SlideShare a Scribd company logo
1 of 5
Mechanical Completion
Certificate (MCC)
A certificate issued by the Executor to document that his MC scope
has been carried out. The MC certificates shall be used per MC
package.
Mechanical Completion
Check Record (MCCR)
A discipline Check record for the various equipment. These records
form the basis of the MC documentation. MCCRs are prepared for
one or more items for recording of the results from checking and
testing performed during Mechanical completion.Mechanical completion and commissioning Z-007
Rev. 2, Dec. 1999
NORSOK standard Page 4 of 54
Mechanical Completion (MC) The checking and testing of equipment and construction to confirm
that the installation is in accordance with drawings and
specifications and ready for commissioning in a safe manner and in
compliance with project requirements.
Mechanical Completions, Preservation, Pre-
Commissioning & Commissioning
Mechanical Completion (CMS)
Mechanical Completion is an integral process of management verification of approved design
installation. It represents the interface between construction and commissioning group activities and
includes all interface checks between all systems and subsystems whether modular or plant wide.
Mechanical Completion verification confirms that construction and installation of equipment, piping,
instrumentation, cabling, electrical, telecoms and mechanical components are physically complete
and all inspections, testing and documentation requirements have been completed.
Preservation
Preservation covers the method of protection and preventative maintenance carried out on equipment
and systems before and after they are taken into use. The process begins with the application of
preservatives and protection fittings by suppliers/vendors, prior to delivery permitting the
equipment/system to arrive at GPS fabrication yard undamaged.
Pre-Commissioning
Pre-Commissioning (PC) is the stage that involves the verification of functional operability of
elements within the system, by subjecting them to a set of simulated operational conditions, to
achieve a state of readiness for commissioning. Pre-commissioning requires energisation of
equipment and the introduction of the Permit to Work / LOTO systems.
Some examples include the running and entire testing of the power generation systems, testing of
emergency shutdown and control systems and dynamic trials on oil and gas export systems prior to
load out to minimize the offshore or site scope.
Commissioning
GPS’s commissioning capability consists of checking and testing all functions according to their
design parameters in conditions as close as possible to the design conditions, and in bringing them to
the status “Ready for Start-Up / Operations Readiness”.
Start-Up & Commissioning
Late facility design details, accelerated construction schedules, just-
in-time manufacturing of equipment and managed low-levels of
materials inventory at the distributor are the New Normal. As such,
improper attention to systems completion, systems turnover, pre-
commissioning, commissioning and start-up can lead a project further
toward failed economics.
Useful Definitions:
System – A section of the facility or process which is mechanically
continuous, but which can be isolated from other sections of the plant
or process in a way which allows independent turnover, inspection or
confirmation of process function.
Pre-Commissioning – Checking for design conformance, piping
mechanical completion, electrical code compliance and instrumentation installation and process tubing
adequacy. Pre-Commissioning includes equipment run-in, PLC and DCS action checks, and a rotation
check of process equipment which can be isolated from the overall process. Pre-Commissioning
activities overlap with construction activities. The two are isolated from one-another by system
boundaries and a robust system package turnover protocol. LOTO compliance, always a must, takes on
even greater meaning as electrical equipment and circuits become energized and equipment rotation
inspections commence.
Commissioning – The phase of a project where actual process fluids are introduced to process
equipment. Commissioning includes multiple function and process performance checks but precedes
actual Start-Up.
Start-Up – When stable process conditions are established and intentional product making or
manufacturing for sale commences.
As one of the last contractors to have access to the work, Ardent
inherits the lost schedule float of all construction predecessors in the
form of construction acceleration. To help manage ourselves toward
timely and efficient completion we have developed a number of
proprietary databases and work-order progress management tools. These tools blend well with systems
turnover and follow on well into systems pre-commissioning and start-up.
Pre-Commissioning starts when facility systems achieve Mechanical Completion. In today's fast track
world of building while some detailed designs are still in review, the Pre-Commissioning efforts must be
