CONTENTS
 Construction of 72.5~145kV
◦ 3-ph encapsulated
◦ 3-ph segregated
 Construction of 245~362kV
◦ One break
◦ Two break
Construction of 72.5~145kV
 3-ph encapsulated v/s 3-ph segregated
 Both type GIS with
the assumption that
the busbar diameter
and insulation
distance are equal
for both of those
type.
 Segregated type has
a higher space
factor and therefor
has grater potential
to be made smaller
with a new design.
Construction of 72.5~145kV
 3-ph encapsulated
1. Circuit Breaker
2. Bus Disconnector
with maintenance
Earthing switch
3. Bus Disconnector
4. BCT
5. Line DS/ES
6. High speed ES
(HSES)
7. Cable head
8. Operating
mechanism for
CB
9. Potential
transformer
10.GAS area
 3-ph encapsulated
Construction of 72.5~145kV
 3-ph segregated
1. Main bus
2. Bus Disconnector
3. Earthing switch
for maintenance
4. Circuit breaker
5. Current
transformer
6. Line
Disconnector
7. Earthing switch
for making-proof
8. Bushing
9. Insulator spacer
10.Operating
mechanism for
CB
 3-ph segregated
Construction of 245~362kV
 one break  Two break
 one break
Construction of 245~362kV
1. Main bus
2. Bus Disconnector
3. Earthing switch
for maintenance
4. Current
transformer
5. Circuit breaker
6. Line
Disconnector
7. Earthing switch
for making-proof
8. Bushing
9. Insulator spacer
10.Operating
mechanism for
CB
 one break
 one break
 one break
 Two break
Construction of 245~362kV
1. Main bus
2. Bus Disconnector
3. Earthing switch
for maintenance
4. Current
transformer
5. Circuit breaker
6. Line
Disconnector
7. Earthing switch
for making-proof
8. Bushing
9. Insulator spacer
10.Operating
mechanism for
CB
 Two break
 Two break
 Two break
FURTHER PRESENTATION WORK
 Construction of high voltage GIS sub-station
 Maintenance of GIS sub-station
 GIS approach in the GRID
 Visit of 400/220KV GIS substation located at DASTAN
, bardoli .
REFERENCES
 GAS INSULATED SWITCHEAR(R) , 2003.01(09)
2011.08 PRINTED IN KOREA HUMAN POWER.
 SHUICHI SUIYAMA ,” EXTRA-HIGH VOLTAGE SF6
AS –INSULATED SWITCHEAR ” , IEEE , VOL.45
NO.3 , FUJI ELECTRICAL .
 ALSTOM , B65 ,72.5-145KV GAS-INSULATED
SUBSTATION .
 ALSTOM , B105 , 245-362KV GAS-INSULATED
SUBSTATION .
Gas insulated sub station 3

More Related Content

What's hot

Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
sharique_64
 

What's hot (20)

Gas insulated substation 2
Gas insulated substation 2Gas insulated substation 2
Gas insulated substation 2
 
Powerpoint presentation on SF6 circuit breaker
Powerpoint presentation on SF6 circuit breakerPowerpoint presentation on SF6 circuit breaker
Powerpoint presentation on SF6 circuit breaker
 
GIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & ShanniGIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & Shanni
 
Ppt
PptPpt
Ppt
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
27072013140225 gas-insulated-substations
27072013140225 gas-insulated-substations27072013140225 gas-insulated-substations
27072013140225 gas-insulated-substations
 
Gis ppt (gas insulated sub station) deepak kumar kannaujiya,
Gis ppt (gas insulated sub station)  deepak kumar kannaujiya,Gis ppt (gas insulated sub station)  deepak kumar kannaujiya,
Gis ppt (gas insulated sub station) deepak kumar kannaujiya,
 
Gas insulated substation.
Gas insulated substation.Gas insulated substation.
Gas insulated substation.
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Reactors
ReactorsReactors
Reactors
 
Protection of transformer
Protection of transformerProtection of transformer
Protection of transformer
 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Circuit Breaker and its types
Circuit Breaker and its typesCircuit Breaker and its types
Circuit Breaker and its types
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
GIS(GAS INSULATED SUBSTATION)
GIS(GAS  INSULATED  SUBSTATION) GIS(GAS  INSULATED  SUBSTATION)
GIS(GAS INSULATED SUBSTATION)
 
