FLIXBOROUGH DISASTER
"The disaster was caused by the introduction into a well designed and constructed plant of a
modification which destroyed its integrity."
Cost of JUGAD ”Make shift arrangement”
History
In 1964, Fisons and Dutch State Mines (DSM) set up a joint venture, Nypro, to produce
Nylon-6.
DSM’s process produced caprolactam (the chemical precursor to Nylon-6 from
cyclohexane)
This allowed Nypro to compete head-on with ICI and Dupont’s patented method for
making Nylon-66.
By 1967, the Flixborough plant — the only one of its kind in the UK —was supplying
caprolactam to textiles and chemicals manufacturer Courtaulds
In 1969 Nypro announced it was trebling capacity to 75,000 tonnes a year.
How it Happened 1 June 1974 ………
• The reactors were filled with liquid cyclohexane under pressure at 155 °C, through
which compressed air was bubbled to cause the reaction.
• The plant was shut down and the reactor, one of a series of six, was removed and a
bypass installed to link reactor numbers 4 and 6.
• The 50cm diameter bypass pipe was designed by Nypro engineers who were not
experienced in high-pressure pipework.
• No plans or calculations were produced, the pipework was not pressure tested and was
mounted on temporary scaffolding, unsupported from above.
• Bellows were used to join the pipe to the 60cm reactor flanges and crucially, because
the gravity-assisted reactor series was built on a slope, the pipe included a “dog-leg”
bend to accommodate the change in height.
• The plant was restarted but shut down again two months later when, on 29 May, a
small leak was discovered on a sight glass on a pressure vessel in the plant.
• Once the leak was repaired, in the early hours of the morning of 1 June 1974, the plant
started up for what would be the last time.
Continue……
• “At 4.52pm the 50cm(20 inch) dog-leg pipe and the bellows attached to it ruptured, causing the
entire contents of all five reactors to escape at sonic velocity to form a vast flammable vapour
cloud the size of a football pitch. The vapour’s ignition less than a minute later resulted in an ‘open
flammable cloud explosion.”
• Of the 70 staff on site that weekend, 28 were killed and 36 injured. None of the 18 men working in
the control room survived.
• It was a scene of utter devastation: cars in the works’ car park were compressed to the size of
dustbins, a neighbouring field of wheat was sucked into the partial vacuum created by the blast
and large pieces of the plant came to rest in ironstone workings nearly eight kilometres away.
• Fifty three people off site reported injuries and hundreds more patched up their own cuts and
bruises.
• Almost all homes in Flixborough, and nearby Amcotts and Burton were affected, along with 789 in
Scunthorpe, more than six kilometres away.
• In all, 1821 houses and 167 shops and factories were damaged. The blaze that enveloped the plant
took 250 fire fighters with 50 fire engines three days to contain, and fires burned for a week and a
half. While the plant burned, reaction began.
Failings in technical measures
• Plant Modification / Change Procedures: HAZOP
• Design Codes - Pipework: use of flexible pipes
• No pressure testing was carried out on the installed pipework modification.
• Maintenance Procedures: recommissioning
• Those concerned with the design, construction and layout of the plant did not consider the
potential for a major disaster happening instantaneously.
• Plant Layout: positioning of occupied buildings
• Control Room Design: structural design to withstand major hazards events
• Operating Procedures: As the incident happened during start up when critical decisions were
made under operational stress. In particular the shortage of nitrogen for inerting would tend
to inhibit the venting of off-gas as a method of pressure control/reduction
• Inerting: reliability/back-up/proof testing
Reasons…
• Had it been decided to strip and examine the other reactors and await a report on
the cause of the failure of reactor number 5, the plant must have remained shut
down for several days.The design and construction of the bypass assembly would not
then have been conducted as a rush job.
• The services engineer who provided cover was not qualified to do the job, as a
result, nobody realised that the pressurised bypass assembly would twist and buckle
and ultimately fail.
• The immediate lesson to be learned is that measures must be taken to ensure that
the technical integrity of plant is not violated,” the inquiry concluded.
• It also noted that had the control room’s layout “been differently sited or
constructed or both, loss of life might have been avoided”.
• “The unwise decisions people make about cutting costs or deferring maintenance
are because people have got detached from the consequences of things going
wrong,”
Out come of flixborough……..
• Two European Directives, Seveso I and Seveso II,
The outcome, implemented in the UK as the
Control of Industrial Major Accident Hazards (CIMAH)
Control of Major Accident Hazards (COMAH) Regulations
• Today’s process safety, change management and risk management techniques are also rooted in
Flixborough.
• “Flixborough destroyed the confident feeling that we can always keep large quantities of hazardous
chemicals under control, and therefore we should keep the amounts of them in our plants as low
as reasonably practicable or use safer materials instead”
• Flixborough has left us with a useful legacy of preventative work practices.
• We no longer wait for things to go wrong, rather we have developed techniques to minimise the
risks posed by our workplaces.”
Thank you ……..

