SEKAR PALANI
(Electrical Supervisor)
Kodian Kulam
Tamil Nadu, India
Mob No : 00211-915328659(South Sudan)
00211-929115266
Email Id : sk.enfras@gmail.com
sekarpalani1983@gmail.com
Skype Id: sekar.palani1
CAREER OBJECTIVE:
I seek an opportunity to work in the area of Electrical, Controls & Automations with
Engineering, Construction and Commissioning projects and build a strong career in
33MW Gas Plant, Wellhead for Oil & Gas domain.
PROFILE SNAPSHOT:
A Qualified Diploma. Over all 9.6 years experience in 33MW Gas Plant, Substation,
Power Distribution Line at Oil & Gas Well Head facilities with different country(India,
UAE, Yemen & South Sudan).
Currently associated with ‘Star Contracting Oil & Gas Company Ltd. South Sudan,
‘Star Contracting as an Electrical Supervisor .
Well-versed in handling Electrical Project at Oil & Gas Onshore site.
NATURE OF JOB PERFORMED /RESPONSIBILITIES:
Construction Activities – Electical / Instruments
In my career, my major roll is involved in Electrical Installation & Commissioning Departments
and familiar in carryout Planned PM activities. During that I have handled different types of
HV/MV, MV/LV Transformers, Switchgears, Diesel Generators, HV/MV/LV Motors & associated
switchgears/ starters, PCC & MCC Panels, UPS/Battery chargers, Batteries, Cathodic protection
system, Heat Tracing System, Lighting system, Plant Earthing system & FOC etc.., in Oil & Gas
and Power plant.
Also I have very good knowledge in Computers in MS Office, Word, Excel, Power point,
Project.,etc., and preparing documentation related to job Work Permits, Work Orders, PM
Schedule, PM Procedures, Scope of works, Incident reports, Risk assessment, Bill of material,
Material request and updating the data in appropriate site software like Primavera P6,
MS Project etc..,
Planning Activities-
1. Preparation for WBS(Work break-down structure) & Master Project Schedule Level – 1,
2, 3 & 4.
2. Page 2222 of 7777
2. Preparation of Complete resource loaded schedule in Primavera Level – III & IV and
updating schedule periodically against the variance baseline.
3. Preparation & Updating Progress Measurement Sheet(PMS) for Engineering,
Procurement, Construction & Commissioning based on weightage.
4. Preparing & updating progress “S”-Curve for EPCC based on above PMS and Monitoring
the progress by analzying Planned/Actual.
5. Prepartion of 30/60/90Days Look-ahead Schedule based on as per Client.
6. Preparation Various Resource Histogram such as Manower, Machinery etc,
7. Preparation of Progress Report (Daily, Weekly & Monthly) for Client as well as for
internal review.
8. Preparation of Project Management Plan, Master Schedule
9. Preparation for Cash Flow Chart & Invoicing based on Project.
10. Attend Daily Planning/Scheduling Meeting to achieve the targets.
11. Monitoring progress through out the work process and comparing this with the project
schedule of work and advising the Project Manager of actual and expected slippages.
PROFESSIONAL EXPERIENCE:
Organzation : STAR CONTRACTING OIL & GAS COMPANY LTD, SOUTH SUDAN.
Period of Employment : July 2015 to Till date
Title of Position : Electrical Supervisor .
Details of Project Handled:
1. EPCC for 33kV Power Line Distribution System Connection from Power Plant to
Well Tie-In, 6Nos Well Head(Shutdown Project).
2. EPCC for Well Head Facilited with Flow Line Tie in to OGM-3.
3. Provision of Block 7 Field Rejuvenation Work For OBC and Non- Process Building -
Priority 1 (Water Treatment System).
4. EPCC for Conversion of Anbar SE-01 to Disposal Well.
RESPONBILITIES:
Studying and analyzing the exact scope of work.
Preparation of Method Statement, Procedures and Bill of Quantity where required.
Preparation of ITP, MDR, MIR & RFI.
To execute works in site as per QA/QC Procedures and IFC Drawings.
Supervision and Installation of DB, MDB, SMDB, MCCP.
Installation & Commissioning of various type 33kV Insulated Switchgear, Transformers,
Circuit Breaker & Surge Arrester.
Installation & Commissioning of 33kV overhead line distribution system Installation,
Pre-commissioning & commissioning.
Installation & Commissioning of Heat racing & Cathodic Protection for wellhead.
3. Page 3333 of 7777
Installation & Commissioning of RMU Substation at well Head.
Installation & Commissioning of Earthing system & Lighting system.
Installation & Commissioning of FOC Cable at Power Plant & Well head.
