesign of substation
Design of substation
 
Substation equipments & its functions
Substation equipments & its functionsSubstation equipments & its functions
Substation equipments & its functions
 
66%20Industrial%20Visit%20Report.docx
66%20Industrial%20Visit%20Report.docx66%20Industrial%20Visit%20Report.docx
66%20Industrial%20Visit%20Report.docx
 
Report On Industrial Tour At Khulshi Grid Sub-Station
Report On Industrial Tour At Khulshi Grid Sub-StationReport On Industrial Tour At Khulshi Grid Sub-Station
Report On Industrial Tour At Khulshi Grid Sub-Station
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
 
Study tour to optcl
Study tour to optclStudy tour to optcl
Study tour to optcl
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
Electrical power distribution and utilization
Electrical power distribution and utilizationElectrical power distribution and utilization
Electrical power distribution and utilization
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
Industrail training
Industrail trainingIndustrail training
Industrail training
 
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptxTRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 

Último

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 

Último (20)

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 

Electrical 132kv substation project .. shakir

  • 1. From 1 June to 30 August 2014 Submitted to :- Submitted by:- Mr.Nikhil Nigam Name:-Sheikh Shakir Zahoor (H O D of EEE Deptt) Branch:-Electrical and Electronics Engineering Semster:- 5th sem DELHI TECHNICAL CAMPUS 4th km stone,Main Bahadurgarh Badli Gurgaon Road, Phone:+919541234040 E-mail:info@delhitechnicalcampus.com
  • 2. TO WHOMSOEVER IT MAY CONCERN This is to certify that Mr. Sheikh Shakir Zahoor student of Delhi Technical Campus NayaGaon, Bahadurgarh has undergone his Project training from 26/06/2014 to 14/08/2014 at 132/33 kv substation,Wanpoh Anantnag. We wish him all the success in his future endeavours. For JKPDD Er.Anees ul Islam. JE Incharge at substation Wanpoh.
  • 3. ACKNOWLEDGEMENT I would like to express my gratitude and appreciation to all those who gave me the possibility to complete this report. And to Er.Anees ul Islam ,who was my tutor in doing the project and helped me to complete my training under his supervision. And also those persons, who work in this Department by giving their useful time to me and shearing their knowledge with us. And mostly thanks to our ,H.O.D Er. Nikhil Nigam, who gave me permission to enhance my skills in Industry. And also I want to thank Delhi Technical Campus to give me a chance to get knowledge of industry by permitting thus training during my academic session. Signature of Head of Department: Signature of Student: Er Nikhil Nigam
  • 4. Introduction Any sub-station which handles power at over 132KV is termed as extra High Voltage sub-station by the rules implemented by Indian government. The design process of an EHV sub-station begins with very elemental work of selection of site and estimation of requirements which includes capital and material. It is also needed to keep in mind, the civil aspects of a sub- station design. In India about 75% of electric power used is generated in thermal and nuclear plants, 23% from mostly hydro station and 2% comes from renewable and other resources. The distribution system supplies power to the end consumer, while the transmission system connects between the generating stations and distribution system through transmission line. The entire network forms a power grid and each power grid across the country is interconnected which facilitates uninterrupted supply. While designing a power grid the following aspects must be taken into consideration: 1: Low capital cost. 2: Reliability of the supply power. 3: Low operating cost 4: High efficiency 5: Low cost of energy generation. 6: Simplicity of design. 7: Reserve capacity to meet future requirements Starting from the generating stations to the end users, voltage is needed to be stepped up and down several times in various substations. This ensures efficient transmission of power, minimizing the power losses. Our project was a training of six weeks at 132KV/33KV EHV sub-station where the incoming power is received at 132 KV from a generating station. The power factor is corrected here and the voltage is stepped down to 33KV and power is then transferred to distribution system of the grid to meet the requirements of the end consumers at their suitable voltage. ELECTRICAL SUBSTATION A substation is a part of an electrical generation, transmission, and distribution system. Substations transform voltage from high to low, or the reverse, or perform any of several
  • 5. other important functions. Between the generating station and consumer, electric power may flow through several substations at different voltage levels. A substation may include transformers to change voltage levels between high transmission voltages and lower distribution voltages, or at the interconnection of two different transmission voltages . Image of a Substation Elements of a Substation The various elements of a substation are:- 1. Lightening Arrester 2. Wave Trap 3. Instrument Transformer Current Transformer and Potential Transformer 4. Bus Bar 5. Circuit Breaker 6. Main Transformer 7. Isolator 8. Control and Relay Panel 9. Protective Relaying 10. DC Power Supply 11. Capacitor Bank 12. Switch Gear
  • 6. Lightening Arrester Lightening arrestors are the instrument that are used in the incoming feeders so that to prevent the high voltage entering the main station. This high voltage is very dangerous to the instruments used in the substation. Even the instruments are very costly, so to prevent any damage lightening arrestors are used. The lightening arrestors do not let the lightening to fall on the station. If some lightening occurs the arrestors pull the lightening and ground it to the earth. In any substation the main important is of protection which is firstly done by these lightening arrestors. The lightening arrestors are grounded to the earth so that it can pull the lightening to the ground. The lightening arrestor works with an angle of 30° to 45° making a cone. Image of Lightening Arrestor Wave Trap Wave trap is an instrument using for tripping of the wave. The function of this trap is that it traps the unwanted waves. Its function is of trapping wave. Its shape is like a drum. It is connected to the main incoming feeder so that it can trap the waves which may be dangerous to the instruments here in the substation.
