CURRICULUM VITAE
Rajbir Singh
Email : - salaria_bir@yahoo.com ,
bisalaria@gmail.com
Contact No : +919478040132,+918130796916
Executive Profile - Civil Engineer (Planning/Execution)
Anchoring on site construction activities to ensure completion of project within the time and cost
parameters and effective resource utilization to maximize the output. Supervision of team of engineers for
various types of job and resolving. Preparation and review of method statements. Drawing Co-
ordination with client & Consultant. Site Management, Estimating coasting, Cost control, Quality Control &
Planning. Work in multistory building, Commercials projects, Water Supply & overhead tanks,
Industrial, Refinery & Power projects
WORKING EXPERIENCE-
• From June-2012 to Till Date Today Homes & Infrastructure Pvt Ltd
Project :- Ridge Residency Sec-135, Noida
Designation :- Deputy Project Manager
Job Responsibility
Includes coordinating and looking after the construction of Flats (G +14 & G+23 Floors) Around 18 nos of
Towers having 1850 flats. Execution of Structural & Finishing Work, Road work, Sewerage, Water Supply
& External development, Soft Scape and Hard Scape work .
• FromJuly-2011 to June-2012 SGS India Pvt Lt (Ludhiana).
Project 1 :- 2 x 270 MW GVK Thermal Power Project,
Goindwal Sahib, Tarntaran ,(Punjab ).
Designation :-Team Leader for the Project.
Job Responsibility
Inspection of RCC chimney 275 mtrs height from piling stage to Completion, Guiding the
client’s Engineers at site on quality issues and supervision of construction of Boiler Foundation, T G
Deck, D M plant, Administration Building, Housing Unit. Reviewing the Quality Assurance plan and
test certificates of the construction material. Highlighting the Quality issues at site and suggesting
corrective actions. Witnessing the testing of the construction material at Lab. Preparation of Daily &
Weekly reports and discussing the same with the client. Witnessing the testing of the construction
material at Lab. Preparation of Daily & Weekly reports and discussing the same with the client.
• From March -2010 to July-2011 SGS India Pvt. Ltd. Ludhaina.
Project 2- 3x660MW Super Critical Thermal
Power Project. Talwandi Sabo, Punjab.
Job Profile :-Team Leader for the Project.
1- Leading the team,preparing planning schedule,giving on job training to Engineer,and preparing various types of
reports like,Inspection report,daily, weekly, Monthly reports and NCR Status.
2- Review of Quality Assurance Plan,Drawings and review of all the Procedures.
3- Day to day and Weekly monitoring the progress ofprojectand highlighting the qualityissues byletter to Client.
4- Giving training to contractor engineer and supervisor related to quality.
5- Solving quality related issues pertaining to sites.
6- Attending all the monthly and weekly meeting with the clientand contractor with Preparation related to quality
issue.
7- Providing technical supports to all team Engineers and Client.
8- Calibration ofBatching Plant, cube testing machine and testing ofconstruction Material at site laboratory.
9- Review of various manufacture test certificate of different material based on Technical specification and QAP.
10- Maintaining qualityrecord.
• From Jun. 2009 to Feb. 2010 DS CONSTRUCTIONS FZCO LIBYA
Project :- 1000 Housing Unit Project, Sirte, Libya
Designation:- Sr. Site Engineer
Job responsibility
Includes coordinating and looking after the construction of Flats (G + 3 Floors) around 1500 nos of Flats
.Execution of Structural & Finishing Work .Coordination with clients and Consultant.
• From Jun 2008 to Jun 2009 Today Homes & Infrastructure Pvt Ltd
Project:- Blossom II, Mayfield Garden, Gurgaon (HR)
Designation :- Project Engineer
Job responsibility
Includes coordinating and looking after the construction of Villas & flats (G+2), construction of roads,
drainage works, lessoning with Architects, office administration, coordinating site activities, planning and
Billing etc.
From Oct. 2006 to Jun 2008 Larsen & Toubro Ltd.
Project :- Jamnagar Export Refinery Project
Designation :-Site Engineer.
Scope Preparation of project execution schedule, monitoring, billing, co-ordination with client / contractor.
• Execution Blast resistance RCC wall having 4400 m2 with 800m3 selfcompacting concrete within time schedule.
• I made water tight formwork of 3.66 M height with 19mm thick film faced ply wood.
• I have successfullycompleted RCC Hinge wall in building before time schedule having 4000 Sqm ofwall shutteri ng
& 1000 Cum SCC concrete with record of 20 days.
• While undertaking backfilling inside building we estimated qty of excavation in cable trenches to be taken up after
completion ofwall & slab & maintained filling level to minimize transfer of soil from inside outside building vice versa
• From June 2005 to Oct 2006 RANA SUGAR & DISTILLERY LTD
(AMRITSAR)
Designation:-As a Contractor.
Construction of rack foundation around 200 nos.RCC Cooling Tower 3 no’s 12MT, 10MT, 8MT.CapacityMachine
Foundations .Around 35 No. Boiler foundation having 70MT. Evaporator foundation 12nos.(80Cum.each) , Conveyor
foundation 150Rmt..
• From Aug. 2002 to June 2005 G S BUILDCON P LTD. CHANDIGARH
Designation :- As a Site Engineer
Construction of RCC Over Head Reservoirs having 75000 lit, 1 lacks lit, 2 lacks lit, 3.5 lack lit. around
45nos under Nebar Projects. Laying of Water Supply pipelines using AC Pipes, PVC Pipes, GI, MS
Pipes at PWD Punjab. 3 Floor Industrial Buildings for SITAL FIBER LTD. JALANDHAR. Having
25000sqrm area, boiler foundation, conveyers foundation ,End bearing piles 11 meter depth. etc.
EDUCATIONAL SUMMARY
• Bachelor of Technology (Civil) from Shridhar University, Rajasthan.
• Diploma in Civil Engineering from Mehr Chand Polytechnic Jalandhar Punjab.
• Metric from Punjab School Education Board in March, 1996
SKILL SET,IT(Computers)
MS Word, MS Excel, Power point, Internet and E- Mail responding web management.
ACHIEVEMENTS
Appreciated by Larsen & Toubro Ltd. As best conscious Engineer in safety
at Jamnagar Export Refinery Project (Jamnagar).
• I have successfully completed RCC Hinge wall in building before time schedule having 4000 Sqm of wall
shuttering & 1000 Cum SCC concrete with record of 20 days.
PASSPORT AND VISA DETAILS
• Passport No:G6330189
• Place of Issue: Jalandhar (PUNJAB)
• Date of Expire : 02/01/2018
PERSONAL SUMMARY
•Father’s Name : S. Narinder Singh
• Date of Birth : 10th Jan. 1981
• Marital Status : Married
• Nationality : Indian
• Languages Known : English, Punjabi, Hindi & Arabic
• Hobbies : Computers, Playing.
Declaration:
All references and evidences written above are correct by my best knowledge & Believe.
(RAJBIR SINGH)

