Power Plants in India - Plant Details - For Sealing Compounds for Power Stations Call +91-891-2564393
1. 06-10-2010 st-other-india
Other Thermal Plants in India
Durgapur Works
Haldia Complex
Location: West Bengal Location: West Bengal
Operator: Phillips Carbon Black Ltd Operator: Haldia Petrochemicals Ltd
Configuration: 1 X 30 MW CHP Configuration: 2 X 52-MW steam, 2 X 23 MW gas
Fuel: tailgas turbine CHP
Operation: 2008 Fuel: naphtha
Boiler supplier: BHEL Operation: 1999-2000
T/G supplier: Hangzhou, Greenesol Power Systems Boiler supplier: ??
Quick facts: In Oct 2008, PCB started-up this T/G supplier: ABB
captive power plant at a cost of Rs1bn. The plant EPC: Larsen & Toubro, Sargent & Lundy
was commissioned in April 2009. PCB is India’s Quick facts: Haldia Petrochem is a $1.2bn complex with a
largest carbon black producer and a company of naphtha cracker unit and associated plants which
RPG Enterprises. The new cogen plant fires tail gas manufacture LLDPE, HDPE, polypropylene, and other
from the carbon black manufacturing process. chemicals. It is owned by West Bengal Industrial
Surplus power is sold to CESC. Development Corp, Chatterjee Petrochem, and Tata
Group.
Photograph courtesy of Phillips Carbon Black Ltd
Posted 5 May 2010 Photograph courtesy of Larsen & Toubro
Posted 18 Aug 2007
Abbreviations
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 05/05/10
Home
industcards.com/st-other-india.htm 1/1
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
2. 06-10-2010 st-coal-india-ap
Coal-Fired Plants in Andhra
Pradesh
Dr Narla Tata Rao (Vijayawada)
Location: Andhra Pradesh Nalgonda KVK
Operator: Andhra Pradesh Power Generation Corp Location: Andhra Pradesh Paloncha
Configuration: 6 X 210 MW Operator: KSK Energy Ventures Location: Andhra Pradesh
Operation: 1979-1995 Configuration: 1 X 43 MW Operator: Nava Bharat Ventures Ltd
Fuel: coal Operation: 2007 Configuration: 1 X 50 MW
Boiler supplier: BHEL Fuel: coal Operation: 1996
T/G supplier: BHEL Boiler supplier: ?? Fuel: coal
EPC: WAPCOS T/G supplier: BHEL Boiler supplier: Krupp India, Lentjes
Quick facts: Vijayawada TPS Stage-I cost Rs193 Ouick facts: Construction started in Apr 2006 on T/G supplier: LMZ, Electrosila
crores while Stage-II cost Rs511 crores and Stage- this captive power project for Zuari Cement and Sri Quick facts: This CFB plant supplies a ferro-alloys
III cost Rs840 crores. The plant had the highest load Vishnu Cement. Coal is from the Mahanadi fields. plant and sells surplus power to a local distribution
factor in India from 1994-98 and again in 2001-02. The total cost was Rs 167 crore. company.
Vijayawada TPS received the government’s
Meritorious Productivity Award for 20 consecutive Photograph courtesy of KSK Energy Ventures Photograph courtesy of Nava Bharat Ventures Ltd
years. The plant was renamed after former APSEB Posted 28 Jan 2007 Posted 22 Jun 2007
Chairman Dr N T Rao in Dec 2007.
Photograph courtesy of Andhra Pradesh Power Generation Corp
Posted 14 Apr 2006
Ramagundam STPS Rayalaseema-I
Location: Andhra Pradesh Location: Andhra Pradesh Simhadri
Operator: National Thermal Power Corp Ltd Operator: Andhra Pradesh Power Generation Corp Location: Andhra Pradesh
Configuration: 3 X 200 MW, 4 X 500 MW Configuration: 2 X 210 MW Operator: NTPC Ltd
Operation: 1983-2005 Operation: 1994-1995 Configuration: 2 X 500 MW
Fuel: bituminous coal Fuel: coal Operation: 2002
Boiler supplier: B&W, Breda, BHEL Boiler supplier: BHEL Fuel: hard coal
T/G supplier: Ansaldo, Siemens, BHEL T/G supplier: BHEL Boiler supplier: BHEL
EPC: Development Consultants Private Ltd, BHEL EPC: Shandong Electric Power Construction T/G supplier: BHEL
Quick facts: This was the third of NTPC's super Quick facts: Rayalaseema Stage-I cost Rs860 Quick facts: Two more units are being built at this
thermal projects and supplies electricity to Andhra crores while Stage-II cost Rs511.35 crores and site.
Pradesh, Tamil Nadu, Karnakata, Kerala, Goa, and Stage-III cost Rs840 crores. The plant had the
Pondicherry. The site encompasses 10,630ac. highest load factor in India from 1998-2001 and Photograph courtesy of BHEL
Average coal burn is 30,000tpd. A large-scale again in 2002-04. Two more 210-MW units are under Posted 12 May 2004
afforestation effort is underway in the plant area. construction for service in 2007.