tasked and managed in conjunction with the project's integrated Critical Path schedule. Construction is
often progressed by area, and by the time erection progress exceeds 70% and/or I&E progress exceeds
50%, it is time to begin turning over systems from construction to the Pre-Commissioning team. Ardent's
system turnover database and protocol helps to define,punchlist and manage inspection and pre-
commissioning efforts. Our experienced instrument technicians and field process techs can inspect,
track and assure systems completion progress is monitored, measured, achieved and reported.
Commissioning and Start-up are a key part of project execution and are the natural outflow of quality
systems completion, turnover and pre-commissioning. Introducing and stabilizing process fluids and
conditions and commencing product export are WHY facilities get built. Ardent's Pre-Commissioning,
Commissioning and Start-up Techs can help lead the way to the ultimate finish line, successful project
completion.
5 MECHANICAL COMPLETION
5.1 Introduction
This chapter forms the basis for the execution and documentation of mechanical completion
activities.
Mechanical completion takes place through all phases of a project, up to the commissioning phase.
• Mechanical completion encompasses all disciplines.
• The detailed responsibilities are described in the contract.
• Executor of MC activities is responsible for establishing and compiling the MC dossiers and
report status into PCS.
5.2 Documentation for a MC Package
The MC package shall consist of an MCC, an MCSI, MCCRs and a PLR printout as described
below.
A Mechanical Completion Certificate (MCC) is a form completed by the Executor after all MC is
carried out. The MCC is the cover sheet for each MC package. An MC package shall when signed,
be ready for handover to commissioning.
The Check Records (MCCR) are the forms on which the Executors record the results of all
checks, inspections and tests carried out for each individual item.
A Punch List (PL) shall be prepared by the Executor along with the package a PL shall be included to
document incomplete work.
A Mechanical Completion Status Index (MCSI) listing the status of all MCCRs for the MC
package shall be included.
5.3 Handover at Mechanical completion
Handover from Mechanical completion to commissioning shall be at commissioning package level,
documented by the ready for commissioning certificate (RFCC).
5.4 Carry Over Work Register (COWR)
The COWR lists all punch items that the Project accepts as cannot be completed during present
phase. The register is used for the release of the work from the Executor and will as such be an input
to the scheduling and planning of outstanding work to be performed during later phases.
The COWR Item number and cross reference to the Punch list/MCCR shall be given. COWR work
shall be marked up on drawings or sketches and be included in the records.
Material Status List (MSL) and marked up drawings/instruction shall contain sufficient information
for job setting in a later phase.
5.5 Typical Mechanical completion activities
Mechanical completion activities includes checking of fabrication and installation work.
Executor shall complete packages related to listed disciplines and as required by the MCSI.
Executor shall complete the check list items as per the MCCRs. (See Annex A for typicals). The
activities shall include but not be limited to:
5.5.1 Mechanical
• Visual inspection for complete and correct installation.
• Internal inspection of tanks and vessels.
• Alignment.
• Load testing of lifting equipment.
• Hot oil flushing.
• Bolt tensioning.
• Dimension control.
• Preservation.
5.5.2 Electrical
• Visual inspection for complete and correct installation.
• Insulation and continuity testing of cables.
• Insulation testing of generator, transformers and motors, panels, distribution board etc.
• Earthing checks.
• Static check of switches and control devices.
• Battery preparations.
• Lighting and socket outlet checks.
• Area completion.
• Heat tracing.
• Preservation.
5.5.3 Instrument/Telecommunication
• Calibration and testing of instruments prior to installation.
• Visual inspection for complete and correct installation.
• Insulation and continuity testing of cables.
• Cleaning, flushing, pressure and leak testing of pneumatic and hydraulic tubing.
• Adjustment of control, alarm and shutdown settings.
• Loop testing.
• Function testing of control systems.
• Function testing of field instruments.
• Hot oil flushing of instrument tubing.
• Area completion.
• Preservation.
5.5.4 Piping
• NDE carried out.
• Welding procedures.
• Removal of all items subject to damage during flushing, cleaning and pressure testing.
• Flushing of pipework.
• Chemical cleaning and testing of pipework.
• Drying of tested pipework.
• Preservation of tested pipework.
• Reinstatement of all items after testing.
• Final inspection of pipework.
• Test ISO's and P&ID's showing the extent of each pressure test.
• Pneumatic and hydraulic tubing.
• Hot oil flushing of pipework.
• Bolt tensioning.
• Pipe supports completed.
• Insulation.
• Flow coding.

