ROADS/PAVEMENT
&
TYPES OF ROAD
• NAMESNAMES
ROLL #ROLL #
• SAAD UllaH
26
• MUHAMMAD KAMRAN 40
• HZMZA ANWAR 33
• SHEHZAD KHAN
35
• ARSALAN KHAN
25
• WASEEM AHMAD
R27
What is Road ?
QSM 602
Introduction
 An open, generally
public way for the
passage of vehicles,
people, and animals. 
Purpose :
Many rely on paved roads
to move themselves and their
products rapidly and reliably
Finish with a hard smooth
surface (pavement) helped
make them durable and
able to withstand traffic
and the environment. 
Road pavements
deteriorate over time
due to the impact of
traffic, particularly
heavy vehicles, and
environmental factors.
Roads have a life
expectancy of
between 20 - 30 years.
Functions :
 One of the primary functions of a pavement is
load distribution which can be characterized by
the tire loads; tire configurations; repetition of
loads; distribution of traffic across the pavement;
and vehicle speed.
QSM 602
 Several elements
make up the
roadway.
 Each layer
represents one of the
elements of the
pavement system. 
 All these elements
work together to
provide a quality
durable pavement.
QSM 602
Typical Components
Embankment
 When roads are built higher than the surrounding
ground, a structure of compacted earth called an
embankment is built. 
 The embankment is built to support the other three
layers of the pavement system.
 Embankments can be made from almost any common
type of deposit except topsoil.
QSM 602
Sub-grade
 The sub-grade is made of soils that have been specially
prepared to meet the requirements to support the other
two layers.
 The sub-grade is a selected soil material that is
carefully compacted to provide uniform support to the
pavement.
 The sub-grade lies directly on either the embankment or
the native soil.
QSM 602
Base
 The base is a mixture of crushed rock.
 The base layer provides uniform support to the
pavement and allows water that penetrates any joints
or cracks in the pavement to move quickly to the sub-
drain without saturating and softening the sub-grade.
 The base layer lies directly on top of the sub-grade and
is built of clean sand or rock.
QSM 602
Pavement
The top layer is the pavement.
The pavement materials can either be
Hot Mix Asphalt (HMA) and Portland
Cement Concrete (PCC).
The pavement itself resists bending, and
distributes vehicle weights over a large
area.
QSM 602
Sub-Drain
 The sub-drain collects water from the base and the sub-grade and
drains that water.
 The sub-drain is basically a perforated pipe near the bottom,
surrounded by clean coarse-size rock which allows
rapid transportation of water.
QSM 602
TYPES OF ROAD/PAVEMENT:
1. Flexible road/pavement
2. Rigid road/pavement
 Flexible pavements are those which are
surfaced with bituminous (or asphalt)
materials. 
 Its "flexible" since the total pavement structure
"bends" or "deflects" due to traffic loads. 
 Generally this type of pavement requires some
sort of maintenance or rehabilitation every 10
to 15 years.
QSM 602
QSM 602
Each layer receives the
loads from the above
layer, spreads them out,
and then passes on these
loads to the next layer
below.
LOAD DISTRIBUTION
QSM 602
Material layers are usually arranged in
order of descending load bearing
capacity with the highest load bearing
capacity material (and most expensive)
on the top and the lowest load bearing
capacity material (and least expensive)
on the bottom…….
This is the layer (or layers) under the base
layer. 
A sub-base is not always needed.
A proper sub-base consists of various sizes
of crushed stone aggregate, commonly
known as “crusher run”.
Depending on the sub soils on your site
you may need 8-12 inches of various sizes
of sub-base.
QSM 602
Sub-base Course
 It functions primarily as structural support but it can also
help:
a) Minimize the intrusion of fines from the sub-grade
into the pavement structure.
b) Improve drainage.
c) Minimize frost action damage.
d) Provide a working platform for construction. 
 The subbase generally consists of lower quality materials
than the base course but better than the sub-grade soils. 
QSM 602
Sub-base Course (CONTINUE)…..
 The first coat to be placed, on top of your
proper sub-base, is the base course .
 It provides additional load distribution and
contributes to drainage and frost resistance. 
 The base is built of clean sand or rock.
 The base layer provides uniform support to the
pavement and allows water that
penetrates any joints .
QSM 602
Base Course
 After the binder is put into place with paver, it is compacted with a
vibratory roller for tighter density and added strength.
 Base courses are usually constructed out of:
i) Aggregate: Base courses are most typically constructed
from durable aggregates that will not be damaged by
moisture or frost action.
