Resume UAE

CARRIER OBJECTIVE
❖ T o Work as Mechanical / Piping – Engineer or Supervisor
❖ 14 years of work experience in oil & gas, refinery and petrochemical industries OFF-SOHRE and
On-Shore facilities
QUALIFICATION
❖ H.S.C.( Higher Secondary School at College)
❖ 3 Years Diploma in Mechanical Engineering with Maharashtra State of Technical Education with
Vidyaalankar Polytechnic Wadala (E), Mumbai
 Fire prevention & fire fighting, Personal safety & social responsibility, Personal survival
techniques, Elementary first aid, Helicopter underwater escape training, Confined Space
Entry , H2S / SCBA Certify Training, PTW (permit to work ) signatory and Fire Response
❖ Computer literacy in MS- office Microsoft Excel, Word and Auto CAD 2/3D.
PROFESSIONAL EXPERIENCE:
❖ Currently working in TAKREER Ruwais Refinery Major Turn-Around 2016 Project Abu
Dhabi with Q-con (Qatar Engineering and Construction Company)12 Sep.2015 to Till date.
❖ To work with Global Professional Services Company in RLOC (Ras Laffan Oilfiens
Company ) part of Q-CHEM state of Qatar in the period of 12/08/2014 to 14/04/2015.
❖ To work with Ahmed Mansoor Al’Ali W.L.L. company in a BAPCO REFINERY state of
Bahrain period 04/03/2014 to 18/04/2014
❖ To work with Qatar Kentz W.L.L company in a OMV YAMEN &OFFSHORE HALUL Projects state
of Qatar period 19 / 05 /2013 to 08 / 09 /2013 .
❖ To work RASTANURA PLANT ( KSA) Jubail. With Gulf Consolidated Contractors, in the year of
period 05/ 04/ 2012 to 02/ 02/ 2013.
❖ To work ARAB - D RECYCALING PLAINT short term project with BLAC-CAT Engineering &
Construction Company. At State of Qatar period of 12 /10 /2011 to 27 /02 / 2012.
1
SANTOSH.P.PAWAR
Ambinka apartment 2nd
floor room no-204
Opp.Albertparking.Ulhasnagar-4Dist.-Thane.
Maharashtra. (INDIA).
Skype ID- : santoshpawar45
Contact no : 9860966882 /+91-251-2526472 Email
:santoshp767@gmail.com
santoshpawar377@yahoo.com Contact No - 9860966882
❖ To work RAS- GAS LNG PLANT short term project with Qatar Engineering & construction
company at State of Qatar in the year 12/10/2010 to 17/07/2011.
❖ To work RAS-GAS LNG PLANT short term project With Qatar Engineering & Construction
Company at State of Qatar in the year 07/03/2010 to 13/06/2010 .
❖ To work RAS-GAS LNG PLANT short term project with Qatar Engineering &Construction
Company at State of Qatar in the year 28/04/ 2008 to 07/11/2009 .
❖ QATAR FERTILIGER Company (QAFCO) short term project with Qatar Engineering &
Construction Company at State of Qatar in the year 23/08/2007 to 21/02/ 2008.
❖ KUWAIT CONTROL Company (KCC) Kuwait Electricity & Fresh Water Pipe Line Project in the
period 05 / 05 / 2006 to 23/05/2007 .
❖ JOB & RESPONSIBILITY:
 To carry out Engineering of mechanical construction work preventive, corrective maintenance and
shut-down maintenance activities of mechanical, piping and rotary equipment like as a Gas & Steam
turbine gas turbine and diesel engine turbo expender centrifugal & reciprocating compressor pump
and associate equipment refurbish and repair major overhauling, hot path baroscopic and laser
alignment. Mechanical construction work. structure steal & maintenance work shop fabrication of pipe
spool, support, pipe rack and platform fabrication and fit up as per drawing .Overhauling of valve like
Gate valve, Globe, Butterfly valve, angle valve, RV and NRV .
 Ensuring that the safety, Quality & Environment requirements of the project site are strictly followed.
 In depth knowledge process piping line, fuel gas, water pipe line & Operation & Maintenance work of
plant equipment like Piping fabrication, & erection, pressure Vessel, Column, Heat-Exchanger, Pump
alignment, compressor ,turbine ,Reactors, Valve, Boiler, Fin-Fan, Furnace, Hydro-Jetting, Chemical
Cleaning etc. maintenance work of equipment process plant .
 Following LT & T as per turn around and excavation project and Punch point
✓ Maintenance work and overhauling of Gas turbine, pump, compressor, fin – fan & gear box.
✓ Planning and execution of projects to ensure maximum productivity within optimum quality and in a
safe. piping layout, proficient of design standard ASME 31.1, 31.2, 31.3, and 31.4
✓ Plan and organize, including generation of programmed. Follow-up and optimum resource utilization,
Control and monitoring of departments man-hour expenditure including indirect hours, overtimes
and days off to workers.
✓ Plan daily and five weekly supervisory and manpower distribution Following (PTW) permit to work
procedure preparing all related paper for job completion.
✓ Capable of independently work and know of isometric, GA, and P&ID drawing and specification.
 During the project following all over SEFTY rules, drawing standard quality work code and
specification.
1.CLIENT -: TAKREER RUWAIS REFINERY MAJOR TURNAR0UND 2016(ABU-DHABI).
COMPANY-: QATAR ENGINEERING CONSTRUCTION COMPANY (ABU-DHABI).
DESINGNETION -: MECHANICAL UNIT INCHARGE.
 Major Turn-Around TAKREER- 2016 (Abu-Dhabi) prepared of 3 Unit of 1) Green Diesel.
2) Hydro Cracker. 3) Hydroskimer. T o carry out of all equipment wise and prapering as
per work pack ativity 17 Column,
2
2. CLIENT - : RAS LAFFAN OILFINS CO MPANY ( RLOC- Q-Chem) Major Turn-Around Project
COMPANY -: GLOBAL PROFESSENAL SERVICE COMPANY W.L.L.QATAR.
Designation – Mechanical Maintenance Coordinator
Major turn around project of RAS LAFFAN OILFINS COMPANY (QATAR) -15 Tank, 11 Tower,
21 Vessel, 650 Cut & Weld Jobs, and 54 Heat Exchanger Chemical cleaning hydro test and Box-Up
 Major turn around overhauling of CGC (CRACKED GAS COMPRESSOR) HP-LP-MPCompressor
 Preparing of JSA (job safety analysis), MSDS (material safety data sheet), Obtain Rescue Plan
And Q-Chem certify & certify sticker for entry inside of plant during work of turn around project