More Related Content

What's hot

Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
110921 commissioning of offshore installations
110921 commissioning of offshore installations110921 commissioning of offshore installations
110921 commissioning of offshore installationslaithu2908
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Gary Hayes
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTmuhammad jamil
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.maqsood1459
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORMohsin Iqubal
 
Instrument commissioning engineer
Instrument commissioning engineerInstrument commissioning engineer
Instrument commissioning engineerMaire Tecnimont
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Process Plant Start Up and Commissioning
Process Plant Start Up and CommissioningProcess Plant Start Up and Commissioning
Process Plant Start Up and CommissioningpetroEDGE
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CoursepetroEDGE
 

What's hot (20)

Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
110921 commissioning of offshore installations
110921 commissioning of offshore installations110921 commissioning of offshore installations
110921 commissioning of offshore installations
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Saudi Aramco Engineering Procedures (SAEP)3
Saudi Aramco Engineering Procedures (SAEP)3Saudi Aramco Engineering Procedures (SAEP)3
Saudi Aramco Engineering Procedures (SAEP)3
 
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
 
Nitrogen purging
Nitrogen  purgingNitrogen  purging
Nitrogen purging
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation Engineer
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Basic engineering_Checklist
Basic engineering_ChecklistBasic engineering_Checklist
Basic engineering_Checklist
 
Instrument commissioning engineer
Instrument commissioning engineerInstrument commissioning engineer
Instrument commissioning engineer
 
Project Schedule - Level IV Schedule
Project Schedule - Level IV ScheduleProject Schedule - Level IV Schedule
Project Schedule - Level IV Schedule
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Process Plant Start Up and Commissioning
Process Plant Start Up and CommissioningProcess Plant Start Up and Commissioning
Process Plant Start Up and Commissioning
 
Pipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & MaintenancePipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & Maintenance
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory Course
 

Similar to Mechanical completion

Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resumeUmang Tailor
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument EngineerKamran Saeed
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdfharis348605
 
Controlling interests editors
Controlling interests editorsControlling interests editors
Controlling interests editorseldhoev
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxRamkumar906213
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxRamkumar906213
 
APTRANSCO-Technical-reference-book-2011-vol-ii.pdf
APTRANSCO-Technical-reference-book-2011-vol-ii.pdfAPTRANSCO-Technical-reference-book-2011-vol-ii.pdf
APTRANSCO-Technical-reference-book-2011-vol-ii.pdfssuser1fc1f0
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineKsPuri
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSOlivia Wilson
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSOlivia Wilson
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 

Similar to Mechanical completion (20)

Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resume
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
019113
019113019113
019113
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdf
 
CV
CVCV
CV
 
Cv of nilesh rk
Cv of nilesh rkCv of nilesh rk
Cv of nilesh rk
 
commissioning c-3
commissioning c-3commissioning c-3
commissioning c-3
 
Controlling interests editors
Controlling interests editorsControlling interests editors
Controlling interests editors
 
Brij mohan cv
Brij mohan  cvBrij mohan  cv
Brij mohan cv
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 
Sreekumar_Resume
Sreekumar_ResumeSreekumar_Resume
Sreekumar_Resume
 
APTRANSCO-Technical-reference-book-2011-vol-ii.pdf
APTRANSCO-Technical-reference-book-2011-vol-ii.pdfAPTRANSCO-Technical-reference-book-2011-vol-ii.pdf
APTRANSCO-Technical-reference-book-2011-vol-ii.pdf
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbine
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
GMP Equipment Qualification and Maintenance System .pdf
GMP Equipment Qualification and Maintenance System .pdfGMP Equipment Qualification and Maintenance System .pdf
GMP Equipment Qualification and Maintenance System .pdf
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORS
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORS
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 

Recently uploaded

Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubaijaehdlyzca
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 

