Electricity crisis in Pakistan and its possible solutions
2. TABLE OF CONTENT
• INTRODUCTION
• INTENSITY OF EXISITING
POWER FALIURE
• FACTORS WHICH LED TO
EXISTING
POWER FALIURE
• EFFECT OF CRISIS
1.EFFECT ON PEOPLE
2.EFFECT ON ECONOMY
• SOLUTON TO END POWER
SHORTAGE
1.ENERGY
CONSERVATION
MEASURES
2.SHORT TERM
MEASURE
3.LONG TERM MEASURE
• CONCLUSION.
3. INTRODUCTION
PAKISTAN IS IN THE GRIP
OF SERIOUS POWER SHOR
TAGE CRISIS THAT IS EFFE
CTING ALL THE SECTOR
OF ECONOMY AND THE
VARIOUS SEGMENT OF
THE SOCIETY. THE
ELECTRICITY SHORT FALL
HAS HIT THE RECORD
LEVEL, THE COUNTRY IS
PLUNGING DEEPER &
DEEPER IN TO IHE CRISIS.
THE SITUATION HAS
PUNISHED THE PEOPLE OF
PAKISTAN TO BEAR THE
BURDEN OF 8 TO 16 HOURS
LOAD SHEDDING , WHICH MIGHT
FURTHER INCREASE IN FUTURE.
4. FACTORS WHICH LED TO
EXISTING POWER FALIURE
• ECONOMIC AND POLITICAL
INSTABILITY
• FLUCTUATION OF OIL PRICES IN
INTERNATIONAL MARKET.
• FAULTY DISTRIBUTION SYESTEM
• AGING OF EQUIPMENTS.
• MIS MANAGEMENT OF ENERGY
RESOURCES.
6. SOLUTIONS TO END POWER
SHORTAGE
• ENERGY CONSERVATION MEASURES
1. Educate the users of electricity from conservation measures
through campaign in print and electronic media.
7. SHORT TERM MEASURES:
1.BY THE USE OF WIND AND SOLAR ENERGY
2. OVERHAULING THE POWER PLANTS
3.PROVIDING DUTIES AND TAXES ON ENERGY
CONSERVING DEVICES, SUCH AS ENERGY SAVER
LAMPS, LED LIGHTS, SOLAR OPERATED DEVICE AND
WIND TURBINES.
8. LONG TERM MEASURES:
1.USING THE COAL RESERVES FOR POWER
GENERATION
2. IN LONG TERM MEASURES PAKISTAN ALSO BUILD
MORE DAMS
3. REHABLITATION AND REPLACEMENT OF OUT
DATED TRANSMITION AND DISTRIBUTION SYESTEM