like Crane, Boom truck, Trailer, Forklift, Super Succer, Hand tool, electrical item and sealing belt,
Dishukle.
Equipment internal, External inspection of every equipment like CUI, MFL, MPI, UT, PT, RT,
Holiday test, Photographic of equipment accessories trey, support ring, clamp, Down comers,
distributor pipe, flange face, internal mechanical and final cleaning and final Box-Up procedure.
3.CLIENT - : BAPCO REFINERY (BAHRAIN ) Major Shut – Down and Maintenance Project
COMPANY - : AHMAD MANSOOR AL’ALI W.L.L. From 04 March to 18 April 2014
Designation – Mechanical Supervisor
Job & Responsibilities
 To carry out of following safety rule and regulation on site preparing all project activity.
Obtain permit preparing document make it all material as job location site. Maintenance and
overhauling of centrifugal compressor CLARCK 463B and DJ 50 packages of dresser CLARCK
bundle removing from the casing and replacement. Dismantling and assembling of service
head & diaphragms. Bearing inspection and rotor centering (thrust, journal, magnetic ). Oily
laby honey home laby, labyrinth seal assembling with protocol clearance.
To carry out Valve repairing and gland repacking , internal cleaning of Check valve , Butterfly
valve, Angle valve, Gate valve lapping and keep ready to final inspection and box up. As per
drawing of piping fabrication and modification erection pipe spool. Hydro testing, pneumatic
testing and following QC procedure like RT, UT and PT test as per Clint request.
4.CLIENT - : OMV – ( YEMEN BLOCK S2 ) Al UQLAH Central Processing Facility ( YEMEN ) & HALUL
To OFF SHORE PROJECT
COMPANY –: QATAR KENT’Z W.L.L. From 12 May to 05 Oct. 2013
Designation – Piping supervisor
Job & Responsibilities
 Following safety rule and regulation on site daily meeting project status timely manners to make
schedule for completing project. Preparation of piping spool piping materials,fitting and accessories
for project fabrication erection of pipe spool and fittings on site.
✓ Following (PTW) permit to work procedure preparing all related paper for job completion. Working
with isometric, GA, and P&ID drawing and specification making as a new revision for client
requirements.
✓ Site supervision and implementation of the job as per drawing and specification of the project
supervise of work shop activities and fabrication of piping spools and its support
✓ Inspect the pipe and piping materials as per specification. Preparation of welding procedure
✓ Fabricate of piping spool & tank piping spool bending procedure for outside of tank piping erection
✓ Especially work of defense type of materials like – Tanks daggles pipe, Rolls Royes pipe, CS, SS, Cast
iron, and Galvanizing.
✓ Making of piping material MTO and inspect of PUNCH LIST.
✓ Supervision of Fabrication, Erection, and Execution of Piping project
3
✓ Preparation of welding procedure specification conduce procedure qualification records.
✓ International Standard and Quality work
5. CLIENT - : SATROP PROJECT and RASTANURA Refinery Project (KSA) - April. 2012.
COMPANY - : GULF CONSOLIDETED CONTRACTOR CO. W.L.L. (KSA)
DESINGNATION - MECHANICAL SUPERVISOR
 Project Erection of Piping & Mechanical Construction work.
 To carry out maintenance and over hauling of Gas Turbine – MW Frame 6 GE make 17.5 MW Frame
5p GE make. 27 MW Frame. 6B make and frame 3 GE make – twin and single shaft. Removal and
replacement of turbine & generators rotors. Removal and replacement turbine stage buckets.
Compressor stator blades of turbine stage nozzle and shored segment. Equipped with taking
precision measurement of bearing and clearance of IGVs nozzle segment of turbine bucket lines T
pipes and inspection of the comportment
 Co-ordination with staff discussing about project activity make schedule for saving time and
manpower of Mechanical & Piping project.
✓ During the project following all over SEFTY rules drawing standard quality work code and
specification and following PTW procedure collect as per related document to do the job. Supervision
of Fabrication, Erection, and Execution of Piping project
✓ Preparing of materials and documents for the projects. Making and keeping records for the projects.
Study of Bill of materials for the project.
✓ Site supervision and implementation of the job as per drawing and specification of the project
supervise of work shop activities and fabrication of piping spools and its support
✓ Inspect the pipe and piping materials as per specification. Preparation of welding procedure
✓ Erection of piping job making absolutely as per require isometric, GA, and P&ID drawing and
specification.
✓ Installation works of piping, pipeline and static and -rotary equipment’s in oil, gas sector.
✓ Especially CS SS MS pipe fit up fabrication and arrangement Project Erection of Piping & Mechanical
Construction work.
✓ Co-ordination with staff discussing about project activity make schedule for saving time and
manpower of Mechanical & Piping project
✓ Maintenance work of Heat-Exchangers blinding as per blind location and open the head cover
removed tube bundle as per required capacity of tube bundle puller. Inspect of tube bundle and
cleaned inside & outside tube with Hydro-Jetting Gun and Flexi hose carry on shell test and tube test.
After that BOX-UP with new gasket.
.
6. ARAB - D RECYCALING PLANT (Qatar) - FEB. 2012
DESINGNATION - MECHANICAL SUPERVISOR
JOB & RESPONSIBILITY:
✓ Project Erection of Piping & Mechanical Construction work.
✓ Co-ordination with staff discussing about project activity make schedule for saving time and
manpower of Mechanical & Piping project.
✓ During the project following all over SEFTY rules drawing standard quality work code and
