Power Plants - Other States - - For Sealing Compounds for Power Stations Call +91-891-2564393
1. 06-10-2010 st-coal-india
Coal-Fired Plants in India - other
states
Badarpur Bokaro Dadri (NCTPP)
Location: Delhi Location: Jharkhand Location: Delhi
Operator: NTPC Ltd Operator: Damodar Valley Corp Operator: National Thermal Power Corp Ltd
Configuration: 3 X 100 MW, 2 X 210 MW Configuration: 4 X 45 MW, 3 X 210 MW Configuration: 4 X 210 MW
Operation: 1973-1981 Operation: 1953-1993 Operation: 1991-1994
Fuel: hard coal Fuel: hard coal Fuel: coal
Boiler supplier: BHEL Boiler supplier: CE, Babcock Power, BHEL Boiler supplier: CE, BHEL
T/G supplier: BHEL, DDIT T/G supplier: AEG, GE, MAN, BHEL T/G supplier: BHEL
Photograph courtesy of Ministry of Power Photograph courtesy of Ministry of Power Photograph courtesy of Ministry of Power
Posted 12 May 2004 Posted 12 May 2004 Posted 12 May 2004
Hirakud Smelter
Location: Orissa
Deenbandhu Chhotu Ram Operator: Hindalco Industries Ltd
Location: Rajasthan Configuration: 1 X 67.5 MW, 3 X 100 MW Kahalgaon
Operator: Haryana Power Generation Corp Ltd Operation: 1994-2008 Location: Bihar
Configuration: 2 X 300 MW Fuel: coal Operator: NTPC Ltd
Operation: 2008 Boiler supplier: ISGEC John Thompson, Configuration: 4 X 210 MW, 3 X 500 MW
Fuel: coal ThyssenKrupp Industries India Operation: 1992-2008
Boiler supplier: Shanghai T/G supplier: BHEL Fuel: hard coal
T/G supplier: Dongfang Quick facts: The Hirakud smelter and power Boiler supplier: Podoloski, BHEL
EPC: Reliance, Petron Engineering complex is located in Sambalpur Dist on the banks T/G supplier: LMZ, Electorsila, BHEL
Quick facts: In July 2002, the state government of the world’s longest earthen dam, the 25.8km Quick facts: Kahalgaon is on the Ganga River and
approved two 250-MW coal-fired units as Hirakud Dam spanning the Mahanadi river. The uses coal from the Rajmahal fields of Easten
Yamunanagar Phase-II. The plant, part of the 10th Hirakud smelter, set up by Indal in 1959, was the Coalfields Ltd. Electricity is sent out to Bihar,
Plan, was subsequently named Deenbandhu Chhotu country’s second aluminium smelter operating on Jharkhand, Orissa, Sikkim, and West Bengal. Unit-
Ram. A 660-MW supercritical unit is in planning for power sourced from the hydro power station of the 5 was synchronized on 31 Mar 2007 and went
the site. Hirakud Dam. In 1993, Indal built India’s first CFB commercial on 1 Aug 2008.
captive power plant. Three more steam sets were
Photograph courtesy of Ministry of Power
Photograph courtesy of Petron Engineering Construction Ltd added starting about 10yrs later, each supplied by
Posted 9 Aug 2008
Posted 21 Mar 2010 three CFB boilers.
Photograph courtesy of Power
Posted 11 Nov 2009
www.industcards.com/st-coal-india.htm 1/3
2. 06-10-2010 st-coal-india
Rajiv Gandhi
Location: Rajasthan
Operator: Haryana Power Generation Corp Ltd
Configuration: 2 X 600 MW
Operation: 2010
Fuel: coal Singrauli
Boiler supplier: Shanghai Location: Uttar Pradesh
T/G supplier: Shanghai Rihand 1&2 Operator: NTPC Ltd
EPC: Reliance, Utility Energytech and Engineers Location: Uttar Pradesh Configuration: 5 X 210 MW, 2 X 500 MW
Pvt Ltd, Petron Engineering Operator: NTPC Ltd Operation: 1982-1987
Quick facts: In Jan 2007, Haryana Power Configuration: 2 X 500 MW Fuel: hard coal
Generation issued an LOI to Reliance Energy for Operation: 1988-1989 Boiler supplier: CE, BHEL
EPC work on the Rajiv Gandhi TPP in Hisar District. Fuel: hard coal T/G supplier: BHEL, Siemens
The following month the BTG order for two 600-MW Boiler supplier: ICL Quick facts: The approved investment for Singrauli
units was placed. The Rs3,800cr plant has fuel T/G supplier: GEC was Rs 1190.69 crore. The site is on Rihand
linkage with Mahanadi coal field. The first unit was Quick facts: Two more 500-MW sets were added in Reservoir in Sonebhadra Dist. Some funding was
synchronized in Nov 2009 and went commercial on 2005. from IDA and KfW.
5 Apr 2010 thereby becoming the largest single Photograph courtesy of Ministry of Power Photograph courtesy of Gammon Power Ltd
generating unit in India. Haryana Vidyut Prasaran Posted 12 May 2004 Posted 15 Nov 2008
Nigam Ltd built two double-circuit 400kV lines and
400kV substations at Kirori and Fatehabad to
evacuate power from the new plant. The line to
Fatehabad was charged in January 2010.
Photograph courtesy of Petron Engineering Construction Ltd
Posted 21 Mar 2010
Tau Devi Lal 7&8 Unchahar
Vindhyachal
Location: Haryana Location: Uttar Pradesh
Location: Madhya Pradesh
Operator: Haryana Power Generation Corp Operator: NTPC Ltd
Operator: NTPC Ltd
Configuration: 2 X 250 MW Configuration: 4 X 210 MW
Configuration: 6 X 210 MW, 4 X 500 MW
Operation: 2004-2005 Operation: 1988-1999
Operation: 1987-2007
Fuel: coal Fuel: coal
Fuel: bituminous coal
Boiler supplier: BHEL Boiler supplier: BHEL
Boiler supplier: Taganrog, BHEL
T/G supplier: BHEL T/G supplier: Siemens, BHEL
T/G supplier: LMZ, Electrosila, BHEL
Quick facts: This plant is also known as Panipat. Quick facts: A fifth 210-MW unit is under
EPC: TPE, Electrosila, BHEL
Units 7&8 were commissioned within 34 months of construction for service in 2006 as Unchahar Stage
Quick facts: This is the largest power plant in India.
the contract award, a new record for India. III.
Photograph courtesy of Sarkaritel.com
Photograph courtesy of BHEL Photograph courtesy of BHEL
Posted 30 Jun 2007
Posted 3 Aug 2005 Posted 26 Feb 2005
Abbreviations
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 04/07/10
www.industcards.com/st-coal-india.htm 2/3