ii) HMA: In certain situations where high base stiffness is
desired, base courses can be constructed using a
variety of HMA mixes. 
QSM 602
Base Course (Cont)
 This is the top layer which comes in contact with traffic. 
 It normally contains the highest quality materials. 
 It serves to prevent the entrance of excessive quantities of
surface water into the underlying base & sub-grade.
 It is sometimes subdivided into two layers:
i) Wearing Course: A layer in direct contact with traffic
loads.  It is meant to take the impact of traffic wear and
can be removed and replaced as it becomes worn. 
ii) Intermediate/Binder Course: It's main purpose is to
distribute load. It may compose of one or several HMA
sublayers.
QSM 602
Surface Course
 Hot mix asphalt (HMA) is "the black stuff" used
as a pavement material.
 Its a combination of aggregate and asphalt
binder mixed together at elevated temperatures
that forms a hard, strong construction material
when cooled to suitable temperatures.  
 Also known as "asphalt concrete" (AC), "asphalt",
"blacktop" or "bitumin“.
QSM 602
Surface Course
 when it is well mixed, it is laid down on the roadway as
pavement.
 The pavement must then be compacted to achieve
uniform density.
 If this is not done properly,  it can reduce the life time of
the pavement and increase the costs of maintaining the
road.
 It usually costs less.
 The life expectancy of an asphalt pavement is between
15 to 20 years.
QSM 602
Surface Course
2. RIGID PAVEMENT…
TYPE OF ROAD/PAVEMENT
 Rigid pavement composed of a PCC surface course.
 Such pavements are "stiffer" than flexible pavements
due to the high modulus of elasticity of the PCC
material. 
 Further, these pavements can have reinforcing steel,
which is generally used to reduce or eliminate joints. 
 Because of its relative rigidity, the pavement structure
distributes loads over a wide area with only one, or at
most two, structural layers.
 This type of pavement can serve 20 to 40 years with
little or no maintenance or rehabilitation and often used
in urban and high traffic areas.
QSM 602
 This is the layer (or layers) under the base layer. 
 The properties and function of this layer are
similar to as in flexible roads/pavements.
 A sub-base is not always needed and therefore
may often be omitted (OPTIONAL DEPENDING
ON SUBGRAGE OR SOIL).
QSM 602
Sub-base Course
 This is the layer directly below the PCC layer and generally
consists of aggregate or stabilized sub-grade.
 It provides additional load distribution, contributes to
drainage, uniform support to the pavement and a stable
platform for construction equipment.
 Base courses are usually constructed out of:
a) Aggregate base. 
b) Stabilized aggregate or soil.
c) Dense-graded HMA. 
d) Lean concrete
QSM 602
Base Course
 The surface course is the layer in contact with
traffic loads.
It consists of the PCC slab which is the stiffest
layer and provides the majority of strength.
   The surface course can vary in thickness but is
usually between 150 mm (for light loading) and
300mm (for heavy loads and high traffic).
 Portland cement concrete is used as pavement
material.
QSM 602
Surface Course
Portland cement concrete is made by
mixing portland cement with water, and
coarse- and fine-size rocks.
It initially can be more expensive.
The life expectancy of portland  cement
pavement varies, as little as 20 years or more
than 40 years.
QSM 602
Surface Course
There are several factors that affect
pavement life:
Traffic volume
Quality of materials used
Construction practices, and
How well the other layers of the road
perform.
QSM 602
Hard Shoulder
 Continuous strips alongside pavements, which vehicles
may drive during emergencies.
 Normally 3 m wide to fulfilled the functions of the slow
lane.
QSM 602
Kerbs
 To define the limits of
carriageway.
 It is the dividing line
between
carriageway and
footpath.
QSM 602
Drainage- Surface and Subsurface
 Road Chamber – Cross falls.
 To cope with heavy water run-off during a storm.
QSM 602
Street lamps:
 Street lamps are
designed to
illuminate the
surrounding area at
night, not only as a
deterrent to criminals
but also to allow
people to see where
they're going.
QSM 602
Road Markings:
 This furniture is any kind of
device or material that is
used on a road surface in
order to convey official
information.
 They provide guidance and
information to drivers and
pedestrians.
 They can be used to
delineate traffic lanes or serve
as noise generators when run
across a road.
QSM 602
traffic Signs:
 They warn drivers of upcoming road
conditions such as a "blind curve",
speed limits, etc.
 Direction signs tell the reader the way
to a location.
 Direction signs are usually mounted on
poles.
 Illumination is added in order to aid
nighttime users.
QSM 602