Mais conteúdo relacionado

Mais procurados

Oil refinery processes 14 th jan
Oil refinery processes 14 th janOil refinery processes 14 th jan
Oil refinery processes 14 th janProbodh Mallick
 
The mexico city explosion of 1984
The mexico city explosion of 1984The mexico city explosion of 1984
The mexico city explosion of 1984Mohit Nayal
 
Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraCase study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraAbhishant Baishya
 
Dow Fire and Explosion Index (Dow F&EI) and Mond Index
Dow Fire and Explosion Index (Dow F&EI) and Mond IndexDow Fire and Explosion Index (Dow F&EI) and Mond Index
Dow Fire and Explosion Index (Dow F&EI) and Mond IndexEvonne MunYee
 
Propylene Production by Propane Dehydrogenation (PDH)
Propylene Production by Propane Dehydrogenation (PDH)Propylene Production by Propane Dehydrogenation (PDH)
Propylene Production by Propane Dehydrogenation (PDH)Amir Razmi
 
Deepwater Horizon Case Slides
Deepwater Horizon Case SlidesDeepwater Horizon Case Slides
Deepwater Horizon Case SlidesBrandon Swartwood
 
Ethylene Plant Design Considerations
Ethylene Plant Design ConsiderationsEthylene Plant Design Considerations
Ethylene Plant Design ConsiderationsGerard B. Hawkins
 
Seveso Disaster : Chemical Events , Effects and Seveso Directives
Seveso Disaster : Chemical Events , Effects and Seveso DirectivesSeveso Disaster : Chemical Events , Effects and Seveso Directives
Seveso Disaster : Chemical Events , Effects and Seveso DirectivesPankaj Kumar
 
Heater operation
Heater operationHeater operation
Heater operationJOMON M.C
 
Chapter 5c -hydrocracking_i
Chapter 5c -hydrocracking_iChapter 5c -hydrocracking_i
Chapter 5c -hydrocracking_iHelena Francis
 
Deep Water Horizon Oil Spill (B. P. Oil Spill)
Deep Water Horizon Oil Spill (B. P. Oil Spill)Deep Water Horizon Oil Spill (B. P. Oil Spill)
Deep Water Horizon Oil Spill (B. P. Oil Spill)Syed Ali Roshan
 
Oil 101 - Introduction to Refining
Oil 101 - Introduction to RefiningOil 101 - Introduction to Refining
Oil 101 - Introduction to RefiningEKT Interactive
 
The texas city disaster
The texas city disasterThe texas city disaster
The texas city disasterYashGoyal110
 
Topic 01 incidents and accidents
Topic 01 incidents and accidentsTopic 01 incidents and accidents
Topic 01 incidents and accidentsBasitali Nevarekar
 

Mais procurados (20)

Oil refinery processes 14 th jan
Oil refinery processes 14 th janOil refinery processes 14 th jan
Oil refinery processes 14 th jan
 
The mexico city explosion of 1984
The mexico city explosion of 1984The mexico city explosion of 1984
The mexico city explosion of 1984
 
Boiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singaporeBoiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singapore
 
Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraCase study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
 
Dow Fire and Explosion Index (Dow F&EI) and Mond Index
Dow Fire and Explosion Index (Dow F&EI) and Mond IndexDow Fire and Explosion Index (Dow F&EI) and Mond Index
Dow Fire and Explosion Index (Dow F&EI) and Mond Index
 
Oil rig disaster piper alpha
Oil rig disaster piper alphaOil rig disaster piper alpha
Oil rig disaster piper alpha
 
Propylene Production by Propane Dehydrogenation (PDH)
Propylene Production by Propane Dehydrogenation (PDH)Propylene Production by Propane Dehydrogenation (PDH)
Propylene Production by Propane Dehydrogenation (PDH)
 
