PROJECT PROGRESS REPORT
                             As of EO March 2012

Project Title: Red and Black School Building Program
Implementing Agency: DepEd -CAR
Donor:      (X) GOP                        Loan/Grant Proceeds:
            ( ) Loan                       Peso Counterpart:
            ( ) Grant                      Total Project Cost: 146.54 M (CY 2011)
                                                               142.7 M (CY 2012)

Location/Area Coverage:      Regionwide
Description:

The Regular School Building Program specifically targets schools which are
categorized under the Red Zone or those which have a ratio of 56 or more students to
one classroom: and the Black Zone, or schools which make use of makeshift
classrooms and facilities.

The standard DepEd design is 7m x 9m classroom for rural areas with a classroom-
student ratio of 1:45. This standard also applies to all public secondary schools,
regardless of location and class size.

In CAR, the CY 2011 projects (carry-over) have a total project cost of Php 146.5 M.
The table below shows the details per province/city:

         Province/city    No. of sites       No. of       Project       Status
                           (CY 2011)      Classrooms       Cost        (AO Mar
                                                                         2012)
         Abra                 18              16         17,436,000     70.56%
         Apayao               21              26         15,812,000     85.78%
         Benguet              18              28         25,793,000     94.50%


         Ifugao               13              21         15,993,000    90.56%

         Kalinga               40              64        41,486,000    88.91%
         Mt. Province          33              34        20,042,000    89.89%
         Baguio                6               10         9,981,000     100%
          Total, CAR          149             209       146,543,000    88.44%

Meanwhile, SARO (Php 142.7 M) for CY 2012 projects is yet for release which
caused implementation delay.
Project Duration:    Start: January             End: December
                               PROJECT PROGRESS
  For CY 2012       AO 1 Quarter AO 2nd Quarter AO 3rd Quarter AO 4th Quarter
                        st

Target
Actual             88.44 %
Slippage
Cumulative Status:           Status              Physical         Financial
(Since start of        Target
project)               Actual (slippage)          88.44%
Current                Late release of project SARO for CY 2012
Implementation
Issues and/or
Problems
Encountered (if any):
Actions Taken/         Followed-up SARO release
Recommendations:
Remarks:
Agency Contact         DIR. ELLEN B. DONATO
Person:                OIC-Regional Director IV
                       Wangal, La Trinidad
                       2601 Benguet
                       Tel No. 422-1318 (RD)
Red and Black School Building Program

More Related Content

Similar to Red and Black School Building Program

Ind ii program design document-pilot program prim pp presentation 0811201...
Ind ii    program design document-pilot program prim pp presentation  0811201...Ind ii    program design document-pilot program prim pp presentation  0811201...
Ind ii program design document-pilot program prim pp presentation 0811201...Indonesia Infrastructure Initiative
 
Summary of programs and projects as of first quarter 2012
Summary of programs and projects as of first quarter 2012Summary of programs and projects as of first quarter 2012
Summary of programs and projects as of first quarter 2012Rdc Cordillera
 
Proposed budget 2012 2013
Proposed budget 2012 2013Proposed budget 2012 2013
Proposed budget 2012 2013grelli
 
Summary of priority sectoral program projects
Summary of priority sectoral program projectsSummary of priority sectoral program projects
Summary of priority sectoral program projectsRdc Cordillera
 
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...OECD Environment
 
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...IRC
 
Landscape of REDD+ Funding Disbursements in DRC and Updates on REDD+ projects
Landscape of REDD+ Funding Disbursements in DRC and Updates on REDD+ projectsLandscape of REDD+ Funding Disbursements in DRC and Updates on REDD+ projects
Landscape of REDD+ Funding Disbursements in DRC and Updates on REDD+ projectsCIFOR-ICRAF
 
Sustainability of Solar Mini-Grids in Nigeria
Sustainability of Solar Mini-Grids in NigeriaSustainability of Solar Mini-Grids in Nigeria
Sustainability of Solar Mini-Grids in NigeriaAdedoyin Adeleke
 
2. COSOP results review mtr 2016
2. COSOP results review mtr 20162. COSOP results review mtr 2016
2. COSOP results review mtr 2016ifadseahub
 
Session Harmonization 3c - Minta kampala seminar 2010
Session Harmonization 3c - Minta kampala seminar 2010Session Harmonization 3c - Minta kampala seminar 2010
Session Harmonization 3c - Minta kampala seminar 2010IRC
 
5 john o'brien presentations success stories
5 john o'brien presentations success stories5 john o'brien presentations success stories
5 john o'brien presentations success storiesUNDPhr
 
Research Challenge_Research Report_PTiT
Research Challenge_Research Report_PTiTResearch Challenge_Research Report_PTiT
Research Challenge_Research Report_PTiTLe Phuong Linh
 

Similar to Red and Black School Building Program (20)

Da charmp 2 2nd qtr_f
Da charmp 2 2nd qtr_fDa charmp 2 2nd qtr_f
Da charmp 2 2nd qtr_f
 
MRU: FPE Report 2014 of the FPE Chair and CEO
MRU: FPE Report 2014 of the FPE Chair and CEOMRU: FPE Report 2014 of the FPE Chair and CEO
MRU: FPE Report 2014 of the FPE Chair and CEO
 
Ind ii program design document-pilot program prim pp presentation 0811201...
Ind ii    program design document-pilot program prim pp presentation  0811201...Ind ii    program design document-pilot program prim pp presentation  0811201...
Ind ii program design document-pilot program prim pp presentation 0811201...
 
