OPT

     Material From:
“The Goal” and “The Race”
   By Goldratt and Fox
OPT (Optimized Production
         Technology)
A computer based management system used for
production planning and scheduling, seeking the
goal of throughput maximization through the
following:
– Balanced flow, not capacity
– Minimization and /or elimination of bottlenecks
– Variable lot sizes
Also know as: “Theory of Constraints”
OPT Philosophy
The Goal: To Make Money
Measures:
1. Net Profit
2. Return on Investment
3. Cash Flow
OPT Operational Measures
1. Throughput
  The rate at which goods are sold
2. Inventory
  Any raw materials, components, and finished
  goods that have been paid for but not sold
3. Operating Expenses
  The cost of converting inventory into throughput
     •   Direct or indirect labor
     •   Energy
     •   Capital facilities
How to Achieve The Goal
By the following:
  – Increasing throughput
  – Decreasing inventory
  – Decreasing operating expenses
OPT Key – “Identify Bottlenecks”

Bottleneck: A point of storage in the
manufacturing process that holds down the
amount of product that a factory can produce.

The basic approach is to identify bottlenecks, and
concentrate on keeping them 100% busy, then find
ways to increase throughput at the bottleneck,
subject to demand.
Troops Analogy (I)




• Spreading troops mean high inventories (e.g. work in
  process). Closely packed troops mean lower inventories.
Troops Analogy (II)




• Rearranging the soldiers reduces spreading. By putting the
  slowest soldiers at the front and the fastest ones in the rear.
   – Good Idea, but may be impossible to put the slowest operation into
     the first operation
Troops Analogy (III)




• Put Drummers in front row to set the pace and
  sergeants urge the soldiers to close any gaps.
   – Sergeant is the expeditor and drummer is the material
     management system assisted by a computer
Troops Analogy (IV)
• “If a worker doesn’t have anything to do,
  let’s find him something to do.” – This
  mentality will cause workers to work at
  their own paces.
Troops Analogy (V)
• The causes of excess
  inventories is when
  each worker works
  with full capacity.
Troops Analogy (VI)
• Does the drum beat according to the
  constraints of the plant or according to some
  unrealistic assumptions ..
  Like:
  – Infinite capacity
  – Predetermined lead times
  – Fixed, constant batch sizes
Troops Analogy (VII)




• Tie the rows of soldiers together to limit the
  spreading of the inventories.
   – The Invention of Henry Ford –The assembly line
   – Dr. Ohno from Toyota – The Kanban system
Troops Analogy (VIII)
• Synchronized manufacturing assembly lines and
  kanbans.
  – Predetermined inventory buffers (either limited by
    space or number of cards) regulate the rate of
    production for assembly lines and kanban system.
  – “Stop working when the buffer is filled!”
  – The work is synchronized, inventory is low. But any
    significant disruption will cause the entire system to
    stop.
Troops Analogy (IX)



  The drum is held by the excess capacity of the gating
  operations
  Result:
• Inventory is high
• Current throughput is protected
• Future throughput is in danger
Troops Analogy (X)




  The drum is held by marketing demands
  Result:
• Inventory is low
• Current throughput is in danger
• Future throughput is increased
Troops Analogy (XI)