More Related Content

What's hot

Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavementspradip dangar
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumensrinivas2036
 
construction of flexible pavement
construction of flexible pavementconstruction of flexible pavement
construction of flexible pavementRafi Khan
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADkumawat123
 
PAVEMENT DESIGN & TYPES
PAVEMENT DESIGN & TYPES PAVEMENT DESIGN & TYPES
PAVEMENT DESIGN & TYPES Mahendra meena
 
Study of design of the flexible pavements ppt
Study of design of the flexible pavements pptStudy of design of the flexible pavements ppt
Study of design of the flexible pavements pptShaik Asif Ahmed
 
Pavement design
Pavement designPavement design
Pavement designhusna004
 
Seal coat,prime coat and tack coat
Seal coat,prime coat and tack coatSeal coat,prime coat and tack coat
Seal coat,prime coat and tack coatMuhammadArif856
 
Bitumen and modified bitumen
Bitumen and modified bitumenBitumen and modified bitumen
Bitumen and modified bitumenpradip dangar
 
highway maintenance and evaluation
highway maintenance and evaluation highway maintenance and evaluation
highway maintenance and evaluation Senthamizhan M
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 

What's hot (20)

Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
road construction
road constructionroad construction
road construction
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
Pavement design
Pavement designPavement design
Pavement design
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumen
 
construction of flexible pavement
construction of flexible pavementconstruction of flexible pavement
construction of flexible pavement
 
Unit 4
Unit 4Unit 4
Unit 4
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
 
PAVEMENT DESIGN & TYPES
PAVEMENT DESIGN & TYPES PAVEMENT DESIGN & TYPES
PAVEMENT DESIGN & TYPES
 
Bituminous pavement
Bituminous pavementBituminous pavement
Bituminous pavement
 
Study of design of the flexible pavements ppt
Study of design of the flexible pavements pptStudy of design of the flexible pavements ppt
Study of design of the flexible pavements ppt
 
Road construction
Road constructionRoad construction
Road construction
 
Pavement design
Pavement designPavement design
Pavement design
 
Seal coat,prime coat and tack coat
Seal coat,prime coat and tack coatSeal coat,prime coat and tack coat
Seal coat,prime coat and tack coat
 
Bitumen and modified bitumen
Bitumen and modified bitumenBitumen and modified bitumen
Bitumen and modified bitumen
 
highway maintenance and evaluation
highway maintenance and evaluation highway maintenance and evaluation
highway maintenance and evaluation
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Pavement failures
Pavement failuresPavement failures
Pavement failures
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 

Viewers also liked

PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality managementejlp12
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 
التطوع لماذا ؟؟؟
التطوع لماذا ؟؟؟التطوع لماذا ؟؟؟
التطوع لماذا ؟؟؟ahmed hassan
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2ejlp12
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost managementejlp12
 

Viewers also liked (6)

PMP 00
PMP 00PMP 00
PMP 00
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality management
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
التطوع لماذا ؟؟؟
التطوع لماذا ؟؟؟التطوع لماذا ؟؟؟
التطوع لماذا ؟؟؟
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 

Similar to ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WEC

Project transportation saad ullah wec
Project transportation saad ullah wecProject transportation saad ullah wec
Project transportation saad ullah wecSAAD ULLAH
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptxWajehUlHassan
 
pavement engineering 17-10-20 (2) (2).pptx
pavement engineering 17-10-20 (2) (2).pptxpavement engineering 17-10-20 (2) (2).pptx
pavement engineering 17-10-20 (2) (2).pptxlogeshwari jambunathan
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement designRohit Ranjan
 
journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...IJERD Editor
 
Kissner Paving - Brief Introduction About Pavement Design
Kissner Paving - Brief Introduction About Pavement Design Kissner Paving - Brief Introduction About Pavement Design
Kissner Paving - Brief Introduction About Pavement Design Kissner Paving
 