Photograph courtesy of BHEL Photograph courtesy of Andhra Pradesh Power Generation Corp
Posted 27 Jun 2007 Posted 14 Apr 2006
Abbreviations
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 02/14/10
industcards.com/st-coal-india-ap.htm 1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
3. 06-10-2010 cc-india
CCGT Plants in India - other states
Dabhol
Location: Maharashtra HPL Cogen
Operator: Ratnagiri Gas and Power Pvt Ltd Location: West Bengal
Configuration: 1 X 670-MW, 2+1 CCGT, 2 X 740-MW Operator: Haldia Petrochemicals Ltd
2+1 CCGT with 9001 FA gas turbines Configuration: 110-MW, 2+1 CCGT with 6551B gas
Fuel: naphtha, natural gas, distillate oil turbines, 17-MW steam set, CHP
Operation: 1999-2007 Dadri Fuel: naphtha, natural gas, LFO, refinery residues
HRSG supplier: Vogt, Kawasaki Location: Uttar Pradesh Operation: 2000
T/G supplier: General Electric Operator: NTPC Ltd HRSG supplier: L&T
EPC: Bechtel Configuration: Two 409-MW, 2+1 CCGT blocks with T/G supplier: GE, ABB
Quick facts: Dabhol is on a 1,700ac coastal site V94 gas turbines EPC: L&T/S&L
about 160km south of Mumbai. It was originally Fuel: natural gas, oil Quick facts: In Aug 1997, the engineering contract
developed by Enron and budgeted at $2.8bn with 3 X Operation: 1992-1994 for this CCGT at the HPL works in Midanpore Dist
695-MW CCGT blocks an an LNG terminal. After HRSG supplier: Biro was awarded to L&T. This integrated naphtha-based
7yrs of development, Unit-1 was dedicated in May T/G supplier: Siemens, BHEL petrochemical complex is at Haldia, a major river
1999, about 2yrs behind the original schedule. The EPC: Lahmeyer, Tata port town about 60km from Kolkata at the
$1.8bn Phase-II financing closed in Apr 1999 and in Quick facts: This is one of the early Indian CCGT confluence of Hugli and Haldi Rivers. The cracker
Jun, a $300mn order was placed with GE for two CC plants. The site is on the Upper Ganga Branch and associated process units produce ethylene,
209FA blocks. From Jan to May 2001, the four Canal in Gautambudhnagar District. Ga is supplied propylene, and other materials. HPL Cogeneration
Phase II GTs were progressively synchronized and from the HBJ Pipeline. The plant cost Rs 960.35 Ltd was set up as a 49:51 power generation joint
steam blows completed on the HRSGs. The Dabhol- Crore and was built with financing assistance from venture between HPL and L&T, but in May 2008,
2 steam turbine was rolled in April and the Dabhol-3 KfW. HPL bought out the L&T stake and also began
steam set was nearly ready for testing when work preparations to partially switch the plant to natural
was halted on 17 Jun 2001. In May 2001, MSEB Photograph courtesy of Siemens
gas. Two auxiliary boilers and duct-firing systems
Posted 25 Oct 2007
unilaterally rescinded the DPC PPA and Dabhol allow for the production of up to 480 tph of process
Phase I was shutdown. Finally, the state steam. In 2006, Evonik obtained a 6yr O&M
government and other parties took over the project, contract for the HPL plant.
which gradually returned to service during 2006/07,
first on naphtha and finally on natural gas as Photograph courtesy of Evonik India
Posted 14 Mar 2010
originally designed.
Photograph by Boneyjoe
Posted 9 Sep 2007
Kathalguri Kayamkulam
Karuppur Location: Assam Location: Kerala
Location: Tamil Nadu Operator: Northeastern Electric Power Corp Ltd Operator: NTPC Ltd
Operator: Aban Power Co Ltd Configuration: Three 97-MW, 2+1 CCGT blocks with Configuration: 360-MW, 2+1 CCGT with 9001E gas
Configuration: 120-MW, 1+1 CCGT with 6001FA gas 6001 gas turbines (Block 1) and M251 gas turbines turbines
turbine (Blocks 2&3) Fuel: naphtha
Fuel: gas Fuel: natural gas Operation: 1998
Operation: 2005 Operation: 1995-1998 HRSG supplier: NEM
HRSG supplier: Thermax HRSG supplier: ?? T/G supplier: GE, BHEL
T/G supplier: GE, DDIT T/G supplier: GE, BHEL, MHI, Melco EPC: Development Consultants Private Ltd
EPC: BHEL Quick facts: This project was largely funded by Quick facts: In Nov 1998, NTPC commissioned the
Quick facts: This CCGT plant was commissioned on Japan Bank for International Cooperation. In addition first gas turbine at the Kayamkulam plant at
11 Aug 2005 and uses natural gas from the to building the CCGT plant to use Assam’s natural Choolatheruvu, Alappuzha district. The plant was
f ll i i d i O t b 1999 b t littl
www.industcards.com/cc-india.htm 1/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
4. 06-10-2010 cc-india
Kuttalam gas field in Thanjavur Dist, Tamil Nadu. All gas reserves, funding was made available for a fully commissioned in October 1999, but was little
power generated is sold to Tamil Nadu Electricity substantial associated transmission system. At used initially since its only available fuel was
Board. GEA supplied an air-cooled condenser completion, Kathalguri was able to supply 25% of naphtha. Financial assistance for the Rs1,190cr
electricity demand in the Northwest Region and scheme was obtained from the World Bank. Three
Photograph courtesy of Aban Group helped to alleviate regional power shortages that had 650-MW CC blocks are in development at
Posted 10 Feb 2007
steadily worsened during the 1990s. Kayamkulam, which is also known as Rajiv Gandhi.
Photograph courtesy of BHEL Photograph by David Appleyard
Posted 13 May 2006 Posted 25 Jan 2006
Tanirbavi
Location: Karnataka
Operator: GMR Energy
Configuration: 220-MW, 4+1 CCGT power barge with
M6000PC gas turbines
Fuel: naptha
Regency
Operation: 2000 Uran
Location: Tamil Nadu
HRSG supplier: Hyundai Location: Maharashtra
Operator: KSK Energy Ventures
T/G supplier: General Electric, Alstom Operator: Maharashtra State Power Generation Co
Configuration: 59-MW, 1+1 CCGT with 6001 gas
EPC: Hyundai, TCE Ltd
turbine CHP
Quick facts: In Oct 1999, Hyundai won a $160mn Configuration: 4 X 60 MW V93 GT (Unit-1 scrapped
Fuel: gas
contract to build the Tanirbavi barge-based CCGT 2003), 2 X 336-MW, 2+1 CCGT blocks withV94.2
Operation: 2006
plant. Financing closed in September 2000 and in gas turbines
HRSG supplier: ??