Mais conteúdo relacionado

Mais procurados (20)

CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Cv copy. khedr-c
Cv   copy. khedr-cCv   copy. khedr-c
Cv copy. khedr-c
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
 
CV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles finalCV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles final
 
AKBAR CV
AKBAR CVAKBAR CV
AKBAR CV
 
cv-sammy
cv-sammycv-sammy
cv-sammy
 
Mior Shahrial Mior Abdul Yunus
Mior Shahrial Mior Abdul YunusMior Shahrial Mior Abdul Yunus
Mior Shahrial Mior Abdul Yunus
 
Anees Khan Resume from GK
Anees Khan Resume from GKAnees Khan Resume from GK
Anees Khan Resume from GK
 
Omar Al Nadi CV عمر
Omar Al Nadi CV عمرOmar Al Nadi CV عمر
Omar Al Nadi CV عمر
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
RESUME VICTOR
RESUME VICTORRESUME VICTOR
RESUME VICTOR
 
Manoranjan Bal Resume
Manoranjan Bal ResumeManoranjan Bal Resume
Manoranjan Bal Resume
 
Application of Project Manager-Peng Sher Seong
Application of Project Manager-Peng Sher SeongApplication of Project Manager-Peng Sher Seong
Application of Project Manager-Peng Sher Seong
 
RESUME
RESUMERESUME
RESUME
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 

Destaque

mi primer slideshare
mi primer slidesharemi primer slideshare
mi primer slideshareGladis Mozo
 
LangJonathanresume2015
LangJonathanresume2015LangJonathanresume2015
LangJonathanresume2015Jonathan Lang
 