  • 7. Image of Wave trap Instrument Transformer Instrument transformers are used to step-down the current or voltage to measurable values. They provide standardized, useable levels of current or voltage in a variety of power monitoring and measurement applications. Both current and voltage instrument transformers are designed to have predictable characteristics on overloads. Proper operation of over-current protection relays requires that current transformers provide a predictable transformation ratio even during a short circuit. These are further classified into two types which are discussed below. a. Current Transformers b. Potential Transformers Current Transformer Current transformers are basically used to take the readings of the currents entering the substation. This transformer steps down the current from 800 amps to 1 amp. This is done because we have no instrument for measuring of such a large current. The main use of this transformer is a. Distance Protection b. Backup Protection c. Measurement A current transformer is defined as an instrument transformer in which the secondary current is substantially proportional to the primary current (under normal conditions of operation) and differs in phase from it by an angle which is approximately zero for an appropriate direction of the connections. This highlights the accuracy requirement of the current
  • 8. transformer but also important is the isolating function, which means no matter what the system voltage the secondary circuit need to be insulated only for a low voltage. Current Transformer Potential Transformer There are two potential transformers used in the bus connected both side of the bus. The potential transformer uses a bus isolator to protect itself. The main use of this transformer is to measure the voltage through the bus. This is done so as to get the detail information of the voltage passing through the bus to the instrument. There are two main parts in it a. Measurement b. Protection The standards define a voltage transformer as one in which the secondary voltage is substantially proportional to the primary voltage and differs in phase from it by an angle which is approximately equal to zero for an appropriate direction of the connections. This in essence means that the voltage transformer has to be as close as possible to the ideal transformer
  • 9. . Bus Bar The bus is a line in which the incoming feeders come into and get into the instruments for further step up or step down. The first bus is used for putting the incoming feeders in la single line. There may be double line in the bus so that if any fault occurs in the one the other can still have the current and the supply will not stop. The two lines in the bus are separated by a little distance by a conductor having a connector between them. This is so that one can work at a time and the other works only if the first is having any fault. A bus bar in electrical power distribution refers to thick strips of copper or aluminium that conduct electricity within a switchboard, distribution board, substation, or other electrical apparatus. The size of the bus bar is important in determining the maximum amount of current that can be safely carried. Bus bars are typically either flat strips or hollow tubes as these shapes allow heat to dissipate more efficiently due to their high surface area to cross sectional area ratio. The skin effect makes 50-60 Hz AC bus bars more than about 8 mm (1/3 in) thick inefficient, so hollow or flat shapes are prevalent in higher current applications. A hollow section has higher stiffness than a solid rod of equivalent current carrying capacity, which allows a greater span between bus bar supports in outdoor switchyards. A bus bar may either be supported on insulators or else insulation may completely surround it. Bus bars are protected from accidental contact either by a metal enclosure or by elevation out of normal reach. Neutral bus bars may also be insulated. Earth bus bars are typically bolted directly onto any metal chassis of their enclosure. Bus bars may be enclosed in a metal housing, in the form of bus duct or bus way, segregated-phase bus, or isolated-phase bus.
  • 10. Image of Bus Bar Circuit Breaker The circuit breakers are used to break the circuit if any fault occurs in any of the instrument. These circuit breaker breaks for a fault which can damage other instrument in the station. For any unwanted fault over the station we need to break the line current. This is only done automatically by the circuit breaker. There are mainly two types of circuit breakers used for any substations. They are a. SF6 circuit breakers b. Spring circuit breakers. The use of SF6 circuit breaker is mainly in the substations which are having high input kv input, say above 220kv and more. The gas is put inside the circuit breaker by force i.e. under high pressure. When if the gas gets decreases there is a motor connected to the circuit breaker. The motor starts operating if the gas went lower than 20.8 bar. There is a meter connected to the breaker so that it can be manually seen if the gas goes low. The circuit breaker uses the SF6 gas to reduce the torque produce in it due to any fault in the line. The circuit breaker has a direct link with the instruments in the station, when any fault occur alarm bell rings. The spring type of circuit breakers is used for small kv stations. The spring here reduces the torque produced so that the breaker can function again. The spring type is used for step down side of 132kv to 33kv also in 33kv to 11kv and so on. They are only used in low distribution side.