Power System Restoration Drill
Power System Restoration DrillPower System Restoration Drill
Power System Restoration Drill
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
Online Condition Monitoring And Diagnosis Of Power Transformers Their Bushin...
 Online Condition Monitoring And Diagnosis Of Power Transformers Their Bushin... Online Condition Monitoring And Diagnosis Of Power Transformers Their Bushin...
Online Condition Monitoring And Diagnosis Of Power Transformers Their Bushin...
 
power transformer and its usage
power transformer and its usage power transformer and its usage
power transformer and its usage
 

Viewers also liked

Presentation for Seminar (fixed)
Presentation for Seminar (fixed)Presentation for Seminar (fixed)
Presentation for Seminar (fixed)
Ai' Chaq
 
HSC Gas Insulated Standard Capacitor
HSC Gas Insulated Standard CapacitorHSC Gas Insulated Standard Capacitor
HSC Gas Insulated Standard Capacitor
Fang Sam
 
ABB Transformer Bushing Molykote Recommendations - Project Sales Corp
ABB Transformer Bushing Molykote Recommendations - Project Sales CorpABB Transformer Bushing Molykote Recommendations - Project Sales Corp
ABB Transformer Bushing Molykote Recommendations - Project Sales Corp
Project Sales Corp
 
BS 2 Electrical installation 1
BS 2 Electrical installation 1BS 2 Electrical installation 1
BS 2 Electrical installation 1
Est
 
Earthing Syatem
Earthing SyatemEarthing Syatem
Earthing Syatem
Noman Khan
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
Biswajit Pratihari
 

Viewers also liked (17)

Gas insulated sub station 4
Gas insulated sub station 4Gas insulated sub station 4
Gas insulated sub station 4
 
Presentation for Seminar (fixed)
Presentation for Seminar (fixed)Presentation for Seminar (fixed)
Presentation for Seminar (fixed)
 
HSC Gas Insulated Standard Capacitor
HSC Gas Insulated Standard CapacitorHSC Gas Insulated Standard Capacitor
HSC Gas Insulated Standard Capacitor
 
Electrical installation hanbook (4th edition)
Electrical installation hanbook (4th edition)Electrical installation hanbook (4th edition)
Electrical installation hanbook (4th edition)
 
Dry type RIF(RIP) condenser transformer bushing advantages
Dry type RIF(RIP) condenser transformer bushing advantagesDry type RIF(RIP) condenser transformer bushing advantages
Dry type RIF(RIP) condenser transformer bushing advantages
 
ABB Transformer Bushing Molykote Recommendations - Project Sales Corp
ABB Transformer Bushing Molykote Recommendations - Project Sales CorpABB Transformer Bushing Molykote Recommendations - Project Sales Corp
ABB Transformer Bushing Molykote Recommendations - Project Sales Corp
 
Increasing Transformer Reliability by Smart Bushing
Increasing Transformer Reliability by Smart BushingIncreasing Transformer Reliability by Smart Bushing
Increasing Transformer Reliability by Smart Bushing
 
Gas insulated sub station 2
Gas insulated sub station 2Gas insulated sub station 2
Gas insulated sub station 2
 
Abb electrical installation handbook 6th edition2010
Abb electrical installation handbook 6th edition2010Abb electrical installation handbook 6th edition2010
Abb electrical installation handbook 6th edition2010
 
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWARFACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
 
Online hv bushing monitoring
Online hv bushing monitoringOnline hv bushing monitoring
Online hv bushing monitoring
 
HV Substation Earthing Guide - Central Networks
HV Substation Earthing Guide - Central NetworksHV Substation Earthing Guide - Central Networks
HV Substation Earthing Guide - Central Networks
 
BS 2 Electrical installation 1
BS 2 Electrical installation 1BS 2 Electrical installation 1
BS 2 Electrical installation 1
 
Earthing Syatem
Earthing SyatemEarthing Syatem
Earthing Syatem
 
Basics of earthing
Basics of earthingBasics of earthing
Basics of earthing
 
Deepak kumar
Deepak kumarDeepak kumar
Deepak kumar
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
 

Similar to Gas insulated sub station 3

Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
Reza Shah Abadi
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
Reza Shah Abadi
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
Ramendra Dhiman
 
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Power System Operation
 

Similar to Gas insulated sub station 3 (20)