Recently uploaded (20)

Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 

Mechanical completion

  • 1. Mechanical Completion Certificate (MCC) A certificate issued by the Executor to document that his MC scope has been carried out. The MC certificates shall be used per MC package. Mechanical Completion Check Record (MCCR) A discipline Check record for the various equipment. These records form the basis of the MC documentation. MCCRs are prepared for one or more items for recording of the results from checking and testing performed during Mechanical completion.Mechanical completion and commissioning Z-007 Rev. 2, Dec. 1999 NORSOK standard Page 4 of 54 Mechanical Completion (MC) The checking and testing of equipment and construction to confirm that the installation is in accordance with drawings and specifications and ready for commissioning in a safe manner and in compliance with project requirements. Mechanical Completions, Preservation, Pre- Commissioning & Commissioning Mechanical Completion (CMS) Mechanical Completion is an integral process of management verification of approved design installation. It represents the interface between construction and commissioning group activities and includes all interface checks between all systems and subsystems whether modular or plant wide. Mechanical Completion verification confirms that construction and installation of equipment, piping, instrumentation, cabling, electrical, telecoms and mechanical components are physically complete and all inspections, testing and documentation requirements have been completed. Preservation Preservation covers the method of protection and preventative maintenance carried out on equipment and systems before and after they are taken into use. The process begins with the application of preservatives and protection fittings by suppliers/vendors, prior to delivery permitting the equipment/system to arrive at GPS fabrication yard undamaged. Pre-Commissioning Pre-Commissioning (PC) is the stage that involves the verification of functional operability of elements within the system, by subjecting them to a set of simulated operational conditions, to achieve a state of readiness for commissioning. Pre-commissioning requires energisation of equipment and the introduction of the Permit to Work / LOTO systems.
  • 2. Some examples include the running and entire testing of the power generation systems, testing of emergency shutdown and control systems and dynamic trials on oil and gas export systems prior to load out to minimize the offshore or site scope. Commissioning GPS’s commissioning capability consists of checking and testing all functions according to their design parameters in conditions as close as possible to the design conditions, and in bringing them to the status “Ready for Start-Up / Operations Readiness”. Start-Up & Commissioning Late facility design details, accelerated construction schedules, just- in-time manufacturing of equipment and managed low-levels of materials inventory at the distributor are the New Normal. As such, improper attention to systems completion, systems turnover, pre- commissioning, commissioning and start-up can lead a project further toward failed economics. Useful Definitions: System – A section of the facility or process which is mechanically continuous, but which can be isolated from other sections of the plant or process in a way which allows independent turnover, inspection or confirmation of process function. Pre-Commissioning – Checking for design conformance, piping mechanical completion, electrical code compliance and instrumentation installation and process tubing adequacy. Pre-Commissioning includes equipment run-in, PLC and DCS action checks, and a rotation check of process equipment which can be isolated from the overall process. Pre-Commissioning activities overlap with construction activities. The two are isolated from one-another by system boundaries and a robust system package turnover protocol. LOTO compliance, always a must, takes on even greater meaning as electrical equipment and circuits become energized and equipment rotation inspections commence. Commissioning – The phase of a project where actual process fluids are introduced to process equipment. Commissioning includes multiple function and process performance checks but precedes actual Start-Up. Start-Up – When stable process conditions are established and intentional product making or manufacturing for sale commences. As one of the last contractors to have access to the work, Ardent inherits the lost schedule float of all construction predecessors in the form of construction acceleration. To help manage ourselves toward timely and efficient completion we have developed a number of