APR Workshop 2010-APR Performance-Maria Donnat
APR Workshop 2010-APR Performance-Maria DonnatAPR Workshop 2010-APR Performance-Maria Donnat
APR Workshop 2010-APR Performance-Maria Donnat
 
2nd qtr rpmes 2013
2nd qtr rpmes 20132nd qtr rpmes 2013
2nd qtr rpmes 2013
 
Summary of programs and projects as of first quarter 2012
Summary of programs and projects as of first quarter 2012Summary of programs and projects as of first quarter 2012
Summary of programs and projects as of first quarter 2012
 
Proposed budget 2012 2013
Proposed budget 2012 2013Proposed budget 2012 2013
Proposed budget 2012 2013
 
Summary of priority sectoral program projects
Summary of priority sectoral program projectsSummary of priority sectoral program projects
Summary of priority sectoral program projects
 
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
 
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
Session 3B Finance - Getenet community development funds ethiopia (pp tminimi...
 
Landscape of REDD+ Funding Disbursements in DRC and Updates on REDD+ projects
Landscape of REDD+ Funding Disbursements in DRC and Updates on REDD+ projectsLandscape of REDD+ Funding Disbursements in DRC and Updates on REDD+ projects
Landscape of REDD+ Funding Disbursements in DRC and Updates on REDD+ projects
 
Sustainability of Solar Mini-Grids in Nigeria
Sustainability of Solar Mini-Grids in NigeriaSustainability of Solar Mini-Grids in Nigeria
Sustainability of Solar Mini-Grids in Nigeria
 
2. COSOP results review mtr 2016
2. COSOP results review mtr 20162. COSOP results review mtr 2016
2. COSOP results review mtr 2016
 
Session Harmonization 3c - Minta kampala seminar 2010
Session Harmonization 3c - Minta kampala seminar 2010Session Harmonization 3c - Minta kampala seminar 2010
Session Harmonization 3c - Minta kampala seminar 2010
 
5 john o'brien presentations success stories
5 john o'brien presentations success stories5 john o'brien presentations success stories
5 john o'brien presentations success stories
 
iSAC6+ | An unique citizen attention service
iSAC6+ | An unique citizen attention serviceiSAC6+ | An unique citizen attention service
iSAC6+ | An unique citizen attention service
 
4 eremie presentation
4 eremie presentation4 eremie presentation
4 eremie presentation
 
1st qtr rpmes report
1st qtr rpmes report1st qtr rpmes report
1st qtr rpmes report
 
Research Challenge_Research Report_PTiT
Research Challenge_Research Report_PTiTResearch Challenge_Research Report_PTiT
Research Challenge_Research Report_PTiT
 
MEI Presentation Tel Aviv 24 April 2012
MEI Presentation Tel Aviv 24 April 2012MEI Presentation Tel Aviv 24 April 2012
MEI Presentation Tel Aviv 24 April 2012
 

More from Rdc Cordillera

Search for cordillera champions
Search for cordillera championsSearch for cordillera champions
Search for cordillera championsRdc Cordillera
 
Doh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fDoh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fRdc Cordillera
 
Dpwh kabugao pudtol_2nd qtr_f
Dpwh kabugao pudtol_2nd qtr_fDpwh kabugao pudtol_2nd qtr_f
Dpwh kabugao pudtol_2nd qtr_fRdc Cordillera
 
Dpwh kabugao solsona_2nd qtr_f
Dpwh kabugao solsona_2nd qtr_fDpwh kabugao solsona_2nd qtr_f
Dpwh kabugao solsona_2nd qtr_fRdc Cordillera
 
2nd qtr major program projects
2nd qtr major program projects2nd qtr major program projects
2nd qtr major program projectsRdc Cordillera
 
State of the Nation Address 2012
State of the Nation Address 2012State of the Nation Address 2012
State of the Nation Address 2012Rdc Cordillera
 
State of the region address cordillera administrative region
State of the region address   cordillera administrative regionState of the region address   cordillera administrative region
State of the region address cordillera administrative regionRdc Cordillera
 
Red and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRed and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRdc Cordillera
 
National greening program inspection report
National greening program inspection reportNational greening program inspection report
National greening program inspection reportRdc Cordillera
 
ARISP III Inspection Report
ARISP III Inspection ReportARISP III Inspection Report
ARISP III Inspection ReportRdc Cordillera
 
2012 rpmc inspection reports
2012 rpmc inspection reports2012 rpmc inspection reports
2012 rpmc inspection reportsRdc Cordillera
 