Laying & Termination of LV, HV, MV under ground cables from Terminal Pole to RMU,
RMU to Transformer, Transformer to MDB and MDB to Well Head Facilities.
Cable Insulation Test & HV Cable Hipot Test.
Phase Sequence Testing.
Responsible for Monitoring and controlling all electrical activities and raising of Request
for Inspection (RFI) to Client once work gets complete.
Co-ordination with Pre-commissioning & Commissioning Team.
Manpower handling and work allocation daily basis.
Arranging machinery & Transportation on a daily basis.
Preparation of Progress Report (Daily, Weekly & Monthly) for Client as well as for
internal review(Primavera P6, MS Project & Excel).
UAE - DUBAI EXPERIENCE:
Organzation : SUNLINE ELECTROMECHANICAL CO LLC, DUBAI
Period of Employment : Jan 14 to Jun 15
Title of Position : Electrical Supervisor.
Details of Project Handled:
1. Scope of Work: Construction of Switchgear Installations, Various size cable laying &
termination works, Three Unit of RO Plant Project, Al Yassat Island.
Client – DEWA
Main Contractor: UTICO, Ras Al Khaimah
2. Scope of work: Construction for 33kV 3C x 400Sqmm Cable Laying work at Dubai
Design District.
Consulant: PERSONS
Main Contractor: Centuar Electromechanical Co LLC, Dubai
3. Scope of Work: Installation of Switchgear & All Size Cable Laying & Termination Works
at Four Seasons Hotel, Abu Dhabi.
Consulant: AECOM
Main Contractor: HAYDON MEC
RESPONBILITIES:
Studying and analyzing the exact scope of work.
Preparation of Method Statement, Procedures and Bill of Quantity where required.
Preparation of ITP, MDR, MIR & RFI.
To execute works in site as per QA/QC Procedures and IFC Drawings.
Preparing for Power Cable drum schedule to choose the exact matching location to avoid
wastage.
4. Page 4444 of 7777
Installation of Various type Cable tray, trunking & basket.
Installation of DB, MDB, SMDB, MCCP.
Installation of Various type Motor, Transformer and Generator.
Erection and Installation of Line different Protection Panel and Metering Panels.
Installation of Optical Patch Panel.
Laying of various size, core control cables between the switchgear and Protection Panels
as per approved cable schedule.
Megger Testing.
Phase Sequence Testing.
Responsible for Monitoring and controlling all electrical activities and raising of Request
for Inspection (RFI) to Client once work gets complete.
Co-ordination with Pre-commissioning & Commissioning Team.
Manpower handling and work allocation daily basis.
Arranging machinery & Transportation on a daily basis.
Preparation of Progress Report (Daily, Weekly & Monthly) for Client as well as for
internal review.
YEMEN EXPERIENCE:
Organzation : HAWK INTERNATIONAL FINANCE & CONSTRUCTION CO LTD,
YEMEN(ONSHORE OIL & GAS SITE).
Period of Employment : Jul 12 to Nov 13
Title of Position : Electrical Supervisor
Details of Project Handled:
1. Scope of work: EPCC for 33MW Gas Power Plant at Kharir Block 10 Site, Yemen(Oil &
Gas Field).
Client: TOTAL E&P.
2. Scope of work: EPCC for 33kV Overhead Transmission Line Distribution System
Connection from Gas Power Plant to 45 Well Heads(63kms). Kharir Power Plant at
Kharir Black 10 Site, Oil & Gas field Yemen.
Client: TOTAL E&P.
RESPONBILITIES:
1. To execute works in site as per QA/QC Procedures and IFC Drawings.
2. Installation, Pre-commissioning & commissioning of BPU, CPU, CCU & Camp Substation.
3. Construction, Pre-commissioning & Commissioning of 33kV Overhead Distribution Line
from Power Plant to Well Head.
4. Supervision and Installation of various type 33kV Insulated Switchgear, Transformers,
Circuit Breaker & Surge Arrester.
5. Page 5555 of 7777
5. Supervision and Installation of DB, MDB, SMDB, MCCP, Switchgear Panels.
6. Supervision and Installation of Various type Vertical Switch & Horizontal Switch.
7. Various type cable laying & termination of LV, HV, MV under ground cables from
Terminal Pole to RMU, RMU to Transformer, Transformer to MDB and MDB to Well
Head Facilities.
8. Supervision and Installation of Switchgears.
9. Supervision and Insulation Resistance Testing.
10. Supervision for Phase Sequence Testing.
11. Manpower handling and work allocation daily basis.
12. Arranging machinery & Transportation on a daily basis.
13. Preparing and Mainting QA/QC documents.
14. Preparing final documentation for all activity works.
15. Co-ordination with Client, HO & Staff for smooth execution of project.
16. Preparation of Progress Report (Daily, Weekly & Monthly) for Client as well as for
internal review.