  • 3. proprietary databases and work-order progress management tools. These tools blend well with systems turnover and follow on well into systems pre-commissioning and start-up. Pre-Commissioning starts when facility systems achieve Mechanical Completion. In today's fast track world of building while some detailed designs are still in review, the Pre-Commissioning efforts must be tasked and managed in conjunction with the project's integrated Critical Path schedule. Construction is often progressed by area, and by the time erection progress exceeds 70% and/or I&E progress exceeds 50%, it is time to begin turning over systems from construction to the Pre-Commissioning team. Ardent's system turnover database and protocol helps to define,punchlist and manage inspection and pre- commissioning efforts. Our experienced instrument technicians and field process techs can inspect, track and assure systems completion progress is monitored, measured, achieved and reported. Commissioning and Start-up are a key part of project execution and are the natural outflow of quality systems completion, turnover and pre-commissioning. Introducing and stabilizing process fluids and conditions and commencing product export are WHY facilities get built. Ardent's Pre-Commissioning, Commissioning and Start-up Techs can help lead the way to the ultimate finish line, successful project completion. 5 MECHANICAL COMPLETION 5.1 Introduction This chapter forms the basis for the execution and documentation of mechanical completion activities. Mechanical completion takes place through all phases of a project, up to the commissioning phase. • Mechanical completion encompasses all disciplines. • The detailed responsibilities are described in the contract. • Executor of MC activities is responsible for establishing and compiling the MC dossiers and report status into PCS. 5.2 Documentation for a MC Package The MC package shall consist of an MCC, an MCSI, MCCRs and a PLR printout as described below. A Mechanical Completion Certificate (MCC) is a form completed by the Executor after all MC is carried out. The MCC is the cover sheet for each MC package. An MC package shall when signed, be ready for handover to commissioning. The Check Records (MCCR) are the forms on which the Executors record the results of all checks, inspections and tests carried out for each individual item. A Punch List (PL) shall be prepared by the Executor along with the package a PL shall be included to document incomplete work. A Mechanical Completion Status Index (MCSI) listing the status of all MCCRs for the MC package shall be included. 5.3 Handover at Mechanical completion Handover from Mechanical completion to commissioning shall be at commissioning package level,
  • 4. documented by the ready for commissioning certificate (RFCC). 5.4 Carry Over Work Register (COWR) The COWR lists all punch items that the Project accepts as cannot be completed during present phase. The register is used for the release of the work from the Executor and will as such be an input to the scheduling and planning of outstanding work to be performed during later phases. The COWR Item number and cross reference to the Punch list/MCCR shall be given. COWR work shall be marked up on drawings or sketches and be included in the records. Material Status List (MSL) and marked up drawings/instruction shall contain sufficient information for job setting in a later phase. 5.5 Typical Mechanical completion activities Mechanical completion activities includes checking of fabrication and installation work. Executor shall complete packages related to listed disciplines and as required by the MCSI. Executor shall complete the check list items as per the MCCRs. (See Annex A for typicals). The activities shall include but not be limited to: 5.5.1 Mechanical • Visual inspection for complete and correct installation. • Internal inspection of tanks and vessels. • Alignment. • Load testing of lifting equipment. • Hot oil flushing. • Bolt tensioning. • Dimension control. • Preservation. 5.5.2 Electrical • Visual inspection for complete and correct installation. • Insulation and continuity testing of cables. • Insulation testing of generator, transformers and motors, panels, distribution board etc. • Earthing checks. • Static check of switches and control devices. • Battery preparations. • Lighting and socket outlet checks. • Area completion. • Heat tracing. • Preservation. 5.5.3 Instrument/Telecommunication
  • 5. • Calibration and testing of instruments prior to installation. • Visual inspection for complete and correct installation. • Insulation and continuity testing of cables. • Cleaning, flushing, pressure and leak testing of pneumatic and hydraulic tubing. • Adjustment of control, alarm and shutdown settings. • Loop testing. • Function testing of control systems. • Function testing of field instruments. • Hot oil flushing of instrument tubing. • Area completion. • Preservation. 5.5.4 Piping • NDE carried out. • Welding procedures. • Removal of all items subject to damage during flushing, cleaning and pressure testing. • Flushing of pipework. • Chemical cleaning and testing of pipework. • Drying of tested pipework. • Preservation of tested pipework. • Reinstatement of all items after testing. • Final inspection of pipework. • Test ISO's and P&ID's showing the extent of each pressure test. • Pneumatic and hydraulic tubing. • Hot oil flushing of pipework. • Bolt tensioning. • Pipe supports completed. • Insulation. • Flow coding.