Plegable power point presentation
Plegable power point presentation Plegable power point presentation
Plegable power point presentation santiagorc5
 
V cloud request manager overview presentation
V cloud request manager overview presentationV cloud request manager overview presentation
V cloud request manager overview presentationsolarisyourep
 
RHBC 182: Christianity's Impact on Education
RHBC 182: Christianity's Impact on EducationRHBC 182: Christianity's Impact on Education
RHBC 182: Christianity's Impact on Educationrhbc
 
Remove deal slider permanently (easy virus removal)
Remove deal slider permanently (easy virus removal)Remove deal slider permanently (easy virus removal)
Remove deal slider permanently (easy virus removal)haroNaroum
 
2/28/16 Announcements
2/28/16 Announcements2/28/16 Announcements
2/28/16 Announcementsrhbc
 
RHBC 301: The Best Is Yet To Come
RHBC 301: The Best Is Yet To ComeRHBC 301: The Best Is Yet To Come
RHBC 301: The Best Is Yet To Comerhbc
 
Top 50 trips from Moscow on November 2015
Top 50 trips from Moscow on November 2015Top 50 trips from Moscow on November 2015
Top 50 trips from Moscow on November 2015Sam Zakhezin
 
3/6/16 Announcements
3/6/16 Announcements3/6/16 Announcements
3/6/16 Announcementsrhbc
 
China-Us Symposium 2014 Program
China-Us Symposium 2014 ProgramChina-Us Symposium 2014 Program
China-Us Symposium 2014 ProgramJessie Wang
 
RHBC 185: Christianity's Impact on The Arts
RHBC 185: Christianity's Impact on The ArtsRHBC 185: Christianity's Impact on The Arts
RHBC 185: Christianity's Impact on The Artsrhbc
 
RHBC Announcements 07/17/16
RHBC Announcements 07/17/16RHBC Announcements 07/17/16
RHBC Announcements 07/17/16rhbc
 
How to uninstall gold page.com
How to uninstall gold page.comHow to uninstall gold page.com
How to uninstall gold page.comharoNaroum
 
TiO2 Article from cadnews_2002_fall
TiO2 Article from cadnews_2002_fallTiO2 Article from cadnews_2002_fall
TiO2 Article from cadnews_2002_fallRichard Towne
 
Inspirasi Kemandirian Energi - Keuangan
Inspirasi Kemandirian Energi - KeuanganInspirasi Kemandirian Energi - Keuangan
Inspirasi Kemandirian Energi - KeuanganRino Sudibyo
 
OMTRA -Presentation - Extra-Provincial Collection of POA Fines
OMTRA -Presentation - Extra-Provincial Collection of POA FinesOMTRA -Presentation - Extra-Provincial Collection of POA Fines
OMTRA -Presentation - Extra-Provincial Collection of POA FinesFrançois Sauvageau
 

Destaque (18)

Presentation DGS 2011UA
Presentation DGS 2011UAPresentation DGS 2011UA
Presentation DGS 2011UA
 
mi primer slideshare
mi primer slidesharemi primer slideshare
mi primer slideshare
 
LangJonathanresume2015
LangJonathanresume2015LangJonathanresume2015
LangJonathanresume2015
 
Plegable power point presentation
Plegable power point presentation Plegable power point presentation
Plegable power point presentation
 
V cloud request manager overview presentation
V cloud request manager overview presentationV cloud request manager overview presentation
V cloud request manager overview presentation
 
RHBC 182: Christianity's Impact on Education
RHBC 182: Christianity's Impact on EducationRHBC 182: Christianity's Impact on Education
RHBC 182: Christianity's Impact on Education
 
Remove deal slider permanently (easy virus removal)
Remove deal slider permanently (easy virus removal)Remove deal slider permanently (easy virus removal)
Remove deal slider permanently (easy virus removal)
 
2/28/16 Announcements
2/28/16 Announcements2/28/16 Announcements
2/28/16 Announcements
 
RHBC 301: The Best Is Yet To Come
RHBC 301: The Best Is Yet To ComeRHBC 301: The Best Is Yet To Come
RHBC 301: The Best Is Yet To Come
 
Top 50 trips from Moscow on November 2015
Top 50 trips from Moscow on November 2015Top 50 trips from Moscow on November 2015
Top 50 trips from Moscow on November 2015
 