specification and following PTW procedure collect as per reelected document to do the job.
✓ Maintenance work of Column and blinding as per blind location dements pipe line, opening the Man
way removed Dimester Pad cleaning or replace as per instruction.
4
✓ Internal cleaning, removed Trey as per instruction. Cleaned weld joint with pneumatic tools keep ready
NDT inspection and reinstallation of new Trey again inspection Trey after finally BOX-UP the Man
way and De-Blinding alignment the line.
 Maintenance work of Furnace blinding as per blind location of Furnace area and removed pipe line
spool .removed heater bracket and inspect tiles plate, gas burner diesel burner gas burner heat tube
,radiant tube section tube crossover inlet coil out let cleaned internal Furnace. and refectory work
Alignment pipe spool, De-Blinding and BOX-UP
6. RAS —GAS LNG PLANT (Qatar) 2011
DESIGNATION - MECHANICAL SUPERVISOR
JOB & RESPONSIBILITIES:
✓ Tool Box talk about the hazard of the job and the plant.
✓ Preparation of the job and pre Shut-down activity
✓ Desiccation about the equipment TEG FLASH DRUM (Vessel) & REBOILER Heat exchanger
✓ Sifting material blind & Gasket to site and located equipment using mobile crane.
✓ Carry out inspection priority shut down preparing obtain the work permit from using authority
✓ Lotto system lock the solution box as per operation Lotto prosier
✓ Removed blind and installed blind & spade and torque after carryout man way opened for external
inspection.
✓ We provide all hoses ventilation vessel & Reboiler heat exchanger
✓ Obtain confined space certificate and arrange to carryout initial gasses to vessel & Reboiler heat
exchanger inspection.
✓ Installed material scaffolding, as per integrity recommendation and buffing to clean weld joint for
NDT inspection
✓ We carry out appeared inside the vessel & Reboiler heat exchanger remove material scaffolding,
lighting and all foraging material from inside the vessel
✓ Reboiler heat exchanger. and obtain Box up certificate vessel & Reboiler heat exchanger
✓ De-blinded and blinding location and final torturing and sign of job completion and return blind
and other material back to material group.
7. RAS —GAS LNG PLANT (Qatar) 2010
1. DESIGNATION - PIPING SUPERVISOR
JOB RESPONSIBILITIES:
✓ Tool box talk about the hazard of the Job And the Plant
✓ Preparation of the Job and Pre Shot Down activity
✓ Site supervision and implementation of the job as per drawing and specification of the project
supervise of work shop activities and fabrication of piping spools and its support Inspect the pipe
and piping materials as per specification. Preparation of welding procedure
✓ Erection of piping job making absolutely as per require isometric, GA, and P&ID drawing and
specification. Make ready what was the things material and equipment required on the site..
✓ Installation of 82" Sea water Pipe line spool length 10 meter and installation of ANODE inside the
pipe line as per plant to lay down area between both ANODE 3 meter distances.
✓ Installation of 82" Butterfly value in sea water line and removing the spool loop in 82" pipe line and
re-installation.
✓ Maintenance work of FIN-FAN – blinding as per blinding location open the all coolers tubes
adapter and removed washer and inspect the washer and adapter materials its spoil installed new
5
adapter ,washer cleaned tube check the hydro test of coolers tube and inspect leakage and finally
box up.
8. RAS-GAS LNG PLANT (Qatar) 2008
DESIGNATION - MECHANICAL SUPERVISOR
✓ Talks to tool box meeting about the hazard's
✓ Make it ready of job permit & preparing of all paper like (JSK.) job safety Analysis and isolation list
of line
✓ Handling the all Foreman, Charge hand, worker, Fitter and fabricator for distributing on job
location.
✓ Erecting of piping and mechanical work of the project
✓ Fabrication job of the piping project
✓ To work at Air Filter house and installation of air filter of the Gas TURBINE UNIT
✓ To work vessel, column and making ready to inspection other box ping to work as Blinding & De-
blinding work.
9. QAFCO- (QATAR FERTILISER COMPANY), 2007 Working With QATAR ENGINEERING &
CONSTRUCTION COMPANY) (Q- CON)
DESIGNATION - PIPING SUPERVISOR
JOB & RESPONSIBILITIES:
✓ Supervision of Fabrication, Erection, and Execution of Piping project
✓ Site supervision and implementation of the job as per drawing and specification of the project
supervise of work shop activities and fabrication of piping spools and its support
✓ Preparation of welding procedure specification conduce procedure qualification records
✓ Erection of piping job making absolutely
✓ Capable of independently work and know of isometric drawing and specification
✓ Installation works of piping , pipeline and static equipments in oil and gas sector
✓ Especially CS, SS, MS, Pipe fit up fabrication an arrangements
10. KUWAIT CONTROL CO. STATE OF KUWAIT MINISTRY OF LECTRICITY AND WATER FRESH
WATER PIPELINE — MEW 3375PROJECT.
DESIGNATION - PIPING SUPERVISOR
JOB RESPONSIBILITIES:
✓ Installation and replacement of magnetic flow meter. at different location water pipe line
✓ Supervision of Fabrication, Erection, and Execution of Piping project.
✓ Preparation of welding procedure specification conduce procedure qualification records.
✓ International Standard and Quality work
PERSONAL DETAILS:
NAME : Santosh Prabhakar Pawar
NATIONALITY : Indian
AGE : 33 Years
DATE OF BIRTH : 02/07/1978
GENDER : Male
6
MARITAL STATUS : Married
QUALIFICATION : HSC (DIPLOMA HOLDER)
PASSPORT NO. : F 7143062 (ECNR)
DATE OF ISSUE : 23/03/2006
DATE OF EXPIRY : 22/03/2016
LANGUAGES KNOWN : English, Arabic, Marathi and Hindi.
Place : Mumbai Date : 12/.05/.2015 SANTOSH PRABHAKAR PAWAR
7