Apr 2001 the American ExIm approved $5.1mn in Fuel: natural gas, oil
T/G supplier: BHEL
support for the $207mn project, which at the time, Operation: 1982-1994
EPC: Toyo Engineering
was owned by PSEG Global and GMR in a 49:51 HRSG supplier: Deutsche Babcock
Quick facts: In Feb 2005, BHEL received a Rs84
joint venture. The 106m barge was built in Ulsan and T/G supplier: Siemens
crore equipment contract for this industrial CHP at
moored in the Gurupur River in Mangalore. Metso EPC: Siemens, Lahmeyer, Tata
Kallugurani village in Ramanathpuram Dist.
Automation supplied its maxDNA digital control Quick facts: Uran power station is near Bokadvira
Financial closure was in Aug 2005. Regency Power
system. Simple-cycle operations started in Jun Village, 1km away from Uran town and 55Km from
Corp was set-up to build the plant for a number of
2001 when it was considered the largest single- Mumbai by road. The site is surrounded on three
industrial customers including Regency Ceramics,
barge, generating facility in the world. In Oct 2002, side by the Arabian Sea. Uran cost about Rs
Brakes India, Lakshmi Mills, and Orchid Chemicals.
PSEG sold its stake in Tanirbavi for $45mn. In Jun 1,118.5 Crores. Grid connection is by 4 X 220Kv
KSK was responsible for project implementation,
2008, the original PPA expired and, in Sep 2009, lines to Apta S/S and 2 X 220kV lines to Kharghar
permitting, procurement, and the wheeling
GMR announced it would move the barge power S/S.
arrangement with TNEB. Natural gas is from the
plant to Kakinda in Andhra Pradesh starting in Jan
Cauvery basin. Photograph courtesy of Maharashtra State Power Generation Co
2010. The 1,200km move and dredging on the
Ltd
Photograph courtesy of KSK Energy Ventures Godavari River upstream from Kakinda cost about
Posted 3 Feb 2010
Posted 21 Jan 2007 R245cr. Fuel at the new site will be LNG and
operation is expected in April 2010. GMR plans to
retain the 30ac Mangalore site plus associated
infrastructure for possible future use.
Photograph courtesy of GMR Energy
Posted 4 Feb 2004
Valuthur
Location: Tamil Nadu
Operator: Tamil Nadu Electricity Board
Configuration: 95-MW, 1+1 CCGT with 6001FA gas
turbine, 92-MW, 1+1 CCGT with V643.A gas turbine
Fuel: gas
Operation: 2002-2008
HRSG supplier: Alstom
T/G supplier: BHEL, Siemens/Ansaldo, Alstom
Power India
EPC: Fichtner India, BHEL, Vasavi Power, GEA
India, Dastur & Co
www.industcards.com/cc-india.htm 2/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
5. 06-10-2010 st-coal-india-chh-or
Coal-Fired Plants in India -
Chhattisgarh & Orissa
Hirakud Smelter
Jharsuguda CPP
Location: Orissa
Bhilai Location: Orissa
Operator: Hindalco Industries Ltd
Location: Chhattisgarh Operator: Vedanta Resources plc
Configuration: 1 X 67.5 MW, 3 X 100 MW
Operator: NTPC-SAIL Power Co (P) Ltd Configuration: 9 X 135 MW
Operation: 1994-2008
Configuration: 2 X 250 MW Operation: 2008-2010
Fuel: coal
Operation: 2008-2009 Fuel: coal
Boiler supplier: ISGEC John Thompson,
Fuel: coal Boiler supplier: Shanghai
ThyssenKrupp Industries India
Boiler supplier: BHEL T/G supplier: Shanghai
T/G supplier: BHEL
T/G supplier: BHEL EPC: SEPCO-III
Quick facts: The Hirakud smelter and power
EPC: BHEL Quick facts: In Feb 2004, Lanco Amarkantak Power
complex is located in Sambalpur Dist on the banks
Quick facts: This plant was built to supply electricity issued an RFQ for the EPC contract for its proposed
of the world’s longest earthen dam, the 25.8km
to the Bhilai Steel Works and other SAIL units. 250-MW coal-fired plant at Pathadi village in Korba
Hirakud Dam spanning the Mahanadi river. The
Excess output is sold into India's Western Grid. District. In the event, two 300-MW sets were
Hirakud smelter, set up by Indal in 1959, was the
Unit-1 went commercial on 22 Apr 2009, followed by country’s second aluminium smelter operating on ordered from Dongfang. The first unit came online
Unit-2 on 21 Oct 2009. about 2yrs past the original schedule. Total cost of
power sourced from the hydro power station of the
Phase-I was about $275mn. The project has a
Hirakud Dam. In 1993, Indal built India’s first CFB
Photograph courtesy of NTPC-SAIL Power Co (P) Ltd 400kV switchyard and a 32km, 400kV tie-line to
captive power plant. Three more steam sets were
Posted 14 Feb 2010 PGCIL’s 400kV Korba-Seepat line. Phase-II is to
added starting about 10yrs later, each supplied by
consist of 2 X 660 MW supercritical sets.
three CFB boilers.
Photograph by painkiller416 (Panoramio)
Photograph courtesy of Power
Posted 3 Oct 2010
Posted 11 Nov 2009
O P Jindal
Jharsuguda Sterlite Location: Chhattisgarh
Location: Orissa Operator: Jindal Power Ltd
Operator: Sterlite Energy Ltd Configuration: 4 X 250 MW
Kharagprasad
Configuration: 4 X 600 MW Operation: 2007-2008
Location: Orissa
Operation: 2010-2011 Fuel: coal
Operator: Nava Bharat Ventures Ltd
Fuel: coal Boiler supplier: BHEL
Configuration: 1 X 30 MW
Boiler supplier: Harbin T/G supplier: BHEL
Operation: 2003
T/G supplier: Dongfang EPC: BHEL, Punj Lloyd
Fuel: coal
EPC: SEPCO-III Quick facts: This is the largest coal-fired IPP in
Boiler supplier: ??
