1. CARRIER OBJECTIVE
❖ T o Work as Mechanical / Piping – Engineer or Supervisor
❖ 14 years of work experience in oil & gas, refinery and petrochemical industries OFF-SOHRE and
On-Shore facilities
QUALIFICATION
❖ H.S.C.( Higher Secondary School at College)
❖ 3 Years Diploma in Mechanical Engineering with Maharashtra State of Technical Education with
Vidyaalankar Polytechnic Wadala (E), Mumbai
Fire prevention & fire fighting, Personal safety & social responsibility, Personal survival
techniques, Elementary first aid, Helicopter underwater escape training, Confined Space
Entry , H2S / SCBA Certify Training, PTW (permit to work ) signatory and Fire Response
❖ Computer literacy in MS- office Microsoft Excel, Word and Auto CAD 2/3D.
PROFESSIONAL EXPERIENCE:
❖ Currently working in TAKREER Ruwais Refinery Major Turn-Around 2016 Project Abu
Dhabi with Q-con (Qatar Engineering and Construction Company)12 Sep.2015 to Till date.
❖ To work with Global Professional Services Company in RLOC (Ras Laffan Oilfiens
Company ) part of Q-CHEM state of Qatar in the period of 12/08/2014 to 14/04/2015.
❖ To work with Ahmed Mansoor Al’Ali W.L.L. company in a BAPCO REFINERY state of
Bahrain period 04/03/2014 to 18/04/2014
❖ To work with Qatar Kentz W.L.L company in a OMV YAMEN &OFFSHORE HALUL Projects state
of Qatar period 19 / 05 /2013 to 08 / 09 /2013 .
❖ To work RASTANURA PLANT ( KSA) Jubail. With Gulf Consolidated Contractors, in the year of
period 05/ 04/ 2012 to 02/ 02/ 2013.
❖ To work ARAB - D RECYCALING PLAINT short term project with BLAC-CAT Engineering &
Construction Company. At State of Qatar period of 12 /10 /2011 to 27 /02 / 2012.
1
SANTOSH.P.PAWAR
Ambinka apartment 2nd
floor room no-204
Opp.Albertparking.Ulhasnagar-4Dist.-Thane.
Maharashtra. (INDIA).
Skype ID- : santoshpawar45
Contact no : 9860966882 /+91-251-2526472 Email
:santoshp767@gmail.com
santoshpawar377@yahoo.com Contact No - 9860966882
2. ❖ To work RAS- GAS LNG PLANT short term project with Qatar Engineering & construction
company at State of Qatar in the year 12/10/2010 to 17/07/2011.
❖ To work RAS-GAS LNG PLANT short term project With Qatar Engineering & Construction
Company at State of Qatar in the year 07/03/2010 to 13/06/2010 .
❖ To work RAS-GAS LNG PLANT short term project with Qatar Engineering &Construction
Company at State of Qatar in the year 28/04/ 2008 to 07/11/2009 .
❖ QATAR FERTILIGER Company (QAFCO) short term project with Qatar Engineering &
Construction Company at State of Qatar in the year 23/08/2007 to 21/02/ 2008.
❖ KUWAIT CONTROL Company (KCC) Kuwait Electricity & Fresh Water Pipe Line Project in the
period 05 / 05 / 2006 to 23/05/2007 .
❖ JOB & RESPONSIBILITY:
To carry out Engineering of mechanical construction work preventive, corrective maintenance and
shut-down maintenance activities of mechanical, piping and rotary equipment like as a Gas & Steam
turbine gas turbine and diesel engine turbo expender centrifugal & reciprocating compressor pump
and associate equipment refurbish and repair major overhauling, hot path baroscopic and laser
alignment. Mechanical construction work. structure steal & maintenance work shop fabrication of pipe
spool, support, pipe rack and platform fabrication and fit up as per drawing .Overhauling of valve like
Gate valve, Globe, Butterfly valve, angle valve, RV and NRV .
Ensuring that the safety, Quality & Environment requirements of the project site are strictly followed.
In depth knowledge process piping line, fuel gas, water pipe line & Operation & Maintenance work of
plant equipment like Piping fabrication, & erection, pressure Vessel, Column, Heat-Exchanger, Pump
alignment, compressor ,turbine ,Reactors, Valve, Boiler, Fin-Fan, Furnace, Hydro-Jetting, Chemical
Cleaning etc. maintenance work of equipment process plant .
Following LT & T as per turn around and excavation project and Punch point
✓ Maintenance work and overhauling of Gas turbine, pump, compressor, fin – fan & gear box.