Recomendados

DVenkatesh Rotating Equip cv 2016 por
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016D Venkatesh
744 visualizações7 slides
Planning Engineer CV por
Planning Engineer CVPlanning Engineer CV
Planning Engineer CVMohammed Shaker
4.3K visualizações2 slides
Nisanth April 2015 por
Nisanth April 2015Nisanth April 2015
Nisanth April 2015Nisanth K N
1.2K visualizações4 slides
Leo Doc (CV)A(Mechanical Supervisor) por
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
1.9K visualizações9 slides
Mechanical Engineer - Plumbing and Fire Fighting por
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingHazem Mahdy
9.5K visualizações4 slides
R. Prajapati CV for Process Engineer for Oil and Gas Website por
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteRameshchandra Prajapati
12K visualizações5 slides

Mais conteúdo relacionado

Mais procurados

CV-SEENI MOHAMED-2016 por
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016Seeni Mohamed A
767 visualizações4 slides
MEP ENGINEER por
MEP ENGINEER MEP ENGINEER
MEP ENGINEER robinjacob0101
3.5K visualizações5 slides
Piping Engineer CV por
Piping Engineer CVPiping Engineer CV
Piping Engineer CVOmar Al-Naimi
1.2K visualizações2 slides
MECHANICAL SUPERVISOR 007 por
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007REHAN MUMTAZ
1.8K visualizações3 slides
Resume_Lead Mechanical Engineer - Static Equipment and Package Units por
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
1.4K visualizações4 slides
CV-MEP-Ahmad Majdalawi por
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiAhmad Majdalawi
283 visualizações8 slides

Mais procurados(20)

CV-SEENI MOHAMED-2016 por Seeni Mohamed A
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
Seeni Mohamed A767 visualizações
MEP ENGINEER por robinjacob0101
MEP ENGINEER MEP ENGINEER
MEP ENGINEER
robinjacob01013.5K visualizações
Piping Engineer CV por Omar Al-Naimi
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
Omar Al-Naimi1.2K visualizações
MECHANICAL SUPERVISOR 007 por REHAN MUMTAZ
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
REHAN MUMTAZ1.8K visualizações
Resume_Lead Mechanical Engineer - Static Equipment and Package Units por Nirav Mistry
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Nirav Mistry1.4K visualizações
CV-MEP-Ahmad Majdalawi por Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
Ahmad Majdalawi283 visualizações
00 resume of site supervisor (Pipeline & welding) por Mohammad Khan
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
Mohammad Khan2.5K visualizações
CV ROBIN JACOB por robinjacob0101
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
robinjacob0101754 visualizações
Resume por Prasanth P
ResumeResume
Resume
Prasanth P905 visualizações
Lokman's Resume-Rotating Equipment por Lokman Ali P.Eng.
Lokman's Resume-Rotating EquipmentLokman's Resume-Rotating Equipment
Lokman's Resume-Rotating Equipment
Lokman Ali P.Eng.2.3K visualizações
Anas M H Mechanical Piping Engineer 2016 por Anas M H
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
Anas M H1K visualizações
kiran Planning sche engineer CV por kiran kumar Reddy
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
kiran kumar Reddy1K visualizações
Piping engineer cv por Muhammad Ali
Piping engineer cvPiping engineer cv
Piping engineer cv
Muhammad Ali209 visualizações
CV_VEERAKAMU.C_PIPING_ por VEERAKAMU C
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
VEERAKAMU C520 visualizações
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning por Mohamed Mustafa
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Mohamed Mustafa1K visualizações
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas por jaison varkey
Resume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & GasResume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
jaison varkey12.3K visualizações
Karthik Resume por KARTHIK NATARAJAN
Karthik Resume Karthik Resume
Karthik Resume
KARTHIK NATARAJAN992 visualizações
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (... por Rakesh Arora
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Rakesh Arora2.8K visualizações
Sathishkumar mechanical engineer - 2016 por sathish kumar
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
sathish kumar1.7K visualizações

Destaque

RESUME PIPING SUPERVISOR por
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORNOORUDDIN SHAIKH
24.7K visualizações4 slides
Resume - Electrical Engineer (MEP) 9+ Years Exp por
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
102.3K visualizações7 slides
Resume, April 2015 por
Resume, April 2015Resume, April 2015
Resume, April 2015Steven Thompson
156 visualizações2 slides
CV Thierry BEKAERT TP DAO por
CV Thierry BEKAERT TP DAOCV Thierry BEKAERT TP DAO
CV Thierry BEKAERT TP DAOBEKAERT Thierry
1.4K visualizações2 slides
1- C.V WORLD FINAL2 por
1- C.V WORLD FINAL21- C.V WORLD FINAL2
1- C.V WORLD FINAL2Reda Sheta
824 visualizações20 slides
1 Engr. Mohammad Faizal CV (1) - Copy por
1 Engr. Mohammad Faizal CV (1) - Copy1 Engr. Mohammad Faizal CV (1) - Copy
1 Engr. Mohammad Faizal CV (1) - CopyMohammad Faizal Molok
634 visualizações15 slides

Destaque(20)