Quick facts:On 21 Aug 2010, Shri Naveen Patnaik , India. A second phase with 4 X 600-MW units is on
T/G supplier: ??
Chief Minister of Orissa, dedicated this IPP to the order. The plant is named after Om Prakash Jindal,
Quick facts: The plant supplies a ferro-alloys plant
People of Orissa. The total project cost is estimated the late founder of O P Jindal Group. The associated
and sells surplus power to a local distribution
to be Rs8,200cr. The Sterlite project has India’s first mine is the largest in the private sector and it has a
company. A 64-MW unit is being added to the site.
hydrid ESP with baghouse, four 150m natural draft 6mn tpy coal washery, also the largest in the
cooling towers and two 275m stacks. Sterlite Photograph courtesy of Nava Bharat Ventures Ltd country. The facility has a 7km overland covered
Energy is a subsidiary of Sterlite Industries, India's Posted 22 Jun 2007 conveyor from the mine facility, the longest in India.
largest non-ferrous metals and mining company, The tie-line to the grid is a 258km, double-circuit
and in turn a subsidiary of Vedanta Resources plc. 400kV installation built in 1.5yrs. It was built without
any joint-venture with PowerGrid Corp.
Photograph courtesy of www.indiacsr.in
industcards.com/st-coal-india-chh-or.… 1/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
6. 06-10-2010 st-coal-india-chh-or
Posted 3 Oct 2010 Photograph courtesy of Jindal Steel and Power Ltd
Posted 31 Oct 2009
Pathadi-I
Location: Chhattisgarh
Operator: Lanco Amarkantak Power Pvt Ltd Rourkela Phase-II
Configuration: 2 X 300 MW Location: Orissa
Operation: 2009-2010 Raigarh Operator: NTPC-SAIL Power Co (P) Ltd
Fuel: coal Location: Chhattisgarh Configuration: 2 X 60 MW
Boiler supplier: Dongfang Operator: Jindal Steel and Power Operation: 1987-1988
T/G supplier: Dongfang Configuration: 2 X 21 MW, 2 X 55 MW Fuel: coal
EPC: MMC Corp, Shapoorji Palonji Operation: 1994-2004 Boiler supplier: Rafako
Quick facts: In Feb 2004, Lanco Amarkantak Power Fuel: waste coal T/G supplier: BHEL
issued an RFQ for the EPC contract for its proposed Boiler supplier: BHEL Quick facts: This is the second phase of a captive
250-MW coal-fired plant at Pathadi village in Korba T/G supplier: BHEL, DDIT power plant at Rourkela Steel Works. Operations
District. In the event, two 300-MW sets were were taken over by NTPC-SAIL power in March
ordered from Dongfang. The first unit came online Photograph courtesy of Jindal Steel and Power Ltd 2001.
about 2yrs past the original schedule. Total cost of Posted 1 Feb 2004
Phase-I was about $275mn. The project has a Photograph courtesy of NTPC-SAIL Power Co (P) Ltd
400kV switchyard and a 32km, 400kV tie-line to Posted 14 Feb 2010
PGCIL’s 400kV Korba-Seepat line. Phase-II is to
consist of 2 X 660 MW supercritical sets.
Photograph by V A Chakrarthy (Panoramio)
Posted 2 Jun 2010
Talcher STPS
Location: Orissa
Operator: National Thermal Power Corp Ltd
Configuration: 6 X 500 MW
Operation: 1995-2006
Fuel: bituminous coal
Boiler supplier: Stein, BHEL
T/G supplier: ABB, BHEL
EPC: Fouress, Tata Projects
Quick facts: This is India's second largest power
plant. Fuel is mainly from Coal India Ltd’s Mahanadi
Coalfield Ltd. Talcher was originally established by
the Government of Orissa and subsequently sold to
NTPC. However, the entire power generated from
TTPS is dedicated to the State.
Photograph courtesy of BHEL
Posted 25 Jun 2007
Abbreviations
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 10/03/10
Home
industcards.com/st-coal-india-chh-or.… 2/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
7. 06-10-2010 cc-india
CCGT Plants in India - Gujarat
Baroda
Location: Gujarat
Operator: Gujarat Industries Power Co Ltd (GIPCL) Dhuvaran
Configuration: 1 X 145-MW 3+1 CCGT with Bhander Location: Gujarat
6001BTG gas turbines, 1 X 160-MW, 1+1 CCGT Location: Gujarat Operator: Gujarat Urja Vikas Nigam Ltd
with 9001E gas turbine Operator: Essar Power Ltd Configuration: One 107 MW , 1+1 CCGT with
Operation: 1992-1997 Configuration: 165-MW,1+1 CCGT, 340-MW, 2+1 6001FA gas turbine, one 112 MW , 1+1 CCGT with
Fuel: natural gas CCGT, 1 X 110 CHP gas turbine, all 9001E gas 6001FA+e gas turbine
HRSG supplier: NEM turbines Fuel: natural gas
T/G supplier: General Electric, BHEL Fuel: natural gas Operation: 2004-2007
Quick facts: GIPCL was formed by Gujarat Operation: 2007-2008 HRSG supplier: ??
Electricity Board (now Gujarat Urja Vikas Nigam Ltd HRSG supplier: Deltak, IHI, Hangzhou T/G supplier: GE, BHEL
(GUVNL)), Gujarat State Fertilizers & Chemicals Lt T/G supplier: Hitachi, BHEL, Siemens EPC: Reliance Energy, BHEL, SEW Constructions
(GSFC), Gujarat Alkalies & Chemicals Ltd (GACL), Quick facts: This plant was built out in three phases Quick facts: This plant is near Khambhat in Anand
and Petrofils Co-operatives Ltd. Output from the first to support increasing power demand of Essar’s District. The EPC award for the first block was made
block at Baroda is distributed to the owners in Hazira steel complex. to BHEL in Oct 2001 for Rs 310 crore. In March
proportion to their ownership while the second block 2004, BHEL was awarded a Rs 333 crore EPC
was built as an IPP with power sales to GUVNL. Photograph courtesy of Essar Power Ltd contract for the second block, which has BHEL's
Fuel is from Gujarat State Petroleum Corp and Niko Posted 3 Feb 2010 first indigenously manufactured 6001FA machine.