  • 11. Sketch of Circuit Breaker Power Transformer In substation, transformers are applied to step-up the voltage or step-down the voltage. power plant substation steps up the voltage on the other hand distribution substation step-down the voltage using power transformer. There are three transformers in the incoming feeders so that the three lines are step down at the same time. In case of a 220KV or more KV line station auto transformers are used. While in case of lower KV line such as less than 132KV line double winding transformers are used. The transformer is transported on trailers to substation site and as far as possible directly unloaded on the plinth. Transformer tanks up to 25 MVA capacity are generally oil filled, and those of higher capacity are transported with N2 gas filled in them. Positive pressure of N2 is maintained in transformer tank to avoid the ingress of moisture. Radiators should be stored with ends duly blanked with gaskets and end plates to avoid in gross of moisture, dust, and any foreign materials inside. The care should be taken to protect the fins of radiators while unloading and storage to avoid further oil leakages. The radiators should be stored on raised ground keeping the fins intact.
  • 12. Image of Power Transformer Isolator The use of this isolator is to protect the transformer and the other instrument in the line. The isolator isolates the extra voltage to the ground and thus any extra voltage cannot enter the line. Thus an isolator is used after the bus also for protection. Image of Isolator Control and Relay Panel The control and relay panel is of cubical construction suitable for floor mounting. All protective, indicating and control elements are mounted on the front panel for ease of operation and control. The hinged rear door will provide access to all the internal components to facilitate easy inspection and maintenance. Provision is made for terminating incoming cables at the bottom of the panels by providing separate line-up terminal blocks. For cable entry provision is made both from top and bottom. The control and relay panel accepts CT, PT aux 230 AC and 220V/10V DC connections at respective designated terminal points.
  • 13. 220V/10V DC supply is used for control supply of all internal relays and timers and also for energizing closing and tripping coils of the breakers. 230V AC station auxiliary supply is used for internal illumination lamp of the panel and the space heater. Protective HRC fuse are provided within the panel for P.T secondary, Aux AC and battery supplies. Each Capacitor Bank is controlled by breaker and provided with a line ammeter with selector switch for 3 phase system & over current relay (2 phases and 1 Earth fault for 3 ph system). Under voltage and over voltage relays. Neutral Current Unbalance Relays are for both Alarm and Trip facilities breaker control switch with local/remote selector switch, master trip relay and trip alarms acknowledge and reset facilities. Control and Relay Panel Protective Relaying Protective relays are used to detect defective lines or apparatus and to initiate the operation of circuit interrupting devices to isolate the defective equipment. Relays are also used to detect abnormal or undesirable operating conditions other than those caused by defective equipment and either operate an alarm or initiate operation of circuit interrupting devices. Protective relays protect the electrical system by causing the defective apparatus or lines to be disconnected to minimize damage and maintain service continuity to the rest of the system. There are different types of relays. i. Over current relay ii. Distance relay iii. Differential relay iv. Directional over current relay DC Power Supply DC Battery and Charger All but the smallest substations include auxiliary power supplies. AC power is required for substation building small power, lighting, heating and ventilation, some communications equipment, switchgear operating mechanisms, anti-condensation heaters and motors. DC
  • 14. power is used to feed essential services such as circuit breaker trip coils and associated relays, supervisory control and data acquisition (SCADA) and communications equipment. This describes how these auxiliary supplies are derived and explains how to specify such equipment. It has Single 100% battery and 100% charger, Low capital cost, No standby DC System outage for maintenance. Need to isolate battery/charger combination from load under boost charge conditions in order to prevent high boost voltages. Capacitor bank In substation shunt capacitors are used for improving the power factor of the system. Shunt capacitors provide reactive power to improve the power factor. During low load condition the shunt capacitance predominates to compensate the shunt capacitance shunt reactance are employed in substation and will be switched on during low load conditions. Capacitor Bank SWITCHGEAR The term switchgear, used in association with the electric power system, or grid, refers to the combination of electrical disconnects, fuses and/or circuit breakers used to isolate electrical equipment. Switchgear is used both to de-energize equipment to allow work to be done and to clear faults downstream. Switchgear is already a plural, much like the software term code/codes, and is never used as switchgears. The very earliest central power stations used simple open knife switches, mounted on insulating panels of marble or asbestos. Power levels and voltages rapidly escalated, making open manually-operated switches too dangerous to use for anything other than isolation of a de-energized circuit. Oil-filled equipment allowed arc energy to be contained and safely controlled. By the early 20th century, a switchgear line-up would be a metal- enclosed structure with electrically-operated switching elements, using oil circuit breakers. Today, oil-filled equipment has largely been replaced by air-blast, vacuum, or SF6 equipment, allowing large currents and power levels to be safely controlled by automatic equipment incorporating digital controls, protection, metering and communications.