RESUME PIPING SUPERVISOR por NOORUDDIN SHAIKH
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
NOORUDDIN SHAIKH24.7K visualizações
Resume - Electrical Engineer (MEP) 9+ Years Exp por Subhash +966535838322
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
Subhash +966535838322102.3K visualizações
Resume, April 2015 por Steven Thompson
Resume, April 2015Resume, April 2015
Resume, April 2015
Steven Thompson156 visualizações
CV Thierry BEKAERT TP DAO por BEKAERT Thierry
CV Thierry BEKAERT TP DAOCV Thierry BEKAERT TP DAO
CV Thierry BEKAERT TP DAO
BEKAERT Thierry1.4K visualizações
1- C.V WORLD FINAL2 por Reda Sheta
1- C.V WORLD FINAL21- C.V WORLD FINAL2
1- C.V WORLD FINAL2
Reda Sheta824 visualizações
1 Engr. Mohammad Faizal CV (1) - Copy por Mohammad Faizal Molok
1 Engr. Mohammad Faizal CV (1) - Copy1 Engr. Mohammad Faizal CV (1) - Copy
1 Engr. Mohammad Faizal CV (1) - Copy
Mohammad Faizal Molok634 visualizações
Curriculum vitae Pediatric Cardiac Intensivist por Hussain Mahmoud
Curriculum vitae Pediatric Cardiac IntensivistCurriculum vitae Pediatric Cardiac Intensivist
Curriculum vitae Pediatric Cardiac Intensivist
Hussain Mahmoud513 visualizações
mohamed fawzy cv 2712016 por Mohamed Fawzy
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
Mohamed Fawzy643 visualizações
mohamed fawzy cv 2712016 por Mohamed Fawzy
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
Mohamed Fawzy229 visualizações
CV 2016 Surian Tanoto por Surian Tanoto
CV 2016 Surian TanotoCV 2016 Surian Tanoto
CV 2016 Surian Tanoto
Surian Tanoto837 visualizações
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014 por KANNAIYAN VIJAYAKUMAR
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
KANNAIYAN VIJAYAKUMAR6.8K visualizações
Structural & Piping QC Inspector CV - PDF por Chandra Battu
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
Chandra Battu12.4K visualizações
fresher of instrumentation engineer por smasalih
fresher of instrumentation engineerfresher of instrumentation engineer
fresher of instrumentation engineer
smasalih32.8K visualizações
Resume offshore field engineer por andi dipayadnya
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
andi dipayadnya11.1K visualizações
My CV, Shahar Ali tuhin por Mohammed ali
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
Mohammed ali497 visualizações
Top 8 piping engineer resume samples por gedihutes
Top 8 piping engineer resume samplesTop 8 piping engineer resume samples
Top 8 piping engineer resume samples
gedihutes11.7K visualizações
Resume Nazrul Mazdi Mokhtar - Piping Designer por Nazrul Mokhtar
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
Nazrul Mokhtar10.8K visualizações
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar) por MOHAMMED ASLAM SHAREEF
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
MOHAMMED ASLAM SHAREEF3.7K visualizações
Instrumentation Engineer. por guest3235c24
Instrumentation Engineer.Instrumentation Engineer.
Instrumentation Engineer.
guest3235c2431.4K visualizações
Curriculum Vitae por Dr-Tamer Dawod
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Dr-Tamer Dawod1.2K visualizações

Similar a Resume UAE

abhinav rawat resume por
abhinav rawat resumeabhinav rawat resume
abhinav rawat resumeAbhinav Rawat
67 visualizações2 slides
GOBINATH SENIOR PROJECT ENGG MANAGER_ por
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_gobinath gobinath
1K visualizações16 slides
CV of broosto -7-2016 por
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016Broosto George
249 visualizações4 slides
RESUME 2015 - Copy por
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copysalimon hassan
187 visualizações9 slides
Trevor Kemp CV - January 2015 por
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
981 visualizações7 slides
Nadeem kumar cv por
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cvNadeem Kumar
58 visualizações4 slides

Similar a Resume UAE(20)

abhinav rawat resume por Abhinav Rawat
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
Abhinav Rawat67 visualizações
GOBINATH SENIOR PROJECT ENGG MANAGER_ por gobinath gobinath
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
gobinath gobinath1K visualizações
CV of broosto -7-2016 por Broosto George
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
Broosto George249 visualizações
RESUME 2015 - Copy por salimon hassan
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
salimon hassan187 visualizações
Trevor Kemp CV - January 2015 por TREVOR KEMP
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
TREVOR KEMP981 visualizações
Nadeem kumar cv por Nadeem Kumar
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
Nadeem Kumar58 visualizações
Resume_ Arunkumar por Arunkumar M A
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
Arunkumar M A115 visualizações
Siddharth_resume_Engg. por siddharth singh
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
siddharth singh51 visualizações
CV. Mechincal Engineer por Ahmad Hassan
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
Ahmad Hassan95 visualizações
KANNAN RESUME por KANNAN RAMAIYAN
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
KANNAN RAMAIYAN84 visualizações
RashidFaruqi_Resume_Current por Rashid Faruqi
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
Rashid Faruqi399 visualizações
Rengaraj n c vdone por Assignment Help
Rengaraj  n c vdoneRengaraj  n c vdone
Rengaraj n c vdone
Assignment Help202 visualizações
_RESUME HITESH P. DESAI 2015 (2) por hitesh desai
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
hitesh desai767 visualizações
CV - Prasath.V.R por Prasath ravanan
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
Prasath ravanan250 visualizações
CV of Ramprasad-converted-compressed.pdf por RAMPRASADBALLAV1
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
RAMPRASADBALLAV1146 visualizações
NACE CP LEVEL II ENGINEER por RAMA SAMY
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
RAMA SAMY482 visualizações