Seveso tragedy
Seveso tragedySeveso tragedy
Seveso tragedy
 
Deepwater Horizon Case Slides
Deepwater Horizon Case SlidesDeepwater Horizon Case Slides
Deepwater Horizon Case Slides
 
Fire accidents
Fire accidents Fire accidents
Fire accidents
 
Ethylene Plant Design Considerations
Ethylene Plant Design ConsiderationsEthylene Plant Design Considerations
Ethylene Plant Design Considerations
 
Seveso Disaster : Chemical Events , Effects and Seveso Directives
Seveso Disaster : Chemical Events , Effects and Seveso DirectivesSeveso Disaster : Chemical Events , Effects and Seveso Directives
Seveso Disaster : Chemical Events , Effects and Seveso Directives
 
Heater operation
Heater operationHeater operation
Heater operation
 
Chapter 5c -hydrocracking_i
Chapter 5c -hydrocracking_iChapter 5c -hydrocracking_i
Chapter 5c -hydrocracking_i
 
Deep Water Horizon Oil Spill (B. P. Oil Spill)
Deep Water Horizon Oil Spill (B. P. Oil Spill)Deep Water Horizon Oil Spill (B. P. Oil Spill)
Deep Water Horizon Oil Spill (B. P. Oil Spill)
 
Oil 101 - Introduction to Refining
Oil 101 - Introduction to RefiningOil 101 - Introduction to Refining
Oil 101 - Introduction to Refining
 
The texas city disaster
The texas city disasterThe texas city disaster
The texas city disaster
 
The Macondo blowout
The Macondo blowoutThe Macondo blowout
The Macondo blowout
 
Topic 01 incidents and accidents
Topic 01 incidents and accidentsTopic 01 incidents and accidents
Topic 01 incidents and accidents
 
Hydrogen Production Unit
Hydrogen Production UnitHydrogen Production Unit
Hydrogen Production Unit
 

Semelhante a Flixborough disaster

Industrial disasters
Industrial disasters Industrial disasters
Industrial disasters ravali52
 
Flixborough case-history 0
Flixborough case-history 0Flixborough case-history 0
Flixborough case-history 0Nilanjan Dutta
 
Pressure Vessel Accidents: Safety Approach
Pressure Vessel Accidents: Safety ApproachPressure Vessel Accidents: Safety Approach
Pressure Vessel Accidents: Safety ApproachIRJET Journal
 
IRJET-Pressure Vessel Accidents: Safety Approach
IRJET-Pressure Vessel Accidents: Safety ApproachIRJET-Pressure Vessel Accidents: Safety Approach
IRJET-Pressure Vessel Accidents: Safety ApproachIRJET Journal
 
Bhopal Gas Tragedy- The Night of Death
Bhopal Gas Tragedy- The Night of DeathBhopal Gas Tragedy- The Night of Death
Bhopal Gas Tragedy- The Night of DeathParidhi Khandelwal
 
Chernobyl Nuclear Disaster - 1986
Chernobyl Nuclear Disaster - 1986Chernobyl Nuclear Disaster - 1986
Chernobyl Nuclear Disaster - 1986ArnavDixit6
 
Bhopal gas tragedy- industrial disaster
Bhopal gas tragedy- industrial disasterBhopal gas tragedy- industrial disaster
Bhopal gas tragedy- industrial disasternikita kaul
 
Gi 2018 subpart h hazardous materials
Gi 2018 subpart h hazardous materialsGi 2018 subpart h hazardous materials
Gi 2018 subpart h hazardous materialsJohn Newquist
 
PROCESS INSTRUMENTATION NOTES ARE THERE IN
PROCESS INSTRUMENTATION NOTES ARE THERE INPROCESS INSTRUMENTATION NOTES ARE THERE IN
PROCESS INSTRUMENTATION NOTES ARE THERE INvijetakumari201ch059
 
Texas oil refinary explosion
Texas oil refinary explosionTexas oil refinary explosion
Texas oil refinary explosionNeha Baheti
 
Bhopal gas Tragedy.pptx
Bhopal gas Tragedy.pptxBhopal gas Tragedy.pptx
Bhopal gas Tragedy.pptxARTINADEKA
 
Bhopal slides
Bhopal slidesBhopal slides
Bhopal slidesRahulAren
 
Bhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDES
Bhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDES
Bhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESARUNPRAKASHS7
 