3/6/16 Announcements
3/6/16 Announcements3/6/16 Announcements
3/6/16 Announcements
 
China-Us Symposium 2014 Program
China-Us Symposium 2014 ProgramChina-Us Symposium 2014 Program
China-Us Symposium 2014 Program
 
RHBC 185: Christianity's Impact on The Arts
RHBC 185: Christianity's Impact on The ArtsRHBC 185: Christianity's Impact on The Arts
RHBC 185: Christianity's Impact on The Arts
 
RHBC Announcements 07/17/16
RHBC Announcements 07/17/16RHBC Announcements 07/17/16
RHBC Announcements 07/17/16
 
How to uninstall gold page.com
How to uninstall gold page.comHow to uninstall gold page.com
How to uninstall gold page.com
 
TiO2 Article from cadnews_2002_fall
TiO2 Article from cadnews_2002_fallTiO2 Article from cadnews_2002_fall
TiO2 Article from cadnews_2002_fall
 
Inspirasi Kemandirian Energi - Keuangan
Inspirasi Kemandirian Energi - KeuanganInspirasi Kemandirian Energi - Keuangan
Inspirasi Kemandirian Energi - Keuangan
 
OMTRA -Presentation - Extra-Provincial Collection of POA Fines
OMTRA -Presentation - Extra-Provincial Collection of POA FinesOMTRA -Presentation - Extra-Provincial Collection of POA Fines
OMTRA -Presentation - Extra-Provincial Collection of POA Fines
 

Semelhante a Rajbir Singh-2 (20)

RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
Resume updated
Resume updatedResume updated
Resume updated
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumar
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
CV Project Manager
CV Project ManagerCV Project Manager
CV Project Manager
 
PROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCE
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Resume
ResumeResume
Resume
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 
RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 

Rajbir Singh-2

  • 1. CURRICULUM VITAE Rajbir Singh Email : - salaria_bir@yahoo.com , bisalaria@gmail.com Contact No : +919478040132,+918130796916 Executive Profile - Civil Engineer (Planning/Execution) Anchoring on site construction activities to ensure completion of project within the time and cost parameters and effective resource utilization to maximize the output. Supervision of team of engineers for various types of job and resolving. Preparation and review of method statements. Drawing Co- ordination with client & Consultant. Site Management, Estimating coasting, Cost control, Quality Control & Planning. Work in multistory building, Commercials projects, Water Supply & overhead tanks, Industrial, Refinery & Power projects WORKING EXPERIENCE- • From June-2012 to Till Date Today Homes & Infrastructure Pvt Ltd Project :- Ridge Residency Sec-135, Noida Designation :- Deputy Project Manager Job Responsibility Includes coordinating and looking after the construction of Flats (G +14 & G+23 Floors) Around 18 nos of Towers having 1850 flats. Execution of Structural & Finishing Work, Road work, Sewerage, Water Supply & External development, Soft Scape and Hard Scape work . • FromJuly-2011 to June-2012 SGS India Pvt Lt (Ludhiana). Project 1 :- 2 x 270 MW GVK Thermal Power Project, Goindwal Sahib, Tarntaran ,(Punjab ). Designation :-Team Leader for the Project. Job Responsibility
  • 2. Inspection of RCC chimney 275 mtrs height from piling stage to Completion, Guiding the client’s Engineers at site on quality issues and supervision of construction of Boiler Foundation, T G Deck, D M plant, Administration Building, Housing Unit. Reviewing the Quality Assurance plan and test certificates of the construction material. Highlighting the Quality issues at site and suggesting corrective actions. Witnessing the testing of the construction material at Lab. Preparation of Daily & Weekly reports and discussing the same with the client. Witnessing the testing of the construction material at Lab. Preparation of Daily & Weekly reports and discussing the same with the client. • From March -2010 to July-2011 SGS India Pvt. Ltd. Ludhaina. Project 2- 3x660MW Super Critical Thermal Power Project. Talwandi Sabo, Punjab. Job Profile :-Team Leader for the Project. 1- Leading the team,preparing planning schedule,giving on job training to Engineer,and preparing various types of reports like,Inspection report,daily, weekly, Monthly reports and NCR Status. 2- Review of Quality Assurance Plan,Drawings and review of all the Procedures. 3- Day to day and Weekly monitoring the progress ofprojectand highlighting the qualityissues byletter to Client. 4- Giving training to contractor engineer and supervisor related to quality. 5- Solving quality related issues pertaining to sites. 6- Attending all the monthly and weekly meeting with the clientand contractor with Preparation related to quality issue. 7- Providing technical supports to all team Engineers and Client. 8- Calibration ofBatching Plant, cube testing machine and testing ofconstruction Material at site laboratory. 9- Review of various manufacture test certificate of different material based on Technical specification and QAP. 10- Maintaining qualityrecord. • From Jun. 2009 to Feb. 2010 DS CONSTRUCTIONS FZCO LIBYA Project :- 1000 Housing Unit Project, Sirte, Libya Designation:- Sr. Site Engineer Job responsibility
  • 3. Includes coordinating and looking after the construction of Flats (G + 3 Floors) around 1500 nos of Flats .Execution of Structural & Finishing Work .Coordination with clients and Consultant. • From Jun 2008 to Jun 2009 Today Homes & Infrastructure Pvt Ltd Project:- Blossom II, Mayfield Garden, Gurgaon (HR) Designation :- Project Engineer Job responsibility Includes coordinating and looking after the construction of Villas & flats (G+2), construction of roads, drainage works, lessoning with Architects, office administration, coordinating site activities, planning and Billing etc. From Oct. 2006 to Jun 2008 Larsen & Toubro Ltd. Project :- Jamnagar Export Refinery Project Designation :-Site Engineer. Scope Preparation of project execution schedule, monitoring, billing, co-ordination with client / contractor. • Execution Blast resistance RCC wall having 4400 m2 with 800m3 selfcompacting concrete within time schedule. • I made water tight formwork of 3.66 M height with 19mm thick film faced ply wood. • I have successfullycompleted RCC Hinge wall in building before time schedule having 4000 Sqm ofwall shutteri ng & 1000 Cum SCC concrete with record of 20 days. • While undertaking backfilling inside building we estimated qty of excavation in cable trenches to be taken up after completion ofwall & slab & maintained filling level to minimize transfer of soil from inside outside building vice versa • From June 2005 to Oct 2006 RANA SUGAR & DISTILLERY LTD (AMRITSAR) Designation:-As a Contractor. Construction of rack foundation around 200 nos.RCC Cooling Tower 3 no’s 12MT, 10MT, 8MT.CapacityMachine Foundations .Around 35 No. Boiler foundation having 70MT. Evaporator foundation 12nos.(80Cum.each) , Conveyor foundation 150Rmt.. • From Aug. 2002 to June 2005 G S BUILDCON P LTD. CHANDIGARH Designation :- As a Site Engineer Construction of RCC Over Head Reservoirs having 75000 lit, 1 lacks lit, 2 lacks lit, 3.5 lack lit. around 45nos under Nebar Projects. Laying of Water Supply pipelines using AC Pipes, PVC Pipes, GI, MS Pipes at PWD Punjab. 3 Floor Industrial Buildings for SITAL FIBER LTD. JALANDHAR. Having 25000sqrm area, boiler foundation, conveyers foundation ,End bearing piles 11 meter depth. etc.
  • 4. EDUCATIONAL SUMMARY • Bachelor of Technology (Civil) from Shridhar University, Rajasthan. • Diploma in Civil Engineering from Mehr Chand Polytechnic Jalandhar Punjab. • Metric from Punjab School Education Board in March, 1996 SKILL SET,IT(Computers) MS Word, MS Excel, Power point, Internet and E- Mail responding web management. ACHIEVEMENTS Appreciated by Larsen & Toubro Ltd. As best conscious Engineer in safety at Jamnagar Export Refinery Project (Jamnagar). • I have successfully completed RCC Hinge wall in building before time schedule having 4000 Sqm of wall shuttering & 1000 Cum SCC concrete with record of 20 days. PASSPORT AND VISA DETAILS • Passport No:G6330189 • Place of Issue: Jalandhar (PUNJAB) • Date of Expire : 02/01/2018 PERSONAL SUMMARY •Father’s Name : S. Narinder Singh • Date of Birth : 10th Jan. 1981 • Marital Status : Married • Nationality : Indian • Languages Known : English, Punjabi, Hindi & Arabic • Hobbies : Computers, Playing. Declaration: All references and evidences written above are correct by my best knowledge & Believe. (RAJBIR SINGH)