Resume UAE

  • 1. CARRIER OBJECTIVE ❖ T o Work as Mechanical / Piping – Engineer or Supervisor ❖ 14 years of work experience in oil & gas, refinery and petrochemical industries OFF-SOHRE and On-Shore facilities QUALIFICATION ❖ H.S.C.( Higher Secondary School at College) ❖ 3 Years Diploma in Mechanical Engineering with Maharashtra State of Technical Education with Vidyaalankar Polytechnic Wadala (E), Mumbai  Fire prevention & fire fighting, Personal safety & social responsibility, Personal survival techniques, Elementary first aid, Helicopter underwater escape training, Confined Space Entry , H2S / SCBA Certify Training, PTW (permit to work ) signatory and Fire Response ❖ Computer literacy in MS- office Microsoft Excel, Word and Auto CAD 2/3D. PROFESSIONAL EXPERIENCE: ❖ Currently working in TAKREER Ruwais Refinery Major Turn-Around 2016 Project Abu Dhabi with Q-con (Qatar Engineering and Construction Company)12 Sep.2015 to Till date. ❖ To work with Global Professional Services Company in RLOC (Ras Laffan Oilfiens Company ) part of Q-CHEM state of Qatar in the period of 12/08/2014 to 14/04/2015. ❖ To work with Ahmed Mansoor Al’Ali W.L.L. company in a BAPCO REFINERY state of Bahrain period 04/03/2014 to 18/04/2014 ❖ To work with Qatar Kentz W.L.L company in a OMV YAMEN &OFFSHORE HALUL Projects state of Qatar period 19 / 05 /2013 to 08 / 09 /2013 . ❖ To work RASTANURA PLANT ( KSA) Jubail. With Gulf Consolidated Contractors, in the year of period 05/ 04/ 2012 to 02/ 02/ 2013. ❖ To work ARAB - D RECYCALING PLAINT short term project with BLAC-CAT Engineering & Construction Company. At State of Qatar period of 12 /10 /2011 to 27 /02 / 2012. 1 SANTOSH.P.PAWAR Ambinka apartment 2nd floor room no-204 Opp.Albertparking.Ulhasnagar-4Dist.-Thane. Maharashtra. (INDIA). Skype ID- : santoshpawar45 Contact no : 9860966882 /+91-251-2526472 Email :santoshp767@gmail.com santoshpawar377@yahoo.com Contact No - 9860966882
  • 2. ❖ To work RAS- GAS LNG PLANT short term project with Qatar Engineering & construction company at State of Qatar in the year 12/10/2010 to 17/07/2011. ❖ To work RAS-GAS LNG PLANT short term project With Qatar Engineering & Construction Company at State of Qatar in the year 07/03/2010 to 13/06/2010 . ❖ To work RAS-GAS LNG PLANT short term project with Qatar Engineering &Construction Company at State of Qatar in the year 28/04/ 2008 to 07/11/2009 . ❖ QATAR FERTILIGER Company (QAFCO) short term project with Qatar Engineering & Construction Company at State of Qatar in the year 23/08/2007 to 21/02/ 2008. ❖ KUWAIT CONTROL Company (KCC) Kuwait Electricity & Fresh Water Pipe Line Project in the period 05 / 05 / 2006 to 23/05/2007 . ❖ JOB & RESPONSIBILITY:  To carry out Engineering of mechanical construction work preventive, corrective maintenance and shut-down maintenance activities of mechanical, piping and rotary equipment like as a Gas & Steam turbine gas turbine and diesel engine turbo expender centrifugal & reciprocating compressor pump and associate equipment refurbish and repair major overhauling, hot path baroscopic and laser alignment. Mechanical construction work. structure steal & maintenance work shop fabrication of pipe spool, support, pipe rack and platform fabrication and fit up as per drawing .Overhauling of valve like Gate valve, Globe, Butterfly valve, angle valve, RV and NRV .  Ensuring that the safety, Quality & Environment requirements of the project site are strictly followed.  In depth knowledge process piping line, fuel gas, water pipe line & Operation & Maintenance work of plant equipment like Piping fabrication, & erection, pressure Vessel, Column, Heat-Exchanger, Pump alignment, compressor ,turbine ,Reactors, Valve, Boiler, Fin-Fan, Furnace, Hydro-Jetting, Chemical Cleaning etc. maintenance work of equipment process plant .  Following LT & T as per turn around and excavation project and Punch point ✓ Maintenance work and overhauling of Gas turbine, pump, compressor, fin – fan & gear box. ✓ Planning and execution of projects to ensure maximum productivity within optimum quality and in a safe. piping layout, proficient of design standard ASME 31.1, 31.2, 31.3, and 31.4 ✓ Plan and organize, including generation of programmed. Follow-up and optimum resource utilization, Control and monitoring of departments man-hour expenditure including indirect hours, overtimes and days off to workers. ✓ Plan daily and five weekly supervisory and manpower distribution Following (PTW) permit to work procedure preparing all related paper for job completion. ✓ Capable of independently work and know of isometric, GA, and P&ID drawing and specification.  During the project following all over SEFTY rules, drawing standard quality work code and specification. 1.CLIENT -: TAKREER RUWAIS REFINERY MAJOR TURNAR0UND 2016(ABU-DHABI). COMPANY-: QATAR ENGINEERING CONSTRUCTION COMPANY (ABU-DHABI). DESINGNETION -: MECHANICAL UNIT INCHARGE.  Major Turn-Around TAKREER- 2016 (Abu-Dhabi) prepared of 3 Unit of 1) Green Diesel. 2) Hydro Cracker. 3) Hydroskimer. T o carry out of all equipment wise and prapering as per work pack ativity 17 Column, 2