Bhopal gas tragedy
Bhopal gas tragedyBhopal gas tragedy
Bhopal gas tragedySONAL GARG
 
Lessons Learnt from Root Cause Analysis of Gulf.pptx
Lessons Learnt from Root Cause Analysis of Gulf.pptxLessons Learnt from Root Cause Analysis of Gulf.pptx
Lessons Learnt from Root Cause Analysis of Gulf.pptxq46bcx2y5j
 

Semelhante a Flixborough disaster (20)

Industrial disasters
Industrial disasters Industrial disasters
Industrial disasters
 
IOC jaipur
IOC jaipurIOC jaipur
IOC jaipur
 
Flixborough case-history 0
Flixborough case-history 0Flixborough case-history 0
Flixborough case-history 0
 
Pressure Vessel Accidents: Safety Approach
Pressure Vessel Accidents: Safety ApproachPressure Vessel Accidents: Safety Approach
Pressure Vessel Accidents: Safety Approach
 
IRJET-Pressure Vessel Accidents: Safety Approach
IRJET-Pressure Vessel Accidents: Safety ApproachIRJET-Pressure Vessel Accidents: Safety Approach
IRJET-Pressure Vessel Accidents: Safety Approach
 
Bhopal Gas Tragedy- The Night of Death
Bhopal Gas Tragedy- The Night of DeathBhopal Gas Tragedy- The Night of Death
Bhopal Gas Tragedy- The Night of Death
 
Chernobyl Nuclear Disaster - 1986
Chernobyl Nuclear Disaster - 1986Chernobyl Nuclear Disaster - 1986
Chernobyl Nuclear Disaster - 1986
 
Bhopal gas tragedy- industrial disaster
Bhopal gas tragedy- industrial disasterBhopal gas tragedy- industrial disaster
Bhopal gas tragedy- industrial disaster
 
Gi 2018 subpart h hazardous materials
Gi 2018 subpart h hazardous materialsGi 2018 subpart h hazardous materials
Gi 2018 subpart h hazardous materials
 
The explosion and fires at the texaco refinery milford haven
The explosion and fires at the texaco refinery milford havenThe explosion and fires at the texaco refinery milford haven
The explosion and fires at the texaco refinery milford haven
 
PROCESS INSTRUMENTATION NOTES ARE THERE IN
PROCESS INSTRUMENTATION NOTES ARE THERE INPROCESS INSTRUMENTATION NOTES ARE THERE IN
PROCESS INSTRUMENTATION NOTES ARE THERE IN
 
Texas oil refinary explosion
Texas oil refinary explosionTexas oil refinary explosion
Texas oil refinary explosion
 
Bhopal gas Tragedy.pptx
Bhopal gas Tragedy.pptxBhopal gas Tragedy.pptx
Bhopal gas Tragedy.pptx
 
Com dust 511 2018
Com dust 511 2018Com dust 511 2018
Com dust 511 2018
 
Phillips66Talk.ppt
Phillips66Talk.pptPhillips66Talk.ppt
Phillips66Talk.ppt
 
Bhopal slides
Bhopal slidesBhopal slides
Bhopal slides
 
Bhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDES
Bhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDES
Bhopal_SLIDESBhopal_SLIDESBhopal_SLIDESBhopal_SLIDES
 
ppt for ucp.pptx
ppt for ucp.pptxppt for ucp.pptx
ppt for ucp.pptx
 
Bhopal gas tragedy
Bhopal gas tragedyBhopal gas tragedy
Bhopal gas tragedy
 
Lessons Learnt from Root Cause Analysis of Gulf.pptx
Lessons Learnt from Root Cause Analysis of Gulf.pptxLessons Learnt from Root Cause Analysis of Gulf.pptx
Lessons Learnt from Root Cause Analysis of Gulf.pptx
 

Último

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 

Último (20)