Pavementdesign 141218071414-conversion-gate02[1]
Pavementdesign 141218071414-conversion-gate02[1]Pavementdesign 141218071414-conversion-gate02[1]
Pavementdesign 141218071414-conversion-gate02[1]Shitikantha Parhi
 
pavement-design-ppt.pptx
pavement-design-ppt.pptxpavement-design-ppt.pptx
pavement-design-ppt.pptxAmanKumar915397
 
Pavement and Types of pavement
Pavement and Types of pavementPavement and Types of pavement
Pavement and Types of pavementSaleemAbbasLound
 
Seminar report-3rd sem.pdf
Seminar report-3rd sem.pdfSeminar report-3rd sem.pdf
Seminar report-3rd sem.pdframbhuvansonkar1
 
Lecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdfLecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdfOmarAbdi39
 
Construction of Road pavement Civil Engineering
Construction of Road pavement Civil EngineeringConstruction of Road pavement Civil Engineering
Construction of Road pavement Civil EngineeringKotreshN1
 
Construction of Flexible Pavements Using Plastic Wastes
Construction of Flexible Pavements Using Plastic WastesConstruction of Flexible Pavements Using Plastic Wastes
Construction of Flexible Pavements Using Plastic WastesRaghvendraBajpai3
 

Similar to ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WEC (20)

6. road & highways
6. road & highways6. road & highways
6. road & highways
 
Project transportation saad ullah wec
Project transportation saad ullah wecProject transportation saad ullah wec
Project transportation saad ullah wec
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptx
 
pavement engineering 17-10-20 (2) (2).pptx
pavement engineering 17-10-20 (2) (2).pptxpavement engineering 17-10-20 (2) (2).pptx
pavement engineering 17-10-20 (2) (2).pptx
 
Pavements and paths
Pavements and pathsPavements and paths
Pavements and paths
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
pavement-design-ppt.pptx
pavement-design-ppt.pptxpavement-design-ppt.pptx
pavement-design-ppt.pptx
 
journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...
 
Kissner Paving - Brief Introduction About Pavement Design
Kissner Paving - Brief Introduction About Pavement Design Kissner Paving - Brief Introduction About Pavement Design
Kissner Paving - Brief Introduction About Pavement Design
 
Pavementdesign 141218071414-conversion-gate02[1]
Pavementdesign 141218071414-conversion-gate02[1]Pavementdesign 141218071414-conversion-gate02[1]
Pavementdesign 141218071414-conversion-gate02[1]
 
pavement-design-ppt.pptx
pavement-design-ppt.pptxpavement-design-ppt.pptx
pavement-design-ppt.pptx
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
Bituminous pavement
Bituminous pavementBituminous pavement
Bituminous pavement
 
Pavement and Types of pavement
Pavement and Types of pavementPavement and Types of pavement
Pavement and Types of pavement
 
Types of pavement
Types of pavementTypes of pavement
Types of pavement
 
Seminar report-3rd sem.pdf
Seminar report-3rd sem.pdfSeminar report-3rd sem.pdf
Seminar report-3rd sem.pdf
 
Lecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdfLecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdf
 
Construction of Road pavement Civil Engineering
Construction of Road pavement Civil EngineeringConstruction of Road pavement Civil Engineering
Construction of Road pavement Civil Engineering
 
Construction of Flexible Pavements Using Plastic Wastes
Construction of Flexible Pavements Using Plastic WastesConstruction of Flexible Pavements Using Plastic Wastes
Construction of Flexible Pavements Using Plastic Wastes
 