Resources, the operating partners of the Hazira
field. Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
Posted 2 Nov 2008
Photograph courtesy of Gujarat Industries Power Co Ltd
Posted 12 Sep 2007
Gandhar Complex
Location: Gujarat
Hazira GSEG
Operator: Indian Petrochemicals Corp Ltd (IPCL) Hazira
Location: Gujarat
Configuration: 65-MW, 1+1 CCGT with 6001B gas Location: Gujarat
Operator: Gujarat State Energy Generation Ltd
turbine, 2 X 45 MW LM6000 CHP Operator: Essar Power Ltd
Configuration: 150-MW, 2+1 CCGT with GT8C gas
Fuel: naphtha, natural gas Configuration: 515-MW, 3+1 CCGT with 9001E gas
turbines
Operation: 1996-2000 turbines
Fuel: natural gas, oil
HRSG supplier: BHEL Fuel: natural gas, naphtha, oil
Operation: 2001-2002
T/G supplier: GE, BHEL Operation: 1995-1997
HRSG supplier: Hanjung
EPC: L&T HRSG supplier: Hanjung
T/G supplier: Alstom
Quick facts: The IPCL complex a Gandhar was T/G supplier: GE
EPC: Fichtner India, Alstom, Evonik India
developed after the discovery of oil and gas reserves EPC: Hanjung
Quick facts: GSEG is an IPP JV of Gujarat State
in the region. Also promoting the site was Quick facts: This was the first large-scale, multi-fuel
Petroleum Co, Gail, and Kribhco Fertilizer. GUVNL
availability of ocean access, adequate freshwater CCGT IPP in India. It went commercial in Oct 1997
is the offtaker. Plant COD was 1 Jun 2002 Evonik
from the Narmada River, and salt. The foundation and sells 300 MW to Gujarat Urja Vikas Nigam Ltd
India was owners engineer and later assisted in
stone was laid in Oct 1989 and the final investment (GUVNL) under a 20yr PPA signed in 1996. The
commissioning and repairs of initial mechanical
clearance was granted in Mar 1992. The first phase balance of plant output is sold to Essar Steel Ltd.
issues.
included a 170,000 MTA VCM plant, 150,000 MTA
Ph t h t fE P Ltd
industcards.com/cc-india-gujarat.htm 1/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
8. 06-10-2010 cc-india
PVC plant, 115,000 MTA chlor-alkali plant, 130,000 Photograph courtesy of Essar Power Ltd
Posted 3 Feb 2010 Photograph courtesy of Evonik India
MTA caustic soda plant, and captive power plant, all Posted 14 Mar 2010
commissioned by year-end 1996.
Photograph courtesy of Larsen & Toubro
Posted 18 Aug 2007
Paguthan
Location: Gujarat
Operator: Gujarat Paguthan Energy Corp
Configuration: 655-MW, 2+1 CCGT block with V94.2
gas turbines
Fuel: natural gas, naphtha
Kawas Operation: 1998
Location: Gujarat HRSG supplier: Deutsche Babcock
Operator: NTPC Ltd T/G supplier: Siemens
Configuration: two 328-MW, 2+1 CCGT blocks with EPC: Siemens, TCE Consulting Engineers, Fichtner Utran-1
9001E gas turbines Quick facts: This was the third Indian IPP to go on-
Location: Gujarat
Fuel: natural gas, oil, naphtha line, and the largest to that date. The developer of
Operator: Gujarat State Electricity Corp Ltd
Operation: 1992-1994 the $750mn plant was Gujarat Torrent Energy Corp
Configuration: 165-MW, 3+1 CCGT with 6001 gas
HRSG supplier: CMI Ltd (GTEC), a consortium initially consisting of
turbines
T/G supplier: Alstom PowerGen (20%), local pharmaceutical company
Fuel: natural gas
EPC: Alstom, Ebasco, Sogreah Torrent Group (30%), Gujarat Power Corp (12%),
Operation: 1992-1993
Quick facts: Kawas cost Rs 1560 Crore. Fuel is and Siemens (10%). In Jul 1999, PowerGen
HRSG supplier: ??
from the South Basin Gas Field and supplied by the announced that it was buying out Torrent’s interest, T/G supplier: GE, BHEL
HBJ Pipeline. Power is sold to many states and the first such transaction in India. In Dec 2000,
EPC: Fouress Engineering
territories including Chaattisgarh, Dadra & Nagar PowerGen sold most of its stake in Paguthan to
Quick facts: Utran power station is on the Tapi River
Haveli, Daman & Diu, Goa, Gujarat, Madhya CLP Power and the plant is now 100% owned by
about 10km from Surat city in Surat district.
Pradesh, and Maharashtra. A 1,200-MW extension CLP Holdings. The gas turbines are capable of firing
is planned. gas and naphtha independently as well as Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
simultaneously. Gas is received by a pipeline from Posted 2 Nov 2008
Photograph courtesy of Alstom the Gandhar gas fields. The plant is connected to
Posted 15 Jul 2006
the gird with 220kV and 400kV switchyards. Water
supply from the Narmada River is delivered by a
24km pipeline to onsite reservoirs. Mee fogging
systems for each GT were ordered in Jan 2000 and
commissioned by mid-year. A 1,000-MW extension
is planned.
