1. Centro CONGRESSI
FIERA DEL LEVANTE - BARI
21 - 22 - 23 GIUGNO 2023
/2
Organizzazione Con il patrocinio di
Da un’idea di
TOWARDS WATER SECURITY IN AFRICA
JOSEPH HAIM HARROSH
DIRECTOR
2. 2023
Centro CONGRESSI
FIERA DEL LEVANTE - BARI
21 - 22 - 23 GIUGNO 2023
/2
Organizzazione Con il patrocinio di
Da un’idea di
LR GROUP PROVIDES INTEGRATED
CREATIVE SOLUTIONS FOR DEVELOPMENT OF MEDIUM AND LARGE SCALE
PROJECTS IN HIGH-GROWTH ECONOMIES, SINCE 1985
3. 2023
Centro CONGRESSI
FIERA DEL LEVANTE - BARI
21 - 22 - 23 GIUGNO 2023
/2
Organizzazione Con il patrocinio di
Da un’idea di
TOWARDS WATER SECURITY IN AFRICA
The Missing Element
Many countries in Africa have abundant freshwater resources (water stress of 10% or
less), yet water availability does not necessarily result in water security.
• Africa still has the lowest levels of water infrastructure: dams, intakes, pumping
stations, water treatment plants, pipes, reservoirs, etc.
• There is lack of knowledge & technologies for promoting water security
What often holds back the development of large-scale water & sanitation projects that can
significantly advance water security in the region is FINANCING.
• Designated fund or grants for the preparation of Feasibility Studies and Project Design
• Financing for Project Development - EPC
4. 2023
Centro CONGRESSI
FIERA DEL LEVANTE - BARI
21 - 22 - 23 GIUGNO 2023
/2
Organizzazione Con il patrocinio di
Da un’idea di
POTENTIAL FOR ITALIAN-ISRAEL COOPERATION ON WATER & SANITATION
PROJECTS IN AFRICA
• Designated Fund for the preparation of Feasibility Studies and Project Design
• Securing joint insurance financing from Italian and Israeli and Export Credit Agencies: SACE (Italy), and ASHRA
(Israel), as well as financing from Italian, Israeli and other banks.
• Bringing Italian and Israeli technologies, equipment and machineries
5. 2023
Centro CONGRESSI
FIERA DEL LEVANTE - BARI
21 - 22 - 23 GIUGNO 2023
/2
Organizzazione Con il patrocinio di
Da un’idea di
TANZANIA
Mara Valley IrrigaPon Development EPC Project
Objective: provide irrigation for 8,500 ha of agricultural activities & restoration of critically
degraded sub-catchments
Main Components: a multipurpose concrete dam (height 20m; length 700m), hydropower
plant (2.8 MW), water storage and irrigation infrastructure: concrete conveyance canal
(length 66km), flood protection, pipelines, etc.
Value: ~300M EUR
Italy-Israel Cooperation
• Financing: Insurance by SACE (Italy) & ASHRA (Israel); Loans by Italian and
Israeli Banks
• Italian, Israeli, & local sub-contractors
• Equipment & technology: Italian and Israeli
6. Centro CONGRESSI
FIERA DEL LEVANTE - BARI
21 - 22 - 23 GIUGNO 2023
/2
Organizzazione Con il patrocinio di
Da un’idea di
JOSEPH HAIM HARROSH
M: +972 545-222216
E: Harrosh@lr-group.com