More from Rdc Cordillera (19)

1st qtr rpmes 2013
1st qtr rpmes 20131st qtr rpmes 2013
1st qtr rpmes 2013
 
2012 yearend report
2012 yearend report2012 yearend report
2012 yearend report
 
3rd qtr rpmes report
3rd qtr rpmes report3rd qtr rpmes report
3rd qtr rpmes report
 
Search for cordillera champions
Search for cordillera championsSearch for cordillera champions
Search for cordillera champions
 
Nomination form
Nomination formNomination form
Nomination form
 
Vacaciesjan2012 1
Vacaciesjan2012 1Vacaciesjan2012 1
Vacaciesjan2012 1
 
Dpwh kabugao
Dpwh kabugaoDpwh kabugao
Dpwh kabugao
 
Doh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fDoh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_f
 
Dpwh kabugao pudtol_2nd qtr_f
Dpwh kabugao pudtol_2nd qtr_fDpwh kabugao pudtol_2nd qtr_f
Dpwh kabugao pudtol_2nd qtr_f
 
Dpwh kabugao solsona_2nd qtr_f
Dpwh kabugao solsona_2nd qtr_fDpwh kabugao solsona_2nd qtr_f
Dpwh kabugao solsona_2nd qtr_f
 
Dswd 4 ps_2nd qtr_f
Dswd 4 ps_2nd qtr_fDswd 4 ps_2nd qtr_f
Dswd 4 ps_2nd qtr_f
 
Denr ngp 2nd qtr_f
Denr ngp 2nd qtr_fDenr ngp 2nd qtr_f
Denr ngp 2nd qtr_f
 
2nd qtr major program projects
2nd qtr major program projects2nd qtr major program projects
2nd qtr major program projects
 
State of the Nation Address 2012
State of the Nation Address 2012State of the Nation Address 2012
State of the Nation Address 2012
 
State of the region address cordillera administrative region
State of the region address   cordillera administrative regionState of the region address   cordillera administrative region
State of the region address cordillera administrative region
 
Red and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRed and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection report
 
National greening program inspection report
National greening program inspection reportNational greening program inspection report
National greening program inspection report
 
ARISP III Inspection Report
ARISP III Inspection ReportARISP III Inspection Report
ARISP III Inspection Report
 
2012 rpmc inspection reports
2012 rpmc inspection reports2012 rpmc inspection reports
2012 rpmc inspection reports
 

Recently uploaded

Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road ConnectivityTransforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivitynarsireddynannuri1
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxdigiyvbmrkt
 
11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxunark75
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...The Lifesciences Magazine
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.pptNandinituteja1
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)ssuser583c35
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Recently uploaded (14)

Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road ConnectivityTransforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptx
 
11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptx
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.ppt
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf
 
14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf
 

Red and Black School Building Program

  • 1. PROJECT PROGRESS REPORT As of EO March 2012 Project Title: Red and Black School Building Program Implementing Agency: DepEd -CAR Donor: (X) GOP Loan/Grant Proceeds: ( ) Loan Peso Counterpart: ( ) Grant Total Project Cost: 146.54 M (CY 2011) 142.7 M (CY 2012) Location/Area Coverage: Regionwide Description: The Regular School Building Program specifically targets schools which are categorized under the Red Zone or those which have a ratio of 56 or more students to one classroom: and the Black Zone, or schools which make use of makeshift classrooms and facilities. The standard DepEd design is 7m x 9m classroom for rural areas with a classroom- student ratio of 1:45. This standard also applies to all public secondary schools, regardless of location and class size. In CAR, the CY 2011 projects (carry-over) have a total project cost of Php 146.5 M. The table below shows the details per province/city: Province/city No. of sites No. of Project Status (CY 2011) Classrooms Cost (AO Mar 2012) Abra 18 16 17,436,000 70.56% Apayao 21 26 15,812,000 85.78% Benguet 18 28 25,793,000 94.50% Ifugao 13 21 15,993,000 90.56% Kalinga 40 64 41,486,000 88.91% Mt. Province 33 34 20,042,000 89.89% Baguio 6 10 9,981,000 100% Total, CAR 149 209 146,543,000 88.44% Meanwhile, SARO (Php 142.7 M) for CY 2012 projects is yet for release which caused implementation delay.
  • 2. Project Duration: Start: January End: December PROJECT PROGRESS For CY 2012 AO 1 Quarter AO 2nd Quarter AO 3rd Quarter AO 4th Quarter st Target Actual 88.44 % Slippage Cumulative Status: Status Physical Financial (Since start of Target project) Actual (slippage) 88.44% Current Late release of project SARO for CY 2012 Implementation Issues and/or Problems Encountered (if any): Actions Taken/ Followed-up SARO release Recommendations: Remarks: Agency Contact DIR. ELLEN B. DONATO Person: OIC-Regional Director IV Wangal, La Trinidad 2601 Benguet Tel No. 422-1318 (RD)
  • 3. Red and Black School Building Program