✓ Planning and execution of projects to ensure maximum productivity within optimum quality and in a
safe. piping layout, proficient of design standard ASME 31.1, 31.2, 31.3, and 31.4
✓ Plan and organize, including generation of programmed. Follow-up and optimum resource utilization,
Control and monitoring of departments man-hour expenditure including indirect hours, overtimes
and days off to workers.
✓ Plan daily and five weekly supervisory and manpower distribution Following (PTW) permit to work
procedure preparing all related paper for job completion.
✓ Capable of independently work and know of isometric, GA, and P&ID drawing and specification.
During the project following all over SEFTY rules, drawing standard quality work code and
specification.
1.CLIENT -: TAKREER RUWAIS REFINERY MAJOR TURNAR0UND 2016(ABU-DHABI).
COMPANY-: QATAR ENGINEERING CONSTRUCTION COMPANY (ABU-DHABI).
DESINGNETION -: MECHANICAL UNIT INCHARGE.
Major Turn-Around TAKREER- 2016 (Abu-Dhabi) prepared of 3 Unit of 1) Green Diesel.
2) Hydro Cracker. 3) Hydroskimer. T o carry out of all equipment wise and prapering as
per work pack ativity 17 Column,
2
3. 2. CLIENT - : RAS LAFFAN OILFINS CO MPANY ( RLOC- Q-Chem) Major Turn-Around Project
COMPANY -: GLOBAL PROFESSENAL SERVICE COMPANY W.L.L.QATAR.
Designation – Mechanical Maintenance Coordinator
Major turn around project of RAS LAFFAN OILFINS COMPANY (QATAR) -15 Tank, 11 Tower,
21 Vessel, 650 Cut & Weld Jobs, and 54 Heat Exchanger Chemical cleaning hydro test and Box-Up
Major turn around overhauling of CGC (CRACKED GAS COMPRESSOR) HP-LP-MPCompressor
Preparing of JSA (job safety analysis), MSDS (material safety data sheet), Obtain Rescue Plan
And Q-Chem certify & certify sticker for entry inside of plant during work of turn around project
like Crane, Boom truck, Trailer, Forklift, Super Succer, Hand tool, electrical item and sealing belt,
Dishukle.
Equipment internal, External inspection of every equipment like CUI, MFL, MPI, UT, PT, RT,
Holiday test, Photographic of equipment accessories trey, support ring, clamp, Down comers,
distributor pipe, flange face, internal mechanical and final cleaning and final Box-Up procedure.
3.CLIENT - : BAPCO REFINERY (BAHRAIN ) Major Shut – Down and Maintenance Project
COMPANY - : AHMAD MANSOOR AL’ALI W.L.L. From 04 March to 18 April 2014
Designation – Mechanical Supervisor
Job & Responsibilities
To carry out of following safety rule and regulation on site preparing all project activity.
Obtain permit preparing document make it all material as job location site. Maintenance and
overhauling of centrifugal compressor CLARCK 463B and DJ 50 packages of dresser CLARCK
bundle removing from the casing and replacement. Dismantling and assembling of service
head & diaphragms. Bearing inspection and rotor centering (thrust, journal, magnetic ). Oily
laby honey home laby, labyrinth seal assembling with protocol clearance.
To carry out Valve repairing and gland repacking , internal cleaning of Check valve , Butterfly
valve, Angle valve, Gate valve lapping and keep ready to final inspection and box up. As per
drawing of piping fabrication and modification erection pipe spool. Hydro testing, pneumatic
testing and following QC procedure like RT, UT and PT test as per Clint request.
4.CLIENT - : OMV – ( YEMEN BLOCK S2 ) Al UQLAH Central Processing Facility ( YEMEN ) & HALUL
To OFF SHORE PROJECT
COMPANY –: QATAR KENT’Z W.L.L. From 12 May to 05 Oct. 2013
Designation – Piping supervisor
Job & Responsibilities
Following safety rule and regulation on site daily meeting project status timely manners to make
schedule for completing project. Preparation of piping spool piping materials,fitting and accessories
for project fabrication erection of pipe spool and fittings on site.
✓ Following (PTW) permit to work procedure preparing all related paper for job completion. Working
with isometric, GA, and P&ID drawing and specification making as a new revision for client
requirements.