  • 3. 2. CLIENT - : RAS LAFFAN OILFINS CO MPANY ( RLOC- Q-Chem) Major Turn-Around Project COMPANY -: GLOBAL PROFESSENAL SERVICE COMPANY W.L.L.QATAR. Designation – Mechanical Maintenance Coordinator Major turn around project of RAS LAFFAN OILFINS COMPANY (QATAR) -15 Tank, 11 Tower, 21 Vessel, 650 Cut & Weld Jobs, and 54 Heat Exchanger Chemical cleaning hydro test and Box-Up  Major turn around overhauling of CGC (CRACKED GAS COMPRESSOR) HP-LP-MPCompressor  Preparing of JSA (job safety analysis), MSDS (material safety data sheet), Obtain Rescue Plan And Q-Chem certify & certify sticker for entry inside of plant during work of turn around project like Crane, Boom truck, Trailer, Forklift, Super Succer, Hand tool, electrical item and sealing belt, Dishukle. Equipment internal, External inspection of every equipment like CUI, MFL, MPI, UT, PT, RT, Holiday test, Photographic of equipment accessories trey, support ring, clamp, Down comers, distributor pipe, flange face, internal mechanical and final cleaning and final Box-Up procedure. 3.CLIENT - : BAPCO REFINERY (BAHRAIN ) Major Shut – Down and Maintenance Project COMPANY - : AHMAD MANSOOR AL’ALI W.L.L. From 04 March to 18 April 2014 Designation – Mechanical Supervisor Job & Responsibilities  To carry out of following safety rule and regulation on site preparing all project activity. Obtain permit preparing document make it all material as job location site. Maintenance and overhauling of centrifugal compressor CLARCK 463B and DJ 50 packages of dresser CLARCK bundle removing from the casing and replacement. Dismantling and assembling of service head & diaphragms. Bearing inspection and rotor centering (thrust, journal, magnetic ). Oily laby honey home laby, labyrinth seal assembling with protocol clearance. To carry out Valve repairing and gland repacking , internal cleaning of Check valve , Butterfly valve, Angle valve, Gate valve lapping and keep ready to final inspection and box up. As per drawing of piping fabrication and modification erection pipe spool. Hydro testing, pneumatic testing and following QC procedure like RT, UT and PT test as per Clint request. 4.CLIENT - : OMV – ( YEMEN BLOCK S2 ) Al UQLAH Central Processing Facility ( YEMEN ) & HALUL To OFF SHORE PROJECT COMPANY –: QATAR KENT’Z W.L.L. From 12 May to 05 Oct. 2013 Designation – Piping supervisor Job & Responsibilities  Following safety rule and regulation on site daily meeting project status timely manners to make schedule for completing project. Preparation of piping spool piping materials,fitting and accessories for project fabrication erection of pipe spool and fittings on site. ✓ Following (PTW) permit to work procedure preparing all related paper for job completion. Working with isometric, GA, and P&ID drawing and specification making as a new revision for client requirements. ✓ Site supervision and implementation of the job as per drawing and specification of the project supervise of work shop activities and fabrication of piping spools and its support ✓ Inspect the pipe and piping materials as per specification. Preparation of welding procedure ✓ Fabricate of piping spool & tank piping spool bending procedure for outside of tank piping erection ✓ Especially work of defense type of materials like – Tanks daggles pipe, Rolls Royes pipe, CS, SS, Cast iron, and Galvanizing. ✓ Making of piping material MTO and inspect of PUNCH LIST. ✓ Supervision of Fabrication, Erection, and Execution of Piping project 3
  • 4. ✓ Preparation of welding procedure specification conduce procedure qualification records. ✓ International Standard and Quality work 5. CLIENT - : SATROP PROJECT and RASTANURA Refinery Project (KSA) - April. 2012. COMPANY - : GULF CONSOLIDETED CONTRACTOR CO. W.L.L. (KSA) DESINGNATION - MECHANICAL SUPERVISOR  Project Erection of Piping & Mechanical Construction work.  To carry out maintenance and over hauling of Gas Turbine – MW Frame 6 GE make 17.5 MW Frame 5p GE make. 27 MW Frame. 6B make and frame 3 GE make – twin and single shaft. Removal and replacement of turbine & generators rotors. Removal and replacement turbine stage buckets. Compressor stator blades of turbine stage nozzle and shored segment. Equipped with taking precision measurement of bearing and clearance of IGVs nozzle segment of turbine bucket lines T pipes and inspection of the comportment  Co-ordination with staff discussing about project activity make schedule for saving time and manpower of Mechanical & Piping project. ✓ During the project following all over SEFTY rules drawing standard quality work code and specification and following PTW procedure collect as per related document to do the job. Supervision of Fabrication, Erection, and Execution of Piping project ✓ Preparing of materials and documents for the projects. Making and keeping records for the projects. Study of Bill of materials for the project. ✓ Site supervision and implementation of the job as per drawing and specification of the project supervise of work shop activities and fabrication of piping spools and its support ✓ Inspect the pipe and piping materials as per specification. Preparation of welding procedure ✓ Erection of piping job making absolutely as per require isometric, GA, and P&ID drawing and specification. ✓ Installation works of piping, pipeline and static and -rotary equipment’s in oil, gas sector. ✓ Especially CS SS MS pipe fit up fabrication and arrangement Project Erection of Piping & Mechanical Construction work. ✓ Co-ordination with staff discussing about project activity make schedule for saving time and manpower of Mechanical & Piping project ✓ Maintenance work of Heat-Exchangers blinding as per blind location and open the head cover removed tube bundle as per required capacity of tube bundle puller. Inspect of tube bundle and cleaned inside & outside tube with Hydro-Jetting Gun and Flexi hose carry on shell test and tube test. After that BOX-UP with new gasket. . 6. ARAB - D RECYCALING PLANT (Qatar) - FEB. 2012 DESINGNATION - MECHANICAL SUPERVISOR JOB & RESPONSIBILITY: ✓ Project Erection of Piping & Mechanical Construction work. ✓ Co-ordination with staff discussing about project activity make schedule for saving time and manpower of Mechanical & Piping project. ✓ During the project following all over SEFTY rules drawing standard quality work code and specification and following PTW procedure collect as per reelected document to do the job. ✓ Maintenance work of Column and blinding as per blind location dements pipe line, opening the Man way removed Dimester Pad cleaning or replace as per instruction. 4