• To prevent spreading, tie weakest soldier to the
  front row.
• To protect overall pace, provide some slack in the
  rope
•   The Capacity Constraint Resource (C.C.R) should dictate the schedule
    based on market demand and its own potential.
•   The schedule for succeeding operations (including assembly) should be
    derived accordingly.
•   The schedule of preceding operations should support the time buffer
    and thus be derived backwards in time from the C.C.R schedule
Synchronized Manufacturing –
   Locating the Constraints
First step toward synchronized manufacturing
is to identify the constraints.
A Capacity Constraint manifests itself in all
of the major business issues.
An analysis of the major business issues can
be used to identify the capacity constraint
resource (CCR’s)
Synchronized Manufacturing –
      Beating the Drum
Ensure maximum throughput through
forward scheduling of the C.C.R.’s.
Due dates give us the first, rough sequence,
but the sequence must be modified under
any one of four conditions…
Synchronized Manufacturing – Four
     Complicating Conditions
• Different lead times from capacity
  constraint resources to due dates
• One capacity constraint resource feeding
  another one
• Set up at a capacity constraint resource
• A capacity constraint resource feeding more
  than one part to the same product
Synchronized Manufacturing –
     Locating the Time Buffer
• Concentrate protection not at the origin of a
  disturbance, but before critical operations
• Inventory of the right parts in the right
  quantities at the right times in front of the
  right operations give high protection
• Inventory anywhere else is destructive
Ten Rules of OPT
1. Utilization and activation of a resource are not the
   same –
     Activation is what should be done
     Utilization is what can be done
    “100% utilization of a non-bottleneck is
      wasteful.”
2. The level of utilization of a non-bottleneck is
   determined not by its own potential but by some
   other constraint in the system.
Ten Rules of OPT (Cont.)
3. An hour lost at a bottleneck is an hour lost for the
   total system.
4. An hour saved at a non-bottleneck is just a mirage.
5. Bottlenecks govern both the throughput and
   inventory in the system.
6. The transfer batch may not and often should not
   be equal to the process batch.
7. The process batch should be variable, not fixed.
Ten Rules of OPT (Cont.)
8. Capacity and priority should be considered
  simultaneously, not sequentially.
9. Balance flow, not capacity.
10. The sum of local optima is not equal to the
    global optimum.

More Related Content

What's hot

Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
Md. Mazadul Hasan Shishir
 

What's hot (20)

JIT
JITJIT
JIT
 
Line balancing
Line balancingLine balancing
Line balancing
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Method Study
Method Study Method Study
Method Study
 
Introduction to Operations and Supply Chain Management
Introduction to Operations and Supply Chain ManagementIntroduction to Operations and Supply Chain Management
Introduction to Operations and Supply Chain Management
 
MRP-II
MRP-IIMRP-II
MRP-II
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Scheduling
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
PPC
PPCPPC
PPC
 
Line balancing
Line balancingLine balancing
Line balancing
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Work measurement
Work measurementWork measurement
Work measurement
 
Process Planning
Process PlanningProcess Planning
Process Planning
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
 
Product & Process Layouts
Product & Process LayoutsProduct & Process Layouts
Product & Process Layouts
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 

Viewers also liked

Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
jetromarquez
 
Creating Client Value
Creating Client ValueCreating Client Value
Creating Client Value
guesta826212
 
Soft skills pattern and syllabus, ducc systems
Soft skills pattern and syllabus, ducc systemsSoft skills pattern and syllabus, ducc systems
Soft skills pattern and syllabus, ducc systems
DUCC Systems
 
Pendulum lab guide experiment design
Pendulum lab guide  experiment designPendulum lab guide  experiment design
Pendulum lab guide experiment design
giordepasamba
 
8 characteristics of living things in detail
8 characteristics of living things in detail8 characteristics of living things in detail
8 characteristics of living things in detail
Bridget.Bradshaw
 

Viewers also liked (20)

OPT - Optimized Production Technology
OPT - Optimized Production TechnologyOPT - Optimized Production Technology
OPT - Optimized Production Technology
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
 
Make to-availability and beyond
Make to-availability and beyondMake to-availability and beyond
Make to-availability and beyond
 
Utilize Process Improvement Methodologies to Improve Accounting by Tom Sonde ...
Utilize Process Improvement Methodologies to Improve Accounting by Tom Sonde ...Utilize Process Improvement Methodologies to Improve Accounting by Tom Sonde ...
Utilize Process Improvement Methodologies to Improve Accounting by Tom Sonde ...
 
Creating Client Value
Creating Client ValueCreating Client Value
Creating Client Value
 
Gene synthesis technology and applications update—unleash your lab’s potentia...
Gene synthesis technology and applications update—unleash your lab’s potentia...Gene synthesis technology and applications update—unleash your lab’s potentia...
Gene synthesis technology and applications update—unleash your lab’s potentia...
 