132kv G.S.S. Jalore
132kv G.S.S. Jalore132kv G.S.S. Jalore
132kv G.S.S. Jalore
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
 
Broadband planar 90 degrees loaded-stub phase shifter
Broadband planar 90 degrees loaded-stub phase shifterBroadband planar 90 degrees loaded-stub phase shifter
Broadband planar 90 degrees loaded-stub phase shifter
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 
ELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptx
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
 
COBRA PRESENTATION
COBRA  PRESENTATIONCOBRA  PRESENTATION
COBRA PRESENTATION
 
Design Approach To High Voltage High Power Steam-Turbine Driven Alternator
Design Approach To High Voltage High Power Steam-Turbine Driven AlternatorDesign Approach To High Voltage High Power Steam-Turbine Driven Alternator
Design Approach To High Voltage High Power Steam-Turbine Driven Alternator
 
Substation
Substation Substation
Substation
 
Trishuli hydro power plant 3 day educational visit
Trishuli hydro power plant 3 day educational visitTrishuli hydro power plant 3 day educational visit
Trishuli hydro power plant 3 day educational visit
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 
trisuli hydropower nepal
trisuli hydropower nepaltrisuli hydropower nepal
trisuli hydropower nepal
 
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONS
 
Ls catalog thiet bi dien pf e_dienhathe.vn
Ls catalog thiet bi dien pf e_dienhathe.vnLs catalog thiet bi dien pf e_dienhathe.vn
Ls catalog thiet bi dien pf e_dienhathe.vn
 
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxChapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
 

Recently uploaded

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 

Gas insulated sub station 3

  • 1. GAS INSULATED SUB-STATION RONAL PARMAR 140080707003
  • 2. CONTENTS  Construction of 72.5~145kV ◦ 3-ph encapsulated ◦ 3-ph segregated  Construction of 245~362kV ◦ One break ◦ Two break
  • 3. Construction of 72.5~145kV  3-ph encapsulated v/s 3-ph segregated  Both type GIS with the assumption that the busbar diameter and insulation distance are equal for both of those type.  Segregated type has a higher space factor and therefor has grater potential to be made smaller with a new design.
  • 4. Construction of 72.5~145kV  3-ph encapsulated 1. Circuit Breaker 2. Bus Disconnector with maintenance Earthing switch 3. Bus Disconnector 4. BCT 5. Line DS/ES 6. High speed ES (HSES) 7. Cable head 8. Operating mechanism for CB 9. Potential transformer 10.GAS area
  • 6. Construction of 72.5~145kV  3-ph segregated 1. Main bus 2. Bus Disconnector 3. Earthing switch for maintenance 4. Circuit breaker 5. Current transformer 6. Line Disconnector 7. Earthing switch for making-proof 8. Bushing 9. Insulator spacer 10.Operating mechanism for CB
  • 8. Construction of 245~362kV  one break  Two break
  • 9.  one break Construction of 245~362kV 1. Main bus 2. Bus Disconnector 3. Earthing switch for maintenance 4. Current transformer 5. Circuit breaker 6. Line Disconnector 7. Earthing switch for making-proof 8. Bushing 9. Insulator spacer 10.Operating mechanism for CB
  • 13.  Two break Construction of 245~362kV 1. Main bus 2. Bus Disconnector 3. Earthing switch for maintenance 4. Current transformer 5. Circuit breaker 6. Line Disconnector 7. Earthing switch for making-proof 8. Bushing 9. Insulator spacer 10.Operating mechanism for CB
  • 17. FURTHER PRESENTATION WORK  Construction of high voltage GIS sub-station  Maintenance of GIS sub-station  GIS approach in the GRID  Visit of 400/220KV GIS substation located at DASTAN , bardoli .
  • 18. REFERENCES  GAS INSULATED SWITCHEAR(R) , 2003.01(09) 2011.08 PRINTED IN KOREA HUMAN POWER.  SHUICHI SUIYAMA ,” EXTRA-HIGH VOLTAGE SF6 AS –INSULATED SWITCHEAR ” , IEEE , VOL.45 NO.3 , FUJI ELECTRICAL .  ALSTOM , B65 ,72.5-145KV GAS-INSULATED SUBSTATION .  ALSTOM , B105 , 245-362KV GAS-INSULATED SUBSTATION .