  • 5. ✓ Internal cleaning, removed Trey as per instruction. Cleaned weld joint with pneumatic tools keep ready NDT inspection and reinstallation of new Trey again inspection Trey after finally BOX-UP the Man way and De-Blinding alignment the line.  Maintenance work of Furnace blinding as per blind location of Furnace area and removed pipe line spool .removed heater bracket and inspect tiles plate, gas burner diesel burner gas burner heat tube ,radiant tube section tube crossover inlet coil out let cleaned internal Furnace. and refectory work Alignment pipe spool, De-Blinding and BOX-UP 6. RAS —GAS LNG PLANT (Qatar) 2011 DESIGNATION - MECHANICAL SUPERVISOR JOB & RESPONSIBILITIES: ✓ Tool Box talk about the hazard of the job and the plant. ✓ Preparation of the job and pre Shut-down activity ✓ Desiccation about the equipment TEG FLASH DRUM (Vessel) & REBOILER Heat exchanger ✓ Sifting material blind & Gasket to site and located equipment using mobile crane. ✓ Carry out inspection priority shut down preparing obtain the work permit from using authority ✓ Lotto system lock the solution box as per operation Lotto prosier ✓ Removed blind and installed blind & spade and torque after carryout man way opened for external inspection. ✓ We provide all hoses ventilation vessel & Reboiler heat exchanger ✓ Obtain confined space certificate and arrange to carryout initial gasses to vessel & Reboiler heat exchanger inspection. ✓ Installed material scaffolding, as per integrity recommendation and buffing to clean weld joint for NDT inspection ✓ We carry out appeared inside the vessel & Reboiler heat exchanger remove material scaffolding, lighting and all foraging material from inside the vessel ✓ Reboiler heat exchanger. and obtain Box up certificate vessel & Reboiler heat exchanger ✓ De-blinded and blinding location and final torturing and sign of job completion and return blind and other material back to material group. 7. RAS —GAS LNG PLANT (Qatar) 2010 1. DESIGNATION - PIPING SUPERVISOR JOB RESPONSIBILITIES: ✓ Tool box talk about the hazard of the Job And the Plant ✓ Preparation of the Job and Pre Shot Down activity ✓ Site supervision and implementation of the job as per drawing and specification of the project supervise of work shop activities and fabrication of piping spools and its support Inspect the pipe and piping materials as per specification. Preparation of welding procedure ✓ Erection of piping job making absolutely as per require isometric, GA, and P&ID drawing and specification. Make ready what was the things material and equipment required on the site.. ✓ Installation of 82" Sea water Pipe line spool length 10 meter and installation of ANODE inside the pipe line as per plant to lay down area between both ANODE 3 meter distances. ✓ Installation of 82" Butterfly value in sea water line and removing the spool loop in 82" pipe line and re-installation. ✓ Maintenance work of FIN-FAN – blinding as per blinding location open the all coolers tubes adapter and removed washer and inspect the washer and adapter materials its spoil installed new 5
  • 6. adapter ,washer cleaned tube check the hydro test of coolers tube and inspect leakage and finally box up. 8. RAS-GAS LNG PLANT (Qatar) 2008 DESIGNATION - MECHANICAL SUPERVISOR ✓ Talks to tool box meeting about the hazard's ✓ Make it ready of job permit & preparing of all paper like (JSK.) job safety Analysis and isolation list of line ✓ Handling the all Foreman, Charge hand, worker, Fitter and fabricator for distributing on job location. ✓ Erecting of piping and mechanical work of the project ✓ Fabrication job of the piping project ✓ To work at Air Filter house and installation of air filter of the Gas TURBINE UNIT ✓ To work vessel, column and making ready to inspection other box ping to work as Blinding & De- blinding work. 9. QAFCO- (QATAR FERTILISER COMPANY), 2007 Working With QATAR ENGINEERING & CONSTRUCTION COMPANY) (Q- CON) DESIGNATION - PIPING SUPERVISOR JOB & RESPONSIBILITIES: ✓ Supervision of Fabrication, Erection, and Execution of Piping project ✓ Site supervision and implementation of the job as per drawing and specification of the project supervise of work shop activities and fabrication of piping spools and its support ✓ Preparation of welding procedure specification conduce procedure qualification records ✓ Erection of piping job making absolutely ✓ Capable of independently work and know of isometric drawing and specification ✓ Installation works of piping , pipeline and static equipments in oil and gas sector ✓ Especially CS, SS, MS, Pipe fit up fabrication an arrangements 10. KUWAIT CONTROL CO. STATE OF KUWAIT MINISTRY OF LECTRICITY AND WATER FRESH WATER PIPELINE — MEW 3375PROJECT. DESIGNATION - PIPING SUPERVISOR JOB RESPONSIBILITIES: ✓ Installation and replacement of magnetic flow meter. at different location water pipe line ✓ Supervision of Fabrication, Erection, and Execution of Piping project. ✓ Preparation of welding procedure specification conduce procedure qualification records. ✓ International Standard and Quality work PERSONAL DETAILS: NAME : Santosh Prabhakar Pawar NATIONALITY : Indian AGE : 33 Years DATE OF BIRTH : 02/07/1978 GENDER : Male 6
  • 7. MARITAL STATUS : Married QUALIFICATION : HSC (DIPLOMA HOLDER) PASSPORT NO. : F 7143062 (ECNR) DATE OF ISSUE : 23/03/2006 DATE OF EXPIRY : 22/03/2016 LANGUAGES KNOWN : English, Arabic, Marathi and Hindi. Place : Mumbai Date : 12/.05/.2015 SANTOSH PRABHAKAR PAWAR 7