Recently uploaded

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WEC

  • 1.
  • 3. • NAMESNAMES ROLL #ROLL # • SAAD UllaH 26 • MUHAMMAD KAMRAN 40 • HZMZA ANWAR 33 • SHEHZAD KHAN 35 • ARSALAN KHAN 25 • WASEEM AHMAD R27
  • 4. What is Road ? QSM 602 Introduction  An open, generally public way for the passage of vehicles, people, and animals.  Purpose : Many rely on paved roads to move themselves and their products rapidly and reliably Finish with a hard smooth surface (pavement) helped make them durable and able to withstand traffic and the environment.  Road pavements deteriorate over time due to the impact of traffic, particularly heavy vehicles, and environmental factors. Roads have a life expectancy of between 20 - 30 years.
  • 5. Functions :  One of the primary functions of a pavement is load distribution which can be characterized by the tire loads; tire configurations; repetition of loads; distribution of traffic across the pavement; and vehicle speed. QSM 602
  • 6.  Several elements make up the roadway.  Each layer represents one of the elements of the pavement system.   All these elements work together to provide a quality durable pavement. QSM 602 Typical Components
  • 7. Embankment  When roads are built higher than the surrounding ground, a structure of compacted earth called an embankment is built.   The embankment is built to support the other three layers of the pavement system.  Embankments can be made from almost any common type of deposit except topsoil. QSM 602
  • 8. Sub-grade  The sub-grade is made of soils that have been specially prepared to meet the requirements to support the other two layers.  The sub-grade is a selected soil material that is carefully compacted to provide uniform support to the pavement.  The sub-grade lies directly on either the embankment or the native soil. QSM 602
  • 9. Base  The base is a mixture of crushed rock.  The base layer provides uniform support to the pavement and allows water that penetrates any joints or cracks in the pavement to move quickly to the sub- drain without saturating and softening the sub-grade.  The base layer lies directly on top of the sub-grade and is built of clean sand or rock. QSM 602
  • 10. Pavement The top layer is the pavement. The pavement materials can either be Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC). The pavement itself resists bending, and distributes vehicle weights over a large area. QSM 602
  • 11. Sub-Drain  The sub-drain collects water from the base and the sub-grade and drains that water.  The sub-drain is basically a perforated pipe near the bottom, surrounded by clean coarse-size rock which allows rapid transportation of water. QSM 602
  • 12. TYPES OF ROAD/PAVEMENT: 1. Flexible road/pavement 2. Rigid road/pavement
  • 13.  Flexible pavements are those which are surfaced with bituminous (or asphalt) materials.   Its "flexible" since the total pavement structure "bends" or "deflects" due to traffic loads.   Generally this type of pavement requires some sort of maintenance or rehabilitation every 10 to 15 years. QSM 602
  • 14. QSM 602 Each layer receives the loads from the above layer, spreads them out, and then passes on these loads to the next layer below. LOAD DISTRIBUTION
  • 15. QSM 602 Material layers are usually arranged in order of descending load bearing capacity with the highest load bearing capacity material (and most expensive) on the top and the lowest load bearing capacity material (and least expensive) on the bottom…….
  • 16. This is the layer (or layers) under the base layer.  A sub-base is not always needed. A proper sub-base consists of various sizes of crushed stone aggregate, commonly known as “crusher run”. Depending on the sub soils on your site you may need 8-12 inches of various sizes of sub-base. QSM 602 Sub-base Course
  • 17.  It functions primarily as structural support but it can also help: a) Minimize the intrusion of fines from the sub-grade into the pavement structure. b) Improve drainage. c) Minimize frost action damage. d) Provide a working platform for construction.   The subbase generally consists of lower quality materials than the base course but better than the sub-grade soils.  QSM 602 Sub-base Course (CONTINUE)…..
  • 18.  The first coat to be placed, on top of your proper sub-base, is the base course .  It provides additional load distribution and contributes to drainage and frost resistance.   The base is built of clean sand or rock.  The base layer provides uniform support to the pavement and allows water that penetrates any joints . QSM 602 Base Course
  • 19.  After the binder is put into place with paver, it is compacted with a vibratory roller for tighter density and added strength.  Base courses are usually constructed out of: i) Aggregate: Base courses are most typically constructed from durable aggregates that will not be damaged by moisture or frost action. ii) HMA: In certain situations where high base stiffness is desired, base courses can be constructed using a variety of HMA mixes.  QSM 602 Base Course (Cont)