Photograph courtesy of Gujarat Paguthan Energy Corp
Posted 23 Mar 2005
Utran-2
Location: Gujarat
Operator: Gujarat State Electricity Corp Ltd
Configuration: 375-MW, 1+1 CCGT with GT26 gas
turbine
Fuel: natural gas
Operation: 2009
HRSG supplier: Alstom
T/G supplier: Alstom
EPC: Alstom, Alstom Projects India
Quick facts: In June 2007, GSECL awarded Alstom
a Rs1,000cr contract for a 370-MW extension to
Utran, the first GT26-based plant order in India and
the fourth Alstom CCGT in the state. Utran-2 was
commissioned in Oct 2009 and dedicated in May
2010. The total cost was Rs1,414cr.
industcards.com/cc-india-gujarat.htm 2/3
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
9. 06-10-2010 st-coal-india-gujarat
Coal-Fired Plants in India -
Gujarat
Gujarat Cement Works
Sikka
Location: Gujarat
Location: Gujarat
Operator: Ultratech Cement Ltd Sabarmati
Operator: Gujarat Urja Vikas Nigam Ltd
Configuration: 4 X 23 MW Location: Gujarat
Configuration: 2 X 120 MW
Operation: 2008-2009 Operator: Ahmedabad Electric Co Ltd
Operation: 1988-1993
Fuel: lignite Configuration: 3 X 110 MW, 1 X 125 MW
Fuel: coal
Boiler supplier: CMEC Operation: 1979-2003
Boiler supplier: Combustion Engineering, BHEL
T/G supplier: CMEC Fuel: hard coal
T/G supplier: BHEL
EPC: Development Consultants Private Ltd, Desai Boiler supplier: BHEL
Quick facts: Sikka is a small coastal town in
Construction T/G supplier: BHEL
Jamnagar District. Two 250-MW units are under
Quick facts: This CPP at Kovaya cost about
Photograph courtesy of US Energy Association construction for service in 2010.
Rs620cr.
Posted 3 Feb 2002
Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
Photograph courtesy of Desai Construction Ltd Posted 1 Nov 2008
Posted 27 Jun 2010
Surat
Location: Gujarat Ukai
Operator: Gujarat Industries Power Co Ltd (GIPCL) Location: Gujarat
Configuration: 4 X 125 MW Operator: Gujarat Urja Vikas Nigam Ltd Wanakbori
Operation: 1999-2010 Configuration: 2 X 120 MW, 2 X 200 MW, 1 X 210 Location: Gujarat
Fuel: lignite MW Operator: Gujarat Urja Vikas Nigam Ltd
Boiler supplier: BHEL Operation: 1976-1985 Configuration: 7 X 210 MW
T/G supplier: BHEL Fuel: bituminous coal Operation: 1982-1988
Quick facts: GIPCL was formed by Gujarat Boiler supplier: Combustion Engineering, BHEL Fuel: bituminous coal
Electricity Board (now Gujarat Urja Vikas Nigam Ltd T/G supplier: BHEL Boiler supplier: Combustion Engineering, BHEL
(GUVNL)), Gujarat State Fertilizers & Chemicals Lt Quick facts: Ukai is sited on the Left Bank Canal of T/G supplier: BHEL, Siemens
(GSFC), Gujarat Alkalies & Chemicals Ltd (GACL), the Tapti River in Tapi District. Units-1 was Quick facts: This is the largest thermal power
and Petrofils Co-operatives Ltd. Surat was built as extensively overhauled and returned to service in station in Gujarat. It is near Wanakbori Dam on the
an IPP with its own captive mines and has a power May 2008 and a similar program is underway at bank of Mahi River in Kheda District.
purchase agreement with GUVNL. Units 3&4 were Unit-2. The plant burns imported and domestic coal.
dedicated on 30 May 2010 and two 250-MW units A 500-MW extension is in planning. Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
Posted 2 Nov 2008
are planned. All blocks have CFB boilers.
Photograph courtesy of Gujarat Urja Vikas Nigam Ltd
Photograph courtesy of Gujarat Industries Power Co Ltd Posted 2 Nov 2008
Re-posted 2 Jun 2010
Abbreviations
industcards.com/st-coal-india-guj.htm 1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
10. 06-10-2010 nuclear-india
Nuclear Power Plants in India
Kudankulam
Location: Tamil Nadu
Operator: Nuclear Power Corp of India Ltd
Configuration: 2 X 1,000 MW PWR
Operation: 2010-2011
Reactor supplier: AEE
T/G supplier: LMZ, Electrosila
EPC: AEE, NPCIL
Kaiga Quick facts: This is India’s largest nuclear power
Kakrapar project and the Kudankulam units will be the largest
Location: Karnataka
Location: Gujarat generators in India when completed. Talks first
Operator: Nuclear Power Corp of India Ltd
Operator: Nuclear Power Corp of India Ltd began on this $3bn project in 1988, but were
Configuration: 3 X 220 MW PHWR
Configuration: 2 X 220 MW PHWR suspended in 1992 following the collapse of the
Operation: 2000-2007
Operation: 1993-1995 Soviet Union. Discussions were restarted and in Nov
Reactor supplier: NPCIL
Reactor supplier: NPCIL 2001, a general agreement was signed between
T/G supplier: BHEL
T/G supplier: BHEL NPCIL and AEE for supply of two VVER-1000 units
Quick facts: Unit-3 went commercial on 6 May 2007
Quick facts: Two 700-MW PHWR units are planned of the latest design. Equipment was ordered in Feb
at 1800hrs. First criticality was 26 Feb 2007, less
for construction at this site. 2002, and first concrete was the following month. In
than 5yrs after first concrete on 30 Mar 2002.
Apr 2002, AEE signed a $200mn contract with
Photograph courtesy of Nuclear Power Corp of India Ltd Silovye Mashiny for the T/G sets and the Izhora
Photograph courtesy of Nuclear Power Corp of India Ltd Re-posted 23 May 2007
Posted 8 Sep 2004 Factory of Obedinennye Mashinostroitelnye Zavody
(OMZ) is under contract to supply the reactors.