✓ Site supervision and implementation of the job as per drawing and specification of the project
supervise of work shop activities and fabrication of piping spools and its support
✓ Inspect the pipe and piping materials as per specification. Preparation of welding procedure
✓ Fabricate of piping spool & tank piping spool bending procedure for outside of tank piping erection
✓ Especially work of defense type of materials like – Tanks daggles pipe, Rolls Royes pipe, CS, SS, Cast
iron, and Galvanizing.
✓ Making of piping material MTO and inspect of PUNCH LIST.
✓ Supervision of Fabrication, Erection, and Execution of Piping project
3
4. ✓ Preparation of welding procedure specification conduce procedure qualification records.
✓ International Standard and Quality work
5. CLIENT - : SATROP PROJECT and RASTANURA Refinery Project (KSA) - April. 2012.
COMPANY - : GULF CONSOLIDETED CONTRACTOR CO. W.L.L. (KSA)
DESINGNATION - MECHANICAL SUPERVISOR
Project Erection of Piping & Mechanical Construction work.
To carry out maintenance and over hauling of Gas Turbine – MW Frame 6 GE make 17.5 MW Frame
5p GE make. 27 MW Frame. 6B make and frame 3 GE make – twin and single shaft. Removal and
replacement of turbine & generators rotors. Removal and replacement turbine stage buckets.
Compressor stator blades of turbine stage nozzle and shored segment. Equipped with taking
precision measurement of bearing and clearance of IGVs nozzle segment of turbine bucket lines T
pipes and inspection of the comportment
Co-ordination with staff discussing about project activity make schedule for saving time and
manpower of Mechanical & Piping project.
✓ During the project following all over SEFTY rules drawing standard quality work code and
specification and following PTW procedure collect as per related document to do the job. Supervision
of Fabrication, Erection, and Execution of Piping project
✓ Preparing of materials and documents for the projects. Making and keeping records for the projects.
Study of Bill of materials for the project.
✓ Site supervision and implementation of the job as per drawing and specification of the project
supervise of work shop activities and fabrication of piping spools and its support
✓ Inspect the pipe and piping materials as per specification. Preparation of welding procedure
✓ Erection of piping job making absolutely as per require isometric, GA, and P&ID drawing and
specification.
✓ Installation works of piping, pipeline and static and -rotary equipment’s in oil, gas sector.
✓ Especially CS SS MS pipe fit up fabrication and arrangement Project Erection of Piping & Mechanical
Construction work.
✓ Co-ordination with staff discussing about project activity make schedule for saving time and
manpower of Mechanical & Piping project
✓ Maintenance work of Heat-Exchangers blinding as per blind location and open the head cover
removed tube bundle as per required capacity of tube bundle puller. Inspect of tube bundle and
cleaned inside & outside tube with Hydro-Jetting Gun and Flexi hose carry on shell test and tube test.
After that BOX-UP with new gasket.
.
6. ARAB - D RECYCALING PLANT (Qatar) - FEB. 2012
DESINGNATION - MECHANICAL SUPERVISOR
JOB & RESPONSIBILITY:
✓ Project Erection of Piping & Mechanical Construction work.
✓ Co-ordination with staff discussing about project activity make schedule for saving time and
manpower of Mechanical & Piping project.
✓ During the project following all over SEFTY rules drawing standard quality work code and
specification and following PTW procedure collect as per reelected document to do the job.
✓ Maintenance work of Column and blinding as per blind location dements pipe line, opening the Man
way removed Dimester Pad cleaning or replace as per instruction.
4
5. ✓ Internal cleaning, removed Trey as per instruction. Cleaned weld joint with pneumatic tools keep ready
NDT inspection and reinstallation of new Trey again inspection Trey after finally BOX-UP the Man
way and De-Blinding alignment the line.
Maintenance work of Furnace blinding as per blind location of Furnace area and removed pipe line
spool .removed heater bracket and inspect tiles plate, gas burner diesel burner gas burner heat tube
,radiant tube section tube crossover inlet coil out let cleaned internal Furnace. and refectory work
Alignment pipe spool, De-Blinding and BOX-UP
6. RAS —GAS LNG PLANT (Qatar) 2011
DESIGNATION - MECHANICAL SUPERVISOR
JOB & RESPONSIBILITIES:
✓ Tool Box talk about the hazard of the job and the plant.
✓ Preparation of the job and pre Shut-down activity
✓ Desiccation about the equipment TEG FLASH DRUM (Vessel) & REBOILER Heat exchanger
✓ Sifting material blind & Gasket to site and located equipment using mobile crane.
✓ Carry out inspection priority shut down preparing obtain the work permit from using authority
✓ Lotto system lock the solution box as per operation Lotto prosier
✓ Removed blind and installed blind & spade and torque after carryout man way opened for external
inspection.