  • 20.  This is the top layer which comes in contact with traffic.   It normally contains the highest quality materials.   It serves to prevent the entrance of excessive quantities of surface water into the underlying base & sub-grade.  It is sometimes subdivided into two layers: i) Wearing Course: A layer in direct contact with traffic loads.  It is meant to take the impact of traffic wear and can be removed and replaced as it becomes worn.  ii) Intermediate/Binder Course: It's main purpose is to distribute load. It may compose of one or several HMA sublayers. QSM 602 Surface Course
  • 21.  Hot mix asphalt (HMA) is "the black stuff" used as a pavement material.  Its a combination of aggregate and asphalt binder mixed together at elevated temperatures that forms a hard, strong construction material when cooled to suitable temperatures.    Also known as "asphalt concrete" (AC), "asphalt", "blacktop" or "bitumin“. QSM 602 Surface Course
  • 22.  when it is well mixed, it is laid down on the roadway as pavement.  The pavement must then be compacted to achieve uniform density.  If this is not done properly,  it can reduce the life time of the pavement and increase the costs of maintaining the road.  It usually costs less.  The life expectancy of an asphalt pavement is between 15 to 20 years. QSM 602 Surface Course
  • 23. 2. RIGID PAVEMENT… TYPE OF ROAD/PAVEMENT
  • 24.  Rigid pavement composed of a PCC surface course.  Such pavements are "stiffer" than flexible pavements due to the high modulus of elasticity of the PCC material.   Further, these pavements can have reinforcing steel, which is generally used to reduce or eliminate joints.   Because of its relative rigidity, the pavement structure distributes loads over a wide area with only one, or at most two, structural layers.  This type of pavement can serve 20 to 40 years with little or no maintenance or rehabilitation and often used in urban and high traffic areas. QSM 602
  • 25.  This is the layer (or layers) under the base layer.   The properties and function of this layer are similar to as in flexible roads/pavements.  A sub-base is not always needed and therefore may often be omitted (OPTIONAL DEPENDING ON SUBGRAGE OR SOIL). QSM 602 Sub-base Course
  • 26.  This is the layer directly below the PCC layer and generally consists of aggregate or stabilized sub-grade.  It provides additional load distribution, contributes to drainage, uniform support to the pavement and a stable platform for construction equipment.  Base courses are usually constructed out of: a) Aggregate base.  b) Stabilized aggregate or soil. c) Dense-graded HMA.  d) Lean concrete QSM 602 Base Course
  • 27.  The surface course is the layer in contact with traffic loads. It consists of the PCC slab which is the stiffest layer and provides the majority of strength.    The surface course can vary in thickness but is usually between 150 mm (for light loading) and 300mm (for heavy loads and high traffic).  Portland cement concrete is used as pavement material. QSM 602 Surface Course
  • 28. Portland cement concrete is made by mixing portland cement with water, and coarse- and fine-size rocks. It initially can be more expensive. The life expectancy of portland  cement pavement varies, as little as 20 years or more than 40 years. QSM 602 Surface Course
  • 29. There are several factors that affect pavement life: Traffic volume Quality of materials used Construction practices, and How well the other layers of the road perform. QSM 602
  • 30. Hard Shoulder  Continuous strips alongside pavements, which vehicles may drive during emergencies.  Normally 3 m wide to fulfilled the functions of the slow lane. QSM 602
  • 31. Kerbs  To define the limits of carriageway.  It is the dividing line between carriageway and footpath. QSM 602
  • 32. Drainage- Surface and Subsurface  Road Chamber – Cross falls.  To cope with heavy water run-off during a storm. QSM 602
  • 33. Street lamps:  Street lamps are designed to illuminate the surrounding area at night, not only as a deterrent to criminals but also to allow people to see where they're going. QSM 602
  • 34. Road Markings:  This furniture is any kind of device or material that is used on a road surface in order to convey official information.  They provide guidance and information to drivers and pedestrians.  They can be used to delineate traffic lanes or serve as noise generators when run across a road. QSM 602
  • 35. traffic Signs:  They warn drivers of upcoming road conditions such as a "blind curve", speed limits, etc.  Direction signs tell the reader the way to a location.  Direction signs are usually mounted on poles.  Illumination is added in order to aid nighttime users. QSM 602