Russia has granted a state credit to India to cover
85% of the cost of equipment supply. Completion
was originally scheduled for 2007 but has been
delayed by a variety of factors.
Photograph by Petr Pavlicek and courtesy of Intl Atomic Energy
Agency
Re-posted 17 Mar 2010
Rajasthan
Location: Rajasthan
Madras Narora
Operator: Nuclear Power Corp of India Ltd
Location: Tamil Nadu Location: Uttar Pradesh
Configuration: 1 X 100 MW, 1 X 200 MW, 2 X 220
Operator: Nuclear Power Corp of India Ltd Operator: Nuclear Power Corp of India Ltd
MW PHWR
Configuration: 2 X 170 MW PHWR Configuration: 2 X 220 MW PHWR
Operation: 1973-2010
Operation: 1984-1986 Operation: 1991-1992
Reactor supplier: CGE, L&T, NPCIL
Reactor supplier: NPCIL Reactor supplier: NPCIL
T/G supplier: EE, BHEL
T/G supplier: BHEL T/G supplier: BHEL
Quick facts: RAPS-5 went commercial on 4 Feb
Photograph courtesy of Nuclear Power Corp of India Ltd Photograph courtesy of Nuclear Power Corp of India Ltd
2010 with UNi-6 to follow later in the year.
Posted 8 Sep 2004 Posted 8 Sep 2004
Photograph courtesy of Nuclear Power Corp of India Ltd
Posted 8 Sep 2004
industcards.com/nuclear-india.htm 1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
11. 06-10-2010 nuclear-india
Tarapur 3&4
Location: Maharashtra
Operator: Nuclear Power Corp of India Ltd
Tarapur 1&2 Configuration: 2 X 540 MW PHWR
Location: Maharashtra Operation: 2005-2006
Operator: Nuclear Power Corp of India Ltd Reactor supplier: NPCIL
Configuration: 2 X 160 MW BWR T/G supplier: BHEL
Operation: 1969 Quick facts: In Oct 1998, groundbreaking for the first
Reactor supplier: General Electric 500-MW class PHWRs at Tarapur was held after
T/G supplier: General Electric many delays. Unit-4 went critical on 6 Mar 2005 and
EPC: General Electric commercial on 12 Sep 2005 and the new reactors
Quick facts: A turnkey project. were dedicated to the nation in August 2007. At the
time, they were the biggest generating units in the
Photograph courtesy of Nuclear Power Corp of India Ltd country. In Sep 2009, the new units were reported to
Posted 8 Sep 2004
be producing electricity at Rs2.70/kW.
Photograph courtesy of Department of Atomic Energy (DAE)
Posted 13 Sep 2008
Abbreviations
Updated 06/02/10
Home
industcards.com/nuclear-india.htm 2/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
12. 06-10-2010 biomass-india
Biomass Power Plants in India
Akaltara Malavalli
Location: Chhattisgarh Location: Karnataka
Samalkot Mill
Operator: KVK Energy & Infrastructure Ltd Operator: Malavalli Power Plant
Location: Andhra Pradesh
Configuration: 1 X 20 MW Configuration: 1 X 4.5 MW
Operator: Nava Bharat Ventures Ltd
Operation: 2005 Operation: 2001
Configuration: 1 X 9 MW
Fuel: rice husk, coal Fuel: bagasse, agricultural waste
Operation: 1998
Boiler supplier: ?? Boiler supplier: ??
Fuel: biomass
T/G supplier: ?? T/G supplier: Triveni
Boiler supplier: Thermax
Quick facts: This plant is in Janjgir Champa Dist Quick facts: The project is a joint development of
T/G supplier: Shin Nippon
and cost Rs 46.45 crore. KVK has a 10yr power Ambience Management Services Pvt Ltd and the
purchase agreement with Chhattisgarh SEB, Karnataka Renewable Energy Department. Photograph courtesy of Nava Bharat Ventures Ltd
Posted 22 Jun 2007
Photograph courtesy of KVK Energy & Infrastructure Ltd Photograph courtesy of Malavalli Power Plant
Posted 27 Jan 2007 Posted 25 Mar 2006
Thoothukkudi
Location: Tamil Nadu
Operator: Ind-Barath Energies Ltd
Configuration: 1 X 20 MW
Satya Maharshi
Operation: 2006
Location: Andhra Pradesh
Fuel: biomass
Operator: Velcan Energy India Ltd
Boiler supplier: Walchandnagar
Configuration: 1 X 7.5 MW
T/G supplier: Hangzhou
Operation: 2004
Quick facts: This is India's first biomass power plant
Fuel: cotton stick, rice husk
with advanced steam conditions of 105 ATA/525C.
Boiler supplier: ISGEC John Thompson
The main fuel is Juliflora supplemented with pulse
T/G supplier: Alstom, VA TECH
stalk, cotton stalk, cane trash, and coconut shells
EPC: Areva T&D
with a requirement of about 1.50 lakh tpa.
Quick facts: Electricity is sold under a 10yr contract
Commercial operation was in May 2006 and the
to Aptransco. The plant cost €7.5mn and was
plant is running at 75% PLF. All output is sold to
financed through a consortium of four Indian banks
Tamil Nadu Electricity Board (TNEB) under a 15yr
including Andhra Bank, Corporation Bank, Sindh
PPA. The project cost Rs 71.91 crore. Ireda Ltd and
Bank and State Bank of India.
other banks extended a term loan of Rs 50.34 crore
Photograph courtesy of Velcan Energy SA
and MNRE provided an interest subsidy of Rs 1.83
Posted 17 Jun 2006 crore. The air-cooled condenser system came from
China.