✓ We provide all hoses ventilation vessel & Reboiler heat exchanger
✓ Obtain confined space certificate and arrange to carryout initial gasses to vessel & Reboiler heat
exchanger inspection.
✓ Installed material scaffolding, as per integrity recommendation and buffing to clean weld joint for
NDT inspection
✓ We carry out appeared inside the vessel & Reboiler heat exchanger remove material scaffolding,
lighting and all foraging material from inside the vessel
✓ Reboiler heat exchanger. and obtain Box up certificate vessel & Reboiler heat exchanger
✓ De-blinded and blinding location and final torturing and sign of job completion and return blind
and other material back to material group.
7. RAS —GAS LNG PLANT (Qatar) 2010
1. DESIGNATION - PIPING SUPERVISOR
JOB RESPONSIBILITIES:
✓ Tool box talk about the hazard of the Job And the Plant
✓ Preparation of the Job and Pre Shot Down activity
✓ Site supervision and implementation of the job as per drawing and specification of the project
supervise of work shop activities and fabrication of piping spools and its support Inspect the pipe
and piping materials as per specification. Preparation of welding procedure
✓ Erection of piping job making absolutely as per require isometric, GA, and P&ID drawing and
specification. Make ready what was the things material and equipment required on the site..
✓ Installation of 82" Sea water Pipe line spool length 10 meter and installation of ANODE inside the
pipe line as per plant to lay down area between both ANODE 3 meter distances.
✓ Installation of 82" Butterfly value in sea water line and removing the spool loop in 82" pipe line and
re-installation.
✓ Maintenance work of FIN-FAN – blinding as per blinding location open the all coolers tubes
adapter and removed washer and inspect the washer and adapter materials its spoil installed new
5
6. adapter ,washer cleaned tube check the hydro test of coolers tube and inspect leakage and finally
box up.
8. RAS-GAS LNG PLANT (Qatar) 2008
DESIGNATION - MECHANICAL SUPERVISOR
✓ Talks to tool box meeting about the hazard's
✓ Make it ready of job permit & preparing of all paper like (JSK.) job safety Analysis and isolation list
of line
✓ Handling the all Foreman, Charge hand, worker, Fitter and fabricator for distributing on job
location.
✓ Erecting of piping and mechanical work of the project
✓ Fabrication job of the piping project
✓ To work at Air Filter house and installation of air filter of the Gas TURBINE UNIT
✓ To work vessel, column and making ready to inspection other box ping to work as Blinding & De-
blinding work.
9. QAFCO- (QATAR FERTILISER COMPANY), 2007 Working With QATAR ENGINEERING &
CONSTRUCTION COMPANY) (Q- CON)
DESIGNATION - PIPING SUPERVISOR
JOB & RESPONSIBILITIES:
✓ Supervision of Fabrication, Erection, and Execution of Piping project
✓ Site supervision and implementation of the job as per drawing and specification of the project
supervise of work shop activities and fabrication of piping spools and its support
✓ Preparation of welding procedure specification conduce procedure qualification records
✓ Erection of piping job making absolutely
✓ Capable of independently work and know of isometric drawing and specification
✓ Installation works of piping , pipeline and static equipments in oil and gas sector
✓ Especially CS, SS, MS, Pipe fit up fabrication an arrangements
10. KUWAIT CONTROL CO. STATE OF KUWAIT MINISTRY OF LECTRICITY AND WATER FRESH
WATER PIPELINE — MEW 3375PROJECT.
DESIGNATION - PIPING SUPERVISOR
JOB RESPONSIBILITIES:
✓ Installation and replacement of magnetic flow meter. at different location water pipe line
✓ Supervision of Fabrication, Erection, and Execution of Piping project.
✓ Preparation of welding procedure specification conduce procedure qualification records.
✓ International Standard and Quality work
PERSONAL DETAILS:
NAME : Santosh Prabhakar Pawar
NATIONALITY : Indian
AGE : 33 Years
DATE OF BIRTH : 02/07/1978
GENDER : Male
6
7. MARITAL STATUS : Married
QUALIFICATION : HSC (DIPLOMA HOLDER)
PASSPORT NO. : F 7143062 (ECNR)
DATE OF ISSUE : 23/03/2006
DATE OF EXPIRY : 22/03/2016
LANGUAGES KNOWN : English, Arabic, Marathi and Hindi.
Place : Mumbai Date : 12/.05/.2015 SANTOSH PRABHAKAR PAWAR
7