DUBAI EXPERIENCE:
Organzation : ENFRAS TECHNICAL SERVICES, DUBAI
Period of Employment : Jan 10 to Jun 12
Title of Position : Electrical Supervisor
Detailed of Project Handled:
1. Scope of work: Construction for 33kV Transmission Line Project from Al Hamra Power
Plant to Al Ghail Power Plant.
Client: RAKIA
Main Contractor: EMIRATES HEAVY ENGINEERING
2. Scope of work: Construction for 132kV Transmission Line Project from Fujairah to
Tayween, Fujairah to Khorffakan Lot – 1, 2 & 3.
Client: Transco
Main Contractor: INABENSA.
3. Scope of work: ERS(Emergency Restoration System) Bypass works at Ruwais for
220kV(Sila-Ruwais-Gayathy) & 400kV(Shuweihat – Mussafah, Madinat Zayed – Ruwais –
Sila).
Client: TRANSCO
Main Contractor: KEC INTERNATIONAL LTD
RESPONBILITIES:
• To execute works in site as per QA/QC Procedures and IFC Drawings.
6. Page 6666 of 7777
• Preparing for Conductor and Fiber optic Ground wire(OPGW) drum schedule to choose
the exact matching span for stringing to avoid wastage.
• Involved for Installation for Tower Assembly, Erection & Stringing activities.
• Installation for Horizontal & Vertical Switch.
• Preparation of sleeving and mid span joint reports.
• Responsible for Monitoring and controlling all electrical activities and raising of Request
for Inspection (RFI) to Client once work gets complete.
• Manpower handling and work allocation daily basis.
• Arranging machinery & Transportation on a daily basis.
• Preparation of daily progress and daily work allocation reports for H.O & Client review.
• Preparation of Progress Report (Daily, Weekly & Monthly) for Client as well as for
internal review.
• Attending weekly and monthly progress review meeting at site.
• Co-ordination with Pre-commissioning and Commissioning Team.
• Co-ordination with Clients and other sub–contractors.
DIPOLMA APPRENTICE TRAINING
Undergone Diploma Apprentice Training from March 2008 to February 2009. Apprenticeship
Training in the Protection / Communication /230/110/66/33kV Substation, Kayathar in
Tamil Nadu Electricity Board, here a wide knowledge is gained on the following work.
Substations all type relay testing (Numerical distance & Differential relay, over
current relay & over voltage relay & Frequency relay).
Installation, Testing and Commissioning Circuit Breakers.
Installation, Testing and Commissioning CT, PT, CVT, Lighting Arresters, IVT.
230/110kV Substation equipment cable scheduling and fault finding work.
Operation and Operation instruction of 230/110kV Grid Substation having two
bus bar systems.
INDIA EXPERIENCE
May 2006 to June 2007: V. Rama Chandran & Co (Approved M/W Cell & Overhead Lines
Contractor).
Worked as a Supervisor and gained knowledge in the field of:
Erection of 11/33kV Overhead line on concrete poles.
220/110kV Overhead line erection and stringing works.
Tracking and Fault rectification works in Overhead transmission line.
Transformer, CT, PT, Isolator, Breaker and Insulation works.
230/110kV Control panel board indication and control wiring.
EDUCATION DETAILS
Diploma in Electronics & Communication Engineering from Pasumpon
Nethaji Polytechnic College, State Board of Technical Education and Training
with 69% marks in the year 2006.
12th from Schaffter Hr Sec. School Tirunelveli, Tamilnadu with 73% marks in
the year 2002.
10th from M.K.N Hr Sec. School Subbammal Puram, Tamilnadu with 62% marks
in the year 1999.
7. Page 7777 of 7777
TECHNICAL SKILLS
1. Primavera P6
2. MS Project 2007, 2010 & 2016
3. Auto cad
4. MS Office
LANGUAGES
1. English
2. Tamil
3. Malayalam
COMMUNICATION/ ADDRESS DETAILS
Date of Birth: 06/04/1983
Age: 32 years
Nationality: Indian
Marital Status: Married
Communication /Permanent Address:
No:2/23, North Street
Kodian Kulam Post
Gangai Kondan Via
Tuticorin Dist Tuticorin Dist
Tamil Nadu Tamil Nadu
India – 6273532
PASSPORT DETAILS
Passport Details
Passport No. : G5999453
Place of Issue: Tiruchirappalli
Date of Issue : 20/11/2007
Date of Expiry: 19/11/2017