Photograph courtesy of Ministry of New and Renewable Energy
Posted 7 Nov 2009
Abbreviations
industcards.com/biomass-india.htm 1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
13. 06-10-2010 ic-india
Diesel and Gas-Engine Power
Plants in India
Arkay
Location: Tamil Nadu
Operator: Ind-Barath Energies Ltd Bairabi
Configuration: 10 X 8.7 MW 20V34SG engines, 1 X Location: Mizoram
Butibori-2
8.1 MW steam set Operator: Mizoram Power & Electricity Dept
Location: Maharashtra
Fuel: natural gas Configuration: 4 X 5.75 MW 16V32LN engines
Operator: Indo Rama Synthetics Ltd
Operation: 2006 Fuel: heavy oil
Configuration: 3 X 13.5 MW 16V46 engines
HRSG supplier: ?? Operation: 2004
Fuel: heavy oil
E/G and T/G supplier: Wartsila, Hangzhou E/G supplier: Wartsila, BHEL
Operation: 1996
Quick facts: In Mar 2006, Arkay Energy EPC: BHEL
E/G supplier: Wartsila
(Rameswarm) Ltd, a unit of Ind-Barath Power, Quick facts: This is the largest power plant in
completed this power station at Valantharavai, Mizoram. Photograph courtesy of Wartsila
Posted 13 Jul 2005
Ramnad District. The plant uses gas from isolated Photograph courtesy of Mizoram Power & Electricity Dept
GAIL wells in Ramanathapuram and at the Posted 10 Jun 2010
completion was the largest plant of its kind in India.
Photograph courtesy of Wartsila
Posted 24 Feb 2010
Haebowal Complex
Location: Punjab
Operator: Punjab Energy Development Agency Kasargod
Configuration: 1 X 1 MW JMC320GS-BL engine Location: Kerala
Dalmia Cement
Fuel: biogas Operator: KSK Energy Ventures Ltd
Location: Tamil Nadu
Operation: 2004 Configuration: 3 X 7 MW CM32 engines
Operator: Dalmia Cement
E/G supplier: Jenbacher Fuel: heavy oil
Configuration: 2 X 2 MW 6R32, 1 X 4 MW 12V32
EPC: Clarke Energy India Operation: 2001
engines
Quick facts: This biogas cogeneration system is at E/G supplier: MAK
Fuel: heavy oil
the 50ac Haebowal dairy complex, one of two Quick facts: This is the first IPP in Kerala. The Rs
Operation: 1983-1987
E/G supplier: Wartsila centralized facilities in Ludhiana that in total serve 70.70 crore plant has a 15yr PPA with Kerala State
1,490 dairy operations with 150,000 head of cattle. Electricity Board (KSEB). Low sulfur HFO is
Photograph courtesy of Wartsila Of a total of 2,500 tpd of manure produced per day , supplied by Bharat Petroleum Corp Ltd (BPCL).
Posted 10 Jul 2005
the biogas demonstration project processes 235t to Photograph courtesy of KSK Energy
generate electricity and hot water. Entec Biogas Posted 28 Jan 2007
GmbH supplied the biogas system.
Photograph courtesy of GE Energy
Posted 21 Feb 2007
www.industcards.com/ic-india.htm 1/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com
14. 06-10-2010 ic-india
Nagarpattinam
Leimakhong Modipon Location: Tamil Nadu
Location: Manipur Location: Uttar Pradesh Operator: MMS Steel & Power
Operator: Manipur Electricity Department Operator: Modipon Fibres Co Ltd Configuration: 2 X 6 MW
Configuration: 6 X 6 MW engines Configuration: 1 X 11.5 MW 16V32 engine Fuel: natural gas
Fuel: heavy oil Fuel: heavy oil Operation: 2003
Operation: 2002 Operation: 1986 E/G supplier: ??
E/G supplier: Wartsila, BHEL E/G supplier: Wartsila Quick facts: This captive power plant was later
EPC: BHEL, Simplex Projects Quick facts: This captive power plant has well over extended to 28 MW and cost a total of Rs 65 crore.
Quick facts: The work scope for this project 100,000 running hours having been operated at Fuel is supplied by GAIL and Oil and Natural Gas
included a 33/11kV switchyard. baseload for many years. Corp. Power offtakers include Gujarat Heavy
Chemicals and Brakes India Ltd.
Photograph courtesy of BHEL Photograph courtesy of Wartsila
Posted 24 Feb 2010 Posted 22 Aug 2009 Photograph courtesy of KSK Energy
Posted 28 Jan 2007
Vasavi
Location: Tamil Nadu
Operator: GMR Group
Configuration: 4 X 50 MW 12K90MC-S engines
Fuel: heavy oil
Operation: 1998-1999
RVK Konkepudi
E/G supplier: MAN B&W, Hyundai, ABB
Location: Andhra Pradesh
EPC: Hyundai E&C
Operator: KSK Energy Ventures Ltd
Quick facts: This is the largest power station of its
Configuration: 8 X 3 MW G3616 engines
kind in the world. Engine output is 70,000HP and
Fuel: heavy oil
each machine is is as high as a 5-story building.
Operation: 2000-2001
The plant cost $235mn and went commercial on 4
E/G supplier: Cat
Mar 1999, somewhat ahead of schedule. At the
Quick facts: This is the first successful engine-
time, CMS Energy held a 49% ownership stake, but
based plant of its type in the state. Fuel is supplied
the company announed in Nov 2001 that it was
from local stranded gas assets and from GAIL.
divesting the stake. Low sulfur fuel oil is provided
Customers include India Cements and Zuari
under a 15yr contract with Hindustan Petroleum
Cements.
Corp Ltd. Vasavi is connected to the local 110kV
Photograph courtesy of KSK Energy grid and operated by Hyundai O&M staff. A Metso
Posted 28 Jan 2007 Automation MAX 1000 + PLUS system is used to
control and monitor the engines and BOP
equipment and the plant has an innovative system
that uses wastewater for engine cooling.
Photograph courtesy of Elco Power Systems
Posted 17 Dec 2008
Abbreviations
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 06/10/10
Home
www.industcards.com/ic-india.htm 2/2
Compiled by Project Sales Corp, importers and marketers of Birkosit Turbine Sealing Compound in India http://india.birkosit.com