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 

Flixborough disaster

  • 1. FLIXBOROUGH DISASTER "The disaster was caused by the introduction into a well designed and constructed plant of a modification which destroyed its integrity." Cost of JUGAD ”Make shift arrangement”
  • 2. History In 1964, Fisons and Dutch State Mines (DSM) set up a joint venture, Nypro, to produce Nylon-6. DSM’s process produced caprolactam (the chemical precursor to Nylon-6 from cyclohexane) This allowed Nypro to compete head-on with ICI and Dupont’s patented method for making Nylon-66. By 1967, the Flixborough plant — the only one of its kind in the UK —was supplying caprolactam to textiles and chemicals manufacturer Courtaulds In 1969 Nypro announced it was trebling capacity to 75,000 tonnes a year.
  • 3. How it Happened 1 June 1974 ……… • The reactors were filled with liquid cyclohexane under pressure at 155 °C, through which compressed air was bubbled to cause the reaction. • The plant was shut down and the reactor, one of a series of six, was removed and a bypass installed to link reactor numbers 4 and 6. • The 50cm diameter bypass pipe was designed by Nypro engineers who were not experienced in high-pressure pipework. • No plans or calculations were produced, the pipework was not pressure tested and was mounted on temporary scaffolding, unsupported from above. • Bellows were used to join the pipe to the 60cm reactor flanges and crucially, because the gravity-assisted reactor series was built on a slope, the pipe included a “dog-leg” bend to accommodate the change in height. • The plant was restarted but shut down again two months later when, on 29 May, a small leak was discovered on a sight glass on a pressure vessel in the plant. • Once the leak was repaired, in the early hours of the morning of 1 June 1974, the plant started up for what would be the last time.
  • 4. Continue…… • “At 4.52pm the 50cm(20 inch) dog-leg pipe and the bellows attached to it ruptured, causing the entire contents of all five reactors to escape at sonic velocity to form a vast flammable vapour cloud the size of a football pitch. The vapour’s ignition less than a minute later resulted in an ‘open flammable cloud explosion.” • Of the 70 staff on site that weekend, 28 were killed and 36 injured. None of the 18 men working in the control room survived. • It was a scene of utter devastation: cars in the works’ car park were compressed to the size of dustbins, a neighbouring field of wheat was sucked into the partial vacuum created by the blast and large pieces of the plant came to rest in ironstone workings nearly eight kilometres away. • Fifty three people off site reported injuries and hundreds more patched up their own cuts and bruises. • Almost all homes in Flixborough, and nearby Amcotts and Burton were affected, along with 789 in Scunthorpe, more than six kilometres away. • In all, 1821 houses and 167 shops and factories were damaged. The blaze that enveloped the plant took 250 fire fighters with 50 fire engines three days to contain, and fires burned for a week and a half. While the plant burned, reaction began.
  • 5.
  • 6.
  • 7.
  • 8. Failings in technical measures • Plant Modification / Change Procedures: HAZOP • Design Codes - Pipework: use of flexible pipes • No pressure testing was carried out on the installed pipework modification. • Maintenance Procedures: recommissioning • Those concerned with the design, construction and layout of the plant did not consider the potential for a major disaster happening instantaneously. • Plant Layout: positioning of occupied buildings • Control Room Design: structural design to withstand major hazards events • Operating Procedures: As the incident happened during start up when critical decisions were made under operational stress. In particular the shortage of nitrogen for inerting would tend to inhibit the venting of off-gas as a method of pressure control/reduction • Inerting: reliability/back-up/proof testing
  • 9. Reasons… • Had it been decided to strip and examine the other reactors and await a report on the cause of the failure of reactor number 5, the plant must have remained shut down for several days.The design and construction of the bypass assembly would not then have been conducted as a rush job. • The services engineer who provided cover was not qualified to do the job, as a result, nobody realised that the pressurised bypass assembly would twist and buckle and ultimately fail. • The immediate lesson to be learned is that measures must be taken to ensure that the technical integrity of plant is not violated,” the inquiry concluded. • It also noted that had the control room’s layout “been differently sited or constructed or both, loss of life might have been avoided”. • “The unwise decisions people make about cutting costs or deferring maintenance are because people have got detached from the consequences of things going wrong,”
  • 10. Out come of flixborough…….. • Two European Directives, Seveso I and Seveso II, The outcome, implemented in the UK as the Control of Industrial Major Accident Hazards (CIMAH) Control of Major Accident Hazards (COMAH) Regulations • Today’s process safety, change management and risk management techniques are also rooted in Flixborough. • “Flixborough destroyed the confident feeling that we can always keep large quantities of hazardous chemicals under control, and therefore we should keep the amounts of them in our plants as low as reasonably practicable or use safer materials instead” • Flixborough has left us with a useful legacy of preventative work practices. • We no longer wait for things to go wrong, rather we have developed techniques to minimise the risks posed by our workplaces.” Thank you ……..