U.S. Immigrant Visa Interview Appointments Scheduled by NVC
U.S. Immigrant Visa Interview Appointments Scheduled by NVCU.S. Immigrant Visa Interview Appointments Scheduled by NVC
U.S. Immigrant Visa Interview Appointments Scheduled by NVC
 
Implementation Experiences with SAP Ariba Solutions – Customer Panel
Implementation Experiences with SAP Ariba Solutions – Customer PanelImplementation Experiences with SAP Ariba Solutions – Customer Panel
Implementation Experiences with SAP Ariba Solutions – Customer Panel
 
SNS Gelous color real nail
SNS Gelous color real nailSNS Gelous color real nail
SNS Gelous color real nail
 
Soft skills pattern and syllabus, ducc systems
Soft skills pattern and syllabus, ducc systemsSoft skills pattern and syllabus, ducc systems
Soft skills pattern and syllabus, ducc systems
 
20 Consejos Saludables
20 Consejos Saludables20 Consejos Saludables
20 Consejos Saludables
 
My 10 year plan powerpoint
My 10 year plan powerpoint My 10 year plan powerpoint
My 10 year plan powerpoint
 
Ideation Platform
Ideation PlatformIdeation Platform
Ideation Platform
 
Win runner testing tool
Win runner testing toolWin runner testing tool
Win runner testing tool
 
Pendulum lab guide experiment design
Pendulum lab guide  experiment designPendulum lab guide  experiment design
Pendulum lab guide experiment design
 
Ripe71 FastNetMon open source DoS / DDoS mitigation
Ripe71 FastNetMon open source DoS / DDoS mitigationRipe71 FastNetMon open source DoS / DDoS mitigation
Ripe71 FastNetMon open source DoS / DDoS mitigation
 
8 characteristics of living things in detail
8 characteristics of living things in detail8 characteristics of living things in detail
8 characteristics of living things in detail
 
The Three Transition Types
The Three Transition TypesThe Three Transition Types
The Three Transition Types
 
Sample Appointment Confirmation Email
Sample Appointment Confirmation EmailSample Appointment Confirmation Email
Sample Appointment Confirmation Email
 
OOW15 - Oracle E-Business Suite Integration Best Practices
OOW15 - Oracle E-Business Suite Integration Best PracticesOOW15 - Oracle E-Business Suite Integration Best Practices
OOW15 - Oracle E-Business Suite Integration Best Practices
 

Similar to Optimized Production Technology

Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
Akash Maurya
 

Similar to Optimized Production Technology (20)

Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
The power of decoupling
The power of decoupling The power of decoupling
The power of decoupling
 
Supply chain management
Supply chain management Supply chain management
Supply chain management
 
EngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxEngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptx
 
Why Pull Manufacturing.ppt
Why Pull Manufacturing.pptWhy Pull Manufacturing.ppt
Why Pull Manufacturing.ppt
 
M10 - Theory of Constraints_11_2020 (1).pptx
M10 - Theory of Constraints_11_2020 (1).pptxM10 - Theory of Constraints_11_2020 (1).pptx
M10 - Theory of Constraints_11_2020 (1).pptx
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
14 synchronous manufacturing
14 synchronous manufacturing14 synchronous manufacturing
14 synchronous manufacturing
 
Operations managementppt
Operations managementpptOperations managementppt
Operations managementppt
 
Lecture 3 inventory_build_up_january_2020
Lecture 3 inventory_build_up_january_2020Lecture 3 inventory_build_up_january_2020
Lecture 3 inventory_build_up_january_2020
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activities
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activities
 
A company has actual unit demand for three consecutive years of 124, 126, and...
A company has actual unit demand for three consecutive years of 124, 126, and...A company has actual unit demand for three consecutive years of 124, 126, and...
A company has actual unit demand for three consecutive years of 124, 126, and...
 
A company has actual unit demand for three consecutive years of 124, 126, and...
A company has actual unit demand for three consecutive years of 124, 126, and...A company has actual unit demand for three consecutive years of 124, 126, and...
A company has actual unit demand for three consecutive years of 124, 126, and...
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
 
PPC Chapter 8.pdf
PPC Chapter 8.pdfPPC Chapter 8.pdf
PPC Chapter 8.pdf
 
TOC ConWIP Kanban
TOC ConWIP KanbanTOC ConWIP Kanban
TOC ConWIP Kanban
 
Planning optimisation
Planning optimisationPlanning optimisation
Planning optimisation
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
 
WM - PP Interface
WM - PP InterfaceWM - PP Interface
WM - PP Interface
 

More from Rahardi Gautama

More from Rahardi Gautama (15)

Manajemen kesehatan ternak kambing & domba
Manajemen kesehatan ternak kambing & dombaManajemen kesehatan ternak kambing & domba
Manajemen kesehatan ternak kambing & domba
 
Factor affect goat milk quality
Factor affect goat milk qualityFactor affect goat milk quality
Factor affect goat milk quality
 
Pakan konsentrat sapi perah
Pakan konsentrat sapi perahPakan konsentrat sapi perah
Pakan konsentrat sapi perah
 
Pregnancy toxeinia in a sheep flock
Pregnancy toxeinia in a sheep flockPregnancy toxeinia in a sheep flock
Pregnancy toxeinia in a sheep flock
 
SNI Sapi Potong
SNI Sapi PotongSNI Sapi Potong
SNI Sapi Potong
 
Nutrient requirment table NRC
Nutrient requirment table NRCNutrient requirment table NRC
Nutrient requirment table NRC
 
Mineral and vitamin_nutrition_for_beef_cattle
Mineral and vitamin_nutrition_for_beef_cattleMineral and vitamin_nutrition_for_beef_cattle
Mineral and vitamin_nutrition_for_beef_cattle
 
Beef Cattle Nutrition
Beef Cattle NutritionBeef Cattle Nutrition
Beef Cattle Nutrition
 
Effects of feeding a saccharomyces cerevisiae
Effects of feeding a saccharomyces cerevisiaeEffects of feeding a saccharomyces cerevisiae
Effects of feeding a saccharomyces cerevisiae
 
Optimalisasi fugsi rumen dengan pemberian ragi
Optimalisasi fugsi rumen dengan pemberian ragiOptimalisasi fugsi rumen dengan pemberian ragi
Optimalisasi fugsi rumen dengan pemberian ragi
 
Maximun Residu FAO
Maximun Residu FAOMaximun Residu FAO
Maximun Residu FAO
 
Growht residu monensin
Growht residu monensinGrowht residu monensin
Growht residu monensin
 
Rumensin a new feed additive for feedlot cattle
Rumensin  a new feed additive for feedlot cattleRumensin  a new feed additive for feedlot cattle
Rumensin a new feed additive for feedlot cattle
 
Lysine requirements for feedlot cattle
Lysine requirements for feedlot cattleLysine requirements for feedlot cattle
Lysine requirements for feedlot cattle
 
Theory of Constraints" Thinking Processes
Theory of Constraints" Thinking ProcessesTheory of Constraints" Thinking Processes
Theory of Constraints" Thinking Processes
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 

Optimized Production Technology

  • 1. OPT Material From: “The Goal” and “The Race” By Goldratt and Fox
  • 2. OPT (Optimized Production Technology) A computer based management system used for production planning and scheduling, seeking the goal of throughput maximization through the following: – Balanced flow, not capacity – Minimization and /or elimination of bottlenecks – Variable lot sizes Also know as: “Theory of Constraints”
  • 3. OPT Philosophy The Goal: To Make Money Measures: 1. Net Profit 2. Return on Investment 3. Cash Flow
  • 4. OPT Operational Measures 1. Throughput The rate at which goods are sold 2. Inventory Any raw materials, components, and finished goods that have been paid for but not sold 3. Operating Expenses The cost of converting inventory into throughput • Direct or indirect labor • Energy • Capital facilities
  • 5. How to Achieve The Goal By the following: – Increasing throughput – Decreasing inventory – Decreasing operating expenses
  • 6. OPT Key – “Identify Bottlenecks” Bottleneck: A point of storage in the manufacturing process that holds down the amount of product that a factory can produce. The basic approach is to identify bottlenecks, and concentrate on keeping them 100% busy, then find ways to increase throughput at the bottleneck, subject to demand.
  • 7. Troops Analogy (I) • Spreading troops mean high inventories (e.g. work in process). Closely packed troops mean lower inventories.
  • 8. Troops Analogy (II) • Rearranging the soldiers reduces spreading. By putting the slowest soldiers at the front and the fastest ones in the rear. – Good Idea, but may be impossible to put the slowest operation into the first operation
  • 9. Troops Analogy (III) • Put Drummers in front row to set the pace and sergeants urge the soldiers to close any gaps. – Sergeant is the expeditor and drummer is the material management system assisted by a computer
  • 10. Troops Analogy (IV) • “If a worker doesn’t have anything to do, let’s find him something to do.” – This mentality will cause workers to work at their own paces.
  • 11. Troops Analogy (V) • The causes of excess inventories is when each worker works with full capacity.
  • 12. Troops Analogy (VI) • Does the drum beat according to the constraints of the plant or according to some unrealistic assumptions .. Like: – Infinite capacity – Predetermined lead times – Fixed, constant batch sizes
  • 13. Troops Analogy (VII) • Tie the rows of soldiers together to limit the spreading of the inventories. – The Invention of Henry Ford –The assembly line – Dr. Ohno from Toyota – The Kanban system
  • 14. Troops Analogy (VIII) • Synchronized manufacturing assembly lines and kanbans. – Predetermined inventory buffers (either limited by space or number of cards) regulate the rate of production for assembly lines and kanban system. – “Stop working when the buffer is filled!” – The work is synchronized, inventory is low. But any significant disruption will cause the entire system to stop.
  • 15. Troops Analogy (IX) The drum is held by the excess capacity of the gating operations Result: • Inventory is high • Current throughput is protected • Future throughput is in danger
  • 16. Troops Analogy (X) The drum is held by marketing demands Result: • Inventory is low • Current throughput is in danger • Future throughput is increased
  • 17. Troops Analogy (XI) • To prevent spreading, tie weakest soldier to the front row. • To protect overall pace, provide some slack in the rope
  • 18.
  • 19. The Capacity Constraint Resource (C.C.R) should dictate the schedule based on market demand and its own potential. • The schedule for succeeding operations (including assembly) should be derived accordingly. • The schedule of preceding operations should support the time buffer and thus be derived backwards in time from the C.C.R schedule
  • 20. Synchronized Manufacturing – Locating the Constraints First step toward synchronized manufacturing is to identify the constraints. A Capacity Constraint manifests itself in all of the major business issues. An analysis of the major business issues can be used to identify the capacity constraint resource (CCR’s)
  • 21. Synchronized Manufacturing – Beating the Drum Ensure maximum throughput through forward scheduling of the C.C.R.’s. Due dates give us the first, rough sequence, but the sequence must be modified under any one of four conditions…
  • 22. Synchronized Manufacturing – Four Complicating Conditions • Different lead times from capacity constraint resources to due dates • One capacity constraint resource feeding another one • Set up at a capacity constraint resource • A capacity constraint resource feeding more than one part to the same product
  • 23. Synchronized Manufacturing – Locating the Time Buffer • Concentrate protection not at the origin of a disturbance, but before critical operations • Inventory of the right parts in the right quantities at the right times in front of the right operations give high protection • Inventory anywhere else is destructive
  • 24. Ten Rules of OPT 1. Utilization and activation of a resource are not the same – Activation is what should be done Utilization is what can be done “100% utilization of a non-bottleneck is wasteful.” 2. The level of utilization of a non-bottleneck is determined not by its own potential but by some other constraint in the system.
  • 25. Ten Rules of OPT (Cont.) 3. An hour lost at a bottleneck is an hour lost for the total system. 4. An hour saved at a non-bottleneck is just a mirage. 5. Bottlenecks govern both the throughput and inventory in the system. 6. The transfer batch may not and often should not be equal to the process batch. 7. The process batch should be variable, not fixed.
  • 26. Ten Rules of OPT (Cont.) 8. Capacity and priority should be considered simultaneously, not sequentially. 9. Balance flow, not capacity. 10. The sum of